Deck 5: Strategic Capacity Management

ملء الشاشة (f)
exit full mode
سؤال
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's short-range competitive strategy.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate-range capacity planning.
سؤال
The basic notion of economies of scale is that as a plant gets larger and volume increases, the average cost per unit of output drops.
سؤال
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
سؤال
A production facility works best when it focuses on a fairly limited set of production objectives.
سؤال
Long-range capacity planning requires top management participation.
سؤال
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
سؤال
The ultimate in plant flexibility is a one-hour-changeover-time plant.
سؤال
At some point, the size of a growing plant can become too large and diseconomies of scale become a capacity planning problem.
سؤال
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
سؤال
Best operating level is the volume of output at which average unit cost is minimized.
سؤال
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
سؤال
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
سؤال
Capacity can be defined as the ability to hold, receive, store, or accommodate.
سؤال
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's long-range competitive strategy.
سؤال
Best operating level is usually a multiple of the level of capacity for which a process was designed.
سؤال
When evaluating capacity, managers need to consider both resource inputs and product outputs.
سؤال
Capacity planning is generally viewed in three time durations: immediate, intermediate, and indeterminate.
سؤال
A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
سؤال
The capacity utilization rate is found by dividing best operating level by capacity used.
سؤال
Capacity flexibility means having the ability to rapidly increase or decrease production levels or to shift production capacity quickly from one product or service to another.
سؤال
The capacity cushion is the ratio of capacity used to the best capacity level.
سؤال
When a firm's design capacity is less than the capacity required to meet its demand, it is said to have a negative capacity cushion.
سؤال
In a decision tree, the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
سؤال
The larger the capacity cushion, the better.
سؤال
In practice, achieving a perfectly balanced plant is usually desirable but impossible.
سؤال
A decision tree problem does not need probabilities or payoffs to generate a solution.
سؤال
Because services cannot be stored for later use, service managers consider time as one of their supplies or resources.
سؤال
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A)Economies of scale
B)Economies of size
C)Economies of shape
D)Economies of scope
E)Economies of shipping
سؤال
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
سؤال
A capacity cushion is the amount of capacity less than expected demand.
سؤال
In practice, achieving a perfectly balanced plant is usually both impossible and undesirable.
سؤال
The smaller the capacity cushion, the better.
سؤال
Outsourcing is a common source of external capacity.
سؤال
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
سؤال
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
سؤال
In decision tree analysis, the time value of money is ignored because the only concern is with cash costs.
سؤال
In solving a decision tree problem, calculations start at the ends of the "branches" of the tree and work backward to the base of the tree.
سؤال
Low rates of capacity utilization in service organizations are never appropriate.
سؤال
Sharing capacity is a common source of external capacity.
سؤال
The capacity focus concept can be put into practice through a mechanism called which of the following?

A)Best operating level (BOL)
B)Plant within a plant (PWP)
C)Total quality management (TQM)
D)Capacity utilization rate (CUR)
E)Zero changeover time (ZXT)
سؤال
At a decision point in a decision tree, which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000, with a probability of 90%; the expected benefit of selecting machine B is $80,000, with a probability of 50%; and the expected benefit of selecting machine C is $60,000, with a probability of 75%?

A)Machine A
B)Machine B
C)Machine C
D)You would be indifferent between machines A and C.
E)You would be indifferent between machines A and B.
سؤال
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
سؤال
Precise capacity design or the rate of service utilization (ρ), is application specific.

A)It could be close to 100% for a sports arena.
B)It could be as low as 0.5 for hospital emergency room.
C)As the degree of uncertainty in demand increases, higher ρ may be appropriate.
D)A, B and C are correct.
E)Only A and B are correct.
سؤال
What is an important difference between capacity planning in services and capacity planning in manufacturing operations?

A)Time
B)Location
C)Demand volatility
D)Utilization affects service
E)All of these
سؤال
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.25
D)1.33
E)100
سؤال
In a decision tree problem involving capacity planning, there was a random outcome node with three random outcomes (A,B, and C) which followed a decision node.The probabilities for A, B and C: P(A)=0.4, P(B) = 0.6 and P(C) = 0.2.Payoff following A,B and C respectively are $10000, $5000 and $2000.Expected value of that random outcome node is:

A)$7400
B)$7000
C)$17000
D)Cannot be determined since there is something wrong with the data given.
E)$5666.
سؤال
Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
سؤال
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.33
D)2.33
E)300
سؤال
In designing a general service facility, capacity should be such that the target rate of service utilization (ρ), in order to get the best general purpose design, should be

A)less than 0.6 (or 60%), so that your system would be within the zone of service with maximum possible utilization within that.
B)more than 0.6 (or 60%) so that your system would have a good utilization
C)about 0.7 (70%) so that your system would be in the zone of service with maximum possible utilization within that.
D)more than 1.0 (100%) so that the servers are fully utilized, even if the customers had to wait a little
E)between 0.9 (90%) and 1.0 (100%) so that the utilization of the system is ideal.
سؤال
Which of the following is not a step used in determining production capacity requirements?

A)Forecasting to predict product sales
B)Forecasting raw material usage
C)Projecting availability of labor
D)Calculating equipment and labor needs
E)Projecting equipment availability
سؤال
Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
سؤال
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A)Probability indexing
B)Johnson's sequencing rule
C)Decision trees
D)Activity system maps
E)Decision mapping
سؤال
When deciding to add capacity to a factory, which of the following need not be considered?

A)Maintaining system balance
B)The frequency of capacity additions
C)Use of external capacity
D)Immediate product demand
E)Availability of raw materials
سؤال
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

A)25 percent
B)100 units per hour
C)75 percent
D)125 percent
E)133 percent
سؤال
Compared with a service operation, a manufacturing operation's capacity is which of the following?

A)More dependent on time and location
B)Subject to more volatile demand fluctuations
C)Utilization more directly impacts quality
D)Demand can be smoothed by inventory policies
E)More capable of reacting to demand fluctuations
سؤال
The way to build in greater flexibility in your workers is to do which of the following?

A)Pay higher wages to motivate a willingness to do a variety to tasks.
B)Provide a broader range of training.
C)Provide a wide variety of technology to augment workers skills.
D)Institute a "pay for skills" program.
E)Use part-time employees with specialized skills as needed.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/57
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Strategic Capacity Management
1
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's short-range competitive strategy.
False
2
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate-range capacity planning.
False
3
The basic notion of economies of scale is that as a plant gets larger and volume increases, the average cost per unit of output drops.
True
4
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
5
A production facility works best when it focuses on a fairly limited set of production objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
6
Long-range capacity planning requires top management participation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
7
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
8
The ultimate in plant flexibility is a one-hour-changeover-time plant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
9
At some point, the size of a growing plant can become too large and diseconomies of scale become a capacity planning problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
10
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
11
Best operating level is the volume of output at which average unit cost is minimized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
12
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
13
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
14
Capacity can be defined as the ability to hold, receive, store, or accommodate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
15
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's long-range competitive strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
16
Best operating level is usually a multiple of the level of capacity for which a process was designed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
17
When evaluating capacity, managers need to consider both resource inputs and product outputs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
18
Capacity planning is generally viewed in three time durations: immediate, intermediate, and indeterminate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
19
A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
20
The capacity utilization rate is found by dividing best operating level by capacity used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
21
Capacity flexibility means having the ability to rapidly increase or decrease production levels or to shift production capacity quickly from one product or service to another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
22
The capacity cushion is the ratio of capacity used to the best capacity level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
23
When a firm's design capacity is less than the capacity required to meet its demand, it is said to have a negative capacity cushion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
24
In a decision tree, the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
25
The larger the capacity cushion, the better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
26
In practice, achieving a perfectly balanced plant is usually desirable but impossible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
27
A decision tree problem does not need probabilities or payoffs to generate a solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
28
Because services cannot be stored for later use, service managers consider time as one of their supplies or resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
29
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A)Economies of scale
B)Economies of size
C)Economies of shape
D)Economies of scope
E)Economies of shipping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
30
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
31
A capacity cushion is the amount of capacity less than expected demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
32
In practice, achieving a perfectly balanced plant is usually both impossible and undesirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
33
The smaller the capacity cushion, the better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
34
Outsourcing is a common source of external capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
35
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
36
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
37
In decision tree analysis, the time value of money is ignored because the only concern is with cash costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
38
In solving a decision tree problem, calculations start at the ends of the "branches" of the tree and work backward to the base of the tree.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
39
Low rates of capacity utilization in service organizations are never appropriate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
40
Sharing capacity is a common source of external capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
41
The capacity focus concept can be put into practice through a mechanism called which of the following?

A)Best operating level (BOL)
B)Plant within a plant (PWP)
C)Total quality management (TQM)
D)Capacity utilization rate (CUR)
E)Zero changeover time (ZXT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
42
At a decision point in a decision tree, which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000, with a probability of 90%; the expected benefit of selecting machine B is $80,000, with a probability of 50%; and the expected benefit of selecting machine C is $60,000, with a probability of 75%?

A)Machine A
B)Machine B
C)Machine C
D)You would be indifferent between machines A and C.
E)You would be indifferent between machines A and B.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
43
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
44
Precise capacity design or the rate of service utilization (ρ), is application specific.

A)It could be close to 100% for a sports arena.
B)It could be as low as 0.5 for hospital emergency room.
C)As the degree of uncertainty in demand increases, higher ρ may be appropriate.
D)A, B and C are correct.
E)Only A and B are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
45
What is an important difference between capacity planning in services and capacity planning in manufacturing operations?

A)Time
B)Location
C)Demand volatility
D)Utilization affects service
E)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
46
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.25
D)1.33
E)100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
47
In a decision tree problem involving capacity planning, there was a random outcome node with three random outcomes (A,B, and C) which followed a decision node.The probabilities for A, B and C: P(A)=0.4, P(B) = 0.6 and P(C) = 0.2.Payoff following A,B and C respectively are $10000, $5000 and $2000.Expected value of that random outcome node is:

A)$7400
B)$7000
C)$17000
D)Cannot be determined since there is something wrong with the data given.
E)$5666.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
48
Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
49
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.33
D)2.33
E)300
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
50
In designing a general service facility, capacity should be such that the target rate of service utilization (ρ), in order to get the best general purpose design, should be

A)less than 0.6 (or 60%), so that your system would be within the zone of service with maximum possible utilization within that.
B)more than 0.6 (or 60%) so that your system would have a good utilization
C)about 0.7 (70%) so that your system would be in the zone of service with maximum possible utilization within that.
D)more than 1.0 (100%) so that the servers are fully utilized, even if the customers had to wait a little
E)between 0.9 (90%) and 1.0 (100%) so that the utilization of the system is ideal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is not a step used in determining production capacity requirements?

A)Forecasting to predict product sales
B)Forecasting raw material usage
C)Projecting availability of labor
D)Calculating equipment and labor needs
E)Projecting equipment availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
52
Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A)Probability indexing
B)Johnson's sequencing rule
C)Decision trees
D)Activity system maps
E)Decision mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
54
When deciding to add capacity to a factory, which of the following need not be considered?

A)Maintaining system balance
B)The frequency of capacity additions
C)Use of external capacity
D)Immediate product demand
E)Availability of raw materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
55
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

A)25 percent
B)100 units per hour
C)75 percent
D)125 percent
E)133 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
56
Compared with a service operation, a manufacturing operation's capacity is which of the following?

A)More dependent on time and location
B)Subject to more volatile demand fluctuations
C)Utilization more directly impacts quality
D)Demand can be smoothed by inventory policies
E)More capable of reacting to demand fluctuations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
57
The way to build in greater flexibility in your workers is to do which of the following?

A)Pay higher wages to motivate a willingness to do a variety to tasks.
B)Provide a broader range of training.
C)Provide a wide variety of technology to augment workers skills.
D)Institute a "pay for skills" program.
E)Use part-time employees with specialized skills as needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.