Deck 17: An Introduction to Agile Project Management

ملء الشاشة (f)
exit full mode
سؤال
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A)Project Managers
B)Customers
C)Sponsers
D)Team Leaders
E)All of the above are correct
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Iterations are short time frames ("time boxes") that typically last from ___________.

A)1-4 days
B)1-2 weeks
C)1-4 weeks
D)4-7 weeks
E)7-12 weeks
سؤال
Once the project scope has been firmly established, every detail of the project is defined through the ________.

A)Deliverables
B)Job tickets
C)WBS
D)Estimates
E)Risks
سؤال
Which each of these Agile principles: is where Teams reflect, learn, and adapt to change; work informs the plan?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
سؤال
Traditional approaches to project management concentrate firmly on thorough planning _________.

A)Up front
B)With the customer
C)With the project team
D)Of the WBS
E)None of the above
سؤال
Which each of these Agile principles: is where team members decide amongst themselves who and what should be done?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
سؤال
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in what industry?

A)Automotive
B)Tool and Dye
C)Publishing
D)Renewable Energy
E)Software
سؤال
A new holistic approach in new commercial product development efforts is known as:

A)Scrum
B)Specific project management
C)Traditional project management
D)Prioritized WBS
E)Functional teams
سؤال
All of the following are part of the Traditional Project Management model except:

A)Fixed scope
B)Deliverables
C)Continuous Design
D)Low uncertainty
E)Conventional Project Teams
سؤال
All of the following are part of the Agile Project Management model except:

A)Flexibility
B)High uncertainty
C)Embrace change
D)Design up front
E)Self organized project teams
سؤال
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that _______ should only take as much time and effort needed to generate useful feedback and evolve an idea.

A)Projects
B)Prototypes
C)Experiments
D)Product Design
E)Development
سؤال
Which each of these Agile principles: create a flow of value to customers by "chunking" project delivery into small, functioning increments?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
سؤال
In the Snap Shot From Practice IDEO: Masters of Design, one of the product innovations is:

A)First Apple Mouse
B)Head's Airflow Tennis Racket
C)Zyliss Salad Spinner
D)Nokia N-Gage Smart phones
E)All of the above are correct
سؤال
hich each of these Agile principles: Test assumptions early and build working prototypes to solicit customer feedback and refine product requirements?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
سؤال
_________ can be a source of unpredictability.

A)Technology
B)Clients
C)Vendors
D)Sponsers
E)WBS
سؤال
Iterative development processes provide the which important advantages:

A)Continuous integration, verification, and validation of the evolving product.
B)Frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C)Early detection of defects and problems.
D)A, B and C are correct
E)None of the above is correct
سؤال
Which is not part of a family of methods designed to respond to the challenges of unpredictable projects?

A)Agile modeling
B)Lean development
C)RUP (Rational Unified Process)
D)Crystal clear
E)Fixed scope
سؤال
_____________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A)Agile project management
B)Hybrid project management
C)Uncertain project management
D)Focused project management
E)Interactive project management
سؤال
Project ________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A)Stability
B)Certainty
C)Unity
D)Uncertainty
E)Degree
سؤال
Which each of these Agile principles: Employ business-driven prioritizations of requirements and features?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
سؤال
Which of the following is not part of the Agile Alliance manifesto that declared four core values?

A)Individuals and interactions over processes and tools.
B)Working software over comprehensive documentation.
C)Creating an end user survey.
D)Customer collaboration over contract negotiation.
E)Responding to change over following a plan.
سؤال
A person who acts on behalf of customers to represent their interests is called a:

A)Customer service representive
B)Project champion
C)Customer liaison
D)Product owner
E)Production coordinator
سؤال
In the Scrum Development Process a specific feature is:

A)Analysis
B)Design
C)Build
D)Trust
E)All of the above are correct.
سؤال
The _________ is the customer's prioritized list of key features desired when the project is completed.

A)Project master
B)Spirit backlog
C)Creative backlog
D)Product backlog
E)Project list
سؤال
How long does the daily scrum last?

A)5 min
B)10 min
C)15 min
D)20 min
E)25 min
سؤال
_________ can be a source of unpredictability.
سؤال
___________ represents the amount of work the team commits to complete during the next sprint.

A)Spirit backlog
B)Product backlog
C)Project backlog
D)Schedule backlog
E)Task backlog
سؤال
What are the questions asked at the daily scrum?

A)What have you done since the last Scrum?
B)What will you do between now and the next Scrum?
C)What is getting in the way (blocks) you from performing your work as effectively as possible?
D)What is the newest schedule changes?
E)A, B, and C are all questions
سؤال
___________ are the maximum budget that should not be exceeded in the development of a given product or service.

A)Project account
B)Contingencies
C)Agile account
D)Ceilings
E)None of the above are correct.
سؤال
_____________ employs business-driven prioritizations of requirements and features.
سؤال
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that _______ should only take as much time and effort needed to generate useful feedback and evolve an idea.
سؤال
Iterations are short time frames ("time boxes") that typically last from __________.
سؤال
A Development Team typically made up of _______ people with cross-functional skill sets.

A)5-9
B)7-10
C)8-12
D)12-14
E)15-20
سؤال
Once the project scope has been firmly established, every detail of the project is defined through the _______.
سؤال
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in the _______ industry.
سؤال
__________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.
سؤال
Project ___________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
سؤال
Traditional approaches to project management concentrate firmly on thorough planning _______.
سؤال
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.
سؤال
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.

A)Scrum
B)Value
C)Spirit
D)Feature
E)Priority
سؤال
____________ teams reflect, learn, and adapt to change; work informs the plan.
سؤال
The customer's prioritized list of key features desired when the project is completed is the ____________.
سؤال
The _______ backlog is developed and controlled by the team.It represents the amount of work the team commits to complete during the next sprint.
سؤال
The daily scrum last _______ minutes.
سؤال
______ is a new holistic approach in new commercial product development efforts.
سؤال
Once the project scope has been firmly established, every detail of the project is defined through the project doctrine.
سؤال
A _____ is a person who acts on behalf of customers to represent their interests.
سؤال
The maximum budget that should not be exceeded in the development of a given product or service are called __________.
سؤال
A ________ typically made up of five-nine people with cross-functional skill sets.
سؤال
Agile methods appear to work best on ______ projects that require only five-nine dedicated team members to complete the work.
سؤال
____________ test assumptions early and build working prototypes to solicit customer feedback and refine product requirements.
سؤال
Project unity varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
سؤال
Many of the Agile principles, including _____________ and intense collaboration, are incompatible with corporate cultures.
سؤال
Traditional project management requires a fairly high degree of predictability to be effective.
سؤال
Traditional approaches to project management concentrate firmly on thorough planning up front.
سؤال
_____________ team members decide amongst themselves who and what should be done.
سؤال
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.
سؤال
__________ frameworks, like Scrum are used exclusively to complete software development projects from beginning to end.
سؤال
___________ create a flow of value to customers by "chunking" project delivery into small, functioning increments.
سؤال
When the project scope and/or technology are not fully known, things become much less predictable.
سؤال
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that projects should only take as much time and effort needed to generate useful feedback and evolve an idea.
سؤال
Continuous improvement teams reflect, learn, and adapt to change; work informs the plan.
سؤال
Experimentation and adaptation tests assumptions that the project manager's interpretation of the project is correct.
سؤال
Fixed Scope is part of the Traditional Project Management model.
سؤال
Agile PM represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.
سؤال
In many cases, customers only begin to understand what they actually desire when they are provided with someone's impression of what they want.
سؤال
The third phase of the Scrum Development Process is to build the feature so that it is functional.
سؤال
Iterations are short time frames ("time boxes") that typically last from two to five weeks.
سؤال
Fundamentally, Agile PM is related to the rolling wave planning and scheduling project methodology.
سؤال
The goal of each sprint is to produce fully functional features.
سؤال
Self-organization are team members who decide amongst themselves who and what should be done.
سؤال
Focus on customer value employs business-driven prioritizations of requirements and features.
سؤال
Conventional project teams are part of the Agile Project Management model.
سؤال
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in the automotive industry.
سؤال
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
سؤال
Lean Development is not part of a family of methods designed to respond to the challenges of unpredictable projects.
سؤال
Agile PM satisfies top management's need for budget, scope, and schedule control.
سؤال
Iterative and incremental deliver creates a flow of value to customers by "chunking" project delivery into large, functioning increments.
سؤال
Priorities are re-evaluated before each iteration.
سؤال
The product owner has the option to change features and priorities at the end of each sprint if desired.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/85
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 17: An Introduction to Agile Project Management
1
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A)Project Managers
B)Customers
C)Sponsers
D)Team Leaders
E)All of the above are correct
B
Explanation: In many cases, customers only begin to understand what they actually desire when they are provided with someone's impression of what they want.
2
Iterations are short time frames ("time boxes") that typically last from ___________.

A)1-4 days
B)1-2 weeks
C)1-4 weeks
D)4-7 weeks
E)7-12 weeks
C
Explanation: Iterations are short time frames ("time boxes") that typically last from one to four weeks.
3
Once the project scope has been firmly established, every detail of the project is defined through the ________.

A)Deliverables
B)Job tickets
C)WBS
D)Estimates
E)Risks
C
Explanation: Once the project scope has been firmly established, every detail of the project is defined through the WBS.
4
Which each of these Agile principles: is where Teams reflect, learn, and adapt to change; work informs the plan?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
5
Traditional approaches to project management concentrate firmly on thorough planning _________.

A)Up front
B)With the customer
C)With the project team
D)Of the WBS
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which each of these Agile principles: is where team members decide amongst themselves who and what should be done?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
7
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in what industry?

A)Automotive
B)Tool and Dye
C)Publishing
D)Renewable Energy
E)Software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
8
A new holistic approach in new commercial product development efforts is known as:

A)Scrum
B)Specific project management
C)Traditional project management
D)Prioritized WBS
E)Functional teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
9
All of the following are part of the Traditional Project Management model except:

A)Fixed scope
B)Deliverables
C)Continuous Design
D)Low uncertainty
E)Conventional Project Teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
10
All of the following are part of the Agile Project Management model except:

A)Flexibility
B)High uncertainty
C)Embrace change
D)Design up front
E)Self organized project teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
11
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that _______ should only take as much time and effort needed to generate useful feedback and evolve an idea.

A)Projects
B)Prototypes
C)Experiments
D)Product Design
E)Development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which each of these Agile principles: create a flow of value to customers by "chunking" project delivery into small, functioning increments?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
13
In the Snap Shot From Practice IDEO: Masters of Design, one of the product innovations is:

A)First Apple Mouse
B)Head's Airflow Tennis Racket
C)Zyliss Salad Spinner
D)Nokia N-Gage Smart phones
E)All of the above are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
14
hich each of these Agile principles: Test assumptions early and build working prototypes to solicit customer feedback and refine product requirements?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
15
_________ can be a source of unpredictability.

A)Technology
B)Clients
C)Vendors
D)Sponsers
E)WBS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
16
Iterative development processes provide the which important advantages:

A)Continuous integration, verification, and validation of the evolving product.
B)Frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C)Early detection of defects and problems.
D)A, B and C are correct
E)None of the above is correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which is not part of a family of methods designed to respond to the challenges of unpredictable projects?

A)Agile modeling
B)Lean development
C)RUP (Rational Unified Process)
D)Crystal clear
E)Fixed scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
18
_____________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A)Agile project management
B)Hybrid project management
C)Uncertain project management
D)Focused project management
E)Interactive project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
19
Project ________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A)Stability
B)Certainty
C)Unity
D)Uncertainty
E)Degree
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which each of these Agile principles: Employ business-driven prioritizations of requirements and features?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is not part of the Agile Alliance manifesto that declared four core values?

A)Individuals and interactions over processes and tools.
B)Working software over comprehensive documentation.
C)Creating an end user survey.
D)Customer collaboration over contract negotiation.
E)Responding to change over following a plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
22
A person who acts on behalf of customers to represent their interests is called a:

A)Customer service representive
B)Project champion
C)Customer liaison
D)Product owner
E)Production coordinator
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the Scrum Development Process a specific feature is:

A)Analysis
B)Design
C)Build
D)Trust
E)All of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
24
The _________ is the customer's prioritized list of key features desired when the project is completed.

A)Project master
B)Spirit backlog
C)Creative backlog
D)Product backlog
E)Project list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
25
How long does the daily scrum last?

A)5 min
B)10 min
C)15 min
D)20 min
E)25 min
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
26
_________ can be a source of unpredictability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
27
___________ represents the amount of work the team commits to complete during the next sprint.

A)Spirit backlog
B)Product backlog
C)Project backlog
D)Schedule backlog
E)Task backlog
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
28
What are the questions asked at the daily scrum?

A)What have you done since the last Scrum?
B)What will you do between now and the next Scrum?
C)What is getting in the way (blocks) you from performing your work as effectively as possible?
D)What is the newest schedule changes?
E)A, B, and C are all questions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
29
___________ are the maximum budget that should not be exceeded in the development of a given product or service.

A)Project account
B)Contingencies
C)Agile account
D)Ceilings
E)None of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
30
_____________ employs business-driven prioritizations of requirements and features.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
31
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that _______ should only take as much time and effort needed to generate useful feedback and evolve an idea.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
32
Iterations are short time frames ("time boxes") that typically last from __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
33
A Development Team typically made up of _______ people with cross-functional skill sets.

A)5-9
B)7-10
C)8-12
D)12-14
E)15-20
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
34
Once the project scope has been firmly established, every detail of the project is defined through the _______.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
35
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in the _______ industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
36
__________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
37
Project ___________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
38
Traditional approaches to project management concentrate firmly on thorough planning _______.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
39
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
40
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.

A)Scrum
B)Value
C)Spirit
D)Feature
E)Priority
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
41
____________ teams reflect, learn, and adapt to change; work informs the plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
42
The customer's prioritized list of key features desired when the project is completed is the ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
43
The _______ backlog is developed and controlled by the team.It represents the amount of work the team commits to complete during the next sprint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
44
The daily scrum last _______ minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
45
______ is a new holistic approach in new commercial product development efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
46
Once the project scope has been firmly established, every detail of the project is defined through the project doctrine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
47
A _____ is a person who acts on behalf of customers to represent their interests.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
48
The maximum budget that should not be exceeded in the development of a given product or service are called __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
49
A ________ typically made up of five-nine people with cross-functional skill sets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
50
Agile methods appear to work best on ______ projects that require only five-nine dedicated team members to complete the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
51
____________ test assumptions early and build working prototypes to solicit customer feedback and refine product requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
52
Project unity varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
53
Many of the Agile principles, including _____________ and intense collaboration, are incompatible with corporate cultures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
54
Traditional project management requires a fairly high degree of predictability to be effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
55
Traditional approaches to project management concentrate firmly on thorough planning up front.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
56
_____________ team members decide amongst themselves who and what should be done.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
57
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
58
__________ frameworks, like Scrum are used exclusively to complete software development projects from beginning to end.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
59
___________ create a flow of value to customers by "chunking" project delivery into small, functioning increments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
60
When the project scope and/or technology are not fully known, things become much less predictable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
61
In the Snap Shot From Practice IDEO: Masters of Design.CEO Tim Brown recommends that projects should only take as much time and effort needed to generate useful feedback and evolve an idea.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
62
Continuous improvement teams reflect, learn, and adapt to change; work informs the plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
63
Experimentation and adaptation tests assumptions that the project manager's interpretation of the project is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
64
Fixed Scope is part of the Traditional Project Management model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
65
Agile PM represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
66
In many cases, customers only begin to understand what they actually desire when they are provided with someone's impression of what they want.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
67
The third phase of the Scrum Development Process is to build the feature so that it is functional.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
68
Iterations are short time frames ("time boxes") that typically last from two to five weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
69
Fundamentally, Agile PM is related to the rolling wave planning and scheduling project methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
70
The goal of each sprint is to produce fully functional features.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
71
Self-organization are team members who decide amongst themselves who and what should be done.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
72
Focus on customer value employs business-driven prioritizations of requirements and features.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
73
Conventional project teams are part of the Agile Project Management model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
74
In the Research Highlight: Product Development practices that Work: The waterfall method is the name used in the automotive industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
75
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
76
Lean Development is not part of a family of methods designed to respond to the challenges of unpredictable projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
77
Agile PM satisfies top management's need for budget, scope, and schedule control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
78
Iterative and incremental deliver creates a flow of value to customers by "chunking" project delivery into large, functioning increments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
79
Priorities are re-evaluated before each iteration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
80
The product owner has the option to change features and priorities at the end of each sprint if desired.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.