Deck 7: Lean Thinking and Lean Systems

ملء الشاشة (f)
exit full mode
سؤال
External setup time refers to

A) the time it takes workers to set up a machine during scheduled maintenance.
B) the time to complete setup activities that do not require that the machine be stopped.
C) the time it takes equipment vendors to set up the machine.
D) none of the above.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following statements regarding lean systems is FALSE?

A) Lean is a philosophy that emphasizes continuous improvement.
B) Lean is an approach that seeks to provide exactly what the customer requires and no more.
C) Lean is not applicable to low-volume manufacturing operations.
D) In a lean system, waste is any activity that does not add value.
سؤال
The ideal setup time for a lean system is

A) 5 minutes.
B) the time it takes the line to get ready.
C) 0 minutes.
D) 1 hour.
سؤال
Which of the following is NOT a lean tenet?

A) Specify what about a product or service creates value from the customer's perspective.
B) Identify, study, and improve the value stream of the process for each product and service.
C) Improve value to customer by producing goods well in advance of demand.
D) Strive for perfection.
سؤال
Which of the following statements regarding lean systems is FALSE?

A) Lean systems are a "push" type of production planning system.
B) Lean systems emphasize reduction in setup (changeover) time.
C) Lean systems emphasize reduction in inventory levels.
D) Lean systems utilize "kanbans" to signal the need for production.
سؤال
Which of the following is NOT generally an element of a lean system?

A) Flexible workforce
B) MRP push system
C) Stable master schedule
D) Kanban pull system
سؤال
Supplier management in a lean system

A) may require co-location of supplier goods close to plants that receive delivery.
B) means an increase in the number of suppliers for each component.
C) generally involves short-term relationships with the buyer.
D) usually requires additional paperwork, as compared with a non-lean system.
سؤال
With regards to suppliers,lean systems typically require

A) delivery of large lots at frequent intervals.
B) buyer inspection of goods and materials.
C) multiple sources from which to purchase.
D) long-term relationships and commitments.
سؤال
Managing quality in a lean system

A) is easy.
B) means that product and service defects are never defined as waste.
C) is done by suppliers.
D) requires continuously exposing and correcting quality problems.
سؤال
The time it takes a container to complete an entire circuit consists of

A) move time, time used, and wait time.
B) wait time, run time, setup time, and idle time.
C) fill time, wait time, move time, time used, and time to be returned to be filled again.
D) none of the above.
سؤال
Why is a uniform load desirable in a lean system?

A) To balance the workload on all work centers.
B) To allow for production of safety stock.
C) To signal the need for more parts.
D) To increase the time for scheduled maintenance.
سؤال
Which of the following is NOT an element of lean?

A) Small lot sizes
B) Modularized master schedule
C) Multifunction workers
D) Kanban pull system
E) Perfect or nearly perfect quality
سؤال
A kanban card is used to signal that

A) the next work center is stopped.
B) a materials handler has run out of parts.
C) a machine has broken down.
D) parts are needed by the subsequent work center.
E) a machine is ready for preventive maintenance.
سؤال
One of the main objectives of a lean system is

A) striving for "good enough."
B) reduction of takt time.
C) reduction of waste.
D) define value from the manufacturer's perspective.
سؤال
The ideal lot size for a lean system is

A) infinite.
B) one.
C) the capacity of the machine.
D) variable according to the production requirements.
E) none of the above.
سؤال
For production control,lean pull systems are best suited for

A) repetitive manufacturing.
B) job shop production.
C) semirepetitive batch manufacturing.
D) unpredictable demand.
سؤال
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a kanban container holds 20 parts,how many containers are required?

A) 25
B) 5
C) 40
D) 20
سؤال
Given the following information pertaining to item AX143,determine the appropriate number of kanban containers that should be used to support production. Demand rate = 500 units/week
Time for container to complete circuit = 2 weeks
Safety stock = 30 percent
Size of container = 5 units

A) <100 containers.
B) Between 100 and 500 containers.
C) >500 containers.
D) There is not enough information to answer the question.
سؤال
The seven forms of waste include all of the following EXCEPT

A) overproduction.
B) waiting time.
C) inventory.
D) bottleneck.
سؤال
The basic foundation of the Toyota production system and just-in-time manufacturing includes all of the following elements EXCEPT

A) simple but high-quality processes.
B) lower inventory levels.
C) smaller batches.
D) longer product development times.
سؤال
Which of the following best represents the idea behind the 5 Why technique?

A) A tool for systematically investigating the cause-and-effect relationships underlying a problem.
B) A tool for exploring the five categories of workspace organization to improve morale, safety, and process efficiency.
C) A technique for determining the appropriate placement of inventory to support a lean system.
D) None of the above.
سؤال
Under a lean thinking philosophy,which of the following would LEAST likely be considered waste?

A) Effort spent sorting defective parts out of a supplier delivery.
B) Customers waiting to be served.
C) Stopping the production line due to a quality problem.
D) Producing a small percentage extra to protect against unexpected problems.
سؤال
A work center uses kanban containers that hold 200 parts.To produce enough parts to fill a container,60 minutes of setup plus run time are needed.Moving the container to the next workstation,waiting time,processing time at the next work station,and return of the empty container take 120 minutes.There is an overall demand rate of 10 units per minute.Calculate the number of containers needed for this process.

A) 6
B) 7
C) 8
D) 9
سؤال
A kanban system cannot be used in service industries.
سؤال
Kaizen events typically take from one to two months.
سؤال
Which of the following is NOT a change associated with a lean production system?

A) Reduced inventory storage space is needed.
B) Reduced automation as lot size approaches one unit.
C) Workers take responsibility for most maintenance of the equipment they use.
D) Routine preventive maintenance time is provided between shifts.
سؤال
Supplier relationships in a lean system are usually developed as an "integrated supplier program" that includes

A) increasing lot sizes to take advantage of volume pricing.
B) treating suppliers the same way the company treats internal operations.
C) chosen suppliers being provided with shipment dates well in advance.
D) none of the above.
سؤال
Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.
سؤال
One-touch setups could require as long as nine minutes to perform.
سؤال
Which of the following is true for takt time in a lean system?

A) Takt time should be set at greater than the average demand of the market.
B) Takt time is the period of time available for production.
C) Takt time is used to match supply and demand.
D) Takt is the Japanese word for time.
سؤال
According to the lean philosophy,a stable master production schedule is desirable to reduce the work-in-process inventories.
سؤال
__________ is(are)the direct observation of work,conducted so that work practices can be improved.

A) 5 Whys
B) 5S
C) Gemba
D) Value stream mapping
سؤال
Which of the following is true about kanban systems?

A) The purpose is to ensure parts are produced JIT to support subsequent processes.
B) Some companies control the movement of the containers by using two types of kanban cards: production cards and withdrawal cards.
C) Kanban cards take the place of shop paperwork used in traditional mass production.
D) All of the above.
سؤال
In lean thinking,inventory hides a variety of forms of waste.Which of the following is NOT an example of waste hidden by inventory?

A) Inferior product quality.
B) Unreliable production machinery.
C) Long, but certain, delivery lead times.
D) Unreliable suppliers.
سؤال
Which of the following is NOT an approach recommended for facilitating implementation of lean?

A) Construct a value stream map of every process step and the associated time or value that is added.
B) Establish a team of employees that will work on process improvement.
C) Only the employee team can specify what is valued in the product or service.
D) Implement the changes to achieve lasting improvement, then repeat the cycle.
سؤال
Which of the following describes a kaizen event?

A) A work stoppage due to a quality problem, either internal or external (supplier quality).
B) Any time when supply is clearly mismatched with customer demand, creating shortages or inventory build-up.
C) A short-term team project focused on finding opportunities for continuous improvement.
D) None of the above.
سؤال
Lean is an example of a pull system while lean thinking is an example of a push system.
سؤال
Which of the following would NOT be an example of waste in a retail grocery store?

A) Produce found past its sell-by date.
B) Customers not able to find the product they seek.
C) Checkout clerk unable to accurately scan a package bar code.
D) All are examples of waste.
سؤال
External setups refer to actions that require stopping the production process.
سؤال
The effect of a lean system on employees can best be described as

A) lean engages employees in problem-solving activities.
B) lean promotes worker specialization and increases economies of scale.
C) lean reduces the need for continuous investment in new skill development.
D) lean supports pay systems based on seniority.
سؤال
Takt time is the demand for the period divided by the available time for production.
سؤال
With lean thinking,a firm's operations layout should evolve to a cellular manufacturing layout.
سؤال
The Japanese term for waste is "gemba."
سؤال
What are the seven forms of waste that a lean system is intended to prevent?
سؤال
What are the five tenets of lean thinking?
In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.
سؤال
Toyota production system is another term for a lean system.
سؤال
How is the 5 Whys technique used in a lean system?
سؤال
Preventive maintenance is another term for stabilizing the master schedule.
سؤال
Explain the concept of value stream mapping.
سؤال
Define the English terms in the 5S technique.How is this applied in practice?
سؤال
"Gemba" refers to data collection using the company's information system.
سؤال
One of the keys to reducing inventory is reducing lead time.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/52
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Lean Thinking and Lean Systems
1
External setup time refers to

A) the time it takes workers to set up a machine during scheduled maintenance.
B) the time to complete setup activities that do not require that the machine be stopped.
C) the time it takes equipment vendors to set up the machine.
D) none of the above.
the time to complete setup activities that do not require that the machine be stopped.
2
Which of the following statements regarding lean systems is FALSE?

A) Lean is a philosophy that emphasizes continuous improvement.
B) Lean is an approach that seeks to provide exactly what the customer requires and no more.
C) Lean is not applicable to low-volume manufacturing operations.
D) In a lean system, waste is any activity that does not add value.
Lean is not applicable to low-volume manufacturing operations.
3
The ideal setup time for a lean system is

A) 5 minutes.
B) the time it takes the line to get ready.
C) 0 minutes.
D) 1 hour.
0 minutes.
4
Which of the following is NOT a lean tenet?

A) Specify what about a product or service creates value from the customer's perspective.
B) Identify, study, and improve the value stream of the process for each product and service.
C) Improve value to customer by producing goods well in advance of demand.
D) Strive for perfection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following statements regarding lean systems is FALSE?

A) Lean systems are a "push" type of production planning system.
B) Lean systems emphasize reduction in setup (changeover) time.
C) Lean systems emphasize reduction in inventory levels.
D) Lean systems utilize "kanbans" to signal the need for production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is NOT generally an element of a lean system?

A) Flexible workforce
B) MRP push system
C) Stable master schedule
D) Kanban pull system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
7
Supplier management in a lean system

A) may require co-location of supplier goods close to plants that receive delivery.
B) means an increase in the number of suppliers for each component.
C) generally involves short-term relationships with the buyer.
D) usually requires additional paperwork, as compared with a non-lean system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
8
With regards to suppliers,lean systems typically require

A) delivery of large lots at frequent intervals.
B) buyer inspection of goods and materials.
C) multiple sources from which to purchase.
D) long-term relationships and commitments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
9
Managing quality in a lean system

A) is easy.
B) means that product and service defects are never defined as waste.
C) is done by suppliers.
D) requires continuously exposing and correcting quality problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
10
The time it takes a container to complete an entire circuit consists of

A) move time, time used, and wait time.
B) wait time, run time, setup time, and idle time.
C) fill time, wait time, move time, time used, and time to be returned to be filled again.
D) none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
11
Why is a uniform load desirable in a lean system?

A) To balance the workload on all work centers.
B) To allow for production of safety stock.
C) To signal the need for more parts.
D) To increase the time for scheduled maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is NOT an element of lean?

A) Small lot sizes
B) Modularized master schedule
C) Multifunction workers
D) Kanban pull system
E) Perfect or nearly perfect quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
13
A kanban card is used to signal that

A) the next work center is stopped.
B) a materials handler has run out of parts.
C) a machine has broken down.
D) parts are needed by the subsequent work center.
E) a machine is ready for preventive maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
14
One of the main objectives of a lean system is

A) striving for "good enough."
B) reduction of takt time.
C) reduction of waste.
D) define value from the manufacturer's perspective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ideal lot size for a lean system is

A) infinite.
B) one.
C) the capacity of the machine.
D) variable according to the production requirements.
E) none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
16
For production control,lean pull systems are best suited for

A) repetitive manufacturing.
B) job shop production.
C) semirepetitive batch manufacturing.
D) unpredictable demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
17
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a kanban container holds 20 parts,how many containers are required?

A) 25
B) 5
C) 40
D) 20
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
18
Given the following information pertaining to item AX143,determine the appropriate number of kanban containers that should be used to support production. Demand rate = 500 units/week
Time for container to complete circuit = 2 weeks
Safety stock = 30 percent
Size of container = 5 units

A) <100 containers.
B) Between 100 and 500 containers.
C) >500 containers.
D) There is not enough information to answer the question.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
19
The seven forms of waste include all of the following EXCEPT

A) overproduction.
B) waiting time.
C) inventory.
D) bottleneck.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
20
The basic foundation of the Toyota production system and just-in-time manufacturing includes all of the following elements EXCEPT

A) simple but high-quality processes.
B) lower inventory levels.
C) smaller batches.
D) longer product development times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following best represents the idea behind the 5 Why technique?

A) A tool for systematically investigating the cause-and-effect relationships underlying a problem.
B) A tool for exploring the five categories of workspace organization to improve morale, safety, and process efficiency.
C) A technique for determining the appropriate placement of inventory to support a lean system.
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
22
Under a lean thinking philosophy,which of the following would LEAST likely be considered waste?

A) Effort spent sorting defective parts out of a supplier delivery.
B) Customers waiting to be served.
C) Stopping the production line due to a quality problem.
D) Producing a small percentage extra to protect against unexpected problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
23
A work center uses kanban containers that hold 200 parts.To produce enough parts to fill a container,60 minutes of setup plus run time are needed.Moving the container to the next workstation,waiting time,processing time at the next work station,and return of the empty container take 120 minutes.There is an overall demand rate of 10 units per minute.Calculate the number of containers needed for this process.

A) 6
B) 7
C) 8
D) 9
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
24
A kanban system cannot be used in service industries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
25
Kaizen events typically take from one to two months.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is NOT a change associated with a lean production system?

A) Reduced inventory storage space is needed.
B) Reduced automation as lot size approaches one unit.
C) Workers take responsibility for most maintenance of the equipment they use.
D) Routine preventive maintenance time is provided between shifts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
27
Supplier relationships in a lean system are usually developed as an "integrated supplier program" that includes

A) increasing lot sizes to take advantage of volume pricing.
B) treating suppliers the same way the company treats internal operations.
C) chosen suppliers being provided with shipment dates well in advance.
D) none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
28
Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
29
One-touch setups could require as long as nine minutes to perform.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is true for takt time in a lean system?

A) Takt time should be set at greater than the average demand of the market.
B) Takt time is the period of time available for production.
C) Takt time is used to match supply and demand.
D) Takt is the Japanese word for time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
31
According to the lean philosophy,a stable master production schedule is desirable to reduce the work-in-process inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
32
__________ is(are)the direct observation of work,conducted so that work practices can be improved.

A) 5 Whys
B) 5S
C) Gemba
D) Value stream mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is true about kanban systems?

A) The purpose is to ensure parts are produced JIT to support subsequent processes.
B) Some companies control the movement of the containers by using two types of kanban cards: production cards and withdrawal cards.
C) Kanban cards take the place of shop paperwork used in traditional mass production.
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
34
In lean thinking,inventory hides a variety of forms of waste.Which of the following is NOT an example of waste hidden by inventory?

A) Inferior product quality.
B) Unreliable production machinery.
C) Long, but certain, delivery lead times.
D) Unreliable suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is NOT an approach recommended for facilitating implementation of lean?

A) Construct a value stream map of every process step and the associated time or value that is added.
B) Establish a team of employees that will work on process improvement.
C) Only the employee team can specify what is valued in the product or service.
D) Implement the changes to achieve lasting improvement, then repeat the cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following describes a kaizen event?

A) A work stoppage due to a quality problem, either internal or external (supplier quality).
B) Any time when supply is clearly mismatched with customer demand, creating shortages or inventory build-up.
C) A short-term team project focused on finding opportunities for continuous improvement.
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
37
Lean is an example of a pull system while lean thinking is an example of a push system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following would NOT be an example of waste in a retail grocery store?

A) Produce found past its sell-by date.
B) Customers not able to find the product they seek.
C) Checkout clerk unable to accurately scan a package bar code.
D) All are examples of waste.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
39
External setups refer to actions that require stopping the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
40
The effect of a lean system on employees can best be described as

A) lean engages employees in problem-solving activities.
B) lean promotes worker specialization and increases economies of scale.
C) lean reduces the need for continuous investment in new skill development.
D) lean supports pay systems based on seniority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
41
Takt time is the demand for the period divided by the available time for production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
42
With lean thinking,a firm's operations layout should evolve to a cellular manufacturing layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
43
The Japanese term for waste is "gemba."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
44
What are the seven forms of waste that a lean system is intended to prevent?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
45
What are the five tenets of lean thinking?
In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
46
Toyota production system is another term for a lean system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
47
How is the 5 Whys technique used in a lean system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
48
Preventive maintenance is another term for stabilizing the master schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
49
Explain the concept of value stream mapping.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
50
Define the English terms in the 5S technique.How is this applied in practice?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
51
"Gemba" refers to data collection using the company's information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
52
One of the keys to reducing inventory is reducing lead time.