Deck 9: Reducing Project Duration

ملء الشاشة (f)
exit full mode
سؤال
In selecting the best activity to crash you would first select the activity with the

A) Earliest start time.
B) Most steep slope.
C) Least steep slope.
D) Longest duration.
E) Largest crash time.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When reducing project duration,the duration for a project that is optimal is at the point where

A) Direct costs are the lowest.
B) Indirect costs are the lowest.
C) Direct costs equal indirect costs.
D) Total project costs are the lowest.
E) The project changes from time-constrained to resource-constrained.
سؤال
As a project is crashed and project duration is reduced,indirect costs typically

A) Increase.
B) Become unstable.
C) Decrease.
D) Become unreliable.
E) Stay the same.
سؤال
Cost slope can be determined by dividing the

A) Run by the rise.
B) Rise by the run.
C) Crash cost by the normal cost.
D) Normal cost by the crash cost.
E) Indirect cost by direct cost.
سؤال
Without any formal planning,the president of a software company remarks in a speech that new technologically advanced software will be available in one year.This may lead to a project that must be done faster than anticipated.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
سؤال
An activity's crash cost includes ________ costs.

A) Direct
B) Indirect
C) Overhead
D) Total
E) Normal
سؤال
The direct cost for completing an activity in the shortest time it can realistically be completed in is called its __________ cost.

A) Normal
B) Reserve
C) Crash
D) Accelerated
E) Expedited
سؤال
Emily has recently learned that she needs to reduce the duration of her project to meet an imposed deadline.She has calculated the crash cost per unit and knows the maximum units each activity can be reduced.What is the next step?

A) Find the activity with the lowest crash cost
B) Calculate the optimum cost-time point
C) Calculate the crash point
D) Identify the critical path
E) Find the activity with the highest crash cost
سؤال
Intense global competition and rapid technological advances create pressure to develop projects rapidly.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
سؤال
Which of the following correctly calculates an activity's cost slope?

A) (normal cost - crash cost)/(normal time - crash time)
B) (crash cost - normal cost)/(normal time - crash time)
C) (normal time - crash time)/(crash cost - normal cost)
D) (normal time - crash time)/(normal cost - crash cost)
E) (crash cost - normal cost)/(crash time - normal time)
سؤال
The less steep the cost slope of an activity,the

A) Less it costs to shorten one time period.
B) More it costs to shorten one time period.
C) Smaller the crash time is.
D) Larger the crash time is.
E) Cannot be determined by the information given.
سؤال
When reducing project duration,the crash cost per unit has to be calculated and the maximum units each activity can be reduced must be known.After this,the critical path must be identified.What is the next step?

A) Find the activity with the lowest crash cost
B) Calculate the optimum cost-time point
C) Calculate the crash point
D) Calculate indirect cost per time unit
E) Find the activity with the steepest cost slope
سؤال
When determining which activity to crash,there are other factors that should be assessed beyond cost.Which of the following is NOT one of these factors?

A) The inherent risk associated with the activity
B) How crashing will impact the morale and motivation of the individuals working on that activity
C) Resource availability after crashing that activity
D) The level of difficulty involved in completing the activity
E) When during the project the activity will occur
سؤال
Before crashing,direct costs for an activity represent normal costs,which typically mean low-cost,efficient methods for completing the activity in a(n)________ amount of time.

A) Normal
B) Budgeted
C) Optimized
D) Expected
E) Targeted
سؤال
The shortest possible time an activity can be completed realistically is called ___­­­_____ time.

A) Expedited
B) Accelerated
C) Crash
D) Optimistic
E) Optimal
سؤال
As a project is crashed and project duration is reduced,direct costs typically

A) Increase.
B) Become unstable.
C) Decrease.
D) Become unreliable.
E) Stay the same.
سؤال
Which of the following is NOT considered a project indirect cost?

A) Supervision
B) Consultants
C) Equipment
D) Interest
E) The project manager's salary
سؤال
Adverse weather,design flaws,and equipment breakdown can create negative slack.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
سؤال
In a Project Cost-Duration Graph,total project costs are a sum of

A) Labor,material and equipment costs.
B) Direct costs plus interest.
C) Direct labor costs and the project manager's salary.
D) Direct costs and the project manager's salary.
E) Direct and indirect costs.
سؤال
A contractor finished a bridge across a lake 18 months early and received more than $6 million for the early completion.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
سؤال
Which of the following is NOT a rational reason to reduce project duration?

A) Incentive contracts
B) High network sensitivity
C) Imposed deadlines
D) High overhead costs
E) Unforeseen delays
سؤال
Which of the following projects would be least benefited if additional resources were added?

A) Splitting and stacking a cord of wood
B) Developing new software
C) Harvesting a crop by hand
D) Building a cabin
E) Moving to a new house
سؤال
All of the following are disadvantages of scheduling overtime EXCEPT

A) Overtime is associated the with additional costs of coordination and communication.
B) Sustained overtime work by salaried employees may incur burnout.
C) Productivity is reduced the longer one is working.
D) More hours results in higher expenses if paying workers hourly.
E) Continued overtime can lead to a higher turnover rate.
سؤال
One way of reducing project costs is identifying tasks that _________ can do themselves.

A) Vendors
B) Suppliers
C) Customers
D) Company employees
E) Project teams
سؤال
Sometimes very high __________ costs are recognized before a project begins and reducing these costs through shorter project durations becomes a high priority.

A) Labor
B) Direct
C) Project
D) Overhead
E) Interest
سؤال
The relationship between the normal point and the crash point is assumed to be

A) Linear.
B) Curvilinear.
C) Variable.
D) Conversely related.
E) Exponentially related.
سؤال
Intense global competition and rapid technological advances combine to create a(n)________-imposed project duration date.
سؤال
When a project manager must reduce project duration but resources are constrained,creating a software program that will have fewer features than originally planned or building a house without the bonus room the owner originally specified in the plans would both be examples of

A) Fast-tracking.
B) Using critical-chain project management.
C) Reducing project scope.
D) Compromising quality.
E) Doing it twice-first fast and then correctly.
سؤال
When it is necessary to reduce project duration and resources are constrained,which of the following is NOT a reasonable option?

A) Establishing a core project team
B) Fast-tracking
C) Reduce project scope
D) Compromise quality
E) Critical-chain project management
سؤال
Which of the following is NOT a technique for accelerating project completion when resources are not constrained?

A) Assign additional staff and equipment
B) Establish a core team
C) Do it twice-first fast and then correctly
D) Reduce project scope
E) Compromise quality
سؤال
Without any formal planning,the president of a software company remarks in a speech that new technologically advanced software will be available in one year.This may lead to a project that must be done faster than anticipated.The completion date has been __________.
سؤال
It is going to cost $80,000 a day simply to house and feed a construction crew in the farthest reaches of northern Alaska.This would be an example of a situation requiring reducing the project duration due to

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
سؤال
Which of the following is NOT one of the more commonly used options for cutting project costs?

A) Reduce project scope
B) Have owner take more responsibility
C) Move the completion date further out
D) Brainstorm cost savings options
E) Outsource project activities
سؤال
There are fewer options available for reducing project time if you are __________________ than if you can spend more than your original budget.
سؤال
Reducing project duration

A) Involves crashing all activities to their crash point.
B) Can only be done when resources are not constrained.
C) Is always more expensive.
D) Tends to increase network sensitivity.
E) Should be considered for all projects.
سؤال
The ________ project cost is the sum of the indirect and direct costs.
سؤال
According to Brooks' Law,adding more people to a late project is most likely to have which of the following impacts?

A) Keep the project from slipping any further
B) Get the project back on schedule
C) Make the project slip further
D) Lead to burnout
E) Decrease team motivation
سؤال
Sometimes very high ________ costs are recognized before a project begins and reducing these costs through shorter project duration becomes a high priority.
سؤال
An activity's normal time and cost are 8 and $100,respectively.Its estimated crash time and cost are 6 and $160,respectively.What is this activity's crash cost per time unit?

A) $33
B) $30
C) $60
D) $65
E) $153
سؤال
When the project team is salaried,which of the following is the preferred choice for accelerating project completion?

A) Assigning additional staff and equipment
B) Subcontract work
C) Schedule overtime
D) Outsource project work
E) Establish a core project team
سؤال
When considering whether to move the project to its optimum cost-time position,the manager should also consider ________.
سؤال
There are more options available for reducing project time if you are not resource constrained.
سؤال
Direct costs are assignable directly to a particular ________.
سؤال
In order to shorten the duration of a project the project manager should limit the choices of activities to just those which are on the __________.
سؤال
____________ is the rearranging of the project network logic so that critical activities are done in parallel rather than sequentially.
سؤال
As a project's duration is reduced,indirect costs are ___________.
سؤال
Because direct costs are assumed to be developed from normal methods and in a normal amount of time,any reduction in activity time should ________ the cost of the activity.
سؤال
The less steep the cost slope of an activity,the ________ it costs to shorten one time period.
سؤال
Overhead costs such as supervision,administration,consultants,and interest are examples of ________ project costs.
سؤال
When you schedule ________,you avoid the additional costs of coordination and communication when new people are added.
سؤال
According to ________ law,adding more manpower to a late software project makes it later.
سؤال
The ________ time for an activity represents low-costs,realistic,efficient methods for completing the activity under typical conditions.
سؤال
Costs such as labor,materials,equipment,or contractors are examples of ________ project costs.
سؤال
An activity's ________ is calculated by dividing the rise by the run.
سؤال
When project managers know an activity's ________,they are able to compare which critical activities to shorten.
سؤال
Reducing the duration of an activity is called ________.
سؤال
The direct cost for completing an activity as early as possible is called its ________ cost.
سؤال
Creation of the ___________ graph keeps the importance of indirect costs in the forefront of decision making.
سؤال
One way of reducing project costs is identifying tasks that _________ can do themselves.
سؤال
An activity's normal time and cost are 5 and $40,respectively.Its estimated crash time and cost are 4 and $70,respectively.This activity's crash cost per time unit is ________.
سؤال
Indirect costs generally represent overhead costs such as supervision,administration,consultants,and interest.
سؤال
The total cost for each time unit of a project is the sum of labor,materials,and equipment.
سؤال
Crashing can negatively impact the morale and motivation of the project team.
سؤال
Crashing a more expensive activity may be wise if fewer inherent risks are involved.
سؤال
Incentive contracts can make the reduction of project time rewarding-usually for both the project contractor and owner.
سؤال
Direct costs are so named because they can be assigned directly to a work package and activity.
سؤال
When reducing project duration,there will always be an optimum cost-time point where the total cost of the project is less than it was when the project was initially planned under normal conditions.
سؤال
An activity must be crashed on each critical path in order to reduce project duration.
سؤال
Managers have several effective methods for crashing specific project activities when resources are not constrained.
سؤال
When adding resources,there are limits as to how much speed can be gained.
سؤال
Total cost for specific project durations is computed and then compared with the benefits of reducing project time,before the project begins or while it is in progress.
سؤال
When crashing an activity,you always crash to its crash point.
سؤال
Shortening an activity's duration is termed crashing.
سؤال
Because direct costs are assumed to be developed from "normal" methods and in a "normal" amount of time,any reduction in activity time should add to the costs of the activity.
سؤال
The cost slope of an activity is calculated by dividing the run by the rise.
سؤال
If indirect costs are a significant percentage of total project costs,reductions in project time can represent very real savings.
سؤال
Brooks' law states that adding manpower to a software project helps keep it on schedule.
سؤال
Crashing frequently results in overallocation of resources.
سؤال
The accuracy of crash times and costs is frequently rough at best,when compared with normal time and cost.
سؤال
The higher the cost slope of an activity the lower the cost to reduce its duration.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Reducing Project Duration
1
In selecting the best activity to crash you would first select the activity with the

A) Earliest start time.
B) Most steep slope.
C) Least steep slope.
D) Longest duration.
E) Largest crash time.
C
Explanation: The less steep the cost slope of an activity,the less it costs to shorten one time period.
2
When reducing project duration,the duration for a project that is optimal is at the point where

A) Direct costs are the lowest.
B) Indirect costs are the lowest.
C) Direct costs equal indirect costs.
D) Total project costs are the lowest.
E) The project changes from time-constrained to resource-constrained.
D
Explanation: The optimum cost-time point for a project is when the total project costs are the lowest.
3
As a project is crashed and project duration is reduced,indirect costs typically

A) Increase.
B) Become unstable.
C) Decrease.
D) Become unreliable.
E) Stay the same.
C
Explanation: Indirect costs vary with time.That is,any reduction in time should result in a reduction of indirect costs.
4
Cost slope can be determined by dividing the

A) Run by the rise.
B) Rise by the run.
C) Crash cost by the normal cost.
D) Normal cost by the crash cost.
E) Indirect cost by direct cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
Without any formal planning,the president of a software company remarks in a speech that new technologically advanced software will be available in one year.This may lead to a project that must be done faster than anticipated.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
An activity's crash cost includes ________ costs.

A) Direct
B) Indirect
C) Overhead
D) Total
E) Normal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
The direct cost for completing an activity in the shortest time it can realistically be completed in is called its __________ cost.

A) Normal
B) Reserve
C) Crash
D) Accelerated
E) Expedited
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
Emily has recently learned that she needs to reduce the duration of her project to meet an imposed deadline.She has calculated the crash cost per unit and knows the maximum units each activity can be reduced.What is the next step?

A) Find the activity with the lowest crash cost
B) Calculate the optimum cost-time point
C) Calculate the crash point
D) Identify the critical path
E) Find the activity with the highest crash cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
Intense global competition and rapid technological advances create pressure to develop projects rapidly.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following correctly calculates an activity's cost slope?

A) (normal cost - crash cost)/(normal time - crash time)
B) (crash cost - normal cost)/(normal time - crash time)
C) (normal time - crash time)/(crash cost - normal cost)
D) (normal time - crash time)/(normal cost - crash cost)
E) (crash cost - normal cost)/(crash time - normal time)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
The less steep the cost slope of an activity,the

A) Less it costs to shorten one time period.
B) More it costs to shorten one time period.
C) Smaller the crash time is.
D) Larger the crash time is.
E) Cannot be determined by the information given.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
When reducing project duration,the crash cost per unit has to be calculated and the maximum units each activity can be reduced must be known.After this,the critical path must be identified.What is the next step?

A) Find the activity with the lowest crash cost
B) Calculate the optimum cost-time point
C) Calculate the crash point
D) Calculate indirect cost per time unit
E) Find the activity with the steepest cost slope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
When determining which activity to crash,there are other factors that should be assessed beyond cost.Which of the following is NOT one of these factors?

A) The inherent risk associated with the activity
B) How crashing will impact the morale and motivation of the individuals working on that activity
C) Resource availability after crashing that activity
D) The level of difficulty involved in completing the activity
E) When during the project the activity will occur
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
Before crashing,direct costs for an activity represent normal costs,which typically mean low-cost,efficient methods for completing the activity in a(n)________ amount of time.

A) Normal
B) Budgeted
C) Optimized
D) Expected
E) Targeted
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
The shortest possible time an activity can be completed realistically is called ___­­­_____ time.

A) Expedited
B) Accelerated
C) Crash
D) Optimistic
E) Optimal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
As a project is crashed and project duration is reduced,direct costs typically

A) Increase.
B) Become unstable.
C) Decrease.
D) Become unreliable.
E) Stay the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is NOT considered a project indirect cost?

A) Supervision
B) Consultants
C) Equipment
D) Interest
E) The project manager's salary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
Adverse weather,design flaws,and equipment breakdown can create negative slack.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
In a Project Cost-Duration Graph,total project costs are a sum of

A) Labor,material and equipment costs.
B) Direct costs plus interest.
C) Direct labor costs and the project manager's salary.
D) Direct costs and the project manager's salary.
E) Direct and indirect costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
A contractor finished a bridge across a lake 18 months early and received more than $6 million for the early completion.This is an example of reducing project duration caused by

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is NOT a rational reason to reduce project duration?

A) Incentive contracts
B) High network sensitivity
C) Imposed deadlines
D) High overhead costs
E) Unforeseen delays
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following projects would be least benefited if additional resources were added?

A) Splitting and stacking a cord of wood
B) Developing new software
C) Harvesting a crop by hand
D) Building a cabin
E) Moving to a new house
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
All of the following are disadvantages of scheduling overtime EXCEPT

A) Overtime is associated the with additional costs of coordination and communication.
B) Sustained overtime work by salaried employees may incur burnout.
C) Productivity is reduced the longer one is working.
D) More hours results in higher expenses if paying workers hourly.
E) Continued overtime can lead to a higher turnover rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
One way of reducing project costs is identifying tasks that _________ can do themselves.

A) Vendors
B) Suppliers
C) Customers
D) Company employees
E) Project teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
Sometimes very high __________ costs are recognized before a project begins and reducing these costs through shorter project durations becomes a high priority.

A) Labor
B) Direct
C) Project
D) Overhead
E) Interest
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
The relationship between the normal point and the crash point is assumed to be

A) Linear.
B) Curvilinear.
C) Variable.
D) Conversely related.
E) Exponentially related.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
Intense global competition and rapid technological advances combine to create a(n)________-imposed project duration date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
When a project manager must reduce project duration but resources are constrained,creating a software program that will have fewer features than originally planned or building a house without the bonus room the owner originally specified in the plans would both be examples of

A) Fast-tracking.
B) Using critical-chain project management.
C) Reducing project scope.
D) Compromising quality.
E) Doing it twice-first fast and then correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
When it is necessary to reduce project duration and resources are constrained,which of the following is NOT a reasonable option?

A) Establishing a core project team
B) Fast-tracking
C) Reduce project scope
D) Compromise quality
E) Critical-chain project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is NOT a technique for accelerating project completion when resources are not constrained?

A) Assign additional staff and equipment
B) Establish a core team
C) Do it twice-first fast and then correctly
D) Reduce project scope
E) Compromise quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Without any formal planning,the president of a software company remarks in a speech that new technologically advanced software will be available in one year.This may lead to a project that must be done faster than anticipated.The completion date has been __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
It is going to cost $80,000 a day simply to house and feed a construction crew in the farthest reaches of northern Alaska.This would be an example of a situation requiring reducing the project duration due to

A) Imposed project deadlines.
B) Time to market.
C) Unforeseen project delays.
D) High overhead.
E) Incentive contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is NOT one of the more commonly used options for cutting project costs?

A) Reduce project scope
B) Have owner take more responsibility
C) Move the completion date further out
D) Brainstorm cost savings options
E) Outsource project activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
There are fewer options available for reducing project time if you are __________________ than if you can spend more than your original budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
Reducing project duration

A) Involves crashing all activities to their crash point.
B) Can only be done when resources are not constrained.
C) Is always more expensive.
D) Tends to increase network sensitivity.
E) Should be considered for all projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
The ________ project cost is the sum of the indirect and direct costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
According to Brooks' Law,adding more people to a late project is most likely to have which of the following impacts?

A) Keep the project from slipping any further
B) Get the project back on schedule
C) Make the project slip further
D) Lead to burnout
E) Decrease team motivation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
Sometimes very high ________ costs are recognized before a project begins and reducing these costs through shorter project duration becomes a high priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
An activity's normal time and cost are 8 and $100,respectively.Its estimated crash time and cost are 6 and $160,respectively.What is this activity's crash cost per time unit?

A) $33
B) $30
C) $60
D) $65
E) $153
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
When the project team is salaried,which of the following is the preferred choice for accelerating project completion?

A) Assigning additional staff and equipment
B) Subcontract work
C) Schedule overtime
D) Outsource project work
E) Establish a core project team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
When considering whether to move the project to its optimum cost-time position,the manager should also consider ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
There are more options available for reducing project time if you are not resource constrained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
Direct costs are assignable directly to a particular ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
In order to shorten the duration of a project the project manager should limit the choices of activities to just those which are on the __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
____________ is the rearranging of the project network logic so that critical activities are done in parallel rather than sequentially.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
As a project's duration is reduced,indirect costs are ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
Because direct costs are assumed to be developed from normal methods and in a normal amount of time,any reduction in activity time should ________ the cost of the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
The less steep the cost slope of an activity,the ________ it costs to shorten one time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
Overhead costs such as supervision,administration,consultants,and interest are examples of ________ project costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
When you schedule ________,you avoid the additional costs of coordination and communication when new people are added.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
According to ________ law,adding more manpower to a late software project makes it later.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
The ________ time for an activity represents low-costs,realistic,efficient methods for completing the activity under typical conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Costs such as labor,materials,equipment,or contractors are examples of ________ project costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
An activity's ________ is calculated by dividing the rise by the run.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
When project managers know an activity's ________,they are able to compare which critical activities to shorten.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
Reducing the duration of an activity is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
The direct cost for completing an activity as early as possible is called its ________ cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
Creation of the ___________ graph keeps the importance of indirect costs in the forefront of decision making.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
One way of reducing project costs is identifying tasks that _________ can do themselves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
An activity's normal time and cost are 5 and $40,respectively.Its estimated crash time and cost are 4 and $70,respectively.This activity's crash cost per time unit is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Indirect costs generally represent overhead costs such as supervision,administration,consultants,and interest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
The total cost for each time unit of a project is the sum of labor,materials,and equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
Crashing can negatively impact the morale and motivation of the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Crashing a more expensive activity may be wise if fewer inherent risks are involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Incentive contracts can make the reduction of project time rewarding-usually for both the project contractor and owner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
Direct costs are so named because they can be assigned directly to a work package and activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
When reducing project duration,there will always be an optimum cost-time point where the total cost of the project is less than it was when the project was initially planned under normal conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
An activity must be crashed on each critical path in order to reduce project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Managers have several effective methods for crashing specific project activities when resources are not constrained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
When adding resources,there are limits as to how much speed can be gained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
Total cost for specific project durations is computed and then compared with the benefits of reducing project time,before the project begins or while it is in progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
When crashing an activity,you always crash to its crash point.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
Shortening an activity's duration is termed crashing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
Because direct costs are assumed to be developed from "normal" methods and in a "normal" amount of time,any reduction in activity time should add to the costs of the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
The cost slope of an activity is calculated by dividing the run by the rise.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
If indirect costs are a significant percentage of total project costs,reductions in project time can represent very real savings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
Brooks' law states that adding manpower to a software project helps keep it on schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
Crashing frequently results in overallocation of resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
The accuracy of crash times and costs is frequently rough at best,when compared with normal time and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
The higher the cost slope of an activity the lower the cost to reduce its duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.