Deck 6: Developing a Project Plan

ملء الشاشة (f)
exit full mode
سؤال
Information to develop a project network is collected from the

A) Organization breakdown structure.
B) Work breakdown structure.
C) Budget.
D) Project proposal.
E) Responsibility matrix.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is NOT one of the basic rules to follow when developing project networks?

A) An activity cannot begin until all preceding activities have been completed
B) Each activity must have a unique identification number
C) Conditional statements are allowed but looping statements are not allowed
D) An activity identification number must be larger than that of any preceding activities
E) Networks flow from left to right
سؤال
Which of the following can be used without coordinating with managers of succeeding activities?

A) Total slack
B) Free slack
C) Critical float
D) Float pad
E) Slip pad
سؤال
________ activities are to be completed immediately following a particular activity.

A) Merge
B) Burst
C) Predecessor
D) Successor
E) Parallel
سؤال
On a project network,the activity times are derived from the

A) Organization breakdown structure.
B) Work packages.
C) Budget.
D) Project proposal.
E) Responsibility matrix.
سؤال
Arrows on an activity-on-node (AON)project network represent

A) An activity.
B) Project flow.
C) Dependency.
D) Project flow and dependency.
E) An activity and dependency.
سؤال
Which of the following correctly calculates the early finish for an activity?

A) LS + DUR
B) ES + DUR
C) LF + DUR
D) ES + SL
E) LF + SL
سؤال
The critical path in a project network is the

A) Shortest path through the network.
B) Longest path through the network.
C) Network path with the most difficult activities.
D) Network path using the most resources.
E) Network path with the most merge activities.
سؤال
A sequence of connected,dependent activities is termed a(n)

A) Path of events.
B) Parallel path.
C) Activity chain.
D) Path.
E) Dependent chain.
سؤال
A(n)_________ activity has more than one dependency arrow flowing from it.

A) Parallel
B) Critical path
C) Burst
D) Merge
E) Independent
سؤال
An activity that has more than one dependency arrow flowing into it is termed a(n)

A) Parallel activity.
B) Critical path.
C) Burst activity.
D) Merge activity.
E) Independent activity.
سؤال
Which of the following represents an activity on an activity-on-node (AON)project network?

A) An arrow
B) A line
C) A node
D) Both an arrow and a line
E) An arrow,a line and a node all represent activities
سؤال
The forward pass in project network calculations determines all of the following EXCEPT

A) Earliest time an activity can begin.
B) Earliest time an activity can finish.
C) Duration of the project.
D) The critical path.
E) How soon the project can finish.
سؤال
Bill is building a project network that involves testing a prototype.He must design the prototype (activity 1),build the prototype (activity 2),and test the prototype (activity 3).Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3.If the prototype fails testing,Bill must redesign the prototype;therefore,activity 3 is a predecessor for activity 1.This is an example of

A) Conditional statements.
B) Looping.
C) Having more than one start node.
D) Good network development.
E) Natural network flow.
سؤال
Which of the following is provided by both the project network and the work breakdown structure?

A) Dependencies
B) Sequencing
C) Interrelationships
D) Activity duration
E) Timing
سؤال
Activities which can take place at the same time are termed

A) Parallel activity.
B) Critical path.
C) Burst activity.
D) Merge activity.
E) Independent activity.
سؤال
Which of the following does NOT help describe a project network?

A) A graphic display of the flow and sequence of work through the project
B) Provides the basis for scheduling labor and equipment
C) Gives the times when activities can start and finish and when they can be delayed
D) Highlights major deliverables and identifies their completion dates
E) Identifies critical activities
سؤال
When translated into a project network,a work package will become

A) A single activity.
B) One or more activities.
C) A milestone.
D) A critical path.
E) An arrow.
سؤال
________ activities must be completed immediately before a particular activity.

A) Merge
B) Burst
C) Predecessor
D) Successor
E) Parallel
سؤال
The backward pass in project network calculations determines all of the following EXCEPT

A) Latest time an activity can begin.
B) Earliest time an activity can finish.
C) The critical path.
D) How long an activity can be delayed.
E) Latest time an activity can finish.
سؤال
System documentation cannot end until three days after testing has started.This is an example of which kind of lag?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
سؤال
Tom is responsible for ordering hardware for a custom home his company is building.The contractor installing the hardware is scheduled to start in 5 working days,but the hardware is on backorder and will not arrive for another 9 working days.Fortunately,Tom has 10 days of slack;however,he shares this slack with the hardware installer.He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days.Tom and the installer share 10 days of

A) Free Slack.
B) Shared Slack.
C) Total Slack.
D) Critical Slack.
E) Functional Slack.
سؤال
Which of the following is true about hammock activities?

A) They are used to identify the use of fixed resources or costs over a segment of a project
B) They are a combination of Start to Start and Start to Finish lags
C) They are activities in which the costs are not subject to change
D) They are an alternative description for the critical path
E) They are highly sensitive
سؤال
Concurrent engineering,which has dramatically reduced the development time for new products,relies on what kind of lag?

A) Start to Start lags
B) Start to Finish lags
C) Finish to Finish lags
D) Finish to Start lags
E) Any of these could be correct
سؤال
If a project has more than one activity that can begin when the project is to start,a common start node should be used to indicate a clear project beginning on the network.Without a common start node,each path is a

A) Critical path.
B) Parallel path.
C) Dangler path.
D) Multiple start path.
E) Confused path.
سؤال
Activities that can take place at the same time if the manager wishes them to are called ________ activities.
سؤال
The amount of time an activity can be delayed and yet not delay the project is termed

A) Total slack.
B) Free slack.
C) Critical float.
D) Float pad.
E) Slip pad.
سؤال
The delaying of any activity on the __________ will delay the completion of the project by the same amount.
سؤال
Which of the following will correctly calculate the total slack in an activity?

A) LS - ES
B) LF - EF
C) LS - LF
D) LF - ES
E) Either LS - ES or LF - EF
سؤال
If,for some reason,the project must be expedited to meet an earlier date,which of the following actions would the project manager take first?

A) Check to see which activities cost the least
B) Check to see which activities have the longest duration
C) Check to see which activities are on the critical path
D) Check to see which activities have the most slack
E) Check to see which activities have the highest risk
سؤال
The likelihood the original critical path(s)will change once the project is initiated is referred to as

A) Flexibility.
B) Resilience.
C) Sensitivity.
D) Concurrent engineering.
E) Rigidity.
سؤال
The requirement for a freshly poured foundation to cure before beginning construction is an example of which of the following type of lag?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
سؤال
When completing a backward pass,you carry the LS to the next preceding activity to establish the LF,unless the next preceding activity is a burst activity,in which case you select

A) The smallest LS of all its immediate successor activities to establish the LF.
B) The largest ES of all its immediate successor activities to establish the LF.
C) The average LS of all its immediate successor activities to establish the LF.
D) The smallest ES of all its immediate successor activities to establish the LF.
E) The largest LS of all its immediate successor activities to establish the LF.
سؤال
The minimum amount of time a dependent activity must be delayed to begin or end is referred to as

A) Hammock.
B) Laddering.
C) Lag.
D) Cushion.
E) Buffer.
سؤال
The activity time estimates used to build a project network are derived from ________.
سؤال
If testing cannot be completed any earlier than four days after the prototype has been built,what type of lag exists?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
سؤال
The assumption that all immediate preceding activities must be 100% complete is too restrictive in some situations.When an activity is broken down into smaller segments in order to start the succeeding activity sooner,this is called

A) Hammock activities.
B) Concurrent engineering.
C) A forward pass.
D) Dissecting.
E) Laddering.
سؤال
Which of the following correctly calculates the late start for an activity?

A) EF - DUR
B) ES - DUR
C) LF - DUR
D) ES - SL
E) LF - SL
سؤال
An activity that has more than one predecessor is a _________ activity.
سؤال
An element in the project that consumes time is a(n)___________.
سؤال
Activities that can occur while an activity is taking place are called ________ activities.
سؤال
A(n)__________ activity is frequently used to identify the use of fixed resources or costs over a segment of the project.
سؤال
In a project network,________ indicate activity dependency and project flow.
سؤال
The _________ lag is the most typical type of lag that is encountered in developing networks.
سؤال
In a project network,recycling through a set of activities or __________ is not permitted.
سؤال
An activity has a duration of 10 days.Its early start is 4 and its late start is 6.This activity has _____ days of total slack.
سؤال
A(n)_____________ calculates how late an activity can start and finish.
سؤال
________ slack must be coordinated with all participants in the activities that follow in the chain.
سؤال
Activities that must occur immediately before a given activity are called ________ activities.
سؤال
A(n)________ is the minimum amount of time a dependent activity must be delayed to begin or end.
سؤال
___________ reflects the likelihood the original critical path(s)will change once the project is initiated.
سؤال
A(n)________ activity has more than one successor activity.
سؤال
The ________ calculates the critical path and determines how long an activity can be delayed without delaying the project.
سؤال
Activities that must immediately follow a given activity are called ________ activities.
سؤال
A network has only one critical path and the slack for noncritical activities is high.This network would appear to have a _______ level of sensitivity
سؤال
When an activity with a long duration is broken into smaller segments so that the following activities can begin sooner it is called __________.
سؤال
The ________ calculates the earliest times that activities can start or finish.
سؤال
A(n)_____________ calculates project duration.
سؤال
The longest path through a project network is called the _________.
سؤال
________ can never be negative and applies only to the last activity in a single chain of activities.
سؤال
Using free slack does not delay any following activities and requires no coordination with managers of other activities.
سؤال
The backward pass through a project network determines slack or how long an activity can be delayed without impacting the completion date of the project.
سؤال
An activity is an element of the project that always requires time.
سؤال
Gantt charts are popular because they represent an easy-to-understand,clear picture on a time-scaled horizon.
سؤال
An activity can include only one work package.
سؤال
If a network has more than one critical path but noncritical activities have very little slack,the network is considered to have a high level of sensitivity.
سؤال
An activity cannot begin until ALL preceding connected activities have been completed.
سؤال
It is possible for a project network to have more than one critical path.
سؤال
Burst activities have more than one activity immediately following them (more than one dependency arrow flowing from them).
سؤال
Experience suggests that when there are multiple starts,a common start node should be used to indicate a clear project beginning on the network.Similarly,a single project end node can be used to indicate a clear ending.
سؤال
The forward pass through a project network determines the critical path.
سؤال
The backward pass determines project duration.
سؤال
If the project has a duration of 13 days,the project should be completed 13 days from the day it starts.
سؤال
A merge activity is one that merges with other activities into a succeeding activity.
سؤال
It is acceptable for arrows to cross one another in a network diagram.
سؤال
Different activities along the same path can have different total slack.
سؤال
In developing a project network,neither looping nor conditional statements are permitted.
سؤال
When completing a forward pass,you carry the early finish to the next activity where it becomes its early start unless the next succeeding activity is a merge activity.In this case you select the smallest early finish number of all its immediate predecessor activities.
سؤال
The critical path is the shortest path through a network and indicates activities that cannot be delayed without delaying the project.
سؤال
The WBS identifies dependencies,the sequencing of activities,and the timing of activities.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Developing a Project Plan
1
Information to develop a project network is collected from the

A) Organization breakdown structure.
B) Work breakdown structure.
C) Budget.
D) Project proposal.
E) Responsibility matrix.
B
Explanation: The project network is developed from the information collected for the work breakdown structure (WBS)and is a graphic flow chart of the project job plan.
2
Which of the following is NOT one of the basic rules to follow when developing project networks?

A) An activity cannot begin until all preceding activities have been completed
B) Each activity must have a unique identification number
C) Conditional statements are allowed but looping statements are not allowed
D) An activity identification number must be larger than that of any preceding activities
E) Networks flow from left to right
C
Explanation: Conditional statements are not allowed (that is,this type of statement should not appear: If successful,do something;if not,do nothing).
3
Which of the following can be used without coordinating with managers of succeeding activities?

A) Total slack
B) Free slack
C) Critical float
D) Float pad
E) Slip pad
B
Explanation: Free slack is the amount of time an activity can be delayed without delaying any succeeding activity.It only occurs at the end of a chain of activities where you have a merge activity and requires no coordination with managers of succeeding activities unless all the available free slack is used.
4
________ activities are to be completed immediately following a particular activity.

A) Merge
B) Burst
C) Predecessor
D) Successor
E) Parallel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
On a project network,the activity times are derived from the

A) Organization breakdown structure.
B) Work packages.
C) Budget.
D) Project proposal.
E) Responsibility matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
Arrows on an activity-on-node (AON)project network represent

A) An activity.
B) Project flow.
C) Dependency.
D) Project flow and dependency.
E) An activity and dependency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following correctly calculates the early finish for an activity?

A) LS + DUR
B) ES + DUR
C) LF + DUR
D) ES + SL
E) LF + SL
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
The critical path in a project network is the

A) Shortest path through the network.
B) Longest path through the network.
C) Network path with the most difficult activities.
D) Network path using the most resources.
E) Network path with the most merge activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
A sequence of connected,dependent activities is termed a(n)

A) Path of events.
B) Parallel path.
C) Activity chain.
D) Path.
E) Dependent chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
A(n)_________ activity has more than one dependency arrow flowing from it.

A) Parallel
B) Critical path
C) Burst
D) Merge
E) Independent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
An activity that has more than one dependency arrow flowing into it is termed a(n)

A) Parallel activity.
B) Critical path.
C) Burst activity.
D) Merge activity.
E) Independent activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following represents an activity on an activity-on-node (AON)project network?

A) An arrow
B) A line
C) A node
D) Both an arrow and a line
E) An arrow,a line and a node all represent activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
The forward pass in project network calculations determines all of the following EXCEPT

A) Earliest time an activity can begin.
B) Earliest time an activity can finish.
C) Duration of the project.
D) The critical path.
E) How soon the project can finish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
Bill is building a project network that involves testing a prototype.He must design the prototype (activity 1),build the prototype (activity 2),and test the prototype (activity 3).Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3.If the prototype fails testing,Bill must redesign the prototype;therefore,activity 3 is a predecessor for activity 1.This is an example of

A) Conditional statements.
B) Looping.
C) Having more than one start node.
D) Good network development.
E) Natural network flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following is provided by both the project network and the work breakdown structure?

A) Dependencies
B) Sequencing
C) Interrelationships
D) Activity duration
E) Timing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Activities which can take place at the same time are termed

A) Parallel activity.
B) Critical path.
C) Burst activity.
D) Merge activity.
E) Independent activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following does NOT help describe a project network?

A) A graphic display of the flow and sequence of work through the project
B) Provides the basis for scheduling labor and equipment
C) Gives the times when activities can start and finish and when they can be delayed
D) Highlights major deliverables and identifies their completion dates
E) Identifies critical activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
When translated into a project network,a work package will become

A) A single activity.
B) One or more activities.
C) A milestone.
D) A critical path.
E) An arrow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
________ activities must be completed immediately before a particular activity.

A) Merge
B) Burst
C) Predecessor
D) Successor
E) Parallel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
The backward pass in project network calculations determines all of the following EXCEPT

A) Latest time an activity can begin.
B) Earliest time an activity can finish.
C) The critical path.
D) How long an activity can be delayed.
E) Latest time an activity can finish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
System documentation cannot end until three days after testing has started.This is an example of which kind of lag?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
Tom is responsible for ordering hardware for a custom home his company is building.The contractor installing the hardware is scheduled to start in 5 working days,but the hardware is on backorder and will not arrive for another 9 working days.Fortunately,Tom has 10 days of slack;however,he shares this slack with the hardware installer.He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days.Tom and the installer share 10 days of

A) Free Slack.
B) Shared Slack.
C) Total Slack.
D) Critical Slack.
E) Functional Slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is true about hammock activities?

A) They are used to identify the use of fixed resources or costs over a segment of a project
B) They are a combination of Start to Start and Start to Finish lags
C) They are activities in which the costs are not subject to change
D) They are an alternative description for the critical path
E) They are highly sensitive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
Concurrent engineering,which has dramatically reduced the development time for new products,relies on what kind of lag?

A) Start to Start lags
B) Start to Finish lags
C) Finish to Finish lags
D) Finish to Start lags
E) Any of these could be correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
If a project has more than one activity that can begin when the project is to start,a common start node should be used to indicate a clear project beginning on the network.Without a common start node,each path is a

A) Critical path.
B) Parallel path.
C) Dangler path.
D) Multiple start path.
E) Confused path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
Activities that can take place at the same time if the manager wishes them to are called ________ activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
The amount of time an activity can be delayed and yet not delay the project is termed

A) Total slack.
B) Free slack.
C) Critical float.
D) Float pad.
E) Slip pad.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
The delaying of any activity on the __________ will delay the completion of the project by the same amount.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following will correctly calculate the total slack in an activity?

A) LS - ES
B) LF - EF
C) LS - LF
D) LF - ES
E) Either LS - ES or LF - EF
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
If,for some reason,the project must be expedited to meet an earlier date,which of the following actions would the project manager take first?

A) Check to see which activities cost the least
B) Check to see which activities have the longest duration
C) Check to see which activities are on the critical path
D) Check to see which activities have the most slack
E) Check to see which activities have the highest risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
The likelihood the original critical path(s)will change once the project is initiated is referred to as

A) Flexibility.
B) Resilience.
C) Sensitivity.
D) Concurrent engineering.
E) Rigidity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
The requirement for a freshly poured foundation to cure before beginning construction is an example of which of the following type of lag?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
When completing a backward pass,you carry the LS to the next preceding activity to establish the LF,unless the next preceding activity is a burst activity,in which case you select

A) The smallest LS of all its immediate successor activities to establish the LF.
B) The largest ES of all its immediate successor activities to establish the LF.
C) The average LS of all its immediate successor activities to establish the LF.
D) The smallest ES of all its immediate successor activities to establish the LF.
E) The largest LS of all its immediate successor activities to establish the LF.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
The minimum amount of time a dependent activity must be delayed to begin or end is referred to as

A) Hammock.
B) Laddering.
C) Lag.
D) Cushion.
E) Buffer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
The activity time estimates used to build a project network are derived from ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
If testing cannot be completed any earlier than four days after the prototype has been built,what type of lag exists?

A) Start to Start
B) Start to Finish
C) Finish to Finish
D) Finish to Start
E) Any of these could be correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
The assumption that all immediate preceding activities must be 100% complete is too restrictive in some situations.When an activity is broken down into smaller segments in order to start the succeeding activity sooner,this is called

A) Hammock activities.
B) Concurrent engineering.
C) A forward pass.
D) Dissecting.
E) Laddering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following correctly calculates the late start for an activity?

A) EF - DUR
B) ES - DUR
C) LF - DUR
D) ES - SL
E) LF - SL
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
An activity that has more than one predecessor is a _________ activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
An element in the project that consumes time is a(n)___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
Activities that can occur while an activity is taking place are called ________ activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
A(n)__________ activity is frequently used to identify the use of fixed resources or costs over a segment of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
In a project network,________ indicate activity dependency and project flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
The _________ lag is the most typical type of lag that is encountered in developing networks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
In a project network,recycling through a set of activities or __________ is not permitted.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
An activity has a duration of 10 days.Its early start is 4 and its late start is 6.This activity has _____ days of total slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
A(n)_____________ calculates how late an activity can start and finish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
________ slack must be coordinated with all participants in the activities that follow in the chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
Activities that must occur immediately before a given activity are called ________ activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
A(n)________ is the minimum amount of time a dependent activity must be delayed to begin or end.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
___________ reflects the likelihood the original critical path(s)will change once the project is initiated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
A(n)________ activity has more than one successor activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
The ________ calculates the critical path and determines how long an activity can be delayed without delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
Activities that must immediately follow a given activity are called ________ activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
A network has only one critical path and the slack for noncritical activities is high.This network would appear to have a _______ level of sensitivity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
When an activity with a long duration is broken into smaller segments so that the following activities can begin sooner it is called __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
The ________ calculates the earliest times that activities can start or finish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
A(n)_____________ calculates project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
The longest path through a project network is called the _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
________ can never be negative and applies only to the last activity in a single chain of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Using free slack does not delay any following activities and requires no coordination with managers of other activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
The backward pass through a project network determines slack or how long an activity can be delayed without impacting the completion date of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
An activity is an element of the project that always requires time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Gantt charts are popular because they represent an easy-to-understand,clear picture on a time-scaled horizon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
An activity can include only one work package.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
If a network has more than one critical path but noncritical activities have very little slack,the network is considered to have a high level of sensitivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
An activity cannot begin until ALL preceding connected activities have been completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
It is possible for a project network to have more than one critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Burst activities have more than one activity immediately following them (more than one dependency arrow flowing from them).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Experience suggests that when there are multiple starts,a common start node should be used to indicate a clear project beginning on the network.Similarly,a single project end node can be used to indicate a clear ending.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
The forward pass through a project network determines the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
The backward pass determines project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
If the project has a duration of 13 days,the project should be completed 13 days from the day it starts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
A merge activity is one that merges with other activities into a succeeding activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
It is acceptable for arrows to cross one another in a network diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
Different activities along the same path can have different total slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
In developing a project network,neither looping nor conditional statements are permitted.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
When completing a forward pass,you carry the early finish to the next activity where it becomes its early start unless the next succeeding activity is a merge activity.In this case you select the smallest early finish number of all its immediate predecessor activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
The critical path is the shortest path through a network and indicates activities that cannot be delayed without delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
The WBS identifies dependencies,the sequencing of activities,and the timing of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.