Deck 15: The Systems Development Life Cycle and Project Management: Addressing the Challenges of Building Ais Systems

ملء الشاشة (f)
exit full mode
سؤال
The systems development life cycle has five phases: Planning,Analysis,Design,Implementation and Maintenance.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project sponsor is generally the same person as the project manager.
سؤال
The 100% Rule is a rule requiring 100% planning of all external tasks.
سؤال
The breakdown of all of the project tasks needed for completion is often called the work breakdown structure.
سؤال
Tasks that must be completed in a specific sequence but don't require additional resources or a specific completion time are considered to have task dependency.
سؤال
The design phase of the SDLC begins with a business need for a new or better information system.
سؤال
The triple constraints of project management are also referred to as Dempster's triangle.
سؤال
The Technology Acceptance Model defines perceived usefulness as the extent to which a person believes that the use of a particular system would be free of effort.
سؤال
The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the desired schedule,it will likely never recoup the time or cost necessary to be considered successful.
سؤال
The triple constraints of project management include time,scope,and effort.
سؤال
Control Objectives for Information and related Technology (CobIT)provides managers,auditors,and IT users with a set of generally accepted measurements,processes,indicators,and best practices to assist them in maximizing the benefits derived through the use of information technology.
سؤال
Parallel or concurrent tasks are tasks that be done at the same time.
سؤال
The analysis phase of the SDLC involves a complete,detailed analysis of the systems needs of the end user.
سؤال
The maintenance phase of the SDLC is the final phase of the SDLC and includes making changes,corrections,additions,and upgrades (generally smaller in scope)to ensure the system continues to meet the business requirements that have been set out for it.
سؤال
Control Objectives for Information and related Technology's (CobIT)guidance is guided by a structure that corresponds to the SDLC,namely: Plan and Organize,Acquire and Implement,Deliver and Support and Monitor and Evaluate.
سؤال
Segregation of duties can be the source of IT material weaknesses when assessing the effectiveness of internal controls over the company's accounting information system.
سؤال
PERT is actually an acronym for Program Evaluation Review Tool.
سؤال
The project sponsor generally obtains necessary resources for successful project completion.
سؤال
The Project Manager is the lead member of the project team that is responsible for the project.
سؤال
The Technology Acceptance Model defines perceived ease of use as users adopting a new or modified system to the extent they believe the system will help them perform their job better.
سؤال
As part of effective IT planning in systems development life cycle,a return on investment (ROI)calculation may be performed as part of the economic feasibility analysis.Often,many of the benefits from a new information system may be intangible benefits (e.g.system is easier to use or system enhances customer service,etc.)that are hard to quantify in an income statement.What are some intangible benefits of a state-of-the-art course registration system at your college or university?
سؤال
The PERT and Gantt charts primarily address the triple constraint of:

A) Technical issues
B) Time
C) Cost
D) Scope
سؤال
Let's suppose that Wal-Mart wants to make sure its top-selling products are placed on the modular shelves at the right level for customers to find and buy.Using Wal-Mart as an example,explain what types of activities would occur in each of the five phases of the systems development life cycle in preparation for this providing this type of information to Wal-Mart and its suppliers.
سؤال
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Relevant Scope
B) Reassessment
C) Reliability
D) Benefits Realization
سؤال
Which phase of the systems development life cycle includes transforming the plan from the design phase into an actual,functioning system:

A) Implementation Phase
B) Maintenance phase
C) Analysis phase
D) Design Phase
سؤال
The triple constraint of project management includes the constraint of:

A) Technical issues
B) Time
C) Adoption
D) Usability
سؤال
The Technology Acceptance Model predicts:

A) Whether a new system is needed.
B) Whether the system will be adopted.
C) When and how the system will be modified to induce acceptance.
D) Which type of smart phone will be more successful in the marketplace.
سؤال
In 2009,_____ of the projects failed or were challenged.

A) 82%
B) 68%
C) 49%
D) 35%
سؤال
In this chapter,project management is defined as:

A) The process of carrying out the systems development life cycle to achieve an intended outcome.
B) Making sure all of the inputs are available to complete the project.
C) Writing the software code for the entire project.
D) Managing the project through the implementation phase.
سؤال
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Relevant Timeframe
B) Timeliness
C) Measurable Performance
D) Benefits Realization
سؤال
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Alignment
B) Unbiased
C) Measurable Performance
D) Achievability
سؤال
The Sarbanes-Oxley Act's 404 Reports require management and auditors to report on

A) The current financial condition of the firm and perceived threats to its financial condition.
B) The academic background and experience of the company's accounting leadership.
C) The effectiveness of the internal controls of the company's accounting information system.
D) The quality of the project management planning.
سؤال
Which phase of the systems development life cycle would describe in detail the desired features of the system?

A) Analysis phase
B) Planning phase
C) Design Phase
D) Implementation Phase
سؤال
The critical path in a PERT chart represents:

A) The tasks that must be completed without errors.
B) The path of processes that is critical for system adoption.
C) The most important tasks of the whole project.
D) The longest path of tasks needed for project completion.
سؤال
The final phase of the systems development life cycle is the

A) Analysis phase
B) Maintenance phase
C) Design Phase
D) Implementation Phase
سؤال
The 100% rule suggests that before a PERT chart is done,a project manager must:

A) Make sure 100% of the project is funded.
B) Make sure the project team is devoted solely or 100%, to this project.
C) Make sure that each person on the project team got 100% on their project management final exam.
D) Make sure 100% of the project tasks are defined.
سؤال
A project sponsor is generally defined as:

A) A senior executive that will sponsor, or pay for, the project.
B) A senior executive in the company who takes responsibility for the success of the project.
C) The CEO of the company that likes technology.
D) The system's primary user.
سؤال
The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the desired schedule,it will:

A) Likely only have 15% of the desired benefits.
B) Likely never recoup the time or cost necessary to be considered successful.
C) Have a small likelihood of ever being adopted by system users.
D) Likely be cancelled by the project sponsor.
سؤال
Brainstorm a list of reasons why 68% (including 44% challenged + 24% failed)of the information technology projects either failed or were challenged in 2009.Consider specifics of each of the elements of the triple constraints model and any other common delays including the challenges of working with programmers,software and hardware suppliers and vendors,etc.What is the best way to overcome these issues and decrease the number of projects failed or challenged?
سؤال
Accountants generally do not have all of the necessary systems analyst and systems development skills needed to develop accounting information systems.What skills do accountants have that systems analysts do not have,particularly with respect to a financial reporting system?
سؤال
Tyson Foods (pork,chicken,beef producer)is implementing its SAP system throughout its worldwide operations.If Tyson has the choice,should it implement this system in Brazil before,at the same time,or after the implementation in the United States? Use the Technology Acceptance Model as a model (in particular,perceived ease of use)to explain your answer.
سؤال
What is the difference in roles between a project sponsor and a project manager? Why are they each important?
سؤال
Explain how the Technology Acceptance Model can be used as a useful tool in planning an IT project.
سؤال
What can be done to combat scope creep?
سؤال
Explain how the Technology Acceptance Model can be used as a useful tool in modifying an IT project.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: The Systems Development Life Cycle and Project Management: Addressing the Challenges of Building Ais Systems
1
The systems development life cycle has five phases: Planning,Analysis,Design,Implementation and Maintenance.
True
2
The project sponsor is generally the same person as the project manager.
False
3
The 100% Rule is a rule requiring 100% planning of all external tasks.
False
4
The breakdown of all of the project tasks needed for completion is often called the work breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
5
Tasks that must be completed in a specific sequence but don't require additional resources or a specific completion time are considered to have task dependency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
6
The design phase of the SDLC begins with a business need for a new or better information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
7
The triple constraints of project management are also referred to as Dempster's triangle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
8
The Technology Acceptance Model defines perceived usefulness as the extent to which a person believes that the use of a particular system would be free of effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
9
The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the desired schedule,it will likely never recoup the time or cost necessary to be considered successful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
10
The triple constraints of project management include time,scope,and effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
11
Control Objectives for Information and related Technology (CobIT)provides managers,auditors,and IT users with a set of generally accepted measurements,processes,indicators,and best practices to assist them in maximizing the benefits derived through the use of information technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
12
Parallel or concurrent tasks are tasks that be done at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
13
The analysis phase of the SDLC involves a complete,detailed analysis of the systems needs of the end user.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
14
The maintenance phase of the SDLC is the final phase of the SDLC and includes making changes,corrections,additions,and upgrades (generally smaller in scope)to ensure the system continues to meet the business requirements that have been set out for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
15
Control Objectives for Information and related Technology's (CobIT)guidance is guided by a structure that corresponds to the SDLC,namely: Plan and Organize,Acquire and Implement,Deliver and Support and Monitor and Evaluate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
16
Segregation of duties can be the source of IT material weaknesses when assessing the effectiveness of internal controls over the company's accounting information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
17
PERT is actually an acronym for Program Evaluation Review Tool.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
18
The project sponsor generally obtains necessary resources for successful project completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
19
The Project Manager is the lead member of the project team that is responsible for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
20
The Technology Acceptance Model defines perceived ease of use as users adopting a new or modified system to the extent they believe the system will help them perform their job better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
21
As part of effective IT planning in systems development life cycle,a return on investment (ROI)calculation may be performed as part of the economic feasibility analysis.Often,many of the benefits from a new information system may be intangible benefits (e.g.system is easier to use or system enhances customer service,etc.)that are hard to quantify in an income statement.What are some intangible benefits of a state-of-the-art course registration system at your college or university?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
22
The PERT and Gantt charts primarily address the triple constraint of:

A) Technical issues
B) Time
C) Cost
D) Scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
23
Let's suppose that Wal-Mart wants to make sure its top-selling products are placed on the modular shelves at the right level for customers to find and buy.Using Wal-Mart as an example,explain what types of activities would occur in each of the five phases of the systems development life cycle in preparation for this providing this type of information to Wal-Mart and its suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
24
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Relevant Scope
B) Reassessment
C) Reliability
D) Benefits Realization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which phase of the systems development life cycle includes transforming the plan from the design phase into an actual,functioning system:

A) Implementation Phase
B) Maintenance phase
C) Analysis phase
D) Design Phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
26
The triple constraint of project management includes the constraint of:

A) Technical issues
B) Time
C) Adoption
D) Usability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
27
The Technology Acceptance Model predicts:

A) Whether a new system is needed.
B) Whether the system will be adopted.
C) When and how the system will be modified to induce acceptance.
D) Which type of smart phone will be more successful in the marketplace.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
28
In 2009,_____ of the projects failed or were challenged.

A) 82%
B) 68%
C) 49%
D) 35%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
29
In this chapter,project management is defined as:

A) The process of carrying out the systems development life cycle to achieve an intended outcome.
B) Making sure all of the inputs are available to complete the project.
C) Writing the software code for the entire project.
D) Managing the project through the implementation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
30
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Relevant Timeframe
B) Timeliness
C) Measurable Performance
D) Benefits Realization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
31
The IFAC suggested ten core principles of effective information technology planning.Which of these are not one of those ten core principles?

A) Alignment
B) Unbiased
C) Measurable Performance
D) Achievability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
32
The Sarbanes-Oxley Act's 404 Reports require management and auditors to report on

A) The current financial condition of the firm and perceived threats to its financial condition.
B) The academic background and experience of the company's accounting leadership.
C) The effectiveness of the internal controls of the company's accounting information system.
D) The quality of the project management planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which phase of the systems development life cycle would describe in detail the desired features of the system?

A) Analysis phase
B) Planning phase
C) Design Phase
D) Implementation Phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
34
The critical path in a PERT chart represents:

A) The tasks that must be completed without errors.
B) The path of processes that is critical for system adoption.
C) The most important tasks of the whole project.
D) The longest path of tasks needed for project completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
35
The final phase of the systems development life cycle is the

A) Analysis phase
B) Maintenance phase
C) Design Phase
D) Implementation Phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
36
The 100% rule suggests that before a PERT chart is done,a project manager must:

A) Make sure 100% of the project is funded.
B) Make sure the project team is devoted solely or 100%, to this project.
C) Make sure that each person on the project team got 100% on their project management final exam.
D) Make sure 100% of the project tasks are defined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
37
A project sponsor is generally defined as:

A) A senior executive that will sponsor, or pay for, the project.
B) A senior executive in the company who takes responsibility for the success of the project.
C) The CEO of the company that likes technology.
D) The system's primary user.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
38
The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the desired schedule,it will:

A) Likely only have 15% of the desired benefits.
B) Likely never recoup the time or cost necessary to be considered successful.
C) Have a small likelihood of ever being adopted by system users.
D) Likely be cancelled by the project sponsor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
39
Brainstorm a list of reasons why 68% (including 44% challenged + 24% failed)of the information technology projects either failed or were challenged in 2009.Consider specifics of each of the elements of the triple constraints model and any other common delays including the challenges of working with programmers,software and hardware suppliers and vendors,etc.What is the best way to overcome these issues and decrease the number of projects failed or challenged?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
40
Accountants generally do not have all of the necessary systems analyst and systems development skills needed to develop accounting information systems.What skills do accountants have that systems analysts do not have,particularly with respect to a financial reporting system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
41
Tyson Foods (pork,chicken,beef producer)is implementing its SAP system throughout its worldwide operations.If Tyson has the choice,should it implement this system in Brazil before,at the same time,or after the implementation in the United States? Use the Technology Acceptance Model as a model (in particular,perceived ease of use)to explain your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
42
What is the difference in roles between a project sponsor and a project manager? Why are they each important?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
43
Explain how the Technology Acceptance Model can be used as a useful tool in planning an IT project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
44
What can be done to combat scope creep?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
45
Explain how the Technology Acceptance Model can be used as a useful tool in modifying an IT project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.