Camber refers to

A)upward deflection of a beam to counter downward deflection by a dead load plus a live load.
B)downward deflection of a beam.
C)upward deflection of a beam to counter downward deflection by a live load.
D)upward deflection of a beam to counter downward deflection by a dead load.
E)none of the above.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
If the floor of a steel- frame building has only primary and secondary components, the secondary components consist of

A)steel joists.
B)floor deck.
C)joist girders.
D)W- section beams.
E)none of the above.
سؤال
The preliminary framing layout of a building is generally prepared by the

A)steel fabricator.
B)project's structural engineer.
C)general contractor.
D)project architect.
E)none of the above.
سؤال
The erection of structural steel members is generally done by the

A)steel detailer.
B)structural engineer.
C)general contractor.
D)American Institute of Steel Construction.
E)none of the above.
سؤال
In a column splice detail, a butt plate is required when

A)the upper- story column is much larger in height than the lower- story column.
B)the upper- story column is the same height as the lower- story column.
C)the upper- story column has the same cross- sectional dimensions as the lower- story column.
D)the upper- story column is much smaller in height than the lower- story column.
E)none of the above.
سؤال
Which of the following is not an ASTM designation for steel bolts?

A)A507 bolts
B)A490 bolts
C)A325 bolts
D)A307 bolts
سؤال
The fabrication of structural steel components is done based on

A)structural construction drawings.
B)architectural construction drawings.
C)both A and B.
D)shop drawings.
E)none of the above.
سؤال
In a multistory steel- frame building, the columns are generally spliced

A)every two floors.
B)every floor.
C)every three floors.
D)every four floors.
E)none of the above.
سؤال
A shear connection between a steel beam and a steel column can be made without connecting beam flanges to the column.
سؤال
Field bolting of steel members is generally preferred over field welding.
سؤال
The preliminary framing layout of a steel- frame building is generally presented in

A)plan view.
B)elevation view.
C)three- dimensional view.
D)all of the above.
E)none of the above.
سؤال
A slip- critical connection between framing members is obtained by

A)welding the members together using gas welding.
B)bolting the members and tightening them with a spud wrench.
C)bolting the members and tightening them with a spud wrench using full force.
D)welding the members together using arc welding.
E)none of the above.
سؤال
A shear connection between a steel beam and a steel column is also called

A)a rigid connection.
B)a simple connection.
C)a semirigid connection.
D)an AISC Type I connection.
E)none of the above.
سؤال
If the floor of a steel- frame building has primary, secondary, and tertiary components, the tertiary components consist of

A)joist girders.
B)W- section beams.
C)steel joists.
D)any one of the above.
E)none of the above.
سؤال
In connecting the upper- column shaft with a lower- column shaft in a multistory steel- frame building, we generally require

A)one flange plate.
B)four flange plates.
C)three flange plates.
D)two flange plates.
سؤال
The installation of a floor or roof deck is done by

A)the erector.
B)the general contractor.
C)the manufacturer of the deck.
D)A, B, or C.
E)A or B.
سؤال
If the floor of a steel- frame building has primary, secondary, and tertiary components, the secondary components consist of

A)W- shape beams.
B)steel joists.
C)steel joist girders.
D)any one of the above.
E)A or B.
سؤال
A rigid connection between a steel beam and a steel column can be made without connecting beam flanges to the column.
سؤال
A snug- tight connection between framing members is obtained by

A)welding the members together using gas welding.
B)welding the members together using arc welding.
C)bolting the members and tightening them with a spud wrench using full force.
D)bolting the members and tightening them with a spud wrench.
E)none of the above.
سؤال
Details of connections between structural steel members are prepared by the

A)architect.
B)structural engineer.
C)both A and B.
D)general contractor.
E)none of the above.
سؤال
What is the difference between a primary beam and a secondary beam in a steel frame structure?
سؤال
To level a column so that it is plumb,

A)leveling bolts are used.
B)high- strength plastic shims are used.
C)steel shims are used.
D)any one of the above.
E)none of the above.
سؤال
Steel frame members are connected together either through welding or bolting. The connections may be accomplished either at the site or in the fabricator's shop. Which method is preferred for site- made connections and why?
سؤال
A multistory steel- frame structure must be provided with a central shear core.
سؤال
The term racking refers to the effect produced on the structure mainly by

A)roof live load.
B)floor live loads.
C)dead loads.
D)lateral loads.
E)none of the above.
سؤال
In connecting a steel column to concrete foundations, anchor bolts are used. These bolts are embedded into the foundation by

A)a specialized bolt- embedding outfit.
B)the erector.
C)the general contractor.
D)the fabricator.
E)none of the above.
سؤال
Which steel sections are commonly used for columns and which for beams?
سؤال
Which components of a steel frame structure are used to resist the lateral loads?
سؤال
Eccentric K- bracing is generally recommended for use

A)because it increases frame stability more than other forms of bracing.
B)because it is more economical than other forms of bracing.
C)in seismic regions.
D)in hurricane- prone regions.
E)all of the above.
سؤال
In steel construction, the structural steel members are brought to the construction site in precut lengths and connected together at the site according to the detail drawings. Who prepares the details of connections between the components?
سؤال
The difference between diagonal bracing and K- bracing between steel columns is that

A)K- bracing members also carry some gravity loads, while diagonal framing members do not.
B)K- bracing members are heavier than diagonal bracing members.
C)K- bracing provides less spatial interruption than diagonal bracing.
D)all of the above.
E)none of the above.
سؤال
Which of the two-a rigid frame or a braced frame-provides greater structural stiffness, that is, greater lateral stability?

A)Rigid frame
B)Braced frame
سؤال
What is a framing layout?
سؤال
The floor of a steel frame building consists of primary beams and secondary beams. Which of these two members directly support the deck?
سؤال
A braced- frame steel structure is generally more economical than a comparable rigid- frame structure.
سؤال
Are steel detailers generally independent professionals like most structural engineers?
سؤال
The central shear core in a steel- frame building

A)should consist of steel- braced frames along both directions of the building.
B)should consist of reinforced concrete walls in both directions of the building.
C)either A or B.
D)should consist of reinforced concrete walls in one direction of the building and steel- braced frames in the other direction.
سؤال
In a braced- frame steel structure, the braced bays

A)may be provided on the exterior facade or the interior of the building.
B)may be provided on the exterior facade, the interior of the building, or both.
C)should be provided only on the exterior facade of the building.
D)should be provided on both the exterior facade and the interior of the building.
E)should be provided only in the interior of the building.
سؤال
A steel column may or may not need a base plate at the bottom.
سؤال
A steel- frame building may consist of either a rigid frame or a braced frame. A combination of the two systems (braced- and rigid- frame systems)cannot be used in the same building.
سؤال
The column- to- beam connection can either be a shear connection or a moment connection. Which of these two connections is used in a rigid frame?
سؤال
Explain what the term framing plan means. What information does a framing plan include?
سؤال
Is fabrication of steel components and their erection at site performed by the same contractor or different subcontractors?
سؤال
Explain the pros and cons of welding versus bolting in steel structures.
سؤال
Explain the roles of the general contractor, fabricator, and erector of a structural steel building.
سؤال
The column- to- beam connection can either be a shear connection or a moment connection. Which of these two connections is used in a braced frame?
سؤال
Each steel column is provided with a base plate. Is the base plate bolted or welded to the column and where-at the site or in fabricator's shop?
سؤال
Steel frame members are connected together through welding or bolting. The connections may be accomplished at the site or in the fabricator's shop. Which method is preferred for shop- made connections and why?
سؤال
With the help of sketches and notes, explain the difference between a simple connection and a rigid connection between a wide- flange column and a wide- flange beam.
سؤال
The connections in a steel- frame structure consist of: (i)column- to- beam connection, (ii)beam- to- beam connection, and (iii)column- to- column connection. Which of the three connections requires the use of long splice plates?
سؤال
In a typical structural steel floor or roof framing, there are three types of elements, called primary, secondary, and tertiary elements. Explain what these are and what material(s)they consist of.
سؤال
Using sketches and notes, explain how the joists and joist girders are stabilized against overturning.
سؤال
What is camber? In which structural members is it provided and why?
سؤال
Is AISC Type II connection a shear connection or a moment connection?
سؤال
With the help of sketches and notes, explain the connection of a column of an upper floor with that of a lower floor.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Structural Steel Construction
1
Camber refers to

A)upward deflection of a beam to counter downward deflection by a dead load plus a live load.
B)downward deflection of a beam.
C)upward deflection of a beam to counter downward deflection by a live load.
D)upward deflection of a beam to counter downward deflection by a dead load.
E)none of the above.
D
2
If the floor of a steel- frame building has only primary and secondary components, the secondary components consist of

A)steel joists.
B)floor deck.
C)joist girders.
D)W- section beams.
E)none of the above.
B
3
The preliminary framing layout of a building is generally prepared by the

A)steel fabricator.
B)project's structural engineer.
C)general contractor.
D)project architect.
E)none of the above.
D
4
The erection of structural steel members is generally done by the

A)steel detailer.
B)structural engineer.
C)general contractor.
D)American Institute of Steel Construction.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
In a column splice detail, a butt plate is required when

A)the upper- story column is much larger in height than the lower- story column.
B)the upper- story column is the same height as the lower- story column.
C)the upper- story column has the same cross- sectional dimensions as the lower- story column.
D)the upper- story column is much smaller in height than the lower- story column.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is not an ASTM designation for steel bolts?

A)A507 bolts
B)A490 bolts
C)A325 bolts
D)A307 bolts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
The fabrication of structural steel components is done based on

A)structural construction drawings.
B)architectural construction drawings.
C)both A and B.
D)shop drawings.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
In a multistory steel- frame building, the columns are generally spliced

A)every two floors.
B)every floor.
C)every three floors.
D)every four floors.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
A shear connection between a steel beam and a steel column can be made without connecting beam flanges to the column.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
Field bolting of steel members is generally preferred over field welding.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
The preliminary framing layout of a steel- frame building is generally presented in

A)plan view.
B)elevation view.
C)three- dimensional view.
D)all of the above.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
A slip- critical connection between framing members is obtained by

A)welding the members together using gas welding.
B)bolting the members and tightening them with a spud wrench.
C)bolting the members and tightening them with a spud wrench using full force.
D)welding the members together using arc welding.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
A shear connection between a steel beam and a steel column is also called

A)a rigid connection.
B)a simple connection.
C)a semirigid connection.
D)an AISC Type I connection.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
If the floor of a steel- frame building has primary, secondary, and tertiary components, the tertiary components consist of

A)joist girders.
B)W- section beams.
C)steel joists.
D)any one of the above.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
In connecting the upper- column shaft with a lower- column shaft in a multistory steel- frame building, we generally require

A)one flange plate.
B)four flange plates.
C)three flange plates.
D)two flange plates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
The installation of a floor or roof deck is done by

A)the erector.
B)the general contractor.
C)the manufacturer of the deck.
D)A, B, or C.
E)A or B.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
If the floor of a steel- frame building has primary, secondary, and tertiary components, the secondary components consist of

A)W- shape beams.
B)steel joists.
C)steel joist girders.
D)any one of the above.
E)A or B.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
A rigid connection between a steel beam and a steel column can be made without connecting beam flanges to the column.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
A snug- tight connection between framing members is obtained by

A)welding the members together using gas welding.
B)welding the members together using arc welding.
C)bolting the members and tightening them with a spud wrench using full force.
D)bolting the members and tightening them with a spud wrench.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
Details of connections between structural steel members are prepared by the

A)architect.
B)structural engineer.
C)both A and B.
D)general contractor.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is the difference between a primary beam and a secondary beam in a steel frame structure?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
To level a column so that it is plumb,

A)leveling bolts are used.
B)high- strength plastic shims are used.
C)steel shims are used.
D)any one of the above.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
Steel frame members are connected together either through welding or bolting. The connections may be accomplished either at the site or in the fabricator's shop. Which method is preferred for site- made connections and why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
A multistory steel- frame structure must be provided with a central shear core.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
The term racking refers to the effect produced on the structure mainly by

A)roof live load.
B)floor live loads.
C)dead loads.
D)lateral loads.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
In connecting a steel column to concrete foundations, anchor bolts are used. These bolts are embedded into the foundation by

A)a specialized bolt- embedding outfit.
B)the erector.
C)the general contractor.
D)the fabricator.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which steel sections are commonly used for columns and which for beams?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which components of a steel frame structure are used to resist the lateral loads?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
Eccentric K- bracing is generally recommended for use

A)because it increases frame stability more than other forms of bracing.
B)because it is more economical than other forms of bracing.
C)in seismic regions.
D)in hurricane- prone regions.
E)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
In steel construction, the structural steel members are brought to the construction site in precut lengths and connected together at the site according to the detail drawings. Who prepares the details of connections between the components?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
The difference between diagonal bracing and K- bracing between steel columns is that

A)K- bracing members also carry some gravity loads, while diagonal framing members do not.
B)K- bracing members are heavier than diagonal bracing members.
C)K- bracing provides less spatial interruption than diagonal bracing.
D)all of the above.
E)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the two-a rigid frame or a braced frame-provides greater structural stiffness, that is, greater lateral stability?

A)Rigid frame
B)Braced frame
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
What is a framing layout?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
The floor of a steel frame building consists of primary beams and secondary beams. Which of these two members directly support the deck?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
A braced- frame steel structure is generally more economical than a comparable rigid- frame structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
Are steel detailers generally independent professionals like most structural engineers?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
The central shear core in a steel- frame building

A)should consist of steel- braced frames along both directions of the building.
B)should consist of reinforced concrete walls in both directions of the building.
C)either A or B.
D)should consist of reinforced concrete walls in one direction of the building and steel- braced frames in the other direction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
In a braced- frame steel structure, the braced bays

A)may be provided on the exterior facade or the interior of the building.
B)may be provided on the exterior facade, the interior of the building, or both.
C)should be provided only on the exterior facade of the building.
D)should be provided on both the exterior facade and the interior of the building.
E)should be provided only in the interior of the building.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
A steel column may or may not need a base plate at the bottom.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
A steel- frame building may consist of either a rigid frame or a braced frame. A combination of the two systems (braced- and rigid- frame systems)cannot be used in the same building.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
The column- to- beam connection can either be a shear connection or a moment connection. Which of these two connections is used in a rigid frame?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
Explain what the term framing plan means. What information does a framing plan include?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
Is fabrication of steel components and their erection at site performed by the same contractor or different subcontractors?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
Explain the pros and cons of welding versus bolting in steel structures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
Explain the roles of the general contractor, fabricator, and erector of a structural steel building.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
The column- to- beam connection can either be a shear connection or a moment connection. Which of these two connections is used in a braced frame?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
Each steel column is provided with a base plate. Is the base plate bolted or welded to the column and where-at the site or in fabricator's shop?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
Steel frame members are connected together through welding or bolting. The connections may be accomplished at the site or in the fabricator's shop. Which method is preferred for shop- made connections and why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
With the help of sketches and notes, explain the difference between a simple connection and a rigid connection between a wide- flange column and a wide- flange beam.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
The connections in a steel- frame structure consist of: (i)column- to- beam connection, (ii)beam- to- beam connection, and (iii)column- to- column connection. Which of the three connections requires the use of long splice plates?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
In a typical structural steel floor or roof framing, there are three types of elements, called primary, secondary, and tertiary elements. Explain what these are and what material(s)they consist of.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
Using sketches and notes, explain how the joists and joist girders are stabilized against overturning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
What is camber? In which structural members is it provided and why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
Is AISC Type II connection a shear connection or a moment connection?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
With the help of sketches and notes, explain the connection of a column of an upper floor with that of a lower floor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.