Deck 20: Constraint Management

ملء الشاشة (f)
exit full mode
سؤال
Buffer inventory in front of a bottleneck is called a time buffer.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Synchronous manufacturing refers to the entire production process working together in harmony to achieve the goals of the firm.
سؤال
The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold".
سؤال
Dr.Eli Goldratt feels that the goal of a firm is to make useful products efficiently.
سؤال
According to the theory of constraints,Throughput is the rate at which money is generated by the system through sales.
سؤال
Mr.Goldratt's "Theory of Constraints" is useful only in manufacturing settings.
سؤال
According to the theory of constraints it is wrong to for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes.Unbalanced capacity is better.
سؤال
From an operations standpoint,one of the goals of the firm under the theory of constraints is to increase throughput while simultaneously reducing inventory and reducing operating expense.
سؤال
A way to find a bottleneck is to use one's knowledge of a particular plant,look at the system in operation and talk with supervisors and workers.
سؤال
OPT stands for optimal purchasing technique.
سؤال
On an assembly line a process batch can be infinite.
سؤال
According to the theory of constraints the term productivity is defined as all those actions that bring a company closer to its goals.
سؤال
According to the theory of constraints,a capacity-constrained resource (CCR)is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
سؤال
According to the theory of constraints a bottleneck is any resource whose capacity is greater than the demand placed on it.
سؤال
According to the theory of constraints a non-bottleneck is any resource where capacity is less than the demand placed on it.
سؤال
A synchronous manufacturing system does not have excess capacity throughout the system,except for a bottleneck.
سؤال
According to the theory of constraints,capacity is the time available for production.
سؤال
An MRP system can allow for product rejects by building a larger batch than is demanded,but a JIT system cannot tolerate poor quality.
سؤال
One way to find a bottleneck is to run a capacity resource profile.
سؤال
According to the theory of constraints,throughput is the rate at which product is passed through the manufacturing system.
سؤال
Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.
سؤال
JIT requires a stable production Level.When compared to synchronous manufacturing this is viewed as a negative aspect of JIT.
سؤال
Which of the following is a "focusing step" of Dr.Eli Goldratt's theory of constraints?

A)Reduce system constraints
B)Reinforce system constraints
C)Support system constraints
D)If you have no system constraints,make some
E)Identify system constraints
سؤال
On an assembly line a transfer batch can be one unit.
سؤال
JIT requires vendors to be located nearby.When compared to synchronous manufacturing this is viewed as an advantage of JIT.
سؤال
The "dollar days" inventory measurement is chiefly used to focus management's attention on where inventory is located.
سؤال
The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.
سؤال
According to the theory of constraints which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Inventory
D)Sales
E)Retained earnings
سؤال
A process batch can be no larger than the transfer batch.
سؤال
Rather than try to adjust the master production schedule to change resource loads,it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
سؤال
JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing this is viewed as a negative aspect of JIT.
سؤال
The term Dependent Events refers to a process sequence.
سؤال
Smaller transfer batches give lower work-in-process inventory and faster product flow.
سؤال
The "dollar days" inventory measurement results from a complex algorithm used to compute individual units of inventory and their respective ordering and holding costs.
سؤال
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)Utilization and activation of a resource are not the same
B)Do not allow bottlenecks to govern the flow of the line
C)An hour lost at a bottleneck saves an hour for the entire system
D)Balance the capacities,not the flows
E)The Level of utilization of a bottleneck resource is not determined by its own potential but by some other constraint in the system
سؤال
The synchronous manufacturing approach uses backward scheduling.
سؤال
Larger transfer batches give shorter lead times and lower inventories and there is more material handling than smaller transfer batches.
سؤال
Departments within a firm often are at odds with each other because reward systems are often not synchronized with the basic goal of the firm: to make money.
سؤال
Transfer batch is another term for process batch.
سؤال
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)If you lose an hour at a bottleneck it is better than making scrap
B)Do not balance capacity,balance the flow
C)Do not allow bottlenecks to govern the flow of the line
D)An hour saved at a bottleneck operation is a mirage
E)A the amount in a process batch should be fixed when the batch is begun and not changed over time or along its route
سؤال
What is a word indicating a resource whose capacity is less than the demand placed on it?
سؤال
According to the theory of constraints which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Operating expenses
B)Cash flow
C)Inventory
D)Sales
E)Dividends
سؤال
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C & D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,what would we expect to find when we go out to the shop?
سؤال
Which of the following is not an important concept in TOC?

A)CCR
B)Rope
C)Drum
D)Buffer
E)File
سؤال
What are the three measurements that give guidance to the firm's operations?
سؤال
According to the theory of constraints which of the following can be a CCR?

A)Factory layout
B)Product design
C)An employee
D)A customer
E)Sales literature
سؤال
A useful measure of inventory performance is called "dollar days".In which of the following areas are dollar days measurements not useful?

A)Marketing
B)R & D
C)Manufacturing
D)Project management
E)Purchasing
سؤال
According to Dr.Goldratt,what is the goal of the firm?
سؤال
How many rules of make up Goldratt's Rules of Production Scheduling?
سؤال
According to the theory of constraints which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Inventory
B)Sales
C)Operating revenue
D)Unit cost
E)Overhead per unit
سؤال
According to the theory of constraints which of the following is a kind of time that makes up the cycle time in production?

A)Quality time
B)Idle time
C)Research time
D)Just-in-time
E)Break time
سؤال
According to the theory of constraints which of the following is a kind of time that makes up the cycle time in production?

A)Process time
B)Starting time
C)Quitting time
D)Information time
E)Finish time
سؤال
Which of the following is a negative aspect to JIT compared to synchronous manufacturing?

A)JIT can not deal with outside vendors
B)JIT needs broadly fluctuating production Levels
C)JIT does not allow very much flexibility in the products produced
D)JIT requires a great deal of workforce computational skills
E)JIT does not deal well with bottlenecks
سؤال
Which of the following is an approach to dealing with a bottleneck?

A)Keep a buffer inventory in front of it to insure that it always has something to work on
B)Use Johnson's sequencing rules on bottleneck operations
C)Don't worry about the bottleneck;it will take care of itself
D)Move things to a faster bottleneck
E)Pay an incentive bonus to workers on the bottleneck operation
سؤال
In Goldratt's approach to project management,what is the longest set of sequential tasks called?
سؤال
What is the rate at which money is generated by the system through sales called?
سؤال
What are the three financial measures of the firm's ability to make money?
سؤال
According to the theory of constraints which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Return on investment
D)Sales
E)Direct labor hours
سؤال
Name the five kinds of time that make up production cycle time according to Dr.Eli Goldratt's theory of constraints.
سؤال
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C &D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,what have we discovered about the process A,B,C & D?
سؤال
Where should an in-process quality inspection be placed? Why there?
سؤال
Describe how cost accounting is sometimes antithetical to TOC?
سؤال
In discussing batch size on an assembly line the text makes the point that "one" and "infinity" are equally correct Answers.How can this be?
سؤال
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C &C.A rope (communication)should be directed back to the start of the process,resource A to prevent inventory from building up.Depending upon the situation,a second rope can extend from the finished goods inventory location (another buffer)to resource C as described in the text.C.A small buffer inventory should be held between resource B and resource D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,how would you employ the "drum,buffer,rope" thinking?
This concept is discussed in the text on pages 690-693.The drum or control of the process is at the bottleneck,resource
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/64
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 20: Constraint Management
1
Buffer inventory in front of a bottleneck is called a time buffer.
True
2
Synchronous manufacturing refers to the entire production process working together in harmony to achieve the goals of the firm.
True
3
The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold".
False
4
Dr.Eli Goldratt feels that the goal of a firm is to make useful products efficiently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
5
According to the theory of constraints,Throughput is the rate at which money is generated by the system through sales.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
6
Mr.Goldratt's "Theory of Constraints" is useful only in manufacturing settings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
7
According to the theory of constraints it is wrong to for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes.Unbalanced capacity is better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
8
From an operations standpoint,one of the goals of the firm under the theory of constraints is to increase throughput while simultaneously reducing inventory and reducing operating expense.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
9
A way to find a bottleneck is to use one's knowledge of a particular plant,look at the system in operation and talk with supervisors and workers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
10
OPT stands for optimal purchasing technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
11
On an assembly line a process batch can be infinite.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
12
According to the theory of constraints the term productivity is defined as all those actions that bring a company closer to its goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
13
According to the theory of constraints,a capacity-constrained resource (CCR)is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
14
According to the theory of constraints a bottleneck is any resource whose capacity is greater than the demand placed on it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
15
According to the theory of constraints a non-bottleneck is any resource where capacity is less than the demand placed on it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
16
A synchronous manufacturing system does not have excess capacity throughout the system,except for a bottleneck.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
17
According to the theory of constraints,capacity is the time available for production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
18
An MRP system can allow for product rejects by building a larger batch than is demanded,but a JIT system cannot tolerate poor quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
19
One way to find a bottleneck is to run a capacity resource profile.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
20
According to the theory of constraints,throughput is the rate at which product is passed through the manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
21
Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
22
JIT requires a stable production Level.When compared to synchronous manufacturing this is viewed as a negative aspect of JIT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is a "focusing step" of Dr.Eli Goldratt's theory of constraints?

A)Reduce system constraints
B)Reinforce system constraints
C)Support system constraints
D)If you have no system constraints,make some
E)Identify system constraints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
24
On an assembly line a transfer batch can be one unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
25
JIT requires vendors to be located nearby.When compared to synchronous manufacturing this is viewed as an advantage of JIT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
26
The "dollar days" inventory measurement is chiefly used to focus management's attention on where inventory is located.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
27
The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
28
According to the theory of constraints which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Inventory
D)Sales
E)Retained earnings
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
29
A process batch can be no larger than the transfer batch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
30
Rather than try to adjust the master production schedule to change resource loads,it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
31
JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing this is viewed as a negative aspect of JIT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
32
The term Dependent Events refers to a process sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
33
Smaller transfer batches give lower work-in-process inventory and faster product flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
34
The "dollar days" inventory measurement results from a complex algorithm used to compute individual units of inventory and their respective ordering and holding costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)Utilization and activation of a resource are not the same
B)Do not allow bottlenecks to govern the flow of the line
C)An hour lost at a bottleneck saves an hour for the entire system
D)Balance the capacities,not the flows
E)The Level of utilization of a bottleneck resource is not determined by its own potential but by some other constraint in the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
36
The synchronous manufacturing approach uses backward scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
37
Larger transfer batches give shorter lead times and lower inventories and there is more material handling than smaller transfer batches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
38
Departments within a firm often are at odds with each other because reward systems are often not synchronized with the basic goal of the firm: to make money.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
39
Transfer batch is another term for process batch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)If you lose an hour at a bottleneck it is better than making scrap
B)Do not balance capacity,balance the flow
C)Do not allow bottlenecks to govern the flow of the line
D)An hour saved at a bottleneck operation is a mirage
E)A the amount in a process batch should be fixed when the batch is begun and not changed over time or along its route
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is a word indicating a resource whose capacity is less than the demand placed on it?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
42
According to the theory of constraints which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Operating expenses
B)Cash flow
C)Inventory
D)Sales
E)Dividends
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
43
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C & D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,what would we expect to find when we go out to the shop?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is not an important concept in TOC?

A)CCR
B)Rope
C)Drum
D)Buffer
E)File
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
45
What are the three measurements that give guidance to the firm's operations?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
46
According to the theory of constraints which of the following can be a CCR?

A)Factory layout
B)Product design
C)An employee
D)A customer
E)Sales literature
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
47
A useful measure of inventory performance is called "dollar days".In which of the following areas are dollar days measurements not useful?

A)Marketing
B)R & D
C)Manufacturing
D)Project management
E)Purchasing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
48
According to Dr.Goldratt,what is the goal of the firm?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
49
How many rules of make up Goldratt's Rules of Production Scheduling?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
50
According to the theory of constraints which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Inventory
B)Sales
C)Operating revenue
D)Unit cost
E)Overhead per unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
51
According to the theory of constraints which of the following is a kind of time that makes up the cycle time in production?

A)Quality time
B)Idle time
C)Research time
D)Just-in-time
E)Break time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
52
According to the theory of constraints which of the following is a kind of time that makes up the cycle time in production?

A)Process time
B)Starting time
C)Quitting time
D)Information time
E)Finish time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is a negative aspect to JIT compared to synchronous manufacturing?

A)JIT can not deal with outside vendors
B)JIT needs broadly fluctuating production Levels
C)JIT does not allow very much flexibility in the products produced
D)JIT requires a great deal of workforce computational skills
E)JIT does not deal well with bottlenecks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is an approach to dealing with a bottleneck?

A)Keep a buffer inventory in front of it to insure that it always has something to work on
B)Use Johnson's sequencing rules on bottleneck operations
C)Don't worry about the bottleneck;it will take care of itself
D)Move things to a faster bottleneck
E)Pay an incentive bonus to workers on the bottleneck operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
55
In Goldratt's approach to project management,what is the longest set of sequential tasks called?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
56
What is the rate at which money is generated by the system through sales called?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
57
What are the three financial measures of the firm's ability to make money?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
58
According to the theory of constraints which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Return on investment
D)Sales
E)Direct labor hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
59
Name the five kinds of time that make up production cycle time according to Dr.Eli Goldratt's theory of constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
60
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C &D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,what have we discovered about the process A,B,C & D?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
61
Where should an in-process quality inspection be placed? Why there?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
62
Describe how cost accounting is sometimes antithetical to TOC?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
63
In discussing batch size on an assembly line the text makes the point that "one" and "infinity" are equally correct Answers.How can this be?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
64
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A,B,C &C.A rope (communication)should be directed back to the start of the process,resource A to prevent inventory from building up.Depending upon the situation,a second rope can extend from the finished goods inventory location (another buffer)to resource C as described in the text.C.A small buffer inventory should be held between resource B and resource D.The capacity resource profile tells you that recourse A is scheduled at 95 percent of capacity,recourse B at 80% of capacity,recourse C at 130% of capacity and recourse D at 100% of capacity.Assuming that the data we used to calculate the capacity resource profile was reasonably accurate,how would you employ the "drum,buffer,rope" thinking?
This concept is discussed in the text on pages 690-693.The drum or control of the process is at the bottleneck,resource
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.