Deck 12: Lean Manufacturing

ملء الشاشة (f)
exit full mode
سؤال
Value stream mapping is a technique that aims to eliminate waste in a process.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A focused factory network is a family of manufacturing facilities each producing components that are focused on a nearby large assembly facility.
سؤال
The goal of JIT production is to drive all inventory queues lower.
سؤال
Lean production is a management philosophy and a pull system throughout the plant.
سؤال
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
سؤال
In Japan we would expect a focused factory to be small and have only somewhere between 30 and 1,000 workers.
سؤال
Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials,work in process and finished goods.
سؤال
Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.
سؤال
Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900's.
سؤال
A principle of value stream mapping is to concentrate on speeding up value-added operations.
سؤال
"Quality at the source" requires factory workers to become their own inspectors.
سؤال
Group technology includes the set of psychological tests and training exercises given to group workers to insure a high level of teamwork.
سؤال
JIT production means that we produce the product before it is required so the customer does not wait for the product.
سؤال
Group technology cells help to eliminate movement and queue (waiting)time between operations.
سؤال
JIT manufacturing forces a firm to work with a lower water level despite safety hazards.
سؤال
In the textbook the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
سؤال
Uniform loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
سؤال
Lean production requires a "push & pull" system of inventory replenishment.
سؤال
JIT is typically applied to non-repetitive manufacturing.
سؤال
A focused factory tends to be a small plant designed for one purpose.
سؤال
One of the many JIT techniques that have been successfully applied in service firms is the upgrading of housekeeping.
سؤال
One of the many JIT techniques that have been successfully applied in service firms is leveling facility load.
سؤال
The term "heijunka" means "misfit" in Japanese.In a manufacturing context it refers to highly variable demands on a manufacturing facility that lead to cycles of overtime and layoffs.
سؤال
One of the many JIT techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.
سؤال
Firms in Japan tend to have short-term partnerships with their suppliers and customers.
سؤال
Uniform loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
سؤال
One of the many JIT techniques that have been successfully applied in service firms is the upgrading of quality.
سؤال
Company unions in Japan exist to foster a cooperative relationship with management.
سؤال
Kanban means "symbol" or "box" in Japanese.
سؤال
The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.
سؤال
One of the few JIT techniques that do not work well in service firms is demand-pull scheduling.
سؤال
Heijunka is a Japanese word that means to smooth the production flow.
سؤال
Preventive maintenance is emphasized in lean production to ensure the flows are not interrupted by downtime or malfunctioning equipment.
سؤال
Which of the following are related to lean production?

A)A philosophy of waste elimination
B)Lean consumption
C)Never running out of inventory
D)The Waehi-Subaru method
E)Full use of capacity
سؤال
Using the formula in the textbook the only parameters we need to determine the number of Kanban card sets is the average number of units demanded over some time period,the container size and the safety stock.
سؤال
"Kanban Squares" is an educational game played in Kanban training sessions.
سؤال
In Japanese manufacturing automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.
سؤال
A Kanban control system uses a signaling device to regulate JIT flows.
سؤال
Respect for people is a key to the Japanese improvement ideas in manufacturing.
سؤال
Subcontractor networks are not very important in Japanese manufacturing.
سؤال
Which of the following address elimination of waste under lean production?

A)Info-matic warehouse networks
B)Outsourced housekeeping
C)Quality at the source
D)Backflushing
E)Bottom-round management
سؤال
In trying to implement a lean production system you should work with suppliers to do which of the following?

A)Reduce lead times
B)Focus workstation capacities
C)Backflush
D)Provide quality at the source
E)Heijunka
سؤال
In implementing a lean production system you should work with suppliers to do which of the following?

A)Calculate lead times
B)Quality circles
C)Freeze windows
D)Make frequent deliveries
E)Achieve bottom-round management
سؤال
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Underproduction
B)Excess quality
C)Preventive maintenance
D)Product defects
E)Kaizen
سؤال
To implement a Kanban pull system the firm would do which of the following?

A)Reduce lot sizes
B)Force demand
C)Hire a consultant
D)Bottom-round management
E)Implement group technology
سؤال
Which one of the following concepts is not involved when implementing total quality control?

A)Workers being given responsibility
B)Enforce compliance
C)Fail-safe methods
D)Automatic inspection
E)Level schedule the factory
سؤال
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5 and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?

A)5
B)20
C)27
D)30
E)34
سؤال
In designing a lean production facility layout a designer should do which of the following?

A)Design for work flow balance
B)Locate flexible workstations off line
C)Link operations through a push system
D)Balance capacity using job shop analysis
E)Always keep operations on a single floor of the factory
سؤال
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Overproduction
C)Underproduction
D)Environmental
E)Over-thinking
سؤال
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Heijunka
B)Motion
C)Excess capacity
D)Underproduction
E)Excess demand
سؤال
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)5,000
B)5,500
C)6,300
D)6,500
E)7,000
سؤال
Group technology (GT)is credited with which of the following benefits?

A)Reducing waiting time between process operations
B)Improving inventory discipline
C)Reducing required workforce skills
D)Improved labor relations
E)Improved small group functioning
سؤال
To implement a flow process in developing a lean system a firm might do which of the following?

A)Balance workstation capacities
B)Standardize product configurations
C)Process design with product design
D)Adopt a kaizen philosophy
E)Implement top-down management controls
سؤال
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)42
B)47
C)68
D)89
E)94
سؤال
Which of the following statements holds true for Kanban production control systems?

A)The authority to produce or supply additional parts comes from upstream operations
B)In a paperless control system,containers can be used instead of cards
C)The cards or containers make up the Kanban push system
D)They require substantial quantitative analysis prior to implementation
E)They have not been successful outside of Japan and the United States
سؤال
Which of the following are elements that address elimination of waste under lean production?

A)Production ahead of demand
B)Group plant loading technology
C)Kanban production control system
D)Minimized run times
E)Full capacity utilization
سؤال
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?

A)60
B)80
C)90
D)120
E)150
سؤال
When implementing a lean production system a stabilized schedule is achieved using which of the following?

A)Level scheduling
B)Demand pull
C)Freeze window
D)Reduced lot sizes
E)Bottom-round management
سؤال
To implement a flow process in developing a lean system a firm might do which of the following?

A)Improve capacity utilization
B)Build product in anticipation of demand
C)Reduce setup/changeover time
D)Eliminate some fixed costs
E)Implement groupware
سؤال
Which of the following are key inventory reduction targets under lean production?

A)FIFO inventory
B)Hidden inventory
C)Safety stock
D)Lost inventory
E)Ladder inventory
سؤال
An activity involving periodic exploding of an end item's bill of materials to calculate how many of each part that go into the final product is called which of the following?

A)Frozen window
B)Backflushing
C)Level schedule
D)Group Technology
E)Kanban
سؤال
As lean production methods reduce change-over times and thus enable smaller economic lot sizes and less work-in-process inventory is the importance of quality increased or decreased? Why?
سؤال
What seven design principles guide the design of lean supply chains?
سؤال
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?

A)Organize problem-solving groups
B)Upgrade housekeeping
C)Upgrade quality
D)Freeze windows
E)Eliminate unnecessary activities
سؤال
The Toyota Production System is predicated upon what two philosophies that are also central to the Japanese culture?
سؤال
Explain why lean manufacturing requires a stable demand environment.
سؤال
What are the five guidelines for implementing a lean supply chain presented by Womack and Jones,in their book Lean Thinking?
سؤال
Name Fujio Cho's seven prominent types of waste to be eliminated.
سؤال
Which of the following is a lean production technique that has been successfully applied in service firms?

A)Decision trees
B)Leveling the facility load
C)Linear programming
D)Fully utilizing capacity
E)Backflushing
سؤال
In a lean production system we expect to see which of the following?

A)No "just-in-case" extra inventory
B)More "just-in-case" extra inventory
C)More parts and fewer standardized product configurations
D)Managers being held responsible for quality of the work turned out
E)Closer management/labor relationships
سؤال
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a Kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e. ,inventory holding costs + setup/ordering costs)of each?

A)Inventory holding cost will increase non-linearly with inventory
B)Total costs will be lower for the regular lot-size operation
C)Total costs will be lower for the Kanban/lean production operation
D)The order quantity will be larger for the Kanban/lean production approach
E)As long as the total quantity is the same,total costs will be the same
سؤال
In setting up a kanban control system and you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 2 hours,what number of kanban card sets is needed?
سؤال
Uniform plant loading means smoothing the production flow to dampen schedule variation.This practice is also known by which Japanese name?
سؤال
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour,safety stock is 10% of the demand during lead time,the container size is 5.If the lead time to replenish an order is 5 hours,what number of kanban card sets is needed?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/74
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Lean Manufacturing
1
Value stream mapping is a technique that aims to eliminate waste in a process.
True
2
A focused factory network is a family of manufacturing facilities each producing components that are focused on a nearby large assembly facility.
False
3
The goal of JIT production is to drive all inventory queues lower.
False
4
Lean production is a management philosophy and a pull system throughout the plant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
5
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
6
In Japan we would expect a focused factory to be small and have only somewhere between 30 and 1,000 workers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
7
Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials,work in process and finished goods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
8
Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
9
Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900's.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
10
A principle of value stream mapping is to concentrate on speeding up value-added operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
11
"Quality at the source" requires factory workers to become their own inspectors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
12
Group technology includes the set of psychological tests and training exercises given to group workers to insure a high level of teamwork.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
13
JIT production means that we produce the product before it is required so the customer does not wait for the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
14
Group technology cells help to eliminate movement and queue (waiting)time between operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
15
JIT manufacturing forces a firm to work with a lower water level despite safety hazards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
16
In the textbook the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
17
Uniform loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
18
Lean production requires a "push & pull" system of inventory replenishment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
19
JIT is typically applied to non-repetitive manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
20
A focused factory tends to be a small plant designed for one purpose.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
21
One of the many JIT techniques that have been successfully applied in service firms is the upgrading of housekeeping.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
22
One of the many JIT techniques that have been successfully applied in service firms is leveling facility load.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
23
The term "heijunka" means "misfit" in Japanese.In a manufacturing context it refers to highly variable demands on a manufacturing facility that lead to cycles of overtime and layoffs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
24
One of the many JIT techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
25
Firms in Japan tend to have short-term partnerships with their suppliers and customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
26
Uniform loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
27
One of the many JIT techniques that have been successfully applied in service firms is the upgrading of quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
28
Company unions in Japan exist to foster a cooperative relationship with management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
29
Kanban means "symbol" or "box" in Japanese.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
30
The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
31
One of the few JIT techniques that do not work well in service firms is demand-pull scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
32
Heijunka is a Japanese word that means to smooth the production flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
33
Preventive maintenance is emphasized in lean production to ensure the flows are not interrupted by downtime or malfunctioning equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following are related to lean production?

A)A philosophy of waste elimination
B)Lean consumption
C)Never running out of inventory
D)The Waehi-Subaru method
E)Full use of capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
35
Using the formula in the textbook the only parameters we need to determine the number of Kanban card sets is the average number of units demanded over some time period,the container size and the safety stock.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
36
"Kanban Squares" is an educational game played in Kanban training sessions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
37
In Japanese manufacturing automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
38
A Kanban control system uses a signaling device to regulate JIT flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
39
Respect for people is a key to the Japanese improvement ideas in manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
40
Subcontractor networks are not very important in Japanese manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following address elimination of waste under lean production?

A)Info-matic warehouse networks
B)Outsourced housekeeping
C)Quality at the source
D)Backflushing
E)Bottom-round management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
42
In trying to implement a lean production system you should work with suppliers to do which of the following?

A)Reduce lead times
B)Focus workstation capacities
C)Backflush
D)Provide quality at the source
E)Heijunka
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
43
In implementing a lean production system you should work with suppliers to do which of the following?

A)Calculate lead times
B)Quality circles
C)Freeze windows
D)Make frequent deliveries
E)Achieve bottom-round management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
44
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Underproduction
B)Excess quality
C)Preventive maintenance
D)Product defects
E)Kaizen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
45
To implement a Kanban pull system the firm would do which of the following?

A)Reduce lot sizes
B)Force demand
C)Hire a consultant
D)Bottom-round management
E)Implement group technology
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which one of the following concepts is not involved when implementing total quality control?

A)Workers being given responsibility
B)Enforce compliance
C)Fail-safe methods
D)Automatic inspection
E)Level schedule the factory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
47
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5 and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?

A)5
B)20
C)27
D)30
E)34
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
48
In designing a lean production facility layout a designer should do which of the following?

A)Design for work flow balance
B)Locate flexible workstations off line
C)Link operations through a push system
D)Balance capacity using job shop analysis
E)Always keep operations on a single floor of the factory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
49
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Overproduction
C)Underproduction
D)Environmental
E)Over-thinking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
50
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Heijunka
B)Motion
C)Excess capacity
D)Underproduction
E)Excess demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
51
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)5,000
B)5,500
C)6,300
D)6,500
E)7,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
52
Group technology (GT)is credited with which of the following benefits?

A)Reducing waiting time between process operations
B)Improving inventory discipline
C)Reducing required workforce skills
D)Improved labor relations
E)Improved small group functioning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
53
To implement a flow process in developing a lean system a firm might do which of the following?

A)Balance workstation capacities
B)Standardize product configurations
C)Process design with product design
D)Adopt a kaizen philosophy
E)Implement top-down management controls
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
54
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)42
B)47
C)68
D)89
E)94
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following statements holds true for Kanban production control systems?

A)The authority to produce or supply additional parts comes from upstream operations
B)In a paperless control system,containers can be used instead of cards
C)The cards or containers make up the Kanban push system
D)They require substantial quantitative analysis prior to implementation
E)They have not been successful outside of Japan and the United States
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following are elements that address elimination of waste under lean production?

A)Production ahead of demand
B)Group plant loading technology
C)Kanban production control system
D)Minimized run times
E)Full capacity utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
57
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?

A)60
B)80
C)90
D)120
E)150
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
58
When implementing a lean production system a stabilized schedule is achieved using which of the following?

A)Level scheduling
B)Demand pull
C)Freeze window
D)Reduced lot sizes
E)Bottom-round management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
59
To implement a flow process in developing a lean system a firm might do which of the following?

A)Improve capacity utilization
B)Build product in anticipation of demand
C)Reduce setup/changeover time
D)Eliminate some fixed costs
E)Implement groupware
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following are key inventory reduction targets under lean production?

A)FIFO inventory
B)Hidden inventory
C)Safety stock
D)Lost inventory
E)Ladder inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
61
An activity involving periodic exploding of an end item's bill of materials to calculate how many of each part that go into the final product is called which of the following?

A)Frozen window
B)Backflushing
C)Level schedule
D)Group Technology
E)Kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
62
As lean production methods reduce change-over times and thus enable smaller economic lot sizes and less work-in-process inventory is the importance of quality increased or decreased? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
63
What seven design principles guide the design of lean supply chains?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?

A)Organize problem-solving groups
B)Upgrade housekeeping
C)Upgrade quality
D)Freeze windows
E)Eliminate unnecessary activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
65
The Toyota Production System is predicated upon what two philosophies that are also central to the Japanese culture?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
66
Explain why lean manufacturing requires a stable demand environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
67
What are the five guidelines for implementing a lean supply chain presented by Womack and Jones,in their book Lean Thinking?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
68
Name Fujio Cho's seven prominent types of waste to be eliminated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following is a lean production technique that has been successfully applied in service firms?

A)Decision trees
B)Leveling the facility load
C)Linear programming
D)Fully utilizing capacity
E)Backflushing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
70
In a lean production system we expect to see which of the following?

A)No "just-in-case" extra inventory
B)More "just-in-case" extra inventory
C)More parts and fewer standardized product configurations
D)Managers being held responsible for quality of the work turned out
E)Closer management/labor relationships
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
71
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a Kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e. ,inventory holding costs + setup/ordering costs)of each?

A)Inventory holding cost will increase non-linearly with inventory
B)Total costs will be lower for the regular lot-size operation
C)Total costs will be lower for the Kanban/lean production operation
D)The order quantity will be larger for the Kanban/lean production approach
E)As long as the total quantity is the same,total costs will be the same
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
72
In setting up a kanban control system and you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 2 hours,what number of kanban card sets is needed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
73
Uniform plant loading means smoothing the production flow to dampen schedule variation.This practice is also known by which Japanese name?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
74
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour,safety stock is 10% of the demand during lead time,the container size is 5.If the lead time to replenish an order is 5 hours,what number of kanban card sets is needed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 74 في هذه المجموعة.