Deck 6: Manufacturing and Service Processes

ملء الشاشة (f)
exit full mode
سؤال
A project layout is characterized by a high degree of task ordering.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The term "assembly line" refers to progressive assembly linked by some material handling device.
سؤال
The volume requirements for the product are one determinant of the choice of which process structure to select.
سؤال
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
سؤال
The time needed to respond to a customer's order is called the customer response time.
سؤال
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
سؤال
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
سؤال
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
سؤال
Break-Even Analysis can only be used in production equipment decision making when dealing solely with fixed costs,no variable costs.
سؤال
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment,fixed costs,and variable costs is Break-Even Analysis.
سؤال
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
سؤال
One trade-off illustrated by the product-process matrix is between flexibility and cost.
سؤال
A make-to-order firm will work with the customer to design the product,and then make it from purchased materials,parts,and components.
سؤال
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
سؤال
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
سؤال
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
سؤال
Engineer-to-order firms will work with the customer to design the product,and then make it from purchased materials,parts,and components.
سؤال
Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
سؤال
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
سؤال
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
سؤال
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
سؤال
Little's law states that supply chain processes can be regarded as unrelated and thus treated and analyzed separately.
سؤال
The term "assembly line" refers to progressive assembly linked by some material handling device.
سؤال
The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.
سؤال
In balancing an assembly line,workstation cycle time has to be less than the time between successive units coming off the end of the line.
سؤال
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes.Thus,the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
سؤال
An example of an assemble-to-order firm is Dell Computer.
سؤال
The first step in balancing an assembly line is to specify the precedence relationships among tasks to be performed on the line.
سؤال
For the purposes of assembly-line balancing,the required workstation cycle time is found by dividing production time per day by the required units of output per day.
سؤال
If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes,the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.
سؤال
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
سؤال
In designing a production layout a flexible line layout might have the shape of a "U".
سؤال
A process map shows the physical location of the various processes within a supply chain.
سؤال
Little's law can be thought of as a relationship between units and time.
سؤال
The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.
سؤال
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
سؤال
In assembly-line balancing the theoretical minimum number of workstations is found by a ratio of the sum of all task times divided by the cycle time.
سؤال
A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.
سؤال
Workstation cycle time is the time between successive units coming off the end of the assembly line.
سؤال
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
سؤال
Using the assembly-line balancing procedure,which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

A) 0.72
B) 1.388
C) 250
D) 500
E) Cannot be determined from the information above
سؤال
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4,6,7,2,6,and 5 minutes,and the cycle time is 10 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of the above
سؤال
In designing a production line mixed-model line balancing might be used by JIT manufacturers.
سؤال
Which of the following is not a step in developing a manufacturing cell layout?

A) Grouping parts into families that follow a common sequence of steps
B) Identifying dominant flow patterns of parts families as a basis for location of processes
C) Physically grouping machines and processes into cells
D) Disposing of left-over machinery and outsourcing ungrouped processes
E) None of the above
سؤال
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
سؤال
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A) 500 units
B) 667 units
C) 790 units
D) 900 units
E) 1,000 units
سؤال
You are hired as a consultant to decide if your client should purchase a new,highly specialized,piece of equipment.The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A) The company will recover its initial investment
B) The company's total margin will be less than its investment
C) It is a good investment
D) The break-even is lower than the 15,000 units that are expected to sell
E) All of the above
سؤال
When balancing an assembly line,which of the following is not a way to reduce the longest task time below the required workstation cycle time?

A) Upgrade the equipment
B) Assign a roaming helper to support the line
C) Split the task between two workstations
D) Speed up the assembly line transfer mechanism
E) Use a more skilled worker
سؤال
Which of the following is not considered a major work flow structure?

A) Work Center
B) Project
C) Assembly line
D) Fabrication
E) Continuous Flow
سؤال
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure.The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes.Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of the above
سؤال
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure.The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes.Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.650
C) 0.750
D) 0.850
E) None of the above
سؤال
In a workcenter,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?

A) All batches should be run on machine B
B) Batches of more than 20 units should be run on machine B
C) Batches of fewer than 80 units should be run on machine B
D) Batches with up to 50 units should be run on machine B
E) No batches should be run on machine B
سؤال
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7,4,7,8,9,4,3 and 6 minutes,and the cycle time is 8 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of the above
سؤال
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Workcenter
E) Manual assembly
سؤال
The objective of mixed-model line balancing is to meet the demand for a variety of products and avoid building high inventories.
سؤال
Using the assembly-line balancing procedure,which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

A) 0.104
B) 50
C) 9.6
D) 480
E) Cannot be determined from the information above
سؤال
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
سؤال
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35,and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A) 5,000 units
B) 6,000 units
C) 8,000 units
D) 11,000 units
E) 12,000 units
سؤال
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
سؤال
A difference between project and continuous flow categories of process flow structures is which two of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "Virtual Factory"
E) Profit per unit
سؤال
The formula (Inventory = Throughput rate × Flow time. )is known as what? ___________________
سؤال
According to Little's Law,which of the following ratios is used to find throughput rate?

A) Cycle time/Process time
B) Throughput time/Process velocity
C) Process velocity/Throughput time
D) Inventory/Flow time
E) Value added time/Process velocity
سؤال
Distinguish between a workcenter and a manufacturing cell.
سؤال
You have just determined the actual number of workstations that will be used on an assembly line to be 25 using the assembly-line balancing procedure.The cycle time of the line is 30 seconds and the sum of all that tasks required on the line is 10 minutes.What is the line's efficiency? ________________________________
سؤال
Describe the implications of the product-process matrix for process design in a competitive situation.
سؤال
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Workgroups
C) Workstations
D) Machines
E) Emergency exits
سؤال
Give an example of a project layout.______________________
سؤال
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 7,4,7,5,3 and 6 minutes,and the cycle time is 8 minutes? ______________________________________
سؤال
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
سؤال
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials. )It can make the part on a standard lathe for $250 per unit (also including materials. )It can make the part on a machining center for $50 per unit (also including materials. )The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit.
سؤال
According to Little's law,which of the following can be used to estimate work-in-process inventory?

A) Process time/Cycle time
B) Throughput rate times Flow time
C) Process velocity/Flow time
D) Set up time/Throughput rate
E) Value added time/Process velocity
سؤال
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10,and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even? ______________________
سؤال
Using the assembly-line balancing procedure,what is the required cycle time if the production time in minutes per day is 2,400 and the required output per day in units is 1,200? _________________________________
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/73
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Manufacturing and Service Processes
1
A project layout is characterized by a high degree of task ordering.
True
Explanation: In a project layout,a high degree of task ordering is common.
2
The term "assembly line" refers to progressive assembly linked by some material handling device.
True
Explanation: An assembly line is a layout design for the special purpose of building a product by going through a progressive set of steps.The assembly steps are done in areas referred to as "stations," and typically the stations are linked by some form of material handling device.
3
The volume requirements for the product are one determinant of the choice of which process structure to select.
True
Explanation: Two dimensions (of the product/process matrix,exhibit 6.3)are shown.The first dimension relates to the volume of a particular product or group of standardized products.Standardization is shown on the vertical axis and refers to variations in the product that is produced.These variations are measured in terms of geometric differences,material differences,and so on.Standardized products are highly similar from a manufacturing processing point of view,whereas low standardized products require different processes.
4
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
5
The time needed to respond to a customer's order is called the customer response time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
6
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
7
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
8
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
9
Break-Even Analysis can only be used in production equipment decision making when dealing solely with fixed costs,no variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
10
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment,fixed costs,and variable costs is Break-Even Analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
11
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
12
One trade-off illustrated by the product-process matrix is between flexibility and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
13
A make-to-order firm will work with the customer to design the product,and then make it from purchased materials,parts,and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
14
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
15
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
16
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
17
Engineer-to-order firms will work with the customer to design the product,and then make it from purchased materials,parts,and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
18
Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
19
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
20
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
21
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
22
Little's law states that supply chain processes can be regarded as unrelated and thus treated and analyzed separately.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
23
The term "assembly line" refers to progressive assembly linked by some material handling device.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
24
The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
25
In balancing an assembly line,workstation cycle time has to be less than the time between successive units coming off the end of the line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
26
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes.Thus,the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
27
An example of an assemble-to-order firm is Dell Computer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
28
The first step in balancing an assembly line is to specify the precedence relationships among tasks to be performed on the line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
29
For the purposes of assembly-line balancing,the required workstation cycle time is found by dividing production time per day by the required units of output per day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
30
If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes,the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
31
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
32
In designing a production layout a flexible line layout might have the shape of a "U".
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
33
A process map shows the physical location of the various processes within a supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
34
Little's law can be thought of as a relationship between units and time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
35
The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
36
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
37
In assembly-line balancing the theoretical minimum number of workstations is found by a ratio of the sum of all task times divided by the cycle time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
38
A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
39
Workstation cycle time is the time between successive units coming off the end of the assembly line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
40
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
41
Using the assembly-line balancing procedure,which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

A) 0.72
B) 1.388
C) 250
D) 500
E) Cannot be determined from the information above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
42
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4,6,7,2,6,and 5 minutes,and the cycle time is 10 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
43
In designing a production line mixed-model line balancing might be used by JIT manufacturers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is not a step in developing a manufacturing cell layout?

A) Grouping parts into families that follow a common sequence of steps
B) Identifying dominant flow patterns of parts families as a basis for location of processes
C) Physically grouping machines and processes into cells
D) Disposing of left-over machinery and outsourcing ungrouped processes
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
46
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A) 500 units
B) 667 units
C) 790 units
D) 900 units
E) 1,000 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
47
You are hired as a consultant to decide if your client should purchase a new,highly specialized,piece of equipment.The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A) The company will recover its initial investment
B) The company's total margin will be less than its investment
C) It is a good investment
D) The break-even is lower than the 15,000 units that are expected to sell
E) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
48
When balancing an assembly line,which of the following is not a way to reduce the longest task time below the required workstation cycle time?

A) Upgrade the equipment
B) Assign a roaming helper to support the line
C) Split the task between two workstations
D) Speed up the assembly line transfer mechanism
E) Use a more skilled worker
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is not considered a major work flow structure?

A) Work Center
B) Project
C) Assembly line
D) Fabrication
E) Continuous Flow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
50
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure.The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes.Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
51
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure.The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes.Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.650
C) 0.750
D) 0.850
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
52
In a workcenter,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?

A) All batches should be run on machine B
B) Batches of more than 20 units should be run on machine B
C) Batches of fewer than 80 units should be run on machine B
D) Batches with up to 50 units should be run on machine B
E) No batches should be run on machine B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
53
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7,4,7,8,9,4,3 and 6 minutes,and the cycle time is 8 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Workcenter
E) Manual assembly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
55
The objective of mixed-model line balancing is to meet the demand for a variety of products and avoid building high inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
56
Using the assembly-line balancing procedure,which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

A) 0.104
B) 50
C) 9.6
D) 480
E) Cannot be determined from the information above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
58
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35,and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A) 5,000 units
B) 6,000 units
C) 8,000 units
D) 11,000 units
E) 12,000 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
60
A difference between project and continuous flow categories of process flow structures is which two of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "Virtual Factory"
E) Profit per unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
61
The formula (Inventory = Throughput rate × Flow time. )is known as what? ___________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
62
According to Little's Law,which of the following ratios is used to find throughput rate?

A) Cycle time/Process time
B) Throughput time/Process velocity
C) Process velocity/Throughput time
D) Inventory/Flow time
E) Value added time/Process velocity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
63
Distinguish between a workcenter and a manufacturing cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
64
You have just determined the actual number of workstations that will be used on an assembly line to be 25 using the assembly-line balancing procedure.The cycle time of the line is 30 seconds and the sum of all that tasks required on the line is 10 minutes.What is the line's efficiency? ________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
65
Describe the implications of the product-process matrix for process design in a competitive situation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
66
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Workgroups
C) Workstations
D) Machines
E) Emergency exits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
67
Give an example of a project layout.______________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
68
Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 7,4,7,5,3 and 6 minutes,and the cycle time is 8 minutes? ______________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
69
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
70
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials. )It can make the part on a standard lathe for $250 per unit (also including materials. )It can make the part on a machining center for $50 per unit (also including materials. )The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
71
According to Little's law,which of the following can be used to estimate work-in-process inventory?

A) Process time/Cycle time
B) Throughput rate times Flow time
C) Process velocity/Flow time
D) Set up time/Throughput rate
E) Value added time/Process velocity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
72
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10,and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even? ______________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
73
Using the assembly-line balancing procedure,what is the required cycle time if the production time in minutes per day is 2,400 and the required output per day in units is 1,200? _________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.