Deck 4: Project Integration Management

ملء الشاشة (f)
exit full mode
سؤال
Many problems and directives must be resolved quickly.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Project integration management must occur just within the context of a particular project.
سؤال
An annual discount factor is a multiplier for each year based on the discount rate and year.
سؤال
As projects progress,the organization must reevaluate the need,funding,and will for each project to determine if the project should be continued,redefined,or terminated.
سؤال
You can use the NPV function in Microsoft Access to calculate the NPV quickly.
سؤال
Project managers should never be involved in strategic planning and project selection.
سؤال
Opportunities and directives are essentially the same thing.
سؤال
An organization's information technology project selection process should guide the strategic plan.
سؤال
Net present value and cash flow mean the same thing.
سؤال
Selecting projects is considered an exact science.
سؤال
Many people consider project integration management the key to overall project success.
سؤال
Directing and managing project execution involves carrying out the project management plan by performing the activities included in it.
سؤال
The number of interfaces can increase exponentially as the number of people involved in a project increases.
سؤال
Project integration management does not include interface management.
سؤال
Strategic planning involves determining long-term objectives by analyzing the strengths and weaknesses of an organization,studying opportunities and threats in the business environment,predicting future trends,and projecting the need for new products and services.
سؤال
The first step in creating a weighted scoring model is to assign a weight to each criterion.
سؤال
The ROI is always positive.
سؤال
Payback period is the amount of time it will take to recoup,in the form of net cash inflows,the total dollars invested in a project.
سؤال
The organization should complete low-priority projects before high-priority ones,if the low-priority ones take less time.
سؤال
Information systems can help an organization support a strategy of being a low-cost producer.
سؤال
Some people might use a contract in place of a charter.
سؤال
Many projects fail because of unclear requirements and expectations,so starting with a project charter makes a lot of sense.
سؤال
In the ____ stage of selecting information technology projects,organizations define project scope,benefits,and constraints.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
سؤال
A stakeholder analysis should be part of the overall project plan.
سؤال
A commonsense approach to improving the coordination between project plan development and execution is to follow this simple rule: Those who will do the work should not plan the work.
سؤال
In the ____ stage of selecting information technology projects,organizations select information technology projects.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
سؤال
The ____ step in the planning process is to tie the information technology strategic plan to the organization's overall strategic plan.

A)first
B)second
C)third
D)fourth
سؤال
The introduction or overview of a project must only include a list of definitions and acronyms.
سؤال
There are ____ main processes involved in project integration management.

A)three
B)six
C)ten
D)fifteen
سؤال
A project charter typically does not authorize the project manager to use organizational resources to complete the project.
سؤال
In the ____ stage,organizations tie information technology strategy to mission and vision of organization and identify key business areas.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
سؤال
Many organizations have found that large information technology projects require experienced general managers who understand the business and application area of the technology,not the technology itself.
سؤال
All projects can benefit from using some type of project management information system to coordinate and communicate project information.
سؤال
In the ____ information technology planning stage,the analysis outlines business processes that are central to achieving strategic goals and helps determine which ones could most benefit from information technology.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
سؤال
Project management plans document project planning assumptions and decisions regarding choices.
سؤال
Many people are familiar with SWOT analysis-analyzing Strengths,Weaknesses,Opportunities,and Threats-which is used to aid in ____.

A)project initiation
B)project planning
C)strategic planning
D)strategic initiation
سؤال
____ involves working with stakeholders to create the document that formally authorizes a project.

A)Developing the project charter
B)Developing the preliminary project scope statement
C)Developing the project management plan
D)Directing and managing project execution
سؤال
The outputs of ____ include change request status updates,project management plan updates,and project document updates.

A)monitoring and controlling the project work
B)closing the project
C)developing the project management plan
D)performing integrated change control
سؤال
____ involves coordinating all planning efforts to create a consistent,coherent document.

A)Developing the project charter
B)Developing the preliminary project scope statement
C)Developing the project management plan
D)Directing and managing project execution
سؤال
The key deliverables section of the project management plan should describe the quality expectations for the product deliverables.
سؤال
The ____ is the minimum acceptable rate of return on an investment.

A)return on investment
B)internal rate of return
C)external rate of return
D)required rate of return
سؤال
A(n)____ is a document used to coordinate all project planning documents and help guide a project's execution and control.

A)project management plan
B)statement of work
C)scope statement
D)contact
سؤال
Research shows that ____ is the number one reason cited for why organizations invest in information technology projects.

A)providing financial incentives
B)supporting implicit business objectives
C)supporting explicit business objectives
D)keeping abreast of technological advances
سؤال
Projects that address ____ are much more likely to be successful because they will be important to the organization.

A)a balanced scorecard
B)a weighted scoring model
C)broad organizational needs
D)net present value
سؤال
The ____ section of the project management plan describes how to monitor project progress and handle changes.

A)management objectives
B)project controls
C)risk management
D)technical processes
سؤال
A(n)____ is a document that describes the products or services to be created by the project team.

A)contract
B)statement of work
C)project charter
D)business case
سؤال
The project schedule information section of the project management plan might include ____.

A)a detailed budget
B)key deliverables
C)a detailed schedule
D)project staffing
سؤال
A(n)____ is a document that formally recognizes the existence of a project and provides direction on the project's objectives and management.

A)balanced scorecard
B)business case
C)net present value analysis
D)project charter
سؤال
____ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time.

A)Cost of capital
B)Net present value
C)Cash flow
D)Payback
سؤال
The first step in determining the NPV is to ____.

A)determine the estimated costs and benefits for the life of the project and the products it produces
B)determine the discount rate
C)calculate the net present value
D)determine the cash flow
سؤال
In the mathematical formula for determining the NPV,the variable n is ____.

A)the year of the cash flow
B)the last year of the cash flow
C)the amount of cash flow each year
D)the discount rate
سؤال
You can determine a project's ____ by finding what discount rate results in an NPV of zero for the project.

A)internal rate of return (IRR)
B)required rate of return
C)payback period
D)return on investment (ROI)
سؤال
____ support contributes the most to successful information technology projects.

A)Stakeholder
B)Team
C)Executive
D)User
سؤال
Author ____,who developed the concept of the strategic value of competitive advantage,has written several books and articles on strategic planning and competition.

A)James Bacon
B)Michael Porter
C)Robert Cooper
D)Carol Matlack
سؤال
____ are new requirements imposed by management,government,or some external influence.

A)Opportunities
B)Commands
C)Problems
D)Directives
سؤال
One method for selecting projects based on ____ is to determine whether they first meet three important criteria: need,funding,and will.

A)broad organizational needs
B)using a weighted scoring model
C)implementing a balanced scorecard
D)categorizing information technology projects
سؤال
The ____ section of the project plan should describe the major project functions and activities and identify those individuals who are responsible for them.

A)organizational charts
B)other organizational or process-related information
C)project responsibilities
D)management objectives
سؤال
In a weighted scoring model,the sum of all of the criteria's weights must total ____ percent.

A)0
B)50
C)100
D)150
سؤال
The ____ section of the project management plan describes specific methodologies a project might use and explains how to document information.

A)management objectives
B)project controls
C)risk management
D)technical processes
سؤال
A(n)____ is a methodology that converts an organization's value drivers,such as customer service,innovation,operational efficiency,and financial performance,to a series of defined metrics.

A)payback analysis
B)balanced scorecard
C)weighted scoring model
D)net present value analysis
سؤال
Good ____________________ management is critical to providing stakeholder satisfaction.
سؤال
____ tools track the execution of business process flows and expose how the state of supporting IT systems and resources is impacting end-to-end business process performance in real time.

A)BSM
B)CCB
C)CCA
D)BSC
سؤال
Even though many information technology projects can be completed quickly,it is still important to ____________________ them.
سؤال
Which of the following is an important input to the integrated change control process?

A)Deliverables
B)Work performance information
C)Approved and rejected change requests
D)Approved and validated defect repair
سؤال
On large projects,many project managers say that ____ percent of the job is communicating and managing changes.

A)50
B)70
C)90
D)100
سؤال
The majority of time on a project is usually spent on ____,as is most of the project's budget.

A)execution
B)planning
C)closing
D)monitoring and controlling
سؤال
Many organizations rely on effective _________________________ (NPD)to increase growth and profitability.
سؤال
____ ensures that the descriptions of the project's products are correct and complete.

A)CCB
B)Correction management
C)Configuration management
D)Product description management
سؤال
____________________ involves identifying and managing the points of interaction between various elements of the project.
سؤال
____________________ are chances to improve the organization.
سؤال
____ provide information on how project execution is going.

A)Performance reports
B)Change requests
C)Deliverables
D)Contracts
سؤال
Project initiation starts with identifying potential projects,using realistic methods to select which projects to work on,and then formalizing their initiation by issuing some sort of ____________________.
سؤال
Many information systems are classified as "____________________" because they directly support key business strategies.
سؤال
A(n)____ is a formal,documented process that describes when and how official project documents may be changed.

A)integrated change control
B)change request
C)performance report
D)change control system
سؤال
______________________________ involves coordinating all of the other project management knowledge areas throughout a project's life cycle.
سؤال
The last step in the ____________________ process for selecting information technology projects is choosing which projects to do and assigning resources for working on them.
سؤال
A(n)____ is a formal group of people responsible for approving or rejecting changes to a project.

A)CCA
B)CCB
C)CCC
D)CCD
سؤال
____ should result in improvements in project performance.

A)Corrective actions
B)Corrective reports
C)Preventive actions
D)Proactive methods
سؤال
Most systems analysts begin their careers as ____.

A)database administrators
B)CEOs
C)project managers
D)programmers
سؤال
____________________ are undesirable situations that prevent an organization from achieving its goals.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Project Integration Management
1
Many problems and directives must be resolved quickly.
True
2
Project integration management must occur just within the context of a particular project.
False
3
An annual discount factor is a multiplier for each year based on the discount rate and year.
True
4
As projects progress,the organization must reevaluate the need,funding,and will for each project to determine if the project should be continued,redefined,or terminated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
5
You can use the NPV function in Microsoft Access to calculate the NPV quickly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
6
Project managers should never be involved in strategic planning and project selection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
7
Opportunities and directives are essentially the same thing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
8
An organization's information technology project selection process should guide the strategic plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
9
Net present value and cash flow mean the same thing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
10
Selecting projects is considered an exact science.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
11
Many people consider project integration management the key to overall project success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
12
Directing and managing project execution involves carrying out the project management plan by performing the activities included in it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
13
The number of interfaces can increase exponentially as the number of people involved in a project increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
14
Project integration management does not include interface management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
15
Strategic planning involves determining long-term objectives by analyzing the strengths and weaknesses of an organization,studying opportunities and threats in the business environment,predicting future trends,and projecting the need for new products and services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
16
The first step in creating a weighted scoring model is to assign a weight to each criterion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
17
The ROI is always positive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
18
Payback period is the amount of time it will take to recoup,in the form of net cash inflows,the total dollars invested in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
19
The organization should complete low-priority projects before high-priority ones,if the low-priority ones take less time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
20
Information systems can help an organization support a strategy of being a low-cost producer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
21
Some people might use a contract in place of a charter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
22
Many projects fail because of unclear requirements and expectations,so starting with a project charter makes a lot of sense.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the ____ stage of selecting information technology projects,organizations define project scope,benefits,and constraints.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
24
A stakeholder analysis should be part of the overall project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
25
A commonsense approach to improving the coordination between project plan development and execution is to follow this simple rule: Those who will do the work should not plan the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
26
In the ____ stage of selecting information technology projects,organizations select information technology projects.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
27
The ____ step in the planning process is to tie the information technology strategic plan to the organization's overall strategic plan.

A)first
B)second
C)third
D)fourth
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
28
The introduction or overview of a project must only include a list of definitions and acronyms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
29
There are ____ main processes involved in project integration management.

A)three
B)six
C)ten
D)fifteen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
30
A project charter typically does not authorize the project manager to use organizational resources to complete the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
31
In the ____ stage,organizations tie information technology strategy to mission and vision of organization and identify key business areas.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
32
Many organizations have found that large information technology projects require experienced general managers who understand the business and application area of the technology,not the technology itself.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
33
All projects can benefit from using some type of project management information system to coordinate and communicate project information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
34
In the ____ information technology planning stage,the analysis outlines business processes that are central to achieving strategic goals and helps determine which ones could most benefit from information technology.

A)Project Planning
B)Business Area Analysis
C)Resource Allocation
D)Information Technology Strategy Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
35
Project management plans document project planning assumptions and decisions regarding choices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
36
Many people are familiar with SWOT analysis-analyzing Strengths,Weaknesses,Opportunities,and Threats-which is used to aid in ____.

A)project initiation
B)project planning
C)strategic planning
D)strategic initiation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
37
____ involves working with stakeholders to create the document that formally authorizes a project.

A)Developing the project charter
B)Developing the preliminary project scope statement
C)Developing the project management plan
D)Directing and managing project execution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
38
The outputs of ____ include change request status updates,project management plan updates,and project document updates.

A)monitoring and controlling the project work
B)closing the project
C)developing the project management plan
D)performing integrated change control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
39
____ involves coordinating all planning efforts to create a consistent,coherent document.

A)Developing the project charter
B)Developing the preliminary project scope statement
C)Developing the project management plan
D)Directing and managing project execution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
40
The key deliverables section of the project management plan should describe the quality expectations for the product deliverables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
41
The ____ is the minimum acceptable rate of return on an investment.

A)return on investment
B)internal rate of return
C)external rate of return
D)required rate of return
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
42
A(n)____ is a document used to coordinate all project planning documents and help guide a project's execution and control.

A)project management plan
B)statement of work
C)scope statement
D)contact
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
43
Research shows that ____ is the number one reason cited for why organizations invest in information technology projects.

A)providing financial incentives
B)supporting implicit business objectives
C)supporting explicit business objectives
D)keeping abreast of technological advances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
44
Projects that address ____ are much more likely to be successful because they will be important to the organization.

A)a balanced scorecard
B)a weighted scoring model
C)broad organizational needs
D)net present value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
45
The ____ section of the project management plan describes how to monitor project progress and handle changes.

A)management objectives
B)project controls
C)risk management
D)technical processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
46
A(n)____ is a document that describes the products or services to be created by the project team.

A)contract
B)statement of work
C)project charter
D)business case
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
47
The project schedule information section of the project management plan might include ____.

A)a detailed budget
B)key deliverables
C)a detailed schedule
D)project staffing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
48
A(n)____ is a document that formally recognizes the existence of a project and provides direction on the project's objectives and management.

A)balanced scorecard
B)business case
C)net present value analysis
D)project charter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
49
____ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time.

A)Cost of capital
B)Net present value
C)Cash flow
D)Payback
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
50
The first step in determining the NPV is to ____.

A)determine the estimated costs and benefits for the life of the project and the products it produces
B)determine the discount rate
C)calculate the net present value
D)determine the cash flow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
51
In the mathematical formula for determining the NPV,the variable n is ____.

A)the year of the cash flow
B)the last year of the cash flow
C)the amount of cash flow each year
D)the discount rate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
52
You can determine a project's ____ by finding what discount rate results in an NPV of zero for the project.

A)internal rate of return (IRR)
B)required rate of return
C)payback period
D)return on investment (ROI)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
53
____ support contributes the most to successful information technology projects.

A)Stakeholder
B)Team
C)Executive
D)User
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
54
Author ____,who developed the concept of the strategic value of competitive advantage,has written several books and articles on strategic planning and competition.

A)James Bacon
B)Michael Porter
C)Robert Cooper
D)Carol Matlack
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
55
____ are new requirements imposed by management,government,or some external influence.

A)Opportunities
B)Commands
C)Problems
D)Directives
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
56
One method for selecting projects based on ____ is to determine whether they first meet three important criteria: need,funding,and will.

A)broad organizational needs
B)using a weighted scoring model
C)implementing a balanced scorecard
D)categorizing information technology projects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
57
The ____ section of the project plan should describe the major project functions and activities and identify those individuals who are responsible for them.

A)organizational charts
B)other organizational or process-related information
C)project responsibilities
D)management objectives
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
58
In a weighted scoring model,the sum of all of the criteria's weights must total ____ percent.

A)0
B)50
C)100
D)150
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
59
The ____ section of the project management plan describes specific methodologies a project might use and explains how to document information.

A)management objectives
B)project controls
C)risk management
D)technical processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
60
A(n)____ is a methodology that converts an organization's value drivers,such as customer service,innovation,operational efficiency,and financial performance,to a series of defined metrics.

A)payback analysis
B)balanced scorecard
C)weighted scoring model
D)net present value analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
61
Good ____________________ management is critical to providing stakeholder satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
62
____ tools track the execution of business process flows and expose how the state of supporting IT systems and resources is impacting end-to-end business process performance in real time.

A)BSM
B)CCB
C)CCA
D)BSC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
63
Even though many information technology projects can be completed quickly,it is still important to ____________________ them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is an important input to the integrated change control process?

A)Deliverables
B)Work performance information
C)Approved and rejected change requests
D)Approved and validated defect repair
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
65
On large projects,many project managers say that ____ percent of the job is communicating and managing changes.

A)50
B)70
C)90
D)100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
66
The majority of time on a project is usually spent on ____,as is most of the project's budget.

A)execution
B)planning
C)closing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
67
Many organizations rely on effective _________________________ (NPD)to increase growth and profitability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
68
____ ensures that the descriptions of the project's products are correct and complete.

A)CCB
B)Correction management
C)Configuration management
D)Product description management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
69
____________________ involves identifying and managing the points of interaction between various elements of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
70
____________________ are chances to improve the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
71
____ provide information on how project execution is going.

A)Performance reports
B)Change requests
C)Deliverables
D)Contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
72
Project initiation starts with identifying potential projects,using realistic methods to select which projects to work on,and then formalizing their initiation by issuing some sort of ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
73
Many information systems are classified as "____________________" because they directly support key business strategies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
74
A(n)____ is a formal,documented process that describes when and how official project documents may be changed.

A)integrated change control
B)change request
C)performance report
D)change control system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
75
______________________________ involves coordinating all of the other project management knowledge areas throughout a project's life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
76
The last step in the ____________________ process for selecting information technology projects is choosing which projects to do and assigning resources for working on them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
77
A(n)____ is a formal group of people responsible for approving or rejecting changes to a project.

A)CCA
B)CCB
C)CCC
D)CCD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
78
____ should result in improvements in project performance.

A)Corrective actions
B)Corrective reports
C)Preventive actions
D)Proactive methods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
79
Most systems analysts begin their careers as ____.

A)database administrators
B)CEOs
C)project managers
D)programmers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
80
____________________ are undesirable situations that prevent an organization from achieving its goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.