Good project risk management never goes unnoticed.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A simple approach to using probability/impact information is to calculate risk factors.
سؤال
The psychology literature shows that individuals,working alone,produce fewer ideas than the same individuals produce through brainstorming in small,face-to-face groups.
سؤال
Potential risks can only be identified early in a project.
سؤال
SWOT analysis can be used during risk identification by having project teams focus on the broad perspectives of potential risks for particular projects.
سؤال
The level of detail included in the risk management plan rarely varies across projects.
سؤال
Few organizations develop their own risk questionnaires.
سؤال
The last step in project risk management is deciding how to address this knowledge area for a particular project by performing risk management planning.
سؤال
It is uncommon for people to identify problems or opportunities without really understanding them.
سؤال
A potential response to the risk event of a defective server might be the inclusion of a clause in a contract with the supplier to replace a defective server within a certain time period at a negotiated cost.
سؤال
The cost for risk management should not exceed the potential benefits.
سؤال
Negative and positive risks should always be included in the same probability/impact matrix or chart.
سؤال
You can break down the technology risk category into hardware,software,and network technology.
سؤال
Risk events refer to specific,certain events that may occur to the detriment or enhancement of the project.
سؤال
A probability/impact matrix or chart lists the relative probability of a risk occurring on one side of a matrix or axis on a chart and the relative impact of the risk occurring on the other.
سؤال
Before you can improve project risk management,you must understand what risk is.
سؤال
The Delphi technique is a systematic,interactive forecasting procedure based on independent and anonymous input regarding future events.
سؤال
Risk management is a frequently overlooked aspect of project management.
سؤال
By reviewing the project scope statement,cost,schedule,and communications management plans,enterprise environmental factors,and organizational process assets,project teams can discuss and analyze risk management activities for their particular projects.
سؤال
Negative risk management is like investing in opportunities.
سؤال
The lower the EMV,the better.
سؤال
KLCI Research Group's 2001 survey revealed that ____ percent of the participants said they had procedures in place to identify and assess risk.

A)75
B)87
C)97
D)99
سؤال
A risk management review accomplishes one objective: it keeps management and the customer aware of the major influences that could prevent or enhance the project's success.
سؤال
Selecting the most experienced project manager is recommended for reducing schedule risks.
سؤال
Quantitative risk analysis and qualitative risk analysis must be done together.
سؤال
KLCI Research Group's 2001 survey revealed that the most frequently cited benefit from software risk management practices is to ____.

A)prevent surprises
B)improve ability to negotiate
C)meet customer commitments
D)anticipate/avoid problems
سؤال
William Ibbs and Young H.Kwak's study revealed that the ____ industry had the lowest level of project management maturity in the area of quality management.

A)engineering/construction
B)telecommunications
C)information systems
D)high-tech manufacturing
سؤال
A ____ person achieves a balance between risk and payoff.

A)risk-seeking
B)risk-averse
C)risk-fearing
D)risk-neutral
سؤال
KLCI Research Group's 2001 survey revealed that ____ percent identified anticipating and avoiding problems as the primary benefit of risk management.

A)60
B)80
C)89
D)99
سؤال
William Ibbs and Young H.Kwak's study revealed that the ____ industry had the lowest level of project management maturity in the area of risk management.

A)engineering/construction
B)telecommunications
C)information systems
D)high-tech manufacturing
سؤال
The main output of qualitative risk analysis is a decision tree.
سؤال
Project risk management does not stop with the initial risk analysis.
سؤال
The Monte Carlo analysis can predict the probability of finishing by a certain date or the probability that the cost will be equal to or less than a certain value.
سؤال
Those who are ____ have a higher tolerance for risk,and their satisfaction increases when more payoff is at stake.

A)risk-seeking
B)risk-averse
C)risk-neutral
D)risk-indifferent
سؤال
Increasing the project manager's authority is a strategy for mitigating technical and cost risks.
سؤال
There are ____ major processes involved in risk management.

A)three
B)four
C)five
D)six
سؤال
The Microsoft Solution Framework (MSF)includes a risk management model that includes developing and monitoring a top-ten master list of risks.
سؤال
KLCI Research Group's 2001 survey revealed that ____ percent of the organizations surveyed had a Project Management Office.

A)64
B)75
C)85
D)94
سؤال
Utility rises at a decreasing rate for a ____ person.

A)risk-seeking
B)risk-averse
C)risk-neutral
D)risk-indifferent
سؤال
Several PC-based software packages are available that perform Monte Carlo simulations.
سؤال
____ involves deciding how to approach and plan the risk management activities for the project.

A)Identifying risks
B)Planning risk management
C)Performing qualitative risk analysis
D)Performing quantitative risk analysis
سؤال
____ involves determining which risks are likely to affect a project and documenting the characteristics of each.

A)Identifying risks
B)Planning risk management
C)Performing qualitative risk analysis
D)Performing quantitative risk analysis
سؤال
Unenforceable conditions or contract clauses,and adversarial relations are risk conditions associated with the ____ project management knowledge area.

A)Integration
B)Quality
C)Procurement
D)Human Resources
سؤال
A(n)____ is a diagramming analysis technique used to help select the best course of action in situations in which future outcomes are uncertain.

A)decision tree
B)EMV
C)Monte Carlo analysis
D)watch list
سؤال
"Is there a project champion?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)People risk
سؤال
According to the Standish Group's success potential scoring sheet,____ has the highest relative importance.

A)executive management support
B)clear statement of requirements
C)proper planning
D)user involvement
سؤال
Poor conflict management,poor project organization and definition of responsibilities,and absence of leadership are risk conditions associated with the ____ project management knowledge area.

A)Integration
B)Quality
C)Time
D)Human Resources
سؤال
"If the information technology project is to produce a new product or service,will it be useful to the organization or marketable to others?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)Market risk
سؤال
____ involves numerically estimating the effects of risks on project objectives.

A)Performing qualitative risk analysis
B)Planning risk responses
C)Planning risk management
D)Performing quantitative risk analysis
سؤال
____ involves taking steps to enhance opportunities and reduce threats to meeting project objectives.

A)Performing quantitative risk analysis
B)Planning risk responses
C)Monitoring and controlling risk
D)Performing qualitative risk analysis
سؤال
A project manager can chart the probability and impact of risks on a ____.

A)risk ranking chart
B)risk probability table
C)probability/impact matrix
D)risk assessment matrix
سؤال
____ is a fact-finding technique for collecting information in face-to-face,phone,e-mail,or instant-messaging discussions.

A)Brainstorming
B)SWOT analysis
C)The Delphi technique
D)Interviewing
سؤال
A(n)____ represents decision problems by displaying essential elements,including decisions,uncertainties,causality,and objectives,and how they influence each other.

A)risk breakdown structure
B)influence diagram
C)process flow chart
D)system flow chart
سؤال
"Will the project meet NPV,ROI,and payback estimates?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)Market risk
سؤال
____ are predefined actions that the project team will take if an identified risk event occurs.

A)Fallback plans
B)Contingency reserves
C)Contingency plans
D)Contingency allowances
سؤال
____ involves prioritizing risks based on their probability and impact of occurrence.

A)Performing qualitative risk analysis
B)Planning risk management
C)Planning risk responses
D)Performing quantitative risk analysis
سؤال
____ are/is a qualitative risk analysis tool,and in addition to identifying risks,it maintains an awareness of risks throughout the life of a project.

A)Risk factor analysis
B)Probability/impact matrices or charts
C)Risk registering
D)Top Ten Risk Item Tracking
سؤال
____ involves monitoring identified and residual risks,identifying new risks,carrying out risk response plans,and evaluating the effectiveness of risk strategies throughout the life of the project.

A)Performing quantitative risk analysis
B)Planning risk responses
C)Monitoring and controlling risk
D)Performing qualitative risk analysis
سؤال
____ are developed for risks that have a high impact on meeting project objectives,and are put into effect if attempts to reduce the risk are not effective.

A)Fallback plans
B)Contingency reserves
C)Contingency plans
D)Contingency allowances
سؤال
In a risk breakdown structure,competitors,suppliers,and cash flow are categories that fall under ____ risk.

A)business
B)technical
C)organizational
D)project management
سؤال
A(n)_________________________ documents the procedures for managing risk throughout the project.
سؤال
____ involves allocating ownership of the risk to another party.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
سؤال
____ involves changing the size of the opportunity by identifying and maximizing key drivers of the positive risk.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
سؤال
_________________________ are provisions held by the project spons
سؤال
____ analysis simulates a model's outcome many times to provide a statistical distribution of the calculated results.

A)Decision tree
B)EMV
C)Monte Carlo
D)Watch list
سؤال
A(n)_________________________ is a hierarchy of potential risk categories for a project.
سؤال
What is the first step in a Monte Carlo analysis?

A)Determine the probability distribution of each variable.
B)For each variable,such as the time estimate for a task,select a random value based on the probability distribution for the occurrence of the variable.
C)Assess the range for the variables being considered.
D)Run a deterministic analysis or one pass through the model using the combination of values selected for each one of the variables.
سؤال
____ involves shifting the consequence of a risk and responsibility for its management to a third party.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
سؤال
Risk management can have a(n)____________________ impact on selecting projects,determining the scope of projects,and developing realistic schedules and cost estimates.
سؤال
____________________ is the amount of satisfaction or pleasure received from a potential payoff.
سؤال
____ involves doing whatever you can to make sure the positive risk happens.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
سؤال
____ applies to positive risks when the project team cannot or chooses not to take any actions toward a risk.

A)Risk enhancement
B)Risk acceptance
C)Risk sharing
D)Risk exploitation
سؤال
Inadequate planning,poor resource allocation,poor integration management,and lack of post-project review are risk conditions associated with the ____________________ project management knowledge area.
سؤال
____ risks are a direct result of implementing a risk response.

A)Tertiary
B)Primary
C)Residual
D)Secondary
سؤال
The main output of the ____________________ process is the start of a risk register.
سؤال
Given that all projects involve ____________________ that can have negative or positive outcomes,the question is how to decide which projects to pursue and how to identify and manage project risk throughout a project's life cycle.
سؤال
____ involves eliminating a specific threat,usually by eliminating its causes.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
سؤال
A project ____________________ is an uncertainty that can have a negative or positive effect on meeting project objectives.
سؤال
____ involves reducing the impact of a risk event by reducing the probability of its occurrence.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
سؤال
The idea of striving to balance risks and opportunities suggests that different organizations and people have different ____________________ for risk.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/99
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Project Risk Management
1
Good project risk management never goes unnoticed.
False
2
A simple approach to using probability/impact information is to calculate risk factors.
False
3
The psychology literature shows that individuals,working alone,produce fewer ideas than the same individuals produce through brainstorming in small,face-to-face groups.
False
4
Potential risks can only be identified early in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
5
SWOT analysis can be used during risk identification by having project teams focus on the broad perspectives of potential risks for particular projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
6
The level of detail included in the risk management plan rarely varies across projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
7
Few organizations develop their own risk questionnaires.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
8
The last step in project risk management is deciding how to address this knowledge area for a particular project by performing risk management planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
9
It is uncommon for people to identify problems or opportunities without really understanding them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
10
A potential response to the risk event of a defective server might be the inclusion of a clause in a contract with the supplier to replace a defective server within a certain time period at a negotiated cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
11
The cost for risk management should not exceed the potential benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
12
Negative and positive risks should always be included in the same probability/impact matrix or chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
13
You can break down the technology risk category into hardware,software,and network technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
14
Risk events refer to specific,certain events that may occur to the detriment or enhancement of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
15
A probability/impact matrix or chart lists the relative probability of a risk occurring on one side of a matrix or axis on a chart and the relative impact of the risk occurring on the other.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
16
Before you can improve project risk management,you must understand what risk is.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
17
The Delphi technique is a systematic,interactive forecasting procedure based on independent and anonymous input regarding future events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
18
Risk management is a frequently overlooked aspect of project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
19
By reviewing the project scope statement,cost,schedule,and communications management plans,enterprise environmental factors,and organizational process assets,project teams can discuss and analyze risk management activities for their particular projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
20
Negative risk management is like investing in opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
21
The lower the EMV,the better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
22
KLCI Research Group's 2001 survey revealed that ____ percent of the participants said they had procedures in place to identify and assess risk.

A)75
B)87
C)97
D)99
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
23
A risk management review accomplishes one objective: it keeps management and the customer aware of the major influences that could prevent or enhance the project's success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
24
Selecting the most experienced project manager is recommended for reducing schedule risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
25
Quantitative risk analysis and qualitative risk analysis must be done together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
26
KLCI Research Group's 2001 survey revealed that the most frequently cited benefit from software risk management practices is to ____.

A)prevent surprises
B)improve ability to negotiate
C)meet customer commitments
D)anticipate/avoid problems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
27
William Ibbs and Young H.Kwak's study revealed that the ____ industry had the lowest level of project management maturity in the area of quality management.

A)engineering/construction
B)telecommunications
C)information systems
D)high-tech manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
28
A ____ person achieves a balance between risk and payoff.

A)risk-seeking
B)risk-averse
C)risk-fearing
D)risk-neutral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
29
KLCI Research Group's 2001 survey revealed that ____ percent identified anticipating and avoiding problems as the primary benefit of risk management.

A)60
B)80
C)89
D)99
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
30
William Ibbs and Young H.Kwak's study revealed that the ____ industry had the lowest level of project management maturity in the area of risk management.

A)engineering/construction
B)telecommunications
C)information systems
D)high-tech manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
31
The main output of qualitative risk analysis is a decision tree.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
32
Project risk management does not stop with the initial risk analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
33
The Monte Carlo analysis can predict the probability of finishing by a certain date or the probability that the cost will be equal to or less than a certain value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
34
Those who are ____ have a higher tolerance for risk,and their satisfaction increases when more payoff is at stake.

A)risk-seeking
B)risk-averse
C)risk-neutral
D)risk-indifferent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
35
Increasing the project manager's authority is a strategy for mitigating technical and cost risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
36
There are ____ major processes involved in risk management.

A)three
B)four
C)five
D)six
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
37
The Microsoft Solution Framework (MSF)includes a risk management model that includes developing and monitoring a top-ten master list of risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
38
KLCI Research Group's 2001 survey revealed that ____ percent of the organizations surveyed had a Project Management Office.

A)64
B)75
C)85
D)94
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
39
Utility rises at a decreasing rate for a ____ person.

A)risk-seeking
B)risk-averse
C)risk-neutral
D)risk-indifferent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
40
Several PC-based software packages are available that perform Monte Carlo simulations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
41
____ involves deciding how to approach and plan the risk management activities for the project.

A)Identifying risks
B)Planning risk management
C)Performing qualitative risk analysis
D)Performing quantitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
42
____ involves determining which risks are likely to affect a project and documenting the characteristics of each.

A)Identifying risks
B)Planning risk management
C)Performing qualitative risk analysis
D)Performing quantitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
43
Unenforceable conditions or contract clauses,and adversarial relations are risk conditions associated with the ____ project management knowledge area.

A)Integration
B)Quality
C)Procurement
D)Human Resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
44
A(n)____ is a diagramming analysis technique used to help select the best course of action in situations in which future outcomes are uncertain.

A)decision tree
B)EMV
C)Monte Carlo analysis
D)watch list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
45
"Is there a project champion?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)People risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
46
According to the Standish Group's success potential scoring sheet,____ has the highest relative importance.

A)executive management support
B)clear statement of requirements
C)proper planning
D)user involvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
47
Poor conflict management,poor project organization and definition of responsibilities,and absence of leadership are risk conditions associated with the ____ project management knowledge area.

A)Integration
B)Quality
C)Time
D)Human Resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
48
"If the information technology project is to produce a new product or service,will it be useful to the organization or marketable to others?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)Market risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
49
____ involves numerically estimating the effects of risks on project objectives.

A)Performing qualitative risk analysis
B)Planning risk responses
C)Planning risk management
D)Performing quantitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
50
____ involves taking steps to enhance opportunities and reduce threats to meeting project objectives.

A)Performing quantitative risk analysis
B)Planning risk responses
C)Monitoring and controlling risk
D)Performing qualitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
51
A project manager can chart the probability and impact of risks on a ____.

A)risk ranking chart
B)risk probability table
C)probability/impact matrix
D)risk assessment matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
52
____ is a fact-finding technique for collecting information in face-to-face,phone,e-mail,or instant-messaging discussions.

A)Brainstorming
B)SWOT analysis
C)The Delphi technique
D)Interviewing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
53
A(n)____ represents decision problems by displaying essential elements,including decisions,uncertainties,causality,and objectives,and how they influence each other.

A)risk breakdown structure
B)influence diagram
C)process flow chart
D)system flow chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
54
"Will the project meet NPV,ROI,and payback estimates?" applies to which risk category? ____

A)Financial risk
B)Technology risk
C)Structure/process risk
D)Market risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
55
____ are predefined actions that the project team will take if an identified risk event occurs.

A)Fallback plans
B)Contingency reserves
C)Contingency plans
D)Contingency allowances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
56
____ involves prioritizing risks based on their probability and impact of occurrence.

A)Performing qualitative risk analysis
B)Planning risk management
C)Planning risk responses
D)Performing quantitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
57
____ are/is a qualitative risk analysis tool,and in addition to identifying risks,it maintains an awareness of risks throughout the life of a project.

A)Risk factor analysis
B)Probability/impact matrices or charts
C)Risk registering
D)Top Ten Risk Item Tracking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
58
____ involves monitoring identified and residual risks,identifying new risks,carrying out risk response plans,and evaluating the effectiveness of risk strategies throughout the life of the project.

A)Performing quantitative risk analysis
B)Planning risk responses
C)Monitoring and controlling risk
D)Performing qualitative risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
59
____ are developed for risks that have a high impact on meeting project objectives,and are put into effect if attempts to reduce the risk are not effective.

A)Fallback plans
B)Contingency reserves
C)Contingency plans
D)Contingency allowances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
60
In a risk breakdown structure,competitors,suppliers,and cash flow are categories that fall under ____ risk.

A)business
B)technical
C)organizational
D)project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
61
A(n)_________________________ documents the procedures for managing risk throughout the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
62
____ involves allocating ownership of the risk to another party.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
63
____ involves changing the size of the opportunity by identifying and maximizing key drivers of the positive risk.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
64
_________________________ are provisions held by the project spons
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
65
____ analysis simulates a model's outcome many times to provide a statistical distribution of the calculated results.

A)Decision tree
B)EMV
C)Monte Carlo
D)Watch list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
66
A(n)_________________________ is a hierarchy of potential risk categories for a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
67
What is the first step in a Monte Carlo analysis?

A)Determine the probability distribution of each variable.
B)For each variable,such as the time estimate for a task,select a random value based on the probability distribution for the occurrence of the variable.
C)Assess the range for the variables being considered.
D)Run a deterministic analysis or one pass through the model using the combination of values selected for each one of the variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
68
____ involves shifting the consequence of a risk and responsibility for its management to a third party.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
69
Risk management can have a(n)____________________ impact on selecting projects,determining the scope of projects,and developing realistic schedules and cost estimates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
70
____________________ is the amount of satisfaction or pleasure received from a potential payoff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
71
____ involves doing whatever you can to make sure the positive risk happens.

A)Risk exploitation
B)Risk sharing
C)Risk enhancement
D)Risk acceptance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
72
____ applies to positive risks when the project team cannot or chooses not to take any actions toward a risk.

A)Risk enhancement
B)Risk acceptance
C)Risk sharing
D)Risk exploitation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
73
Inadequate planning,poor resource allocation,poor integration management,and lack of post-project review are risk conditions associated with the ____________________ project management knowledge area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
74
____ risks are a direct result of implementing a risk response.

A)Tertiary
B)Primary
C)Residual
D)Secondary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
75
The main output of the ____________________ process is the start of a risk register.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
76
Given that all projects involve ____________________ that can have negative or positive outcomes,the question is how to decide which projects to pursue and how to identify and manage project risk throughout a project's life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
77
____ involves eliminating a specific threat,usually by eliminating its causes.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
78
A project ____________________ is an uncertainty that can have a negative or positive effect on meeting project objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
79
____ involves reducing the impact of a risk event by reducing the probability of its occurrence.

A)Risk avoidance
B)Risk acceptance
C)Risk transference
D)Risk mitigation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
80
The idea of striving to balance risks and opportunities suggests that different organizations and people have different ____________________ for risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.