Deck 9: Reducing Project Duration

ملء الشاشة (f)
exit full mode
سؤال
In selecting the best activity to reduce you would first select the activity with the

A)Earliest start time
B)Steepest slope
C)Least steep slope
D)Longest duration
E)Largest crash time
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The shortest possible time an activity can be completed realistically is called ___ time.

A)Expedited
B)Accelerated
C)Crash
D)Optimistic
E)Optimal
سؤال
Total project costs include all of the following except:

A)Supervision
B)Administration
C)Project manager's salary
D)Interest
E)All of these are included in total project costs
سؤال
Cost slope can be determined by dividing the

A)Run by the rise
B)Rise by the run
C)Crash cost by the normal cost
D)Normal cost by the crash cost
E)Both B and C are correct
سؤال
An activity's crash costs include ____ costs.

A)Direct
B)Indirect
C)Overhead
D)Both A and B are correct
E)A, B, and C are correct
سؤال
Intense global competition and rapid technological advances create pressure on developing projects rapidly.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
سؤال
The president of a software company remarks in a speech that new technologically advanced software will be available in one year.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
سؤال
Creating a Project Cost-Duration graph is useful:

A)During the pre-project planning phase
B)After the project has begun
C)After the completion of the project
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Project costs are generally classified as ____ costs.

A)Direct
B)Indirect
C)Overhead
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
____ costs are incurred when completing an activity in its realistically shortest time.

A)Normal
B)Reserve
C)Crash
D)Accelerated
E)Expedited
سؤال
Which of the following is not considered a project indirect cost?

A)Supervision
B)Consultants
C)Equipment
D)Interest
E)All of these are considered project indirect costs
سؤال
A contractor finished a bridge across a lake 18 months early and received more than $6 million for the early completion.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
سؤال
An activity's cost slope represents an activity's

A)Total cost per unit of time
B)Cost per unit of time
C)Indirect cost per unit of time
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
The most common response for meeting unattainable deadlines is to

A)Reduce or scale back the scope of the project.
B)Decrease the critical paths
C)Crash all elements of the project
D)Change the time to market statement
E)B, and C are correct
سؤال
The optimum duration for a project is at the point where:

A)Direct costs are the lowest
B)Indirect costs are the lowest
C)Direct costs equal indirect costs
D)Total project costs are the lowest
E)The project changes from time-constrained to resource-constrained
سؤال
Adverse weather, design flaws, and equipment breakdown can create negative slack.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
سؤال
Which of the following correctly calculates an activity's cost slope?

A)(normal cost-crash cost)/(normal time-crash time)
B)(crash cost-normal cost)/(normal time-crash time)
C)(normal time-crash time)/(crash cost-normal cost)
D)(normal time-crash time)/(normal cost-crash cost)
E)(crash cost-normal cost)/(crash time-normal time)
سؤال
The less steep the cost slope of an activity, the

A)Less it costs to shorten one time period
B)More it costs to shorten one time period
C)Smaller the crash time
D)Larger the crash time
E)Cannot be determined by the information given
سؤال
Low-cost, realistic, efficient methods for completing an activity under normal conditions are supported by ____ time.

A)Normal
B)Budget
C)Optimized
D)Expected
E)Target
سؤال
Crashing a project should occur:

A)As early as possible
B)As late as possible
C)Midway through the project
D)Both A and C are correct
E)Cannot be determined with the information given
سؤال
The relationship between cost and time for various durations is assumed to be:

A)Linear
B)Curvilinear
C)Variable
D)Conversely related
E)Exponentially related
سؤال
Which of the following is the easiest method for shortening project time?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Reduce project scope
E)Reduce the quality
سؤال
The project direct-cost line near the normal point is usually:

A)Sloped steeply
B)Relatively flat
C)Rising
D)Falling
E)Gently sloped
سؤال
The Snapshot from Practice which detailed the Northridge earthquake demonstrated the importance of reducing a project's ______.
سؤال
If a network has several critical or near-critical paths it is deemed to be:

A)Well planned
B)The lowest cost alternative
C)Resource-constrained
D)Sensitive
E)Insensitive
سؤال
Intense global competition and rapid technological advances combine to create a(n) ________ imposed project duration date.
سؤال
The most common method for shortening project time is to

A)Subcontract activities
B)Compromise the quality
C)Add additional staff and equipment
D)Work overtime
E)Reduce the project scope
سؤال
The Snapshot from Practice "Cell-Phone Wars" is an excellent example of reducing project duration due to:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
سؤال
Sometimes very high ________ costs are recognized before a project begins and reducing these costs through shorter project durations becomes a high priority.
سؤال
Which of the following is not one of the techniques for accelerating project completion?

A)Assigning additional staff and equipment
B)Establish a core team
C)Do it twice-fast and correctly
D)Reduce project scope
E)All of these are acceptable techniques
سؤال
One way of reducing project costs is identifying tasks that _________ can do themselves.

A)Vendors
B)Suppliers
C)Customers
D)Company employees
E)Project teams
سؤال
A common method for shortening the project time is to:

A)Adding resources
B)Schedule overtime
C)Subcontract an activity
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Which of the following is/are included in a Project Cost-Duration Graph?

A)Total indirect cost
B)Total direct cost
C)Total project cost
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
According to Brooks' Law, adding more people to a late project is most likely to have which of the following impact?

A)Keep the project from slipping any further
B)Get the project back on schedule
C)Make the project slips further
D)Both A and B are correct
E)None of these relate to Brooks' Law
سؤال
Which of the following is not one of the more commonly used options for cutting project costs?

A)Reduce project scope
B)Have owner take more responsibility
C)Moving the completion date further out
D)Brainstorming cost savings options
E)Outsourcing project activities
سؤال
Which of the following is the most common method for shortening project time?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Reduce project scope
E)Reduce the quality
سؤال
A positive situation where moving toward the optimum time can result in very real, large savings-this occurs when the network is:

A)Insensitive
B)Sensitive
C)Ahead of schedule
D)Shifting to the critical chain
E)Implementing a fast-tracking system
سؤال
When the project team is salaried, which of the following is the preferred choice for accelerating project completion?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Work longer hours
E)Both C and D are preferred choices
سؤال
The ________ project cost is the sum of the indirect and direct costs.
سؤال
When a politician makes a public statement that a new building will be available in two years, a(n) ________ duration has reduced the project duration.
سؤال
Because direct costs are assumed to be developed from normal methods and time, any reduction in activity time should ________ the cost of the activity.
سؤال
In the "I'll Bet You..." Snapshot from Practice, the draftsman won ___________ for making a very difficult deadline.
سؤال
Subtracting an activity's crash time from the normal time will calculate an activity's ________.
سؤال
The easiest way to add more resources to a project is not to add more people, but to schedule ________.
سؤال
To shorten the duration of a project the project manager should limit the choices of activities to just those which ________.
سؤال
An activity's ________ is calculated by dividing the rise by the run.
سؤال
The ________ time for an activity represents low-costs, realistic, efficient methods for completing the activity under typical conditions.
سؤال
A network is considered to be ________ if it has a predominate critical path with no other path close in terms of slack.
سؤال
The easiest way to add more labor to a project is not to add more people, but to add ___________.
سؤال
Costs such as supervision, administration, consultants, and interest are examples of ________ project costs.
سؤال
According to ________, adding more manpower to a late software project makes it later.
سؤال
When considering whether to move the project to its optimum cost-time position, the manager should also consider ________.
سؤال
Shortening an activity is called ________.
سؤال
___________ is probably the most common response for meeting unattainable deadlines.
سؤال
A rule of thumb for moderate- to high-technology firms is that a six-month delay in bringing a product to market can result in a gross profit loss of about 35 percent.
سؤال
Costs such as labor, materials, equipment, or contractors are examples of ________ project costs.
سؤال
Direct costs are assignable directly to a project ________.
سؤال
Subtracting an activity's normal cost from the crash cost will calculate an activity's ________.
سؤال
The direct costs for completing an activity as early as possible is called its ________.
سؤال
____________ is the rearranging of the project network logic so that critical activities are done in parallel rather than sequentially.
سؤال
Crash cost is the incremental cost incurred when an activity is reduced in duration.
سؤال
The accuracy of crash times and costs is frequently rough at best, when compared with normal time and cost.
سؤال
Shortening an activity's duration is termed crashing.
سؤال
Expected time for an activity represents low-cost, realistic, efficient methods for completing the activity under anticipated conditions.
سؤال
Crashing a more expensive activity may be wise if fewer inherent risks are involved.
سؤال
Incentive contracts can make reduction of project time rewarding-usually for both the project contractor and owner.
سؤال
Managers have several effective methods for crashing specific project activities when resources are not constrained.
سؤال
A project network is classified as sensitive if it has a large number of interacting paths.
سؤال
While the relationship between normal and crash times is really curvilinear, the assumption that it is linear is seldom a concern for practicing managers.
سؤال
Direct costs are so named because they can be assigned directly to a work package and activity.
سؤال
The higher the slope of an activity the greater the cost to reduce its duration.
سؤال
Because direct costs are assumed to be developed from normal methods and time, any reduction in activity time should add to the costs of the activity.
سؤال
The cost slope of an activity is calculated by dividing the run by the rise.
سؤال
Creating a Project Cost-Duration Graph in the pre-project planning phase without an imposed duration is the best time to use this tool.
سؤال
Crash time is the greatest time reduction possible under realistic conditions.
سؤال
Indirect costs generally represent overhead costs such as supervision, administration, consultants, and interest.
سؤال
The sum of the costs of all the work packages represents the total direct costs for the project.
سؤال
Imposed project durations almost always leads to a higher-cost project than one planned with detailed scheduling of all the project's activities.
سؤال
Collecting crash times for a moderate-size project is relatively easy.
سؤال
The total cost for each possible duration of a project is the sum of labor, materials, and equipment.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Reducing Project Duration
1
In selecting the best activity to reduce you would first select the activity with the

A)Earliest start time
B)Steepest slope
C)Least steep slope
D)Longest duration
E)Largest crash time
C
Explanation: The less steep the cost slope of an activity, the less it costs to shorten one time period.
2
The shortest possible time an activity can be completed realistically is called ___ time.

A)Expedited
B)Accelerated
C)Crash
D)Optimistic
E)Optimal
C
Explanation: The shortest possible time an activity can realistically be completed in is called its crash time.
3
Total project costs include all of the following except:

A)Supervision
B)Administration
C)Project manager's salary
D)Interest
E)All of these are included in total project costs
E
Explanation: Direct costs commonly represent labor, materials, equipment, and sometimes subcontractors.Indirect costs generally represent overhead costs such as supervision, administration, consultants, and interest.
4
Cost slope can be determined by dividing the

A)Run by the rise
B)Rise by the run
C)Crash cost by the normal cost
D)Normal cost by the crash cost
E)Both B and C are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
An activity's crash costs include ____ costs.

A)Direct
B)Indirect
C)Overhead
D)Both A and B are correct
E)A, B, and C are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
Intense global competition and rapid technological advances create pressure on developing projects rapidly.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
The president of a software company remarks in a speech that new technologically advanced software will be available in one year.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
Creating a Project Cost-Duration graph is useful:

A)During the pre-project planning phase
B)After the project has begun
C)After the completion of the project
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
Project costs are generally classified as ____ costs.

A)Direct
B)Indirect
C)Overhead
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
____ costs are incurred when completing an activity in its realistically shortest time.

A)Normal
B)Reserve
C)Crash
D)Accelerated
E)Expedited
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is not considered a project indirect cost?

A)Supervision
B)Consultants
C)Equipment
D)Interest
E)All of these are considered project indirect costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
A contractor finished a bridge across a lake 18 months early and received more than $6 million for the early completion.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
An activity's cost slope represents an activity's

A)Total cost per unit of time
B)Cost per unit of time
C)Indirect cost per unit of time
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
The most common response for meeting unattainable deadlines is to

A)Reduce or scale back the scope of the project.
B)Decrease the critical paths
C)Crash all elements of the project
D)Change the time to market statement
E)B, and C are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
The optimum duration for a project is at the point where:

A)Direct costs are the lowest
B)Indirect costs are the lowest
C)Direct costs equal indirect costs
D)Total project costs are the lowest
E)The project changes from time-constrained to resource-constrained
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Adverse weather, design flaws, and equipment breakdown can create negative slack.This is an example of reducing project duration caused by:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following correctly calculates an activity's cost slope?

A)(normal cost-crash cost)/(normal time-crash time)
B)(crash cost-normal cost)/(normal time-crash time)
C)(normal time-crash time)/(crash cost-normal cost)
D)(normal time-crash time)/(normal cost-crash cost)
E)(crash cost-normal cost)/(crash time-normal time)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
The less steep the cost slope of an activity, the

A)Less it costs to shorten one time period
B)More it costs to shorten one time period
C)Smaller the crash time
D)Larger the crash time
E)Cannot be determined by the information given
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
Low-cost, realistic, efficient methods for completing an activity under normal conditions are supported by ____ time.

A)Normal
B)Budget
C)Optimized
D)Expected
E)Target
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
Crashing a project should occur:

A)As early as possible
B)As late as possible
C)Midway through the project
D)Both A and C are correct
E)Cannot be determined with the information given
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
The relationship between cost and time for various durations is assumed to be:

A)Linear
B)Curvilinear
C)Variable
D)Conversely related
E)Exponentially related
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is the easiest method for shortening project time?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Reduce project scope
E)Reduce the quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
The project direct-cost line near the normal point is usually:

A)Sloped steeply
B)Relatively flat
C)Rising
D)Falling
E)Gently sloped
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
The Snapshot from Practice which detailed the Northridge earthquake demonstrated the importance of reducing a project's ______.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
If a network has several critical or near-critical paths it is deemed to be:

A)Well planned
B)The lowest cost alternative
C)Resource-constrained
D)Sensitive
E)Insensitive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
Intense global competition and rapid technological advances combine to create a(n) ________ imposed project duration date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
The most common method for shortening project time is to

A)Subcontract activities
B)Compromise the quality
C)Add additional staff and equipment
D)Work overtime
E)Reduce the project scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
The Snapshot from Practice "Cell-Phone Wars" is an excellent example of reducing project duration due to:

A)Imposed project deadlines
B)Time to market
C)Unforeseen project delays
D)High overhead
E)Incentive contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Sometimes very high ________ costs are recognized before a project begins and reducing these costs through shorter project durations becomes a high priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is not one of the techniques for accelerating project completion?

A)Assigning additional staff and equipment
B)Establish a core team
C)Do it twice-fast and correctly
D)Reduce project scope
E)All of these are acceptable techniques
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
One way of reducing project costs is identifying tasks that _________ can do themselves.

A)Vendors
B)Suppliers
C)Customers
D)Company employees
E)Project teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
A common method for shortening the project time is to:

A)Adding resources
B)Schedule overtime
C)Subcontract an activity
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is/are included in a Project Cost-Duration Graph?

A)Total indirect cost
B)Total direct cost
C)Total project cost
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
According to Brooks' Law, adding more people to a late project is most likely to have which of the following impact?

A)Keep the project from slipping any further
B)Get the project back on schedule
C)Make the project slips further
D)Both A and B are correct
E)None of these relate to Brooks' Law
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is not one of the more commonly used options for cutting project costs?

A)Reduce project scope
B)Have owner take more responsibility
C)Moving the completion date further out
D)Brainstorming cost savings options
E)Outsourcing project activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is the most common method for shortening project time?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Reduce project scope
E)Reduce the quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
A positive situation where moving toward the optimum time can result in very real, large savings-this occurs when the network is:

A)Insensitive
B)Sensitive
C)Ahead of schedule
D)Shifting to the critical chain
E)Implementing a fast-tracking system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
When the project team is salaried, which of the following is the preferred choice for accelerating project completion?

A)Assigning additional staff and equipment
B)Subcontract work
C)Schedule overtime
D)Work longer hours
E)Both C and D are preferred choices
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
The ________ project cost is the sum of the indirect and direct costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
When a politician makes a public statement that a new building will be available in two years, a(n) ________ duration has reduced the project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
Because direct costs are assumed to be developed from normal methods and time, any reduction in activity time should ________ the cost of the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
In the "I'll Bet You..." Snapshot from Practice, the draftsman won ___________ for making a very difficult deadline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
Subtracting an activity's crash time from the normal time will calculate an activity's ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
The easiest way to add more resources to a project is not to add more people, but to schedule ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
To shorten the duration of a project the project manager should limit the choices of activities to just those which ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
An activity's ________ is calculated by dividing the rise by the run.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
The ________ time for an activity represents low-costs, realistic, efficient methods for completing the activity under typical conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
A network is considered to be ________ if it has a predominate critical path with no other path close in terms of slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
The easiest way to add more labor to a project is not to add more people, but to add ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
Costs such as supervision, administration, consultants, and interest are examples of ________ project costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
According to ________, adding more manpower to a late software project makes it later.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
When considering whether to move the project to its optimum cost-time position, the manager should also consider ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Shortening an activity is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
___________ is probably the most common response for meeting unattainable deadlines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
A rule of thumb for moderate- to high-technology firms is that a six-month delay in bringing a product to market can result in a gross profit loss of about 35 percent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
Costs such as labor, materials, equipment, or contractors are examples of ________ project costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
Direct costs are assignable directly to a project ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
Subtracting an activity's normal cost from the crash cost will calculate an activity's ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
The direct costs for completing an activity as early as possible is called its ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
____________ is the rearranging of the project network logic so that critical activities are done in parallel rather than sequentially.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Crash cost is the incremental cost incurred when an activity is reduced in duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
The accuracy of crash times and costs is frequently rough at best, when compared with normal time and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
Shortening an activity's duration is termed crashing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Expected time for an activity represents low-cost, realistic, efficient methods for completing the activity under anticipated conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Crashing a more expensive activity may be wise if fewer inherent risks are involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
Incentive contracts can make reduction of project time rewarding-usually for both the project contractor and owner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
Managers have several effective methods for crashing specific project activities when resources are not constrained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
A project network is classified as sensitive if it has a large number of interacting paths.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
While the relationship between normal and crash times is really curvilinear, the assumption that it is linear is seldom a concern for practicing managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Direct costs are so named because they can be assigned directly to a work package and activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
The higher the slope of an activity the greater the cost to reduce its duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
Because direct costs are assumed to be developed from normal methods and time, any reduction in activity time should add to the costs of the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
The cost slope of an activity is calculated by dividing the run by the rise.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
Creating a Project Cost-Duration Graph in the pre-project planning phase without an imposed duration is the best time to use this tool.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
Crash time is the greatest time reduction possible under realistic conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
Indirect costs generally represent overhead costs such as supervision, administration, consultants, and interest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
The sum of the costs of all the work packages represents the total direct costs for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
Imposed project durations almost always leads to a higher-cost project than one planned with detailed scheduling of all the project's activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
Collecting crash times for a moderate-size project is relatively easy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
The total cost for each possible duration of a project is the sum of labor, materials, and equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.