سؤال
Jose is looking at a document that outlines the specific deliverables and subdeliverables required to complete the writing of a technical support manual.He is most likely viewing the

A) Responsibility matrix.
B) Organization breakdown structure.
C) Work breakdown structure.
D) Priority matrix.
E) Work package.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The _________ is used to assist in making project trade-offs among schedule,budget,and performance objectives.

A) Responsibility matrix
B) Work breakdown structure
C) Project priority matrix
D) Work package
E) Criterion matrix
سؤال
The first step of project scope definition is to

A) Analyze the strategic plan.
B) Analyze the current budget plan.
C) Meet with team members.
D) Select team members.
E) Define the overall objective to meet the customer's needs.
سؤال
The highest element in the hierarchical breakdown of the WBS is

A) A work package.
B) Subdeliverables.
C) A cost account.
D) Major deliverables.
E) The project.
سؤال
Which of the following is NOT true regarding scope creep?

A) It is when the cost of the project is more than expected
B) It is the tendency for the project scope to expand over time
C) It most likely caused by a scope statement that is too broad
D) It can have both positive and negative impacts on a project
E) It can lead to added costs and possible project delays
سؤال
Scott has just been given a project that has a specific completion date.After a discussion with top management he finds that while the date is important the cost is more important and a slip in delivery would be acceptable if required to meet the cost targets.The completion date is best classified as

A) Constrained.
B) Reduced.
C) Accepted.
D) Limited.
E) Optional.
سؤال
The lowest element in the hierarchical breakdown of the WBS is

A) A deliverable.
B) A work package.
C) A cost account.
D) A lowest subdeliverable.
E) An object.
سؤال
An expected output over the life of a project would be classified as

A) A deliverable.
B) A product.
C) An end object.
D) An objective.
E) A target.
سؤال
The ability of a 911 emergency system to identify the caller's phone number and location is considered to be a

A) Technical requirement.
B) Milestone.
C) Project limit.
D) Project exclusion.
E) Project deliverable.
سؤال
In reviewing the project plan,Susan sees that the first prototype must be completed by October 12.This would be best classified as a

A) Project target.
B) Limit item.
C) Milestone.
D) Project objective.
E) Critical goal.
سؤال
Which of the following is NOT one of the items that would appear on a project scope statement or checklist?

A) Deliverables
B) Technical requirements
C) Objectives
D) Work breakdown structure
E) Reviews with customer
سؤال
One of the primary jobs of a project manager is to manage the trade-offs associated with the project.Which of the following is NOT one of the basic classifications of project priorities?

A) Profit
B) Cost
C) Time
D) Performance
E) All of these are basic classifications
سؤال
There are 5 steps involved when defining a project;which of the following is the second?

A) Analyze the strategic plan
B) Analyze the current budget plan
C) Establish project priorities
D) Select team members
E) Define the major objectives to meet the customer's needs
سؤال
All of the following are usually included in a work package EXCEPT

A) What will be done.
B) The time needed to complete the work.
C) A single person who is responsible for its completion.
D) All the costs for the work package.
E) All of these are included in a work package.
سؤال
"To construct a high-quality,custom home within five months at costs not to exceed $150,000" is best classified as

A) A deliverable.
B) A milestone.
C) An objective.
D) A limit.
E) An exclusion.
سؤال
There are 5 steps involved when defining a project;which of the following is the first?

A) Establish project priorities
B) Define the project scope
C) Verify the budget available
D) Assign team members to work on the project
E) Determine the required completion date
سؤال
How is project scope defined?

A) The length of your project and how much it will cost
B) The deliverables or outputs during the course of the project
C) The range of resources you have available and their capabilities
D) What you expect to deliver to your customer when the project is complete
E) The range of customer expectations
سؤال
Linda has just been assigned manager of a project to develop a new advertising campaign for an established product.Her first step should be to

A) Establish project priorities.
B) Define the project scope.
C) Verify the budget available.
D) Assign team members to work on the project.
E) Determine the required completion date.
سؤال
After reviewing the project scope statement,the owner specifies that costs MUST stay within $400,000.This criterion is classified as

A) Constrained.
B) Enhanced.
C) Accepted.
D) Limited.
E) Fixed.
سؤال
All of the following are ways the WBS helps in managing projects EXCEPT

A) With cost and time estimates the WBS makes it possible to plan,schedule and budget the project.
B) It provides management with information appropriate to each level.
C) Can be used to define communication channels.
D) Allows the project manager to establish the overall objective of the project.
E) As it is developed,organizational units and individuals can be assigned responsibility of work packages.
سؤال
A selective outline of the project that ensures the identification of all tasks and an understanding of what is to be done is called a(n)____________.
سؤال
The tendency for the project deliverables to expand over time-usually by changing requirements,specifications,and priorities-is called

A) Scope erosion.
B) Scope creep.
C) Project bloat.
D) Scope enhancement.
E) Project add-ons.
سؤال
The project scope statement indicates that the client is responsible for training the people who will be using the equipment and that the project team will train the client's trainers.This is an example of

A) Project objectives.
B) Deliverables.
C) Limits and exclusions.
D) Technical requirements.
E) Milestones.
سؤال
The agreement that training will be the responsibility of the customer and not the team is an example of a project ________.
سؤال
There are 5 steps involved when defining a project;which of the following is the last?

A) Code the WBS for tracking
B) Assign the cost account to a manager
C) Assign the work package to a manager
D) Develop the responsibility matrix
E) All of these are included in the final step
سؤال
Significant events in a project that occur at a specific point in time,are natural control points,and are easily recognized by project participants are known as ___________.
سؤال
Having a strong communication plan can go a long way toward mitigating project problems.A communication plan should address all of the following EXCEPT

A) When the information will be communicated.
B) How information should be communicated and to whom.
C) What methods will be used to gather and store information.
D) What information needs to be collected and are there limits as to who has access to it.
E) All of these should be addressed in a communication plan.
سؤال
Which of the following is a good example of a Process Breakdown Structure?

A) New car prototype
B) New software program
C) New instruction manual
D) New sports stadium
E) New project management book
سؤال
Taking advantage of opportunities to reduce costs or accelerate the schedule are examples of project criteria classified as ____________.
سؤال
The first step in planning any project is to ___________.
سؤال
In making project trade-offs,a criterion that is allowed not to meet the original target,for example,allowing the schedule to slip,is classified as ___________.
سؤال
Which of the following is least likely to be included in a work package?

A) How long the work package should take to complete
B) A description of work to be performed
C) Overhead expenses
D) How much the work package should cost to complete
E) The person responsible for the work package
سؤال
If a project is small and does not require an elaborate system to assign tasks,which of the following is a good choice?

A) Responsibility matrix
B) Organization breakdown structure
C) Work breakdown structure
D) Priority matrix
E) Process breakdown structure
سؤال
The need for a functioning computer in countries having different electrical systems is an example of a ________.
سؤال
The integration of the lowest level of the WBS with the organizational units responsible for performing the work is known as

A) Responsibility matrix.
B) Organization breakdown structure.
C) Work breakdown structure.
D) Priority matrix.
E) Process breakdown structure.
سؤال
The WBS is best suited for projects that have a tangible outcome.Which of the following is used when the final outcome of the project is less tangible or is a product of a series of steps or phases?

A) Responsibility matrix
B) Organization breakdown structure
C) A work breakdown structure is still effective for these types of projects
D) Priority matrix
E) Process breakdown structure
سؤال
In regard to project priorities,if a project parameter such as the completion date or the cost of a project is fixed and must be met it is considered ____________.
سؤال
When work packages are integrated with organizational units,a control point is created called a

A) Responsibility matrix.
B) Priority matrix.
C) Work package.
D) Cost account.
E) Project overlap.
سؤال
The last element of a project scope statement or checklist ensures an understanding and agreement of expectations.This is known as ____________.
سؤال
The definition of the end result or mission of your project,or what you expect to deliver to your customer when the project is complete is the project ___________.
سؤال
One of the primary jobs of a project manager is to manage the trade-offs among time,cost,and performance.To do so,the project manager must define and understand the ___________ of the project.
سؤال
An activity that represents a major segment of work is a good example of a milestone.
سؤال
Scope creep can be reduced by carefully writing a(n)__________ statement.
سؤال
A document that is issued by upper management and provides the project manager with written authority to use organizational resources for project activities is called a(n)__________.
سؤال
When specific work packages are assigned to a particular group or person within the organization,the result is called a(n)___________.
سؤال
A technique that clearly establishes priorities with customers and top management so as to create shared expectations and avoid misunderstandings is developing a(n)___________.
سؤال
One of the items included on a project scope statement or checklist is the review with the customer.
سؤال
The WBS is best suited for design and construction projects that have tangible outcomes.When the final outcome of the project is less tangible or it is result of a series of steps or phases,some project managers choose to utilize a(n)___________.
سؤال
An expected output over the life of a project would be classified as a target.
سؤال
Once the __________ has been established,it is the basis for making trade-off decisions later in the project.
سؤال
Project scope describes what you expect to deliver to your customers when the project is complete.
سؤال
One tool that is used by project managers of small projects to summarize the tasks to be accomplished and who is responsible for what on a project is called a(n)__________.
سؤال
There is a strong correlation between project success and clear project scope definition.
سؤال
The final step in defining a project is __________ the WBS for the information system.
سؤال
The intersection of work packages and the organizational unit creates a project control point called a(n)___________.
سؤال
Scope creep occurs when your project is completed over-budget.
سؤال
The most detailed element in the hierarchical breakdown of the project work to be accomplished is known as the __________.
سؤال
The type of information that will need to be collected during a project and who will receive this information can be found in the project __________ plan.
سؤال
The gradual expansion of project requirements,specifications and priorities during the execution of project is known as ____________.
سؤال
The result of subdividing the work of a project into smaller and smaller work elements is called a(n)__________.
سؤال
A typical responsibility matrix will include not only those responsible for a specific task but can also include those who supply support and assistance.
سؤال
Responsibility matrices are used primarily with small and medium-sized projects and have limited use in large projects.
سؤال
A communication plan should include limits on who has access to certain kinds of information.
سؤال
If the project time should be accepted,then the project must be completed on time.
سؤال
If a project criterion should be optimized if at all possible,it is classified as being constrained.
سؤال
The intersection of work packages and the organizational unit creates a project control point called a cost account.
سؤال
Integrating a project's work packages within the organization's management structure is known as work breakdown structure.
سؤال
"Reviews with customer" only refers to projects with external customers who are paying for the project.
سؤال
The fact that a new home being built must meet local building codes is an example of a limit and exclusion.
سؤال
The highest element in the hierarchical breakdown of the WBS is the first major deliverable for the project and the lowest element is a work package.
سؤال
During the course of a project,it is possible that the project priorities may change.
سؤال
For large companies,the organization breakdown structure is used rather than the work breakdown structure.
سؤال
The final stage in defining a project is coding the organization breakdown structure or OBS for the information system.
سؤال
Process breakdown structures are used when the size and the scope of the project do not warrant an elaborate WBS or OBS.
سؤال
Profit,time and performance are all basic classifications of project priorities.
سؤال
In terms of project management,what is a deliverable? Give an example.
سؤال
The hierarchical work breakdown structure provides management with information appropriate to each level.
سؤال
The project charter provides the project manager with written authority to use organizational resources for project activities.
سؤال
Identify and briefly describe the five steps in defining a project.
سؤال
Identify and briefly describe the six elements on the recommended project scope checklist.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/89
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Defining the Project
1
Jose is looking at a document that outlines the specific deliverables and subdeliverables required to complete the writing of a technical support manual.He is most likely viewing the

A) Responsibility matrix.
B) Organization breakdown structure.
C) Work breakdown structure.
D) Priority matrix.
E) Work package.
C
Explanation: Once the scope and deliverables have been identified,the work can be successfully subdivided into smaller work elements.The outcome of this hierarchical process is called the work breakdown structure.
2
The _________ is used to assist in making project trade-offs among schedule,budget,and performance objectives.

A) Responsibility matrix
B) Work breakdown structure
C) Project priority matrix
D) Work package
E) Criterion matrix
C
Explanation: One technique found in practice that is useful for this purpose is completing a priority matrix for the project to identify which criterion is constrained,which should be enhanced,and which can be accepted.
3
The first step of project scope definition is to

A) Analyze the strategic plan.
B) Analyze the current budget plan.
C) Meet with team members.
D) Select team members.
E) Define the overall objective to meet the customer's needs.
E
Explanation: The first step of project scope definition is to define the overall objective to meet your customer's need(s).The project objective answers the questions of what,when,and how much.
4
The highest element in the hierarchical breakdown of the WBS is

A) A work package.
B) Subdeliverables.
C) A cost account.
D) Major deliverables.
E) The project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is NOT true regarding scope creep?

A) It is when the cost of the project is more than expected
B) It is the tendency for the project scope to expand over time
C) It most likely caused by a scope statement that is too broad
D) It can have both positive and negative impacts on a project
E) It can lead to added costs and possible project delays
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
6
Scott has just been given a project that has a specific completion date.After a discussion with top management he finds that while the date is important the cost is more important and a slip in delivery would be acceptable if required to meet the cost targets.The completion date is best classified as

A) Constrained.
B) Reduced.
C) Accepted.
D) Limited.
E) Optional.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
7
The lowest element in the hierarchical breakdown of the WBS is

A) A deliverable.
B) A work package.
C) A cost account.
D) A lowest subdeliverable.
E) An object.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
8
An expected output over the life of a project would be classified as

A) A deliverable.
B) A product.
C) An end object.
D) An objective.
E) A target.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
9
The ability of a 911 emergency system to identify the caller's phone number and location is considered to be a

A) Technical requirement.
B) Milestone.
C) Project limit.
D) Project exclusion.
E) Project deliverable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
10
In reviewing the project plan,Susan sees that the first prototype must be completed by October 12.This would be best classified as a

A) Project target.
B) Limit item.
C) Milestone.
D) Project objective.
E) Critical goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is NOT one of the items that would appear on a project scope statement or checklist?

A) Deliverables
B) Technical requirements
C) Objectives
D) Work breakdown structure
E) Reviews with customer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
12
One of the primary jobs of a project manager is to manage the trade-offs associated with the project.Which of the following is NOT one of the basic classifications of project priorities?

A) Profit
B) Cost
C) Time
D) Performance
E) All of these are basic classifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
13
There are 5 steps involved when defining a project;which of the following is the second?

A) Analyze the strategic plan
B) Analyze the current budget plan
C) Establish project priorities
D) Select team members
E) Define the major objectives to meet the customer's needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
14
All of the following are usually included in a work package EXCEPT

A) What will be done.
B) The time needed to complete the work.
C) A single person who is responsible for its completion.
D) All the costs for the work package.
E) All of these are included in a work package.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
15
"To construct a high-quality,custom home within five months at costs not to exceed $150,000" is best classified as

A) A deliverable.
B) A milestone.
C) An objective.
D) A limit.
E) An exclusion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
16
There are 5 steps involved when defining a project;which of the following is the first?

A) Establish project priorities
B) Define the project scope
C) Verify the budget available
D) Assign team members to work on the project
E) Determine the required completion date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
17
How is project scope defined?

A) The length of your project and how much it will cost
B) The deliverables or outputs during the course of the project
C) The range of resources you have available and their capabilities
D) What you expect to deliver to your customer when the project is complete
E) The range of customer expectations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
18
Linda has just been assigned manager of a project to develop a new advertising campaign for an established product.Her first step should be to

A) Establish project priorities.
B) Define the project scope.
C) Verify the budget available.
D) Assign team members to work on the project.
E) Determine the required completion date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
19
After reviewing the project scope statement,the owner specifies that costs MUST stay within $400,000.This criterion is classified as

A) Constrained.
B) Enhanced.
C) Accepted.
D) Limited.
E) Fixed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
20
All of the following are ways the WBS helps in managing projects EXCEPT

A) With cost and time estimates the WBS makes it possible to plan,schedule and budget the project.
B) It provides management with information appropriate to each level.
C) Can be used to define communication channels.
D) Allows the project manager to establish the overall objective of the project.
E) As it is developed,organizational units and individuals can be assigned responsibility of work packages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
21
A selective outline of the project that ensures the identification of all tasks and an understanding of what is to be done is called a(n)____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
22
The tendency for the project deliverables to expand over time-usually by changing requirements,specifications,and priorities-is called

A) Scope erosion.
B) Scope creep.
C) Project bloat.
D) Scope enhancement.
E) Project add-ons.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
23
The project scope statement indicates that the client is responsible for training the people who will be using the equipment and that the project team will train the client's trainers.This is an example of

A) Project objectives.
B) Deliverables.
C) Limits and exclusions.
D) Technical requirements.
E) Milestones.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
24
The agreement that training will be the responsibility of the customer and not the team is an example of a project ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
25
There are 5 steps involved when defining a project;which of the following is the last?

A) Code the WBS for tracking
B) Assign the cost account to a manager
C) Assign the work package to a manager
D) Develop the responsibility matrix
E) All of these are included in the final step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
26
Significant events in a project that occur at a specific point in time,are natural control points,and are easily recognized by project participants are known as ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
27
Having a strong communication plan can go a long way toward mitigating project problems.A communication plan should address all of the following EXCEPT

A) When the information will be communicated.
B) How information should be communicated and to whom.
C) What methods will be used to gather and store information.
D) What information needs to be collected and are there limits as to who has access to it.
E) All of these should be addressed in a communication plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is a good example of a Process Breakdown Structure?

A) New car prototype
B) New software program
C) New instruction manual
D) New sports stadium
E) New project management book
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
29
Taking advantage of opportunities to reduce costs or accelerate the schedule are examples of project criteria classified as ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
30
The first step in planning any project is to ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
31
In making project trade-offs,a criterion that is allowed not to meet the original target,for example,allowing the schedule to slip,is classified as ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is least likely to be included in a work package?

A) How long the work package should take to complete
B) A description of work to be performed
C) Overhead expenses
D) How much the work package should cost to complete
E) The person responsible for the work package
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
33
If a project is small and does not require an elaborate system to assign tasks,which of the following is a good choice?

A) Responsibility matrix
B) Organization breakdown structure
C) Work breakdown structure
D) Priority matrix
E) Process breakdown structure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
34
The need for a functioning computer in countries having different electrical systems is an example of a ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
35
The integration of the lowest level of the WBS with the organizational units responsible for performing the work is known as

A) Responsibility matrix.
B) Organization breakdown structure.
C) Work breakdown structure.
D) Priority matrix.
E) Process breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
36
The WBS is best suited for projects that have a tangible outcome.Which of the following is used when the final outcome of the project is less tangible or is a product of a series of steps or phases?

A) Responsibility matrix
B) Organization breakdown structure
C) A work breakdown structure is still effective for these types of projects
D) Priority matrix
E) Process breakdown structure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
37
In regard to project priorities,if a project parameter such as the completion date or the cost of a project is fixed and must be met it is considered ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
38
When work packages are integrated with organizational units,a control point is created called a

A) Responsibility matrix.
B) Priority matrix.
C) Work package.
D) Cost account.
E) Project overlap.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
39
The last element of a project scope statement or checklist ensures an understanding and agreement of expectations.This is known as ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
40
The definition of the end result or mission of your project,or what you expect to deliver to your customer when the project is complete is the project ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
41
One of the primary jobs of a project manager is to manage the trade-offs among time,cost,and performance.To do so,the project manager must define and understand the ___________ of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
42
An activity that represents a major segment of work is a good example of a milestone.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
43
Scope creep can be reduced by carefully writing a(n)__________ statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
44
A document that is issued by upper management and provides the project manager with written authority to use organizational resources for project activities is called a(n)__________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
45
When specific work packages are assigned to a particular group or person within the organization,the result is called a(n)___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
46
A technique that clearly establishes priorities with customers and top management so as to create shared expectations and avoid misunderstandings is developing a(n)___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
47
One of the items included on a project scope statement or checklist is the review with the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
48
The WBS is best suited for design and construction projects that have tangible outcomes.When the final outcome of the project is less tangible or it is result of a series of steps or phases,some project managers choose to utilize a(n)___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
49
An expected output over the life of a project would be classified as a target.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
50
Once the __________ has been established,it is the basis for making trade-off decisions later in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
51
Project scope describes what you expect to deliver to your customers when the project is complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
52
One tool that is used by project managers of small projects to summarize the tasks to be accomplished and who is responsible for what on a project is called a(n)__________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
53
There is a strong correlation between project success and clear project scope definition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
54
The final step in defining a project is __________ the WBS for the information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
55
The intersection of work packages and the organizational unit creates a project control point called a(n)___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
56
Scope creep occurs when your project is completed over-budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
57
The most detailed element in the hierarchical breakdown of the project work to be accomplished is known as the __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
58
The type of information that will need to be collected during a project and who will receive this information can be found in the project __________ plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
59
The gradual expansion of project requirements,specifications and priorities during the execution of project is known as ____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
60
The result of subdividing the work of a project into smaller and smaller work elements is called a(n)__________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
61
A typical responsibility matrix will include not only those responsible for a specific task but can also include those who supply support and assistance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
62
Responsibility matrices are used primarily with small and medium-sized projects and have limited use in large projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
63
A communication plan should include limits on who has access to certain kinds of information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
64
If the project time should be accepted,then the project must be completed on time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
65
If a project criterion should be optimized if at all possible,it is classified as being constrained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
66
The intersection of work packages and the organizational unit creates a project control point called a cost account.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
67
Integrating a project's work packages within the organization's management structure is known as work breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
68
"Reviews with customer" only refers to projects with external customers who are paying for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
69
The fact that a new home being built must meet local building codes is an example of a limit and exclusion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
70
The highest element in the hierarchical breakdown of the WBS is the first major deliverable for the project and the lowest element is a work package.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
71
During the course of a project,it is possible that the project priorities may change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
72
For large companies,the organization breakdown structure is used rather than the work breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
73
The final stage in defining a project is coding the organization breakdown structure or OBS for the information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
74
Process breakdown structures are used when the size and the scope of the project do not warrant an elaborate WBS or OBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
75
Profit,time and performance are all basic classifications of project priorities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
76
In terms of project management,what is a deliverable? Give an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
77
The hierarchical work breakdown structure provides management with information appropriate to each level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
78
The project charter provides the project manager with written authority to use organizational resources for project activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
79
Identify and briefly describe the five steps in defining a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
80
Identify and briefly describe the six elements on the recommended project scope checklist.