Deck 9: Material Requirements Planning

ملء الشاشة (f)
exit full mode
سؤال
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to smooth out and become even over time.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding)each item in a product structure file and summing at all levels.
سؤال
An input to the material requirements planning (MRP)system is an inventory records file.
سؤال
MRP stands for Manufacturing Requirements Planning.
سؤال
An output of MRP is a bill of materials (BOM)file.
سؤال
MRP stands for Material Requirements Planning.
سؤال
The MRP program performs its analysis from the bottom up of the product structure trees,imploding requirements level by level.
سؤال
A modular bill of materials includes items with fractional options.
سؤال
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
سؤال
MRP is a logical,easily understandable approach to the problem of determining the number of parts,components,and materials needed to produce each end item.
سؤال
Manufacturing firms maintain bill of materials (BOM)files,which are simply a sequencing of everything that goes into a final product.
سؤال
MRP is most valuable where a number of products are made in batches using the same productive equipment.
سؤال
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
سؤال
The master production schedule states the number of items to be produced during specific time periods.
سؤال
A master production schedule is an input to a material requirements planning (MRP)system.
سؤال
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become more "lumpy."
سؤال
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
سؤال
MRP is based on dependent demand.
سؤال
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
سؤال
An input to the material requirements planning (MRP)system is an exception report.
سؤال
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
سؤال
The lot-for-lot (L4L)lot sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
سؤال
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
سؤال
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
سؤال
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
سؤال
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
سؤال
The economic order quantity (EOQ)lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
سؤال
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
سؤال
Low level coding in MRP indicates the exact status of each item managed by the system in "real time."
سؤال
Lot-for-lot (L4L)is the most common lot sizing technique.
سؤال
"Projected available balance" is a term referring to unsold finished goods inventory.
سؤال
Generally,determining lot sizes in MRP systems is simple.
سؤال
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.
سؤال
Net change MRP reflects the exact status of each item managed by the system in "real time."
سؤال
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
سؤال
In a net change MRP system requirements and schedules are considered rigid and never updated.
سؤال
Net change MRP systems are "activity" driven.
سؤال
The least unit cost method (LUC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
سؤال
The least unit cost method of lot-sizing adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
سؤال
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
سؤال
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
سؤال
MRP systems seek to achieve which of the following?

A) Minimize lot sizes
B) Determine the number of dependent demand items needed
C) Relieve capacity bottlenecks
D) Provide a yardstick for future improvements
E) Improve on JIT methods
سؤال
Which of the following is an input to the master production schedule?

A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
سؤال
Which of the following is one of the main purposes of a MRP system?

A) Educate personnel in basic work rules
B) To determine the amount of materials needed to produce each end item.
C) Stimulate the work force
D) Decrease labor requirements
E) Increase inventory accuracy
سؤال
Which of the following is an input file necessary to run an MRP system?

A) Bill of materials (BOM)file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
سؤال
One of the main purposes of a MRP system is which of the following?

A) Track inventory levels
B) Create productive capacity
C) Decrease layers of management
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism
سؤال
Which of the following industry types will not benefit greatly from the application of MRP?

A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of the above
سؤال
A BOM file is also called which of the following?

A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
سؤال
Which of the following is an input to the master production schedule (MPS)?

A) Inventory records file
B) The aggregate plan
C) The bill of materials
D) The exception report
E) Planned order schedules
سؤال
Which of the following is most closely related to the reason a firm might implement MRP?

A) So they can order the right parts
B) So they can order parts sufficient for immediate use
C) So they can insure that parts to arrive prior to when they are needed
D) To assure appropriate quality levels
E) To keep process costs between the LCL and the UCL
سؤال
Which of the following is an input to the master production schedule?

A) Bill of materials (BOM)file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of the above
سؤال
Which of the following is not a production activity report generated by MRP?

A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill of materials report
سؤال
Which of the following is an input file necessary to run an MRP system?

A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned order schedule
سؤال
The time-phased plan specifying how many and when the firm plans to build each end item is called the Materials Requirements Plan (MRP. )
سؤال
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
سؤال
When implemented correctly,MRP links all areas of the business.
سؤال
A product tree can do which of the following?

A) Help to compute component usage
B) Reduce product scrap
C) Reduce labor overtime
D) Reduce regular time labor
E) Locate raw material supplies
سؤال
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
سؤال
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
سؤال
The customer grace period is a time-span having some specified level of opportunity for the customer to make changes.
سؤال
In an MRP program,the program accesses the status segment of an inventory record according to specific periods called which of the following?

A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
سؤال
In a typical inventory status record which of the following would you not expect to see?

A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
سؤال
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?

A) 670
B) 600
C) 530
D) 70
E) None of the above
سؤال
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?

A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of the above
سؤال
What is the name for demand caused by the demand for a higher level item? __________________________
سؤال
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

A) 1,000
B) 950
C) 500
D) 400
E) 350
سؤال
If annual demand is 12,000 units,annual holding cost is $15 per unit,and setup cost per order is $25,which of the following is the EOQ lot size?

A) 2,000
B) 1,200
C) 1,000
D) 300
E) 200
سؤال
Which of the following files allows us to retrace a material requirement upward in the product structure through each level,identifying each parent item that created the demand?

A) Planning bill of materials file
B) Modular bill of materials file
C) Super bill of materials file
D) Exception report file
E) Peg record file
سؤال
We would expect to see which of the following in an MRP system's inventory status file?

A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
سؤال
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000,inventory on hand is 1,200 and planned receipts are 800?

A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
سؤال
Which of the following is considered a primary report in an MRP system?

A) Planned order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
سؤال
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot size in which these are most nearly equal?

A) Kanban
B) Just-in-time system
C) MRP
D) Least unit cost
E) Least total cost
سؤال
Which of the following is considered a secondary report in an MRP system?

A) Planned order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
سؤال
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost?

A) Economic order quantity
B) Lot-for-lot
C) Least total cost
D) Least unit cost
E) Inventory item averaging
سؤال
Under the lot-for-lot (L4L)lot sizing technique as used in MRP,we would expect which of the following?

A) A consistent lag of supply behind demand
B) Minimized carrying costs
C) Minimized set-up costs
D) A just in time management philosophy
E) Minimized quality problems
سؤال
Which of the following is not a lot sizing technique used in MRP systems?

A) Lot-for-lot (L4L)
B) Economic order quantity (EOQ)
C) Least total cost (LTC)
D) Least unit cost (LUC)
E) Warehouse loading factor (WLF)
سؤال
Which of the following can be used for lot sizing in an MRP system?

A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
سؤال
Which of the following is considered a primary report in an MRP system?

A) Planning reports
B) Performance reports
C) Exception reports
D) Planned order schedules
E) Cycle counting reports
سؤال
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal?

A) Economic Order Quantity
B) Lot for lot
C) Least total cost
D) Least unit cost
E) ABC analysis
سؤال
If annual demand is 6,125 units,annual holding cost is $5 per unit,and setup cost per order is $50,which of the following is the EOQ lot size?

A) 350
B) 247
C) 23
D) 185
E) 78
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/89
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Material Requirements Planning
1
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to smooth out and become even over time.
False
Explanation: The requirements of dependent demand items tend to become more and more lumpy as we go farther down into the product creation sequence.
2
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding)each item in a product structure file and summing at all levels.
True
Explanation: To compute the amount of each item needed at the lower levels,each item would need to be expanded ("exploded")and summed.A more efficient procedure is to store parts data in simple single-level lists.That is,each item and component is listed showing only its parent and the number of units needed per unit of its parent.
3
An input to the material requirements planning (MRP)system is an inventory records file.
True
Explanation: This BOM file is one of the three main inputs to the MRP program.(The other two are the master schedule and the inventory records file. )
4
MRP stands for Manufacturing Requirements Planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
5
An output of MRP is a bill of materials (BOM)file.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
6
MRP stands for Material Requirements Planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
7
The MRP program performs its analysis from the bottom up of the product structure trees,imploding requirements level by level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
8
A modular bill of materials includes items with fractional options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
9
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
10
MRP is a logical,easily understandable approach to the problem of determining the number of parts,components,and materials needed to produce each end item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
11
Manufacturing firms maintain bill of materials (BOM)files,which are simply a sequencing of everything that goes into a final product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
12
MRP is most valuable where a number of products are made in batches using the same productive equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
13
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
14
The master production schedule states the number of items to be produced during specific time periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
15
A master production schedule is an input to a material requirements planning (MRP)system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
16
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become more "lumpy."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
17
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
18
MRP is based on dependent demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
19
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
20
An input to the material requirements planning (MRP)system is an exception report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
21
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
22
The lot-for-lot (L4L)lot sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
23
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
24
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
25
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
26
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
27
The economic order quantity (EOQ)lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
28
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
29
Low level coding in MRP indicates the exact status of each item managed by the system in "real time."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
30
Lot-for-lot (L4L)is the most common lot sizing technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
31
"Projected available balance" is a term referring to unsold finished goods inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
32
Generally,determining lot sizes in MRP systems is simple.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
33
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
34
Net change MRP reflects the exact status of each item managed by the system in "real time."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
35
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
36
In a net change MRP system requirements and schedules are considered rigid and never updated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
37
Net change MRP systems are "activity" driven.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
38
The least unit cost method (LUC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
39
The least unit cost method of lot-sizing adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
40
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
41
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
42
MRP systems seek to achieve which of the following?

A) Minimize lot sizes
B) Determine the number of dependent demand items needed
C) Relieve capacity bottlenecks
D) Provide a yardstick for future improvements
E) Improve on JIT methods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is an input to the master production schedule?

A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is one of the main purposes of a MRP system?

A) Educate personnel in basic work rules
B) To determine the amount of materials needed to produce each end item.
C) Stimulate the work force
D) Decrease labor requirements
E) Increase inventory accuracy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is an input file necessary to run an MRP system?

A) Bill of materials (BOM)file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
46
One of the main purposes of a MRP system is which of the following?

A) Track inventory levels
B) Create productive capacity
C) Decrease layers of management
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following industry types will not benefit greatly from the application of MRP?

A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
48
A BOM file is also called which of the following?

A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is an input to the master production schedule (MPS)?

A) Inventory records file
B) The aggregate plan
C) The bill of materials
D) The exception report
E) Planned order schedules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is most closely related to the reason a firm might implement MRP?

A) So they can order the right parts
B) So they can order parts sufficient for immediate use
C) So they can insure that parts to arrive prior to when they are needed
D) To assure appropriate quality levels
E) To keep process costs between the LCL and the UCL
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is an input to the master production schedule?

A) Bill of materials (BOM)file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which of the following is not a production activity report generated by MRP?

A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill of materials report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is an input file necessary to run an MRP system?

A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned order schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
54
The time-phased plan specifying how many and when the firm plans to build each end item is called the Materials Requirements Plan (MRP. )
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
55
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
56
When implemented correctly,MRP links all areas of the business.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
57
A product tree can do which of the following?

A) Help to compute component usage
B) Reduce product scrap
C) Reduce labor overtime
D) Reduce regular time labor
E) Locate raw material supplies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
60
The customer grace period is a time-span having some specified level of opportunity for the customer to make changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
61
In an MRP program,the program accesses the status segment of an inventory record according to specific periods called which of the following?

A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
62
In a typical inventory status record which of the following would you not expect to see?

A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?

A) 670
B) 600
C) 530
D) 70
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?

A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
65
What is the name for demand caused by the demand for a higher level item? __________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

A) 1,000
B) 950
C) 500
D) 400
E) 350
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
67
If annual demand is 12,000 units,annual holding cost is $15 per unit,and setup cost per order is $25,which of the following is the EOQ lot size?

A) 2,000
B) 1,200
C) 1,000
D) 300
E) 200
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following files allows us to retrace a material requirement upward in the product structure through each level,identifying each parent item that created the demand?

A) Planning bill of materials file
B) Modular bill of materials file
C) Super bill of materials file
D) Exception report file
E) Peg record file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
69
We would expect to see which of the following in an MRP system's inventory status file?

A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000,inventory on hand is 1,200 and planned receipts are 800?

A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
71
Which of the following is considered a primary report in an MRP system?

A) Planned order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot size in which these are most nearly equal?

A) Kanban
B) Just-in-time system
C) MRP
D) Least unit cost
E) Least total cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of the following is considered a secondary report in an MRP system?

A) Planned order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost?

A) Economic order quantity
B) Lot-for-lot
C) Least total cost
D) Least unit cost
E) Inventory item averaging
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
75
Under the lot-for-lot (L4L)lot sizing technique as used in MRP,we would expect which of the following?

A) A consistent lag of supply behind demand
B) Minimized carrying costs
C) Minimized set-up costs
D) A just in time management philosophy
E) Minimized quality problems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which of the following is not a lot sizing technique used in MRP systems?

A) Lot-for-lot (L4L)
B) Economic order quantity (EOQ)
C) Least total cost (LTC)
D) Least unit cost (LUC)
E) Warehouse loading factor (WLF)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following can be used for lot sizing in an MRP system?

A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following is considered a primary report in an MRP system?

A) Planning reports
B) Performance reports
C) Exception reports
D) Planned order schedules
E) Cycle counting reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal?

A) Economic Order Quantity
B) Lot for lot
C) Least total cost
D) Least unit cost
E) ABC analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
80
If annual demand is 6,125 units,annual holding cost is $5 per unit,and setup cost per order is $50,which of the following is the EOQ lot size?

A) 350
B) 247
C) 23
D) 185
E) 78
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 89 في هذه المجموعة.