Deck 7: Work Design and Measurement

ملء الشاشة (f)
exit full mode
سؤال
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
One of the potential benefits of self-directed teams is higher quality.
سؤال
A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.
سؤال
Job enrichment involves giving a workers a greater share of the total task, which is why they feel enriched.
سؤال
One important factor that influences productivity is trust between workers and managers.
سؤال
One of the potential benefits of self-directed teams is higher productivity and greater worker satisfaction.
سؤال
Trust is a factor influencing productivity.
سؤال
Self-directed teams help other work groups make changes to their processes.
سؤال
Ergonomics is an important part of job design to consider when we automate the system.
سؤال
Self-directed teams are allowed to make changes in the work processes under their control.
سؤال
Motivation influences quality and productivity, but not the work environment.
سؤال
One potential disadvantage of self-directed teams is higher training costs.
سؤال
Methods analysis cannot be done for new jobs (ones that do not yet exist) since it requires observation of the process.
سؤال
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
سؤال
One disadvantage of specialization is worker dissatisfaction.
سؤال
The quickest, most effective way to improve an employee's job satisfaction is to increase his or her compensation.
سؤال
One therblig is the equivalent of one hour of sustained work by one average person.
سؤال
Ergonomics is the use of computers and robots in the workplace.
سؤال
Many lower-level jobs are monotonous and boring.
سؤال
Job design relates to people, therefore technology has little impact.
سؤال
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
سؤال
Work measurement concentrates on how long the tasks take to accomplish.
سؤال
Studies on worker efficiency and time of day suggest that the greatest efficiency is at the end of the day when workers are "warmed up."
سؤال
Predetermined time standards are usually based on observing one very efficient worker performing the task.
سؤال
The normal time in time study is obtained by multiplying the observed time by the performance rating.
سؤال
The most widely used method of work measurement is work sampling.
سؤال
Therbligs are basic elemental motions.
سؤال
No stopwatch is required in a work sampling study.
سؤال
Predetermined time standards use historical data from a company's own files.
سؤال
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
سؤال
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
سؤال
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
سؤال
The design of work systems, because objective standards are used, avoids most ethical issues.
سؤال
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
سؤال
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
سؤال
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.
سؤال
Work sampling involves the use of some method of randomizing the observations.
سؤال
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
سؤال
Work sampling can be used to estimate the proportion of time a machine is idle.
سؤال
We incorporate the average seriousness of accidents by measuring the number of lost-time accidents per million labor hours worked.
سؤال
A worker-machine chart can be used to determine how many machines an operator can manage.
سؤال
Methods analysis is particularly valuable when it is used on jobs that:
(I) are high in labor content.
(II) are done frequently.
(III) involve a high degree of automation and mechanization.
(IV) are unsafe, tiring, unpleasant, and/or noisy.

A) I, II, III, and IV
B) I, II, and IV only
C) II and III only
D) II and IV only
E) I and III only
سؤال
If there is a good chance that one or a few employees could wind up in monotonous jobs, job __________ can be a good idea.

A) alteration
B) expansion
C) enrichment
D) enlargement
E) rotation
سؤال
Measured day work refers to an output-based system.
سؤال
A major advantage of job specialization in business is increased:

A) motivation.
B) opportunity for advancement.
C) opportunity for self-fulfillment.
D) productivity.
E) job enrichment.
سؤال
Asking a group of employees at a particular level to take on more responsibility is a form of ___________ loading, also known as job __________.

A) horizontal; enlargement
B) horizontal; rotation
C) vertical; rotation
D) vertical; enrichment
E) horizontal; enrichment
سؤال
From the worker's perspective, an output-based pay system has the advantage of:

A) linking pay more directly to effort.
B) keeping earnings stable.
C) keeping pay totally in the worker's control.
D) minimizing the temptation to work harder for more money.
E) keeping effort from influencing pay.
سؤال
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
سؤال
Time-based systems compensate employees according to the time they have worked and the amount of output they produce.
سؤال
Behavioral approaches to job design include:

A) specialization.
B) ergonomics.
C) job rotation.
D) flow process charts.
E) simo charts.
سؤال
Giving a worker a larger portion of the total task is known as job:

A) expansion.
B) enrichment.
C) enlargement.
D) rotation.
E) elimination.
سؤال
A worker-machine chart can help identify nonproductive parts of a process.
سؤال
Process chart symbols do not include:

A) delay.
B) inspection.
C) operation.
D) rejection.
E) storage.
سؤال
Output-based systems compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
سؤال
It would be acceptable to use a group incentive plan for an assembly line operation.
سؤال
Methods analysis and motion study techniques do not directly consider behavioral aspects of jobs.
سؤال
Work sampling provides both quick and accurate estimates of activity times.
سؤال
Which of the following is not an advantage of time-based pay systems?

A) labor cost stability
B) incentives to increase output
C) ease of administration
D) stability of output
E) ease of pay computations
سؤال
Increasing compensation is always a way to improve worker satisfaction.
سؤال
Which of the following is not generally considered an advantage of specialization?

A) high productivity
B) low wage costs
C) ease of training employees
D) low equipment costs
E) All are advantages
سؤال
In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the:

A) observed time.
B) normal time.
C) standard time.
D) allowance time.
E) performance rating time.
سؤال
Which of the following concerns is not one that job designers focus on?

A) what will be done in a job
B) who will do the job
C) how the job will be done
D) when should the job be completed
E) where the job will be done
سؤال
The methods analysis chart which describes the movements of both hands at the same time is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
سؤال
The chart used to review the overall sequence of an operation by focusing on the movements of either the operator or materials is called a:

A) simo chart.
B) Gantt chart.
C) worker-materials chart.
D) flow process chart.
E) multi-activity chart.
سؤال
In methods analysis, a therblig is a:

A) charting method of analysis.
B) job enrichment technique.
C) dummy task.
D) basic elemental motion.
E) fraction (.0006) of a minute.
سؤال
What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?

A) increases
B) decreases
C) unaffected
D) may increase or decrease, depending on the sample standard deviation
E) impossible to say without additional information
سؤال
Determining the number of cycles to observe is an element of:

A) stopwatch time study.
B) standard elemental times.
C) predetermined time standards.
D) work sampling.
E) MTM tables.
سؤال
The methods analysis chart which describes the overall sequence of operations, transportation, storage, delays, and inspection is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
سؤال
A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:

A) enlargement.
B) rotation.
C) enrichment.
D) involvement.
E) enhancement.
سؤال
When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?

A) allowance factors
B) MTM
C) methods analysis
D) performance rating
E) analysis of therbligs
سؤال
A simo chart includes:

A) delay.
B) storage.
C) transportation.
D) left/right hand movements.
E) inspection.
سؤال
The methods analysis chart which describes the portions of a work cycle during which an operator and equipment are busy or idle is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
سؤال
The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?

A) flow process
B) Gantt
C) simultaneous motion
D) worker-machine
E) delay analysis
سؤال
The chart used to focus on busy and idle portions of a work cycle is a:

A) worker-machine chart.
B) Gantt chart.
C) simo chart.
D) idle chart.
E) flow process chart.
سؤال
In a stopwatch time study, the number of cycles that must be timed is a function of:
(I) the variability of observed times.
(II) the desired accuracy for the estimated job time.
(III) the desired confidence for the estimated job time.

A) I only
B) I and II only
C) II and III only
D) I, II, and III
E) I and III only
سؤال
Which is not a requirement for an effective self-directed team?

A) talent and skills to meet goals
B) one or more members representing supervision
C) a system of reinforcement and celebration
D) clearly stated and commonly held vision and goals
E) effective and skilled interpersonal relations
سؤال
A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time. Normal time for the job in minutes is:

A) 3.20.
B) 3.84.
C) 4.00.
D) 4.80.
E) 5.00.
سؤال
Which of the following most closely describes job enlargement?

A) horizontal loading
B) increasing the level of responsibility associated with a job
C) transferring workers through a series of jobs to increase their scope of experience
D) increasing the amount of workspace assigned to a worker
E) assigning two jobs to the same worker
سؤال
Which of the following is not a potential benefit of the use of self-directed teams?

A) higher quality
B) higher productivity
C) greater worker satisfaction
D) greater satisfaction for middle managers
E) lower turnover
سؤال
One form of long-term team that is increasingly being used, especially in lean production settings, is:

A) quality circle.
B) product design.
C) self-directed.
D) self-improvement.
E) mandatory.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/151
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Work Design and Measurement
1
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
True
2
One of the potential benefits of self-directed teams is higher quality.
True
3
A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.
False
4
Job enrichment involves giving a workers a greater share of the total task, which is why they feel enriched.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
5
One important factor that influences productivity is trust between workers and managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
6
One of the potential benefits of self-directed teams is higher productivity and greater worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
7
Trust is a factor influencing productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
8
Self-directed teams help other work groups make changes to their processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
9
Ergonomics is an important part of job design to consider when we automate the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
10
Self-directed teams are allowed to make changes in the work processes under their control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
11
Motivation influences quality and productivity, but not the work environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
12
One potential disadvantage of self-directed teams is higher training costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
13
Methods analysis cannot be done for new jobs (ones that do not yet exist) since it requires observation of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
14
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
15
One disadvantage of specialization is worker dissatisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
16
The quickest, most effective way to improve an employee's job satisfaction is to increase his or her compensation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
17
One therblig is the equivalent of one hour of sustained work by one average person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
18
Ergonomics is the use of computers and robots in the workplace.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
19
Many lower-level jobs are monotonous and boring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
20
Job design relates to people, therefore technology has little impact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
21
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
22
Work measurement concentrates on how long the tasks take to accomplish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
23
Studies on worker efficiency and time of day suggest that the greatest efficiency is at the end of the day when workers are "warmed up."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
24
Predetermined time standards are usually based on observing one very efficient worker performing the task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
25
The normal time in time study is obtained by multiplying the observed time by the performance rating.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
26
The most widely used method of work measurement is work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
27
Therbligs are basic elemental motions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
28
No stopwatch is required in a work sampling study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
29
Predetermined time standards use historical data from a company's own files.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
30
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
31
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
32
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
33
The design of work systems, because objective standards are used, avoids most ethical issues.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
34
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
35
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
36
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
37
Work sampling involves the use of some method of randomizing the observations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
38
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
39
Work sampling can be used to estimate the proportion of time a machine is idle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
40
We incorporate the average seriousness of accidents by measuring the number of lost-time accidents per million labor hours worked.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
41
A worker-machine chart can be used to determine how many machines an operator can manage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
42
Methods analysis is particularly valuable when it is used on jobs that:
(I) are high in labor content.
(II) are done frequently.
(III) involve a high degree of automation and mechanization.
(IV) are unsafe, tiring, unpleasant, and/or noisy.

A) I, II, III, and IV
B) I, II, and IV only
C) II and III only
D) II and IV only
E) I and III only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
43
If there is a good chance that one or a few employees could wind up in monotonous jobs, job __________ can be a good idea.

A) alteration
B) expansion
C) enrichment
D) enlargement
E) rotation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
44
Measured day work refers to an output-based system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
45
A major advantage of job specialization in business is increased:

A) motivation.
B) opportunity for advancement.
C) opportunity for self-fulfillment.
D) productivity.
E) job enrichment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
46
Asking a group of employees at a particular level to take on more responsibility is a form of ___________ loading, also known as job __________.

A) horizontal; enlargement
B) horizontal; rotation
C) vertical; rotation
D) vertical; enrichment
E) horizontal; enrichment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
47
From the worker's perspective, an output-based pay system has the advantage of:

A) linking pay more directly to effort.
B) keeping earnings stable.
C) keeping pay totally in the worker's control.
D) minimizing the temptation to work harder for more money.
E) keeping effort from influencing pay.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
48
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
49
Time-based systems compensate employees according to the time they have worked and the amount of output they produce.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
50
Behavioral approaches to job design include:

A) specialization.
B) ergonomics.
C) job rotation.
D) flow process charts.
E) simo charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
51
Giving a worker a larger portion of the total task is known as job:

A) expansion.
B) enrichment.
C) enlargement.
D) rotation.
E) elimination.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
52
A worker-machine chart can help identify nonproductive parts of a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
53
Process chart symbols do not include:

A) delay.
B) inspection.
C) operation.
D) rejection.
E) storage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
54
Output-based systems compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
55
It would be acceptable to use a group incentive plan for an assembly line operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
56
Methods analysis and motion study techniques do not directly consider behavioral aspects of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
57
Work sampling provides both quick and accurate estimates of activity times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following is not an advantage of time-based pay systems?

A) labor cost stability
B) incentives to increase output
C) ease of administration
D) stability of output
E) ease of pay computations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
59
Increasing compensation is always a way to improve worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following is not generally considered an advantage of specialization?

A) high productivity
B) low wage costs
C) ease of training employees
D) low equipment costs
E) All are advantages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
61
In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the:

A) observed time.
B) normal time.
C) standard time.
D) allowance time.
E) performance rating time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following concerns is not one that job designers focus on?

A) what will be done in a job
B) who will do the job
C) how the job will be done
D) when should the job be completed
E) where the job will be done
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
63
The methods analysis chart which describes the movements of both hands at the same time is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
64
The chart used to review the overall sequence of an operation by focusing on the movements of either the operator or materials is called a:

A) simo chart.
B) Gantt chart.
C) worker-materials chart.
D) flow process chart.
E) multi-activity chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
65
In methods analysis, a therblig is a:

A) charting method of analysis.
B) job enrichment technique.
C) dummy task.
D) basic elemental motion.
E) fraction (.0006) of a minute.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
66
What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?

A) increases
B) decreases
C) unaffected
D) may increase or decrease, depending on the sample standard deviation
E) impossible to say without additional information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
67
Determining the number of cycles to observe is an element of:

A) stopwatch time study.
B) standard elemental times.
C) predetermined time standards.
D) work sampling.
E) MTM tables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
68
The methods analysis chart which describes the overall sequence of operations, transportation, storage, delays, and inspection is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
69
A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:

A) enlargement.
B) rotation.
C) enrichment.
D) involvement.
E) enhancement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
70
When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?

A) allowance factors
B) MTM
C) methods analysis
D) performance rating
E) analysis of therbligs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
71
A simo chart includes:

A) delay.
B) storage.
C) transportation.
D) left/right hand movements.
E) inspection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
72
The methods analysis chart which describes the portions of a work cycle during which an operator and equipment are busy or idle is a:

A) flow process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous-motion chart.
E) time/efficiency chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
73
The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?

A) flow process
B) Gantt
C) simultaneous motion
D) worker-machine
E) delay analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
74
The chart used to focus on busy and idle portions of a work cycle is a:

A) worker-machine chart.
B) Gantt chart.
C) simo chart.
D) idle chart.
E) flow process chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
75
In a stopwatch time study, the number of cycles that must be timed is a function of:
(I) the variability of observed times.
(II) the desired accuracy for the estimated job time.
(III) the desired confidence for the estimated job time.

A) I only
B) I and II only
C) II and III only
D) I, II, and III
E) I and III only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which is not a requirement for an effective self-directed team?

A) talent and skills to meet goals
B) one or more members representing supervision
C) a system of reinforcement and celebration
D) clearly stated and commonly held vision and goals
E) effective and skilled interpersonal relations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
77
A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time. Normal time for the job in minutes is:

A) 3.20.
B) 3.84.
C) 4.00.
D) 4.80.
E) 5.00.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following most closely describes job enlargement?

A) horizontal loading
B) increasing the level of responsibility associated with a job
C) transferring workers through a series of jobs to increase their scope of experience
D) increasing the amount of workspace assigned to a worker
E) assigning two jobs to the same worker
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following is not a potential benefit of the use of self-directed teams?

A) higher quality
B) higher productivity
C) greater worker satisfaction
D) greater satisfaction for middle managers
E) lower turnover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
80
One form of long-term team that is increasingly being used, especially in lean production settings, is:

A) quality circle.
B) product design.
C) self-directed.
D) self-improvement.
E) mandatory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.