Deck 16: Materials Requirements Planning and ERP

ملء الشاشة (f)
exit full mode
سؤال
A requirements-based system derives orders from:

A)Customer requests
B)Forecast
C)Bill of materials
D)Master schedule
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A Type II MRP system:

A)Only launches orders
B)Has feedback to control capacity
C)Includes planning for personnel and capital
D)Is also known as an Enterprise Resource Planning System
سؤال
Safety stock in an MRP system:

A)Is never needed
B)Is used to provide flexibility to meet changing customer requirements
C)Must provide a 100% service level
D)Is planned at the part level,independent of the safety stock of other parts
سؤال
Planned lead times:

A)Usually are longer than actual working times
B)Ignore interference from other jobs
C)Usually are shorter than actual working times
D)Assume the work is expedited and completed as quickly as possible
سؤال
Type I Material requirements planning systems:

A)Are push production systems
B)Assume infinite capacity while scheduling the jobs in a factory
C)Schedule backward in time starting with the due date of the job
D)All of the above
سؤال
Which of the following most closely describes net material requirements in an MRP system?

A)Gross requirements - planned receipts
B)Gross requirements - (on-hand + scheduled receipts)
C)Gross requirements - on-hand + scheduled receipts
D)Gross requirements - planned order releases
سؤال
All of the following help to handle uncertainty when operating an MRP system EXCEPT:

A)Safety stock
B)Safety lead-time
C)Safety capacity
D)Back-up suppliers
سؤال
A replenishment-based system derives orders from:

A)Capacity available
B)Forecast or customer request
C)Bill of materials
D)Master schedule
سؤال
The gross requirements of a part in an MRP system are determined from:

A)Net requirements + on-hand
B)Net requirements of end item
C)Gross requirements of the immediate part
D)Planned order releases of the immediate parent item
سؤال
Bills of materials are kept current with changes using:

A)Master scheduling systems
B)Engineering change order systems
C)Inventory tracking systems
D)Capacity planning systems
سؤال
Which system specifies the output of the operations function?

A)Parts explosion
B)Bill of materials
C)Master scheduling
D)Capacity planning
سؤال
The parts explosion results in the following outputs:

A)Purchase orders and S&OP (aggregate planning)
B)Purchase orders and bill of materials
C)Purchase orders and shop orders
D)Shop orders and inventory orders
سؤال
Successful MRP implementation requires:

A)Management support,parts explosion,and adequate computer support
B)Marketing support,master schedule,and bill of materials
C)Management support,accurate data,and adequate computer support
D)None of the above
سؤال
Cycle counting:

A)Is counting a fraction of inventory each day
B)Does not eliminate the need for annual physical inventory
C)Is a way to plan inventory on a cyclic basis
D)Is a way to decide how much to order
سؤال
Which of the following is true about MRP Systems?

A)Forecast is based on past demand
B)Lot sizing is EOQ
C)Demand pattern is random
D)Objective is to meet manufacturing needs
سؤال
The bill of materials:

A)Shows how much inventory is available
B)Is a bill sent to the customer for material ordered
C)Is a list of all materials required to produce a part
D)None of the above
سؤال
Which type of MRP system is used as an information system to plan and control inventories and capacities?

A)Type I
B)Type II
C)ERP
D)None of the above
سؤال
Successful MRP system elements include:

A)Implementation planning
B)Accurate data
C)User knowledge
D)All of the above
سؤال
An MRP system is designed to deal with:

A)Lumpy demand
B)Constant demand
C)Uncertain demand
D)Random demand
سؤال
The three inputs for an MRP parts explosion are:

A)Inventory,master schedule,and bill of materials
B)Forecast,inventory,and bill of materials
C)Capacity,master schedule,and inventory
D)Forecast,bill of materials,and master schedule
سؤال
Forecasting demand in MRP Systems is based on the past demand patterns for components.
سؤال
MRP systems work better in a line flow system compared to a job shop.
سؤال
The master schedule should be frozen inside the production lead-time.
سؤال
MRP is a type of pull system.
سؤال
The master schedule is prepared for product families.
سؤال
In MRP "scheduled receipts" are:

A)Identical to "planned order receipts"
B)Identical to "planned order releases"
C)Identical to "net requirements"
D)Open orders not delivered yet
سؤال
Order launching MRP systems are also known as Type II MRP systems.
سؤال
_______ system uses requirements order philosophy,while _____ system uses replenishment order philosophy.

A)Order point,MRP
B)MRP,order point
C)EOQ,Quantity Discount
D)P,Q
سؤال
The Economic Order Quantity model is extremely useful while making decisions on order quantities in MRP systems.
سؤال
A bill of materials can be coupled with a bill of labor if MRP systems are to be used in service industries.
سؤال
When a company uses an ERP system,the different functional areas of the business will share a common database.
سؤال
Compare and contrast MRP systems and Order Point systems of managing inventories.When do firms prefer MRP systems to Order Point Systems? Can MRP systems be used while managing capacity in a factory? Provide sufficient justification for your answer.
سؤال
In MRP systems,inventories are managed according to their dollar usage values (i.e.,high dollar usage inventories are more carefully managed compared to low dollar usage inventories).
سؤال
The master production schedule for Product A shows a need for 30 units,and Product B shows a need of 25 units.To manufacture a unit of Product A,three units of component C are required.To manufacture a unit of Product B,four units of component C are required.Determine the gross requirements for component C to complete production.

A)55
B)190
C)110
D)380
E)None of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/34
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 16: Materials Requirements Planning and ERP
1
A requirements-based system derives orders from:

A)Customer requests
B)Forecast
C)Bill of materials
D)Master schedule
Master schedule
2
A Type II MRP system:

A)Only launches orders
B)Has feedback to control capacity
C)Includes planning for personnel and capital
D)Is also known as an Enterprise Resource Planning System
Has feedback to control capacity
3
Safety stock in an MRP system:

A)Is never needed
B)Is used to provide flexibility to meet changing customer requirements
C)Must provide a 100% service level
D)Is planned at the part level,independent of the safety stock of other parts
Is used to provide flexibility to meet changing customer requirements
4
Planned lead times:

A)Usually are longer than actual working times
B)Ignore interference from other jobs
C)Usually are shorter than actual working times
D)Assume the work is expedited and completed as quickly as possible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
5
Type I Material requirements planning systems:

A)Are push production systems
B)Assume infinite capacity while scheduling the jobs in a factory
C)Schedule backward in time starting with the due date of the job
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following most closely describes net material requirements in an MRP system?

A)Gross requirements - planned receipts
B)Gross requirements - (on-hand + scheduled receipts)
C)Gross requirements - on-hand + scheduled receipts
D)Gross requirements - planned order releases
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
7
All of the following help to handle uncertainty when operating an MRP system EXCEPT:

A)Safety stock
B)Safety lead-time
C)Safety capacity
D)Back-up suppliers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
8
A replenishment-based system derives orders from:

A)Capacity available
B)Forecast or customer request
C)Bill of materials
D)Master schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
9
The gross requirements of a part in an MRP system are determined from:

A)Net requirements + on-hand
B)Net requirements of end item
C)Gross requirements of the immediate part
D)Planned order releases of the immediate parent item
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
10
Bills of materials are kept current with changes using:

A)Master scheduling systems
B)Engineering change order systems
C)Inventory tracking systems
D)Capacity planning systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which system specifies the output of the operations function?

A)Parts explosion
B)Bill of materials
C)Master scheduling
D)Capacity planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
12
The parts explosion results in the following outputs:

A)Purchase orders and S&OP (aggregate planning)
B)Purchase orders and bill of materials
C)Purchase orders and shop orders
D)Shop orders and inventory orders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
13
Successful MRP implementation requires:

A)Management support,parts explosion,and adequate computer support
B)Marketing support,master schedule,and bill of materials
C)Management support,accurate data,and adequate computer support
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
14
Cycle counting:

A)Is counting a fraction of inventory each day
B)Does not eliminate the need for annual physical inventory
C)Is a way to plan inventory on a cyclic basis
D)Is a way to decide how much to order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following is true about MRP Systems?

A)Forecast is based on past demand
B)Lot sizing is EOQ
C)Demand pattern is random
D)Objective is to meet manufacturing needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
16
The bill of materials:

A)Shows how much inventory is available
B)Is a bill sent to the customer for material ordered
C)Is a list of all materials required to produce a part
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which type of MRP system is used as an information system to plan and control inventories and capacities?

A)Type I
B)Type II
C)ERP
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
18
Successful MRP system elements include:

A)Implementation planning
B)Accurate data
C)User knowledge
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
19
An MRP system is designed to deal with:

A)Lumpy demand
B)Constant demand
C)Uncertain demand
D)Random demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
20
The three inputs for an MRP parts explosion are:

A)Inventory,master schedule,and bill of materials
B)Forecast,inventory,and bill of materials
C)Capacity,master schedule,and inventory
D)Forecast,bill of materials,and master schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
21
Forecasting demand in MRP Systems is based on the past demand patterns for components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
22
MRP systems work better in a line flow system compared to a job shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
23
The master schedule should be frozen inside the production lead-time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
24
MRP is a type of pull system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
25
The master schedule is prepared for product families.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
26
In MRP "scheduled receipts" are:

A)Identical to "planned order receipts"
B)Identical to "planned order releases"
C)Identical to "net requirements"
D)Open orders not delivered yet
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
27
Order launching MRP systems are also known as Type II MRP systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
28
_______ system uses requirements order philosophy,while _____ system uses replenishment order philosophy.

A)Order point,MRP
B)MRP,order point
C)EOQ,Quantity Discount
D)P,Q
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
29
The Economic Order Quantity model is extremely useful while making decisions on order quantities in MRP systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
30
A bill of materials can be coupled with a bill of labor if MRP systems are to be used in service industries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
31
When a company uses an ERP system,the different functional areas of the business will share a common database.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
32
Compare and contrast MRP systems and Order Point systems of managing inventories.When do firms prefer MRP systems to Order Point Systems? Can MRP systems be used while managing capacity in a factory? Provide sufficient justification for your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
33
In MRP systems,inventories are managed according to their dollar usage values (i.e.,high dollar usage inventories are more carefully managed compared to low dollar usage inventories).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
34
The master production schedule for Product A shows a need for 30 units,and Product B shows a need of 25 units.To manufacture a unit of Product A,three units of component C are required.To manufacture a unit of Product B,four units of component C are required.Determine the gross requirements for component C to complete production.

A)55
B)190
C)110
D)380
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.