Deck 12: Outsourcing: Managing Interorganizational Relations

ملء الشاشة (f)
exit full mode
سؤال
When considering principled negotiation,both buyers and sellers relying on the blue book to establish price parameters of a used car would be an example of

A) Focusing on interests,not positions.
B) Inventing options of mutual gain.
C) Being honest and forthright.
D) Using objective criteria.
E) Separating the people from the problem.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is NOT an advantage of establishing a long-term partnership?

A) More efficient utilization of resources
B) Reduced administration costs
C) Improved innovation
D) Risk is eventually transferred to the other party
E) Improved performance
سؤال
Key practices in the partnering approach to managing contracted relationships include

A) Single project contracting.
B) Risk being transferred to the other party.
C) Access to each other's organizational resources.
D) Structured communications.
E) Independent project teams.
سؤال
Which of the following is NOT a key to successful partnering relationships?

A) Mutual trust
B) Jointly shared risk
C) Total company involvement
D) Independent project teams
E) Long-term commitment
سؤال
What does the acronym BATNA stand for?

A) Best alternative to a negotiated agreement
B) Be able to negotiate an agreement
C) Better ability to negotiate an agreement
D) Best ability to have a negotiated agreement
E) Better agree than no agreement
سؤال
Disadvantages of outsourcing project work may likely include all of the following EXCEPT

A) Increased conflict.
B) Coordination breakdowns.
C) Increased costs.
D) Loss of control.
E) More internal morale issues.
سؤال
The following are differences between the partnering approach and the traditional approach to managing contracted relationships EXCEPT

A) Mutual trust forms in the partnering approach where suspicion and distrust are prominent in the traditional approach.
B) Contracts establish long-term commitments in the partnering approach while single project contracting is normal in the traditional approach.
C) Access to each other's organization resources is available in the partnering approach but limited in the traditional approach.
D) Risk is shared jointly among partners in a partnering approach but is transferred to the other party in the traditional approach.
E) The partnering approach entails significant time and energy while a handshake is satisfactory in the traditional approach.
سؤال
When negotiating,the tendency is to want to win! Why is this not a good approach when managing contracted relationships?

A) This approach inhibits the degree of trust and cooperation needed for the alliance to work
B) A noncompetitive approach can bring about functional conflict
C) This approach can cause dysfunctional conflict to rise and negotiations to break down
D) Because people have to continue to work together after negotiations
E) All of these are reasons a competitive approach to negotiation should not be used when managing contracted relationships
سؤال
When you call your Internet provider to solve a technical problem and you end up talking to a technician in India or Romania,you have just experienced

A) Telecommunications.
B) Partnering.
C) Outsourcing.
D) Service shift.
E) Bilingual customer service.
سؤال
Which of the following is part of the traditional approach to managing contracted relationships?

A) Structured communications
B) Long-term commitment
C) Total company involvement
D) Shared risk
E) Mutual trust
سؤال
In regard to outsourcing,the MOST effective way to avoid problems with schedules and deadlines is to

A) Develop detailed schedules.
B) Hold frequent status reviews.
C) Add a penalty clause to the contract.
D) Hold frequent conversations with the outsourcer.
E) Build extra time into the schedules that the outsourcer is not aware of.
سؤال
Which of the following is true in regard to negotiation when managing projects?

A) It is a competitive contest
B) Each negotiator should win as much as he or she can for his or her side
C) If project managers are not able to win negotiations,they will not be seen as effective leaders
D) Success is measured by how much is gained compared to the other party
E) It cannot be viewed as a contest
سؤال
Successful firms are very careful in selecting the work to be outsourced.If expectations and requirements are fuzzy or open to debate,working together can become very difficult.The following are ways to clarify requirements and procedures EXCEPT

A) Make sure that different firms' project management systems are integrated.
B) Contract only work with clearly defined deliverables with measurable outcomes.
C) Establish who has access to certain information through robust safeguards.
D) Make sure communication is well structured and interactions are managed to avoid confusion.
E) Document your requirements.
سؤال
Which of the following is the BEST way to ensure that cohesion and cooperation are not undermined and the parties involved will be satisfied when the project is complete?

A) Long-term outsourcing relationships
B) Good negotiation practices
C) Well-established conflict management processes in place
D) Frequent review and status updates
E) Fair and incentive-laden contracts
سؤال
Outsourced projects are susceptible to conflicts since people are unaccustomed to working together.Which of the following is a primary control mechanism for dealing with and resolving problems?

A) Arbitration
B) Escalation
C) Collaboration
D) Mediation
E) Regulation
سؤال
Why are extensive training and team building activities important when managing contracted relationships?

A) Extensive training and team building activities are not worth the effort because people issues will usually work themselves out over time
B) So team members are provided with a theoretical understanding of the barriers to collaboration as well as the skills and procedures to be successful
C) So conflict management processes can be put into place
D) So teams can still function together when co-location is not important for project success
E) So teams can identify difficult individuals and keep their distance during the project
سؤال
Best practices in outsourcing project work include all the following EXCEPT

A) Well-defined requirements and procedures.
B) Training and team-building activities.
C) Well-established conflict management processes.
D) Frequent reviews and status updates.
E) Short-term,no-pressure outsourcing relationships.
سؤال
The transferring of business functions or processes to other companies has traditionally been known as

A) Subcontracting.
B) Downsizing.
C) Partnering.
D) Joint venture.
E) Outsourcing.
سؤال
The result of team building among the project's participants that states their common goals for the project as well as the procedures that will be used to achieve these goals is a

A) Signed contract.
B) Legal partnership agreement.
C) Project plan.
D) Partnering charter.
E) Responsibility matrix.
سؤال
Advantages of outsourcing project work may likely include all of the following EXCEPT

A) Shortened project duration.
B) Reduced costs.
C) Higher level of expertise.
D) Reduced conflict.
E) Increased flexibility.
سؤال
When considering principled negotiation,keeping focus on the issues even when people become upset,frustrated,and even angry is an example of

A) Separating people from the problem.
B) Being honest and forthright.
C) Focusing on interests,not positions.
D) Inventing options for mutual gain.
E) Using objective criteria.
سؤال
When considering principled negotiation,revealing why you are trying to achieve something instead of demanding what you want or need is an example of

A) Separate people from the problem.
B) Be honest.
C) Focus on interests,not positions.
D) Invent options for mutual gain.
E) When possible,use objective criteria.
سؤال
Mathematically,customer satisfaction is a function of the extent to which perceived performance exceeds expectations.A customer satisfaction ratio of .95 indicates that a customer is

A) Very satisfied.
B) Slightly satisfied.
C) Neutral-expectations were met.
D) Slightly dissatisfied.
E) Very dissatisfied.
سؤال
When using the partnering approach to manage contracted relationships,________ is shared jointly among the partners,which encourages innovation and continuous improvement.
سؤال
When considering principled negotiation,when one person identifies options that are of low cost to them but of high interest to the other party,this is an example of

A) Separate people from the problem.
B) Be honest.
C) Focus on interests,not positions.
D) Invent options for mutual gain.
E) When possible,use objective criteria.
سؤال
Since different participants do not share the same values,priorities,and culture,projects are more prone to interpersonal ___________ when outsourcing.
سؤال
When using the partnering approach to manage contracted relationships,mutual ________ forms the basis for strong working relationships.
سؤال
Principled negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.Which of the following is NOT one of the key points of principled negotiation?

A) Use objective criteria when possible
B) Be honest and forthright
C) Focus on interests,not positions
D) Separate the people from the problem
E) Invent options for mutual gain
سؤال
Ultimate success of the project is determined by

A) Whether the project was completed on time.
B) Whether the customer is happy.
C) Whether the project meets specifications.
D) Whether the project was under budget.
E) Whether the project served the purpose it intended.
سؤال
In the traditional approach to managing contracted relationships,________ are structured and guarded.
سؤال
Customer satisfaction can be quantified by

A) Perceived performance divided by actual performance.
B) Actual performance divided by expected performance.
C) Perceived performance divided by expected performance.
D) Actual performance divided by perceived performance.
E) Expected performance divided by actual performance.
سؤال
Which of the following is NOT a reason to have a BATNA?

A) It increases the chance that you will win the negotiation
B) It gives you the power to walk away
C) It can reduce how dependent you are on the other party
D) It increases the likelihood of coming to a win/win agreement
E) It is a good defense against unreasonable win/lose negotiators
سؤال
Which of the following is NOT an element of good negotiation?

A) Be hard on the problem,soft on the people
B) Conflict on a project can be good
C) Negotiation is not a contest
D) Seek first to understand,then to be understood
E) Avoid dealing with unreasonable people
سؤال
Long-term partnerships will provide all the following EXCEPT

A) Improved communication.
B) More efficient utilization of resources.
C) Reduced communication requirements.
D) Lower administrative costs.
E) Improved innovation.
سؤال
The team-building sessions often conclude with the creation of a partnering _________ signed by all of the participants.
سؤال
Which of the following is suggested as the best target for a customer satisfaction ratio?

A) 1.00
B) 1.05
C) 1.10
D) 1.20
E) 1.50
سؤال
When interacting with the customer,it is important that the project manager

A) Show the customer your knowledge on the subject by using technical terms.
B) Speak slowly and in precise terms.
C) Speak the language of the customer.
D) Allow only one person from the project team to communicate with the customer.
E) Ask the customer to repeat important details.
سؤال
In the traditional approach to managing contracted relationships,_________ project contracting is normal.
سؤال
What is the fundamental difference between a fixed-price and a cost-plus contract?

A) On fixed-price contracts partnering is used while it is not used for cost-plus contracts
B) On fixed-price contracts macro estimates are used while micro estimates are used for cost-plus contracts
C) No scope changes are made on fixed-price contracts while scope changes are allowed for cost-plus contracts
D) On fixed-price contracts the cost is set in advance while for cost-plus contracts it is established after the project is completed
E) On fixed-price contracts contractors are used while on cost-plus contracts no external contractors are used
سؤال
The following are ways a project manager can manage a customer's expectations and perceptions EXCEPT

A) Avoid the temptation to oversell the virtues of the project to win approval.
B) Make sure to develop a well-defined scope statement.
C) Delay communicating problems that you feel can be resolved without involving the customer.
D) Share significant risks that might disrupt project execution.
E) Make sure that customer interactions are handled in a competent and professional manner.
سؤال
There is a potential loss of __________ over a project when the core team depends on other organizations that they do not have direct authority over.
سؤال
Fisher and Ury champion the ________ negotiation approach to negotiation because it emphasizes win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
سؤال
One key focus of principled negotiation is to separate people from the _________.
سؤال
Not only can contracted project work be cheaper,it can also be done __________.
سؤال
Toyota and DaimlerChrysler collaborating with suppliers to develop new automobile platforms is an example of outsourcing.
سؤال
A company no longer has to keep up with technological advances.High levels of __________ and technology can be brought onto a project by using contracted services.
سؤال
In regard to outsourcing,the MOST effective way to avoid problems with schedules and deadlines is to add a _________ clause to the contract.
سؤال
Projects are more prone to conflict when outsourcing project work.The primary control mechanism for dealing with and resolving problems is known as _________.
سؤال
The best defense against unreasonable,win/lose negotiators is having what Fisher and Ury call a strong __________.
سؤال
_______ satisfaction is measured by the ratio of perceived performance to expected performance.
سؤال
Whether a client is dissatisfied or delighted with a project is not based on hard facts and objective data but on perceptions and _________.
سؤال
The term __________ has traditionally been applied to the transferring of business functions or processes to other,often foreign,companies.
سؤال
When both buyers and sellers rely on the blue book to establish price parameters for a used car,they are using _________ criteria.
سؤال
Too often project members respond to customer inquiries with technical jargon.Project members should speak the language of the ________.
سؤال
Contracting project services can increase a firm's _________ by no longer being constrained by their own resources.
سؤال
Cost __________ is a major advantage of outsourcing project work because companies can secure competitive prices for contracted services,especially if the work can be outsourced offshore.
سؤال
More and more companies are using online _________ to collect data from all project participants about the quality of working relations.
سؤال
Many people approach _________ as if it is a competitive process.
سؤال
When outsourcing project work,coordination __________ are intensified by physical separation with people working in different buildings,different cities,if not different countries.
سؤال
__________ is less relevant for independent work that does not require ongoing coordination between professionals for different organizations.
سؤال
It is rare in today's flat world to find important projects that are being completed totally in-house.
سؤال
Working in outsourcing teams,projects can be completed faster and more cheaply.
سؤال
In the traditional method of managing projects,total company involvement requires commitment from CEO to team members.
سؤال
Increased conflict and loss of coordination are typical disadvantages of outsourcing project work.
سؤال
Co-location is less relevant for independent work that does not require ongoing coordination between professionals from different organizations.
سؤال
When using the partnering approach to manage contracted relationships,each party's goals and objectives are similar but geared to what is best for them.
سؤال
When separating the people from the problem,negotiators don't react to the emotional outburst,but try to find the issues that triggered it.
سؤال
A prime consideration in choosing outsourcing vendors is to assess the fit with their project management system.
سؤال
Conflict is inevitable on a project;however,if it is handled effectively,it can elevate performance.
سؤال
Project managers have the capability to manage customer expectations and perceptions.
سؤال
When using the partnering approach to manage contracted relationships,access to each other's organization resources is available.
سؤال
In project negotiation each negotiator is out to win as much as he or she can for his or her side.
سؤال
A partnering charter states the common goals for the project as well as the procedures that will be used to achieve these goals.
سؤال
In some countries,laws are considered to be guidelines that are not necessarily followed.
سؤال
In order to keep the customer happy and to keep perceptions about performance high,it is acceptable to falsely assure customers that everything is on track,especially if you feel that the problem will be resolved soon.
سؤال
Trust can be difficult to forge when interactions are limited and people come from different organizations.
سؤال
Principled negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
سؤال
Experience indicates that co-location of project teams is not worth the extra costs.
سؤال
Participants from different organizations working close together at the construction site or in shared office space is an example of a virtual team.
سؤال
It is a good idea to add a penalty clause to an outsourcing agreement to ensure that work is completed on time.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Outsourcing: Managing Interorganizational Relations
1
When considering principled negotiation,both buyers and sellers relying on the blue book to establish price parameters of a used car would be an example of

A) Focusing on interests,not positions.
B) Inventing options of mutual gain.
C) Being honest and forthright.
D) Using objective criteria.
E) Separating the people from the problem.
D
Explanation: Whenever possible,you should insist on using external,objective criteria to settle disagreements.For example,both buyers and sellers relying on the blue book to establish price parameters of a used car.
2
Which of the following is NOT an advantage of establishing a long-term partnership?

A) More efficient utilization of resources
B) Reduced administration costs
C) Improved innovation
D) Risk is eventually transferred to the other party
E) Improved performance
D
Explanation: Among the many advantages for establishing a long-term partnership are reduced administration costs,more efficient utilization of resources,improved communication,improved innovation,and improved performance.
3
Key practices in the partnering approach to managing contracted relationships include

A) Single project contracting.
B) Risk being transferred to the other party.
C) Access to each other's organizational resources.
D) Structured communications.
E) Independent project teams.
C
Explanation: Key practices in partnering relationships include mutual trust,shared goals,a joint project team,open communications,long-term commitment,objective critique,access to each other's organization resources,total company involvement,integration of administrative systems,and shared risk.
4
Which of the following is NOT a key to successful partnering relationships?

A) Mutual trust
B) Jointly shared risk
C) Total company involvement
D) Independent project teams
E) Long-term commitment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
What does the acronym BATNA stand for?

A) Best alternative to a negotiated agreement
B) Be able to negotiate an agreement
C) Better ability to negotiate an agreement
D) Best ability to have a negotiated agreement
E) Better agree than no agreement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
Disadvantages of outsourcing project work may likely include all of the following EXCEPT

A) Increased conflict.
B) Coordination breakdowns.
C) Increased costs.
D) Loss of control.
E) More internal morale issues.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
The following are differences between the partnering approach and the traditional approach to managing contracted relationships EXCEPT

A) Mutual trust forms in the partnering approach where suspicion and distrust are prominent in the traditional approach.
B) Contracts establish long-term commitments in the partnering approach while single project contracting is normal in the traditional approach.
C) Access to each other's organization resources is available in the partnering approach but limited in the traditional approach.
D) Risk is shared jointly among partners in a partnering approach but is transferred to the other party in the traditional approach.
E) The partnering approach entails significant time and energy while a handshake is satisfactory in the traditional approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
When negotiating,the tendency is to want to win! Why is this not a good approach when managing contracted relationships?

A) This approach inhibits the degree of trust and cooperation needed for the alliance to work
B) A noncompetitive approach can bring about functional conflict
C) This approach can cause dysfunctional conflict to rise and negotiations to break down
D) Because people have to continue to work together after negotiations
E) All of these are reasons a competitive approach to negotiation should not be used when managing contracted relationships
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
When you call your Internet provider to solve a technical problem and you end up talking to a technician in India or Romania,you have just experienced

A) Telecommunications.
B) Partnering.
C) Outsourcing.
D) Service shift.
E) Bilingual customer service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is part of the traditional approach to managing contracted relationships?

A) Structured communications
B) Long-term commitment
C) Total company involvement
D) Shared risk
E) Mutual trust
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
In regard to outsourcing,the MOST effective way to avoid problems with schedules and deadlines is to

A) Develop detailed schedules.
B) Hold frequent status reviews.
C) Add a penalty clause to the contract.
D) Hold frequent conversations with the outsourcer.
E) Build extra time into the schedules that the outsourcer is not aware of.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is true in regard to negotiation when managing projects?

A) It is a competitive contest
B) Each negotiator should win as much as he or she can for his or her side
C) If project managers are not able to win negotiations,they will not be seen as effective leaders
D) Success is measured by how much is gained compared to the other party
E) It cannot be viewed as a contest
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
Successful firms are very careful in selecting the work to be outsourced.If expectations and requirements are fuzzy or open to debate,working together can become very difficult.The following are ways to clarify requirements and procedures EXCEPT

A) Make sure that different firms' project management systems are integrated.
B) Contract only work with clearly defined deliverables with measurable outcomes.
C) Establish who has access to certain information through robust safeguards.
D) Make sure communication is well structured and interactions are managed to avoid confusion.
E) Document your requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is the BEST way to ensure that cohesion and cooperation are not undermined and the parties involved will be satisfied when the project is complete?

A) Long-term outsourcing relationships
B) Good negotiation practices
C) Well-established conflict management processes in place
D) Frequent review and status updates
E) Fair and incentive-laden contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
Outsourced projects are susceptible to conflicts since people are unaccustomed to working together.Which of the following is a primary control mechanism for dealing with and resolving problems?

A) Arbitration
B) Escalation
C) Collaboration
D) Mediation
E) Regulation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Why are extensive training and team building activities important when managing contracted relationships?

A) Extensive training and team building activities are not worth the effort because people issues will usually work themselves out over time
B) So team members are provided with a theoretical understanding of the barriers to collaboration as well as the skills and procedures to be successful
C) So conflict management processes can be put into place
D) So teams can still function together when co-location is not important for project success
E) So teams can identify difficult individuals and keep their distance during the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Best practices in outsourcing project work include all the following EXCEPT

A) Well-defined requirements and procedures.
B) Training and team-building activities.
C) Well-established conflict management processes.
D) Frequent reviews and status updates.
E) Short-term,no-pressure outsourcing relationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
The transferring of business functions or processes to other companies has traditionally been known as

A) Subcontracting.
B) Downsizing.
C) Partnering.
D) Joint venture.
E) Outsourcing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
The result of team building among the project's participants that states their common goals for the project as well as the procedures that will be used to achieve these goals is a

A) Signed contract.
B) Legal partnership agreement.
C) Project plan.
D) Partnering charter.
E) Responsibility matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
Advantages of outsourcing project work may likely include all of the following EXCEPT

A) Shortened project duration.
B) Reduced costs.
C) Higher level of expertise.
D) Reduced conflict.
E) Increased flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
When considering principled negotiation,keeping focus on the issues even when people become upset,frustrated,and even angry is an example of

A) Separating people from the problem.
B) Being honest and forthright.
C) Focusing on interests,not positions.
D) Inventing options for mutual gain.
E) Using objective criteria.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
When considering principled negotiation,revealing why you are trying to achieve something instead of demanding what you want or need is an example of

A) Separate people from the problem.
B) Be honest.
C) Focus on interests,not positions.
D) Invent options for mutual gain.
E) When possible,use objective criteria.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
Mathematically,customer satisfaction is a function of the extent to which perceived performance exceeds expectations.A customer satisfaction ratio of .95 indicates that a customer is

A) Very satisfied.
B) Slightly satisfied.
C) Neutral-expectations were met.
D) Slightly dissatisfied.
E) Very dissatisfied.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
When using the partnering approach to manage contracted relationships,________ is shared jointly among the partners,which encourages innovation and continuous improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
When considering principled negotiation,when one person identifies options that are of low cost to them but of high interest to the other party,this is an example of

A) Separate people from the problem.
B) Be honest.
C) Focus on interests,not positions.
D) Invent options for mutual gain.
E) When possible,use objective criteria.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
Since different participants do not share the same values,priorities,and culture,projects are more prone to interpersonal ___________ when outsourcing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
When using the partnering approach to manage contracted relationships,mutual ________ forms the basis for strong working relationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
Principled negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.Which of the following is NOT one of the key points of principled negotiation?

A) Use objective criteria when possible
B) Be honest and forthright
C) Focus on interests,not positions
D) Separate the people from the problem
E) Invent options for mutual gain
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Ultimate success of the project is determined by

A) Whether the project was completed on time.
B) Whether the customer is happy.
C) Whether the project meets specifications.
D) Whether the project was under budget.
E) Whether the project served the purpose it intended.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
In the traditional approach to managing contracted relationships,________ are structured and guarded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Customer satisfaction can be quantified by

A) Perceived performance divided by actual performance.
B) Actual performance divided by expected performance.
C) Perceived performance divided by expected performance.
D) Actual performance divided by perceived performance.
E) Expected performance divided by actual performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is NOT a reason to have a BATNA?

A) It increases the chance that you will win the negotiation
B) It gives you the power to walk away
C) It can reduce how dependent you are on the other party
D) It increases the likelihood of coming to a win/win agreement
E) It is a good defense against unreasonable win/lose negotiators
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is NOT an element of good negotiation?

A) Be hard on the problem,soft on the people
B) Conflict on a project can be good
C) Negotiation is not a contest
D) Seek first to understand,then to be understood
E) Avoid dealing with unreasonable people
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
Long-term partnerships will provide all the following EXCEPT

A) Improved communication.
B) More efficient utilization of resources.
C) Reduced communication requirements.
D) Lower administrative costs.
E) Improved innovation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
The team-building sessions often conclude with the creation of a partnering _________ signed by all of the participants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is suggested as the best target for a customer satisfaction ratio?

A) 1.00
B) 1.05
C) 1.10
D) 1.20
E) 1.50
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
When interacting with the customer,it is important that the project manager

A) Show the customer your knowledge on the subject by using technical terms.
B) Speak slowly and in precise terms.
C) Speak the language of the customer.
D) Allow only one person from the project team to communicate with the customer.
E) Ask the customer to repeat important details.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
In the traditional approach to managing contracted relationships,_________ project contracting is normal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
What is the fundamental difference between a fixed-price and a cost-plus contract?

A) On fixed-price contracts partnering is used while it is not used for cost-plus contracts
B) On fixed-price contracts macro estimates are used while micro estimates are used for cost-plus contracts
C) No scope changes are made on fixed-price contracts while scope changes are allowed for cost-plus contracts
D) On fixed-price contracts the cost is set in advance while for cost-plus contracts it is established after the project is completed
E) On fixed-price contracts contractors are used while on cost-plus contracts no external contractors are used
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
The following are ways a project manager can manage a customer's expectations and perceptions EXCEPT

A) Avoid the temptation to oversell the virtues of the project to win approval.
B) Make sure to develop a well-defined scope statement.
C) Delay communicating problems that you feel can be resolved without involving the customer.
D) Share significant risks that might disrupt project execution.
E) Make sure that customer interactions are handled in a competent and professional manner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
There is a potential loss of __________ over a project when the core team depends on other organizations that they do not have direct authority over.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
Fisher and Ury champion the ________ negotiation approach to negotiation because it emphasizes win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
One key focus of principled negotiation is to separate people from the _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
Not only can contracted project work be cheaper,it can also be done __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
Toyota and DaimlerChrysler collaborating with suppliers to develop new automobile platforms is an example of outsourcing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
A company no longer has to keep up with technological advances.High levels of __________ and technology can be brought onto a project by using contracted services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
In regard to outsourcing,the MOST effective way to avoid problems with schedules and deadlines is to add a _________ clause to the contract.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
Projects are more prone to conflict when outsourcing project work.The primary control mechanism for dealing with and resolving problems is known as _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
The best defense against unreasonable,win/lose negotiators is having what Fisher and Ury call a strong __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
_______ satisfaction is measured by the ratio of perceived performance to expected performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
Whether a client is dissatisfied or delighted with a project is not based on hard facts and objective data but on perceptions and _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
The term __________ has traditionally been applied to the transferring of business functions or processes to other,often foreign,companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
When both buyers and sellers rely on the blue book to establish price parameters for a used car,they are using _________ criteria.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
Too often project members respond to customer inquiries with technical jargon.Project members should speak the language of the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
Contracting project services can increase a firm's _________ by no longer being constrained by their own resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
Cost __________ is a major advantage of outsourcing project work because companies can secure competitive prices for contracted services,especially if the work can be outsourced offshore.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
More and more companies are using online _________ to collect data from all project participants about the quality of working relations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
Many people approach _________ as if it is a competitive process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
When outsourcing project work,coordination __________ are intensified by physical separation with people working in different buildings,different cities,if not different countries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
__________ is less relevant for independent work that does not require ongoing coordination between professionals for different organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
It is rare in today's flat world to find important projects that are being completed totally in-house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
Working in outsourcing teams,projects can be completed faster and more cheaply.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
In the traditional method of managing projects,total company involvement requires commitment from CEO to team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Increased conflict and loss of coordination are typical disadvantages of outsourcing project work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Co-location is less relevant for independent work that does not require ongoing coordination between professionals from different organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
When using the partnering approach to manage contracted relationships,each party's goals and objectives are similar but geared to what is best for them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
When separating the people from the problem,negotiators don't react to the emotional outburst,but try to find the issues that triggered it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
A prime consideration in choosing outsourcing vendors is to assess the fit with their project management system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Conflict is inevitable on a project;however,if it is handled effectively,it can elevate performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Project managers have the capability to manage customer expectations and perceptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
When using the partnering approach to manage contracted relationships,access to each other's organization resources is available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
In project negotiation each negotiator is out to win as much as he or she can for his or her side.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
A partnering charter states the common goals for the project as well as the procedures that will be used to achieve these goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
In some countries,laws are considered to be guidelines that are not necessarily followed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
In order to keep the customer happy and to keep perceptions about performance high,it is acceptable to falsely assure customers that everything is on track,especially if you feel that the problem will be resolved soon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
Trust can be difficult to forge when interactions are limited and people come from different organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
Principled negotiation emphasizes developing win/win solutions while protecting yourself against those who would take advantage of your forthrightness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
Experience indicates that co-location of project teams is not worth the extra costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
Participants from different organizations working close together at the construction site or in shared office space is an example of a virtual team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
It is a good idea to add a penalty clause to an outsourcing agreement to ensure that work is completed on time.