Deck 12: Outsourcing: Managing Interorganizational Relations

ملء الشاشة (f)
exit full mode
سؤال
Which of the following did the state of Ohio do before starting a bond-financed school construction project?

A)Create a specific RFP (request for proposal)
B)Have a dress rehearsal
C)Reviews the performance of contractors on past projects
D)Both A and C are correct
E)A, B, and C are all correct
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is not a potential part of the outsourcing concept?

A)Computers
B)Faxes
C)Computer-aided design systems
D)Video teleconferencing
E)All the above are correct
سؤال
In the Snapshot from Practice "Strategies for Communicating with Outsourcers," which of the following was not one of the suggested strategies?

A)Recognize cultural differences
B)Use a translator to make sure everyone understands
C)Choose the right words
D)Confirm your requirements
E)Set deadlines
سؤال
To avoid problems with schedules and deadlines you should:

A)Develop detailed schedules
B)Hold frequent status reviews
C)Add a penalty clause to the contract
D)Hold frequent conversations with the outsourcer
E)Build extra time into the schedules that the outsourcer is not aware of
سؤال
Which of the following is not a key to successful partnering relationships?

A)Mutual trust
B)Jointly shared risk
C)Total company involvement
D)Independent project teams
E)Long-term commitment
سؤال
The driving motive for increasing the use of outsourcing on projects was:

A)Reducing the trade deficit
B)Reducing costs
C)Improving international sales
D)Making products more international in design
E)Securing technology that was not available domestically
سؤال
When you call your Internet provider to solve a technical problem and you end up talking to a technician in India or Romania, you have just experienced:

A)Telecommunications
B)Partnering
C)Outsourcing
D)Service shift
E)Bilingual customer service
سؤال
Recent outsourcing trends have shown an increasing emphasis on the suppliers for all of the following except:

A)Further cost reductions
B)Increased quality of work performed
C)Increased ability to collaborate
D)Increased ability to work together
E)All of these are recent trends
سؤال
Which of the following is part of the traditional project process?

A)Structured communications
B)Long-term commitment
C)Total company involvement
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Key practices in partnering relationships include:

A)Single project contracting
B)Goals and objectives are similar
C)Access to each other's organizational resources
D)Both B and C are correct
E)A, B, and C are all correct
سؤال
To make sure that an outsourcer thoroughly understands your requirements you should:

A)Document your conversations in writing
B)Insist that the outsourcer write the requirements in their own words
C)Request they build a prototype
D)Both A and C are correct
E)A, B, and C are all correct
سؤال
Advantages of outsourcing project work may likely include all of the following except

A)Shortened project completion
B)Reduced costs
C)Higher level of expertise
D)Reduced conflict
E)Increased flexibility
سؤال
Disadvantages of outsourcing project work may likely include all of the following except

A)Increased conflict
B)Coordination breakdowns
C)Increased costs
D)Loss of control
E)More internal morale issues
سؤال
In the "Competing against the Giants" Snapshot from Practice, SATT Control uses which of the following to successfully compete against much larger competitors?

A)Excellent project management
B)Acts as a system integrator
C)Using the same subsystem vendors again and again
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Among the many advantages for establishing long-term partnerships are:

A)Reduced administrative costs
B)Improved performance
C)Improved communication
D)B and C are both correct
E)A, B, and C are all correct
سؤال
Best practices in outsourcing project work include all the following except:

A)Well defined requirements and procedures
B)Training and teambuilding activities
C)Well established conflict management processes
D)Frequent reviews and status updates
E)All of these are best practices
سؤال
The traditional project process includes all of the following except:

A)Independent project teams
B)Shared goals and objectives
C)Single project teams
D)Risk is transferred to the other party
E)Limited objectivity
سؤال
ontracting project work has long been the norm in the _______ industry.

A)Telecommunications
B)Financial
C)Insurance
D)Construction
E)Retail
سؤال
The result of teambuilding among the project's participants is a:

A)Signed contract
B)Legal partnership agreement
C)Project plan
D)Partnering charter
E)Responsibility matrix
سؤال
The process for the transferring of business functions or processes to other, often foreign, companies has traditionally been known as:

A)Subcontracting
B)Downsizing
C)Partnering
D)Joint venture
E)Outsourcing
سؤال
The dovetailing technique is used in which of the following keys to good negotiation?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
سؤال
Which of the following would be included in best practices in outsourcing project work?

A)Establishing long-term relationships
B)Include financial incentives
C)Reduce costs by using tried and true methods
D)A and B are both correct
E)A, B, and C are all correct
سؤال
Contracting project work has long been the norm in the __________ industry.
سؤال
Which of the following is a part of the noncompetitive view of negotiation?

A)Reaching an agreement
B)Implementation phase
C)Review of the completed project
D)Both A and B are correct
E)A, B, and C are all correct
سؤال
Which of the following is suggested as the best target for a customer satisfaction ratio?

A)1.00
B)1.05
C)1.10
D)1.20
E)1.50
سؤال
In the Snapshot from Practice dealing with the Value Engineering Awards program, which branch of the U.S.government was involved?

A)Department of Defense
B)Department of Commerce
C)Department of Transportation
D)N.A.S.A
E)Department of Education
سؤال
Regarding customer relations, advice passed on by veteran project managers includes:

A)Speak with one voice
B)Speak in precise terms
C)Speak the language of the customer
D)Both A and B are correct
E)Both A and C are correct
سؤال
In the research highlight on IT project managers, which of the following was not one of the roles taken by project managers?

A)Entrepreneur
B)Politician
C)Friend
D)Marketer
E)Auditor
سؤال
Which of the following is reflected in the saying "Let anger fly out the window"?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
سؤال
Which of the following is not one of the elements of good negotiation?

A)Be hard on the problem, soft on the people
B)Conflict on a project can be good
C)Negotiation is not a contest
D)Seek first to understand, then to be understood
E)All of these are elements of good negotiation
سؤال
The __________ project, which created a transportation tunnel between France and England, involved more than 250 organizations.
سؤال
Which of the following is reflected in the saying "Seek first to understand, then to be understood"?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
سؤال
Long-term partnerships will provide all the following except:

A)Improved communication
B)More efficient utilization of resources
C)Reduced need for total number of partnerships
D)Lower administrative costs
E)Improved innovation
سؤال
Teambuilding between partners should:

A)Include engineers, architects, lawyers, specialists and other staff
B)Be facilitated by an outside consultant
C)Not take more than one day
D)A and B are both correct
E)A, B, and C are all correct
سؤال
Customer satisfaction can be quantitified by:

A)Perceived performance divided by actual performance
B)Actual performance divided by expected performance
C)Perceived performance divided by expected performance
D)Actual performance divided by perceived performance
E)Expected performance divided by actual performance
سؤال
In a partnering relationship, ________ is shared jointly among the partners, which encourages innovation and continuous improvement.
سؤال
Which of the following is not one of the key points of principled negotiation?

A)Use objective criteria when possible
B)Be honest and forthright
C)Focus on interests, not positions
D)Separate the people from the problem
E)Invent options for mutual gain
سؤال
In a partnering relationship, ________ forms the basis for strong working relationships.
سؤال
In traditional project relationships, ________ are structured and guarded.
سؤال
In traditional project relationships, ________ is limited due to fear of reprisal and lack of continuous improvement opportunity.
سؤال
Projects are more prone to interpersonal _________ because the different participants do not share the same values, priorities, and culture.
سؤال
There is a potential loss of __________ over a project when the core team depends on other organizations that they do not have direct authority over.
سؤال
Toyota and Daimen-Chrysler collaborating with suppliers to develop new automobile platforms is an example of outsourcing.
سؤال
"Let anger fly out of the window" is an example of the ___________ key point of negotiation.
سؤال
In Ohio before starting a bond-financed ____________, projects management consultants and the related parties get together to figure out how to talk to each others and how to handle problems.
سؤال
_______ satisfaction is measured by the ratio of perceived performance to expected performance.
سؤال
The term __________ has traditionally been applied to the transferring of business functions or processes to other, often foreign, companies.
سؤال
__________ is a major advantage of outsourcing project work because companies can secure competitive prices for contracted services, especially if the work can be outsourced offshore.
سؤال
High levels of __________ and technology can be brought to bear on a project by using contracted services.
سؤال
Fisher and Ury champion the ________ approach to negotiation because it emphasizes win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
سؤال
Explaining why a critical task must be done by a specific time is an example of the ___________ key point of negotiation.
سؤال
As part of an effort to cut costs the United States Department of Defense issues annual __________.
سؤال
Breakdowns in __________ of professionals from different organizations can occur if the project work requires close collaboration and mutual adjustment.
سؤال
Dividing perceived performance by expected performance will calculate __________.
سؤال
Many outsourced projects operate in a _________ environment in which people are linked by computers, faxes, computer-aided design systems, and video teleconferencing.
سؤال
Contracting project services can increase a firm's _________ by no longer being constrained by their own resources.
سؤال
In the Snapshot from Practice involving SATT Control, a Swedish electronics firm, the company referred to one of its competencies as being a ________ who subcontracts the subsystems to other firms.
سؤال
There is little disagreement that __________ was the primary motive behind outsourcing project work.
سؤال
The best defense against unreasonable, win/lose negotiators is having what Fisher and Ury call a strong __________.
سؤال
Not only can contracted project work be cheaper, it can also be done __________.
سؤال
In the traditional method of managing projects, total company involvement requires commitment from CEO to team members.
سؤال
Increased conflict and loss of coordination are typical disadvantages of outsourcing project work.
سؤال
A prime consideration in choosing outsourcing vendors is to assess the fit with their project management system.
سؤال
In project negotiation each negotiator is out to win as much as he or she can for their side.
سؤال
In partnering, each party's goals and objectives are similar but geared to what is best for them.
سؤال
Principled Negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
سؤال
Because English is the language of business, it is not necessary to speak in a direct manner using short sentences made of basic, simple words as this may taken as an insult.
سؤال
Trust can be difficult to forge when interactions are limited and people come from different organizations.
سؤال
Working in outsourcing teams, projects can be completed faster and more cheaply.
سؤال
As part of an effort to cut costs, the United States Department of Defense issues annual Value Engineering Awards.
سؤال
Experience indicates that co-location of project teams is not worth the extra costs.
سؤال
Team-building workshops with outsourcing vendors is usually led by an outside consultant who is an expert in designing and facilitating such workshops.
سؤال
By keeping the focus on the issues and not the personalities, negotiators are better able to let the other person blow off steam.
سؤال
In partnering, access to each other's organization resources is available.
سؤال
All conversations with outsourcers should be followed up with commitments documented in writing since they are likely to understand written English better than spoken English.
سؤال
Participants from different organizations working close together at the construction site or in shared office space is an example of a virtual team.
سؤال
A partnering charter states the common goals for the project as well as the procedures that will be used to achieve these goals.
سؤال
In some countries, laws are considered to be guidelines that are not necessarily followed.
سؤال
For people in some countries, a written, signed contract is merely a suggestion.
سؤال
It is a good idea to add a penalty clause to an outsourcing agreement because deadlines are often taken as a suggestion rather than a commitment.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Outsourcing: Managing Interorganizational Relations
1
Which of the following did the state of Ohio do before starting a bond-financed school construction project?

A)Create a specific RFP (request for proposal)
B)Have a dress rehearsal
C)Reviews the performance of contractors on past projects
D)Both A and C are correct
E)A, B, and C are all correct
B
Explanation: Before starting a bond-financed school construction project, Ohio does what a theater company does before opening night-it holds a dress rehearsal.Just as a theatrical dress rehearsal can allow a company to find and fix glitches before they ruin a show, preconstruction partnering can find early solutions to problems before they become lawsuits.For example, during the discussions it becomes apparent that different parties are interpreting a key requirement differently.Instead of waiting for this difference to escalate into a major problem, the parties reach a shared understanding before work begins.
2
Which of the following is not a potential part of the outsourcing concept?

A)Computers
B)Faxes
C)Computer-aided design systems
D)Video teleconferencing
E)All the above are correct
E
Explanation: Many outsourced projects operate in a virtual environment in which people are linked by computers, faxes, computer-aided design systems, and video teleconferencing.
3
In the Snapshot from Practice "Strategies for Communicating with Outsourcers," which of the following was not one of the suggested strategies?

A)Recognize cultural differences
B)Use a translator to make sure everyone understands
C)Choose the right words
D)Confirm your requirements
E)Set deadlines
B
4
To avoid problems with schedules and deadlines you should:

A)Develop detailed schedules
B)Hold frequent status reviews
C)Add a penalty clause to the contract
D)Hold frequent conversations with the outsourcer
E)Build extra time into the schedules that the outsourcer is not aware of
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is not a key to successful partnering relationships?

A)Mutual trust
B)Jointly shared risk
C)Total company involvement
D)Independent project teams
E)Long-term commitment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
The driving motive for increasing the use of outsourcing on projects was:

A)Reducing the trade deficit
B)Reducing costs
C)Improving international sales
D)Making products more international in design
E)Securing technology that was not available domestically
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
When you call your Internet provider to solve a technical problem and you end up talking to a technician in India or Romania, you have just experienced:

A)Telecommunications
B)Partnering
C)Outsourcing
D)Service shift
E)Bilingual customer service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
Recent outsourcing trends have shown an increasing emphasis on the suppliers for all of the following except:

A)Further cost reductions
B)Increased quality of work performed
C)Increased ability to collaborate
D)Increased ability to work together
E)All of these are recent trends
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is part of the traditional project process?

A)Structured communications
B)Long-term commitment
C)Total company involvement
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
Key practices in partnering relationships include:

A)Single project contracting
B)Goals and objectives are similar
C)Access to each other's organizational resources
D)Both B and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
To make sure that an outsourcer thoroughly understands your requirements you should:

A)Document your conversations in writing
B)Insist that the outsourcer write the requirements in their own words
C)Request they build a prototype
D)Both A and C are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
Advantages of outsourcing project work may likely include all of the following except

A)Shortened project completion
B)Reduced costs
C)Higher level of expertise
D)Reduced conflict
E)Increased flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
Disadvantages of outsourcing project work may likely include all of the following except

A)Increased conflict
B)Coordination breakdowns
C)Increased costs
D)Loss of control
E)More internal morale issues
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
In the "Competing against the Giants" Snapshot from Practice, SATT Control uses which of the following to successfully compete against much larger competitors?

A)Excellent project management
B)Acts as a system integrator
C)Using the same subsystem vendors again and again
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
Among the many advantages for establishing long-term partnerships are:

A)Reduced administrative costs
B)Improved performance
C)Improved communication
D)B and C are both correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Best practices in outsourcing project work include all the following except:

A)Well defined requirements and procedures
B)Training and teambuilding activities
C)Well established conflict management processes
D)Frequent reviews and status updates
E)All of these are best practices
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
The traditional project process includes all of the following except:

A)Independent project teams
B)Shared goals and objectives
C)Single project teams
D)Risk is transferred to the other party
E)Limited objectivity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
ontracting project work has long been the norm in the _______ industry.

A)Telecommunications
B)Financial
C)Insurance
D)Construction
E)Retail
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
The result of teambuilding among the project's participants is a:

A)Signed contract
B)Legal partnership agreement
C)Project plan
D)Partnering charter
E)Responsibility matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
The process for the transferring of business functions or processes to other, often foreign, companies has traditionally been known as:

A)Subcontracting
B)Downsizing
C)Partnering
D)Joint venture
E)Outsourcing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
The dovetailing technique is used in which of the following keys to good negotiation?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following would be included in best practices in outsourcing project work?

A)Establishing long-term relationships
B)Include financial incentives
C)Reduce costs by using tried and true methods
D)A and B are both correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
Contracting project work has long been the norm in the __________ industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is a part of the noncompetitive view of negotiation?

A)Reaching an agreement
B)Implementation phase
C)Review of the completed project
D)Both A and B are correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is suggested as the best target for a customer satisfaction ratio?

A)1.00
B)1.05
C)1.10
D)1.20
E)1.50
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
In the Snapshot from Practice dealing with the Value Engineering Awards program, which branch of the U.S.government was involved?

A)Department of Defense
B)Department of Commerce
C)Department of Transportation
D)N.A.S.A
E)Department of Education
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
Regarding customer relations, advice passed on by veteran project managers includes:

A)Speak with one voice
B)Speak in precise terms
C)Speak the language of the customer
D)Both A and B are correct
E)Both A and C are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
In the research highlight on IT project managers, which of the following was not one of the roles taken by project managers?

A)Entrepreneur
B)Politician
C)Friend
D)Marketer
E)Auditor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is reflected in the saying "Let anger fly out the window"?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is not one of the elements of good negotiation?

A)Be hard on the problem, soft on the people
B)Conflict on a project can be good
C)Negotiation is not a contest
D)Seek first to understand, then to be understood
E)All of these are elements of good negotiation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
The __________ project, which created a transportation tunnel between France and England, involved more than 250 organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is reflected in the saying "Seek first to understand, then to be understood"?

A)Separate people from the problem
B)Be honest
C)Focus on interests, not positions
D)Invent options for mutual gain
E)When possible, use objective criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Long-term partnerships will provide all the following except:

A)Improved communication
B)More efficient utilization of resources
C)Reduced need for total number of partnerships
D)Lower administrative costs
E)Improved innovation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
Teambuilding between partners should:

A)Include engineers, architects, lawyers, specialists and other staff
B)Be facilitated by an outside consultant
C)Not take more than one day
D)A and B are both correct
E)A, B, and C are all correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
Customer satisfaction can be quantitified by:

A)Perceived performance divided by actual performance
B)Actual performance divided by expected performance
C)Perceived performance divided by expected performance
D)Actual performance divided by perceived performance
E)Expected performance divided by actual performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
In a partnering relationship, ________ is shared jointly among the partners, which encourages innovation and continuous improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is not one of the key points of principled negotiation?

A)Use objective criteria when possible
B)Be honest and forthright
C)Focus on interests, not positions
D)Separate the people from the problem
E)Invent options for mutual gain
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
In a partnering relationship, ________ forms the basis for strong working relationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
In traditional project relationships, ________ are structured and guarded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
In traditional project relationships, ________ is limited due to fear of reprisal and lack of continuous improvement opportunity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
Projects are more prone to interpersonal _________ because the different participants do not share the same values, priorities, and culture.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
There is a potential loss of __________ over a project when the core team depends on other organizations that they do not have direct authority over.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
Toyota and Daimen-Chrysler collaborating with suppliers to develop new automobile platforms is an example of outsourcing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
"Let anger fly out of the window" is an example of the ___________ key point of negotiation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
In Ohio before starting a bond-financed ____________, projects management consultants and the related parties get together to figure out how to talk to each others and how to handle problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
_______ satisfaction is measured by the ratio of perceived performance to expected performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
The term __________ has traditionally been applied to the transferring of business functions or processes to other, often foreign, companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
__________ is a major advantage of outsourcing project work because companies can secure competitive prices for contracted services, especially if the work can be outsourced offshore.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
High levels of __________ and technology can be brought to bear on a project by using contracted services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
Fisher and Ury champion the ________ approach to negotiation because it emphasizes win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
Explaining why a critical task must be done by a specific time is an example of the ___________ key point of negotiation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
As part of an effort to cut costs the United States Department of Defense issues annual __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Breakdowns in __________ of professionals from different organizations can occur if the project work requires close collaboration and mutual adjustment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
Dividing perceived performance by expected performance will calculate __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
Many outsourced projects operate in a _________ environment in which people are linked by computers, faxes, computer-aided design systems, and video teleconferencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
Contracting project services can increase a firm's _________ by no longer being constrained by their own resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
In the Snapshot from Practice involving SATT Control, a Swedish electronics firm, the company referred to one of its competencies as being a ________ who subcontracts the subsystems to other firms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
There is little disagreement that __________ was the primary motive behind outsourcing project work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
The best defense against unreasonable, win/lose negotiators is having what Fisher and Ury call a strong __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
Not only can contracted project work be cheaper, it can also be done __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
In the traditional method of managing projects, total company involvement requires commitment from CEO to team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
Increased conflict and loss of coordination are typical disadvantages of outsourcing project work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
A prime consideration in choosing outsourcing vendors is to assess the fit with their project management system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
In project negotiation each negotiator is out to win as much as he or she can for their side.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
In partnering, each party's goals and objectives are similar but geared to what is best for them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
Principled Negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
Because English is the language of business, it is not necessary to speak in a direct manner using short sentences made of basic, simple words as this may taken as an insult.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
Trust can be difficult to forge when interactions are limited and people come from different organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Working in outsourcing teams, projects can be completed faster and more cheaply.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
As part of an effort to cut costs, the United States Department of Defense issues annual Value Engineering Awards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
Experience indicates that co-location of project teams is not worth the extra costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
Team-building workshops with outsourcing vendors is usually led by an outside consultant who is an expert in designing and facilitating such workshops.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
By keeping the focus on the issues and not the personalities, negotiators are better able to let the other person blow off steam.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
In partnering, access to each other's organization resources is available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
All conversations with outsourcers should be followed up with commitments documented in writing since they are likely to understand written English better than spoken English.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
Participants from different organizations working close together at the construction site or in shared office space is an example of a virtual team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
A partnering charter states the common goals for the project as well as the procedures that will be used to achieve these goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
In some countries, laws are considered to be guidelines that are not necessarily followed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
For people in some countries, a written, signed contract is merely a suggestion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
It is a good idea to add a penalty clause to an outsourcing agreement because deadlines are often taken as a suggestion rather than a commitment.