The essential qualities of an effective vision include all of the following except:

A)All team members have the same vision
B)The vision should be communicated to all
C)The vision has to make strategic sense
D)There should be a passion for the vision
E)The vision should be a source of inspiration to others
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is an objective of the first project team meeting?

A)Overview the project's scope and objectives
B)Address interpersonal interaction concerns
C)Model how the team will work together
D)Both A and C are correct
E)A, B, and C are all correct
سؤال
Establishing a team identity is facilitated by:

A)Team members working in a common space
B)Creation of a project team name
C)Effective use of meetings
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Researchers have found that high performance teams will have which of the following norms?

A)Hard work does not get in the way of having fun
B)No information is shared outside the team unless all agree to it
C)It is acceptable to be in trouble, but not to surprise others
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
During which stage of team development do team members try to find out what behaviors are acceptable and what performance expectations are?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
During which stage of team development do close relationships develop and the group demonstrates cohesiveness?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
Which of the following is not one of the major issues that successful project managers must address in the early stages of a project?

A)Relationship Decisions
B)Managing Change Decisions
C)Tracking Decisions
D)Planning Decisions
E)All of these need to be addressed
سؤال
During which stage of team development is high performance not a top priority and team member emotions run from upbeat to depressed?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
During which stage of team development do members accept that they are part of a project group but resist the constraints that the project and the group put on their individuality?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
Tom is managing a project team responsible for erecting a new office building.He notices that team members are trying out different behaviors to see what is acceptable to the project and personal relations.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
The essence of positive synergy can be found in the phrase:

A)Front of ship sink---back of ship sink
B)There is no "I" in team
C)Two heads are better than one
D)The whole is greater than the sum of the parts
E)If it doesn't kill you, it makes you stronger
سؤال
Experience and research indicate that high-performance project teams are much more likely to develop under all the following conditions except:

A)Members are assigned to the project full time
B)Members report solely to the project manager
C)There are 10 or fewer members per team
D)Team members are selected by their managers
E)The project involves a compelling objective
سؤال
Which of the following is not one of the considerations that need to be factored into the project team recruitment process?

A)Political connections
B)Problem-solving ability
C)Ambition, initiative, and energy
D)High degree of technological expertise
E)Availability
سؤال
All of the following have been found to be good for running effective project meetings except:

A)Start meetings on time regardless of whether everyone is present
B)Identify an adjournment time
C)Thoroughly document all decisions
D)Prepare and distribute an agenda prior to the meeting
E)All of these are good for effective meetings
سؤال
In which of the following theories does the project group transition from a lower level to a higher level of performance about halfway through the project?

A)Nominal Group Technique
B)Five Stage Team Development Model
C)Punctuated Equilibrium Model of Group Development
D)Dysfunctional Transition Model
E)Synergistic Transition Development Model
سؤال
Which of the following is commonly associated with high-performing project teams?

A)Risk taking is controlled and not allowed to jeopardize the overall project
B)Roles and specific responsibilities are well-defined
C)A degree of competition among team members is encouraged
D)Mistakes are viewed as opportunities for learning
E)All of these are associated with high-performing teams
سؤال
Sam is the coach of a high school soccer team and has noticed that some close relationships have formed as well as feelings of camaraderie and shared responsibilities for the team's success.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
Roger is new-product project manager for a retail company.Recently the team has exhibited a high degree of conflict over who will control the group and how decisions will be made.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
During which stage of team development is the team fully functional and accepted?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
سؤال
Which of the following are considered very important in the recruiting of project members?

A)The budget available
B)The importance of the project
C)The management structure for the project team
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
________ occurs when the whole is less than the sum of its parts.
سؤال
Strategies to manage dysfunctional conflict do not include _____ the conflict.

A)Control
B)Arbitrate
C)Mediate
D)Accept
E)Encourage
سؤال
The biggest challenge to managing a virtual project team is:

A)Getting reports and technical information communicated
B)Developing trust
C)Establishing effective patterns of communication
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
Which of the following is not one of the most significant sources of conflict during the project execution phase?

A)Priorities
B)Staff issues
C)Schedule slippage
D)Technical problems
E)All of these are significant sources of conflict
سؤال
Which of the following is not one of the most significant sources of conflict during the project planning phase?

A)Priorities
B)Procedures
C)Schedule
D)Technical requirements
E)Costs
سؤال
Which of the following are ways to improve the performance of low-priority projects?

A)Creating a large time investment in the form of a lengthy meeting
B)Interject as much fun as possible into the project
C)Make the benefits of the project as real as possible to the team members
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
Symptoms of groupthink include:

A)The team thinking it is invincible
B)Opinions of those outside the team are considered to be irrelevant
C)Critical thinking disappears
D)Pressure is applied to any dissenter
E)All of these are symptoms of groupthink
سؤال
Which of the following is not one of the tips for alleviating communication problems of virtual teams?

A)Include face-to-face time if at all possible
B)Keep team members informed on how well the overall project is going
C)Share the pain
D)Establish clear norms and protocols for surfacing assumptions and conflicts
E)Establish a code of conduct to avoid delays
سؤال
Which of the following is not one of the steps in facilitating group decision making?

A)Identifying the problem
B)Analyzing the situation
C)Generating alternatives
D)Reaching a decision
E)Follow-up
سؤال
During the ________ stage of group development, close relationships develop and the group demonstrates cohesiveness.
سؤال
Which of the following would be considered the most effective project reward?

A)Individual member rewards
B)Lump-sum cash award
C)All-expenses-paid trip for team members and their families
D)Using negative reinforcement to motivate adequate performance
E)All of these are equally effective
سؤال
Two of the biggest challenges involved in managing a virtual project team are:

A)The language barriers and time management
B)Time management and developing trust
C)The language barriers and developing effective patterns of communication
D)Developing trust and effective patterns of communication
E)Time management and developing effective patterns of communication
سؤال
During the ________ stage of group development, the team prepares for its own disbandment.
سؤال
During the ________ stage of group development, the team is fully functional and working together to accomplishing the project goals.
سؤال
During the delivery phase of a project's life cycle, the most significant source of conflict is:

A)Schedules
B)Priorities
C)Technical
D)Procedures
E)Costs
سؤال
During the ________ stage of group development, the members try to find out what behaviors are acceptable to the team and individual team members.
سؤال
Which of the following is not one of the most significant sources of conflict during the project definition phase?

A)Priorities
B)Administrative procedures
C)Schedule
D)Workforce
E)Costs
سؤال
The first step in facilitating group decision making is to:

A)Call a meeting to discuss the problem
B)Identify the problem
C)Agree that there is a problem
D)Quantify the problem
E)Generate alternatives
سؤال
During the ________ stage of group development, there is conflict over who will control the group and how decisions will be made.
سؤال
Individual rewards for outstanding work would not include:

A)Letters of commendation
B)Public recognition
C)Desirable job assignments
D)Making exceptions to the rules
E)All of these can be used for individual rewards
سؤال
In a ________ project team the members are geographically situated so that they may seldom meet face-to-face as a team.
سؤال
Symbolic actions at the project level can contribute to a unique team subculture are called ________.
سؤال
Experienced project managers stress the importance of ________ rather than appointing team members.
سؤال
Synergy can be both negative as well as positive.
سؤال
In the ________ approach to managing conflict, the manager imposes a solution to the conflict after listening to each party.
سؤال
When the manager intervenes and tries to negotiate a resolution by using reasoning and persuasion, suggesting alternatives and the like the Project Manager is trying to ___________.
سؤال
The use of 6:30
A.M.The meetings continued for about two weeks until the project got back on schedule.At that time the project manager announced that the next meeting was canceled, and no further sunrise meetings were ever scheduled.
A.M.meetings to get a project back on schedule is an example of ______ reinforcement to motivate project performance.
The project manager does not have direct authority over many key people, especially the contractors from the other companies.They do, however, have the freedom to convene meetings at his convenience.So the project manager will institute daily "coordination meetings," which were required of all the principals involved, at 6:30
سؤال
___________ refers to whether a team has direct influence over the problem that needs to be resolved.
سؤال
The ________ suggests that about midway through a project the team transitions into a different behavior pattern more focused on the successful completion of the project.
سؤال
When a project team gets things done without having to go through normal protocols of the parent organization, it may fall into the ____________.
سؤال
_______ are often considered anathema to productivity, yet they are critical to the success of any project.
سؤال
Project managers should manage ___________ conflict.
سؤال
Project managers should encourage ___________ conflict.
سؤال
The development of _________________ is a common device for making a team more tangible.
سؤال
Project managers are responsible for managing the ________ that encourage team performance and extra effort.
سؤال
________ should be used when strong commitment to a decision is needed and there is a low probability of acceptance if the decision were to be made by one person.
سؤال
Expressing the design concept of a new car as a "pocket rocket" (a sports car in the mid-price range) is an example of a simplified ________.
سؤال
In the Snapshot from Practice involving the Tallahassee Democrat newspaper, the key turning point was the handling of an advertisement, eventually known as the ________ that had been sent to the newspaper over a fax machine.
سؤال
Too often when constrained by time, project managers try to accomplish too much during the first meeting, rather than use the ________ principle and not create information overload.
سؤال
In order to match technology to the communication need, 3M developed guidelines to be used on __________ projects.
سؤال
Co-location of team members, team names, and team rituals are common vehicles for establishing a team identity.
سؤال
There is a high degree of internal conflict in the forming stage of team development.
سؤال
Letters of commendation, public recognition for outstanding work, and desirable job assignments are the preferred types of individual rewards.
سؤال
The norming stage of team development is complete when the group establishes a common set of expectations about how members should work together.
سؤال
Groupthink refers to the tendency of members in highly cohesive groups to lose their critical evaluative capabilities resulting in quick decision making with little consideration of alternatives.
سؤال
Everyone on the project team should have the same vision of the project.
سؤال
Most project managers advocate the use of group rewards rather than individual rewards.
سؤال
The storming stage of team development is completed once members begin to think of themselves as part of a group.
سؤال
A project manager should identify a problem in terms of its alternate solutions so that team members can more easily reach a decision on how to solve the problem.
سؤال
Lump-sum cash bonuses are the preferred group reward for project teams.
سؤال
A project vision is an image a project team holds in common about how the project will look upon completion, how they will work together, and how customers will accept the project.
سؤال
Two of the biggest challenges involved in managing a virtual project team are developing trust and effective patterns of communication.
سؤال
A project manager should be wary of people who know too much about a specific technology.
سؤال
Team members can be upset and dissatisfied with conflict, but as long as the disagreement furthers the objectives of the project, then the conflict is functional.
سؤال
The performing stage of team development is characterized by the development of close relationships and group cohesiveness.
سؤال
A project manager arbitrates conflict by intervening and attempting to negotiate a resolution by using reasoning and persuasion, suggesting alternatives and the like.
سؤال
The Punctuated Equilibrium Model of group development has only two phases with a single transition joining them.
سؤال
Regardless of the type of work group, the adjourning stage of team development is the final stage.
سؤال
A project manager should always look for people with good problem-solving ability.
سؤال
Group decision making should be used when strong commitment to the decision is needed and there is a low probability of acceptance if only one person makes the decision.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Managing Project Teams
1
The essential qualities of an effective vision include all of the following except:

A)All team members have the same vision
B)The vision should be communicated to all
C)The vision has to make strategic sense
D)There should be a passion for the vision
E)The vision should be a source of inspiration to others
A
2
Which of the following is an objective of the first project team meeting?

A)Overview the project's scope and objectives
B)Address interpersonal interaction concerns
C)Model how the team will work together
D)Both A and C are correct
E)A, B, and C are all correct
E
Explanation: There are typically three objectives project managers try to achieve during the first meeting of the project team.The first is to provide an overview of the project, including the scope and objectives, the general schedule, method, and procedures.The second is to begin to address some of the interpersonal concerns captured in the team development model: Who are the other team members? How will I fit in? Will I be able to work with these people? The third and most important objective is to begin to model how the team is going to work together to complete the project.
3
Establishing a team identity is facilitated by:

A)Team members working in a common space
B)Creation of a project team name
C)Effective use of meetings
D)Both A and B are correct
E)A, B, and C are all correct
E
4
Researchers have found that high performance teams will have which of the following norms?

A)Hard work does not get in the way of having fun
B)No information is shared outside the team unless all agree to it
C)It is acceptable to be in trouble, but not to surprise others
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
During which stage of team development do team members try to find out what behaviors are acceptable and what performance expectations are?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
During which stage of team development do close relationships develop and the group demonstrates cohesiveness?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is not one of the major issues that successful project managers must address in the early stages of a project?

A)Relationship Decisions
B)Managing Change Decisions
C)Tracking Decisions
D)Planning Decisions
E)All of these need to be addressed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
During which stage of team development is high performance not a top priority and team member emotions run from upbeat to depressed?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
During which stage of team development do members accept that they are part of a project group but resist the constraints that the project and the group put on their individuality?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
Tom is managing a project team responsible for erecting a new office building.He notices that team members are trying out different behaviors to see what is acceptable to the project and personal relations.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
The essence of positive synergy can be found in the phrase:

A)Front of ship sink---back of ship sink
B)There is no "I" in team
C)Two heads are better than one
D)The whole is greater than the sum of the parts
E)If it doesn't kill you, it makes you stronger
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
Experience and research indicate that high-performance project teams are much more likely to develop under all the following conditions except:

A)Members are assigned to the project full time
B)Members report solely to the project manager
C)There are 10 or fewer members per team
D)Team members are selected by their managers
E)The project involves a compelling objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following is not one of the considerations that need to be factored into the project team recruitment process?

A)Political connections
B)Problem-solving ability
C)Ambition, initiative, and energy
D)High degree of technological expertise
E)Availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
All of the following have been found to be good for running effective project meetings except:

A)Start meetings on time regardless of whether everyone is present
B)Identify an adjournment time
C)Thoroughly document all decisions
D)Prepare and distribute an agenda prior to the meeting
E)All of these are good for effective meetings
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
In which of the following theories does the project group transition from a lower level to a higher level of performance about halfway through the project?

A)Nominal Group Technique
B)Five Stage Team Development Model
C)Punctuated Equilibrium Model of Group Development
D)Dysfunctional Transition Model
E)Synergistic Transition Development Model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is commonly associated with high-performing project teams?

A)Risk taking is controlled and not allowed to jeopardize the overall project
B)Roles and specific responsibilities are well-defined
C)A degree of competition among team members is encouraged
D)Mistakes are viewed as opportunities for learning
E)All of these are associated with high-performing teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Sam is the coach of a high school soccer team and has noticed that some close relationships have formed as well as feelings of camaraderie and shared responsibilities for the team's success.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
Roger is new-product project manager for a retail company.Recently the team has exhibited a high degree of conflict over who will control the group and how decisions will be made.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
During which stage of team development is the team fully functional and accepted?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following are considered very important in the recruiting of project members?

A)The budget available
B)The importance of the project
C)The management structure for the project team
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
________ occurs when the whole is less than the sum of its parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
Strategies to manage dysfunctional conflict do not include _____ the conflict.

A)Control
B)Arbitrate
C)Mediate
D)Accept
E)Encourage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
The biggest challenge to managing a virtual project team is:

A)Getting reports and technical information communicated
B)Developing trust
C)Establishing effective patterns of communication
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is not one of the most significant sources of conflict during the project execution phase?

A)Priorities
B)Staff issues
C)Schedule slippage
D)Technical problems
E)All of these are significant sources of conflict
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is not one of the most significant sources of conflict during the project planning phase?

A)Priorities
B)Procedures
C)Schedule
D)Technical requirements
E)Costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following are ways to improve the performance of low-priority projects?

A)Creating a large time investment in the form of a lengthy meeting
B)Interject as much fun as possible into the project
C)Make the benefits of the project as real as possible to the team members
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
Symptoms of groupthink include:

A)The team thinking it is invincible
B)Opinions of those outside the team are considered to be irrelevant
C)Critical thinking disappears
D)Pressure is applied to any dissenter
E)All of these are symptoms of groupthink
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is not one of the tips for alleviating communication problems of virtual teams?

A)Include face-to-face time if at all possible
B)Keep team members informed on how well the overall project is going
C)Share the pain
D)Establish clear norms and protocols for surfacing assumptions and conflicts
E)Establish a code of conduct to avoid delays
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is not one of the steps in facilitating group decision making?

A)Identifying the problem
B)Analyzing the situation
C)Generating alternatives
D)Reaching a decision
E)Follow-up
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
During the ________ stage of group development, close relationships develop and the group demonstrates cohesiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following would be considered the most effective project reward?

A)Individual member rewards
B)Lump-sum cash award
C)All-expenses-paid trip for team members and their families
D)Using negative reinforcement to motivate adequate performance
E)All of these are equally effective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
Two of the biggest challenges involved in managing a virtual project team are:

A)The language barriers and time management
B)Time management and developing trust
C)The language barriers and developing effective patterns of communication
D)Developing trust and effective patterns of communication
E)Time management and developing effective patterns of communication
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
During the ________ stage of group development, the team prepares for its own disbandment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
During the ________ stage of group development, the team is fully functional and working together to accomplishing the project goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
During the delivery phase of a project's life cycle, the most significant source of conflict is:

A)Schedules
B)Priorities
C)Technical
D)Procedures
E)Costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
During the ________ stage of group development, the members try to find out what behaviors are acceptable to the team and individual team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is not one of the most significant sources of conflict during the project definition phase?

A)Priorities
B)Administrative procedures
C)Schedule
D)Workforce
E)Costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
The first step in facilitating group decision making is to:

A)Call a meeting to discuss the problem
B)Identify the problem
C)Agree that there is a problem
D)Quantify the problem
E)Generate alternatives
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
During the ________ stage of group development, there is conflict over who will control the group and how decisions will be made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
Individual rewards for outstanding work would not include:

A)Letters of commendation
B)Public recognition
C)Desirable job assignments
D)Making exceptions to the rules
E)All of these can be used for individual rewards
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
In a ________ project team the members are geographically situated so that they may seldom meet face-to-face as a team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
Symbolic actions at the project level can contribute to a unique team subculture are called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
Experienced project managers stress the importance of ________ rather than appointing team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
Synergy can be both negative as well as positive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
In the ________ approach to managing conflict, the manager imposes a solution to the conflict after listening to each party.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
When the manager intervenes and tries to negotiate a resolution by using reasoning and persuasion, suggesting alternatives and the like the Project Manager is trying to ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
The use of 6:30
A.M.The meetings continued for about two weeks until the project got back on schedule.At that time the project manager announced that the next meeting was canceled, and no further sunrise meetings were ever scheduled.
A.M.meetings to get a project back on schedule is an example of ______ reinforcement to motivate project performance.
The project manager does not have direct authority over many key people, especially the contractors from the other companies.They do, however, have the freedom to convene meetings at his convenience.So the project manager will institute daily "coordination meetings," which were required of all the principals involved, at 6:30
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
___________ refers to whether a team has direct influence over the problem that needs to be resolved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
The ________ suggests that about midway through a project the team transitions into a different behavior pattern more focused on the successful completion of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
When a project team gets things done without having to go through normal protocols of the parent organization, it may fall into the ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
_______ are often considered anathema to productivity, yet they are critical to the success of any project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
Project managers should manage ___________ conflict.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Project managers should encourage ___________ conflict.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
The development of _________________ is a common device for making a team more tangible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
Project managers are responsible for managing the ________ that encourage team performance and extra effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
________ should be used when strong commitment to a decision is needed and there is a low probability of acceptance if the decision were to be made by one person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
Expressing the design concept of a new car as a "pocket rocket" (a sports car in the mid-price range) is an example of a simplified ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
In the Snapshot from Practice involving the Tallahassee Democrat newspaper, the key turning point was the handling of an advertisement, eventually known as the ________ that had been sent to the newspaper over a fax machine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
Too often when constrained by time, project managers try to accomplish too much during the first meeting, rather than use the ________ principle and not create information overload.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
In order to match technology to the communication need, 3M developed guidelines to be used on __________ projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Co-location of team members, team names, and team rituals are common vehicles for establishing a team identity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
There is a high degree of internal conflict in the forming stage of team development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
Letters of commendation, public recognition for outstanding work, and desirable job assignments are the preferred types of individual rewards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
The norming stage of team development is complete when the group establishes a common set of expectations about how members should work together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Groupthink refers to the tendency of members in highly cohesive groups to lose their critical evaluative capabilities resulting in quick decision making with little consideration of alternatives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
Everyone on the project team should have the same vision of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
Most project managers advocate the use of group rewards rather than individual rewards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
The storming stage of team development is completed once members begin to think of themselves as part of a group.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
A project manager should identify a problem in terms of its alternate solutions so that team members can more easily reach a decision on how to solve the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Lump-sum cash bonuses are the preferred group reward for project teams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
A project vision is an image a project team holds in common about how the project will look upon completion, how they will work together, and how customers will accept the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
Two of the biggest challenges involved in managing a virtual project team are developing trust and effective patterns of communication.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
A project manager should be wary of people who know too much about a specific technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
Team members can be upset and dissatisfied with conflict, but as long as the disagreement furthers the objectives of the project, then the conflict is functional.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
The performing stage of team development is characterized by the development of close relationships and group cohesiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
A project manager arbitrates conflict by intervening and attempting to negotiate a resolution by using reasoning and persuasion, suggesting alternatives and the like.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
The Punctuated Equilibrium Model of group development has only two phases with a single transition joining them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
Regardless of the type of work group, the adjourning stage of team development is the final stage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
A project manager should always look for people with good problem-solving ability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
Group decision making should be used when strong commitment to the decision is needed and there is a low probability of acceptance if only one person makes the decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.