The computer technology application that automates the product design process, including but not limited to the functions of geometric modeling, materials stress and strain analysis, drafting, storing product specifications, and mechanical simulation of a product's performance, is called CAD/CAE.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Production systems facilitate integration of all aspects of product design, marketing, and manufacturing.
سؤال
In the pull approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
سؤال
Purchase orders convey authority for the manufacture of a specified product or subassembly in specified quantity and describe the material, labor, and machine requirements for the job.
سؤال
Theoretically, in the push approach to manufacturing, each batch or job consists of one unit.
سؤال
JIT is a manufacturing philosophy or business strategy for designing production systems that are more responsive to precisely timed customer delivery requirements.
سؤال
With the pull approach to manufacturing, factory machinery is arranged in clusters or cells.
سؤال
A supply chain is a sequence of activities performed by an organization that add value or utility to the product produced or service rendered.
سؤال
MRP is an integrated decision support system for planning, executing, and controlling manufacturing operations
سؤال
An assembly line manufacturing system is a highly automated computer integrated manufacturing system that has its goal of achieving the ability to quickly produce wide varieties of products using the same equipment.
سؤال
A cost driver is one of the main factors influencing total cost.
سؤال
MRP is a process that uses bills of material, raw material and WIP inventory status data, open order data, and the master production schedule to calculate a time-phased order requirements schedule for materials and subassemblies.
سؤال
A process costing system attempts to assign costs to products based on the amount of service operations, such as purchase order preparation, material handling, storage time, wait time, and other nonvalue-added processes, that the products consume.
سؤال
The capacity requirements planning (CRP) process that uses the information from the master production schedule and the time-phased order requirements schedule to develop detailed machine and labor use schedule based on available capacity.
سؤال
The inventory production schedule is a statement of specific production goals developed from forecasts of demand, actual sales orders or inventory information.
سؤال
Cycle time is the time it takes from when authorization is made for goods to be produced to when the goods are completed.
سؤال
Product life cycle management (PLM) systems are ERP modules or enterprise system add-ons that organize data by product, including design, manufacturing specifications, quality, and warranty performance.
سؤال
Lifecycle costs are the sum of costs to design, produce, market, deliver, and support a product from conception to ultimate discontinuance.
سؤال
Supply chain management software provides available to promise planning and capable to promise planning.
سؤال
Continuous inventory management is an inventory management approach where inventory needs and production capabilities are matched across the entire global enterprise
سؤال
The process of exploding the BOM involves extending a BOM to determine the total of each component required to manufacture a given quantity of an upper-level assembly or subassembly
سؤال
An automated storage and retrieval system (AS/RS) is a computer-based cart system capable of delivering parts and tools among multiple work centers.
سؤال
Which of the following is not one key characteristics of companies that are successful at managing the pressures resulting from global complexity according to the Deloitte Touche report?

A)improved internal business processes in the areas of customers, products, and supply chains
B)better use of technology to increase integration within and among the areas of customers, products and supply chain
C)pursuit of new lucrative marketing channels
D)better general capabilities in the areas of collaboration, flexibility, visibility, and technology
سؤال
The final move ticket data marks the end of the conversion process and the movement of goods to the finished goods warehouse.
سؤال
Designing new and creative products and getting them to market quickly is an example of:

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
سؤال
A bill of material contains the standard material quantities that are required to produce one unit of end product.
سؤال
Computer-aided manufacturing (CAM) is the application of computer and communications technology to improve productivity by linking computer numerical control (CNC) machines, monitoring production, and providing automatic feedback to control operations.
سؤال
The financial accounting system is concerned with the flow of costs through the factory.
سؤال
The shop floor control process is devoted to monitoring and recording the status of manufacturing orders as they proceed through the factory.
سؤال
Available to promise planning is the accumulation of data on current inventories, sales commitments, planned production and excess production capacity or other planned production capacity that could be quickly converted to production of the desired finished goods necessary to fulfill a sales order request.
سؤال
Capable to promise planning is the accumulation of the data on current inventories, sales commitments, and planned production to determine whether the production of finished goods will be sufficient to commit to additional sales orders.
سؤال
Which of the following is not one of the key drivers of complexity in manufacturing operations in the new millennium according to the Deloitte Touche survey?

A)facing the realities of globalization
B)the quickening pace of product innovation
C)pursuit of new lucrative markets and channels
D)pressure to reduce costs throughout the value chain
سؤال
Which of the following is impacted heavily by flexible costing, ABC, shifting the cost structure more towards variable costs, and reducing direct labor costs?

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
سؤال
An automated storage and retrieval system (AS/RS) is a computer-controlled machine that stores and retrieves parts and tools.
سؤال
The material, labor, and machine requirements for each job are reflected in a manufacturing order.
سؤال
Variance analysis is the process of comparing actual information about input costs and usage to standards.
سؤال
The process of exploding the BOM results in a master production schedule.
سؤال
A step master shows the necessary steps and the time to complete each operation to produce a product.
سؤال
Computer-aided process planning (CAPP) is an automated decision support system that generates manufacturing operations instructions and routings based on information about machining requirements and machine capabilities.
سؤال
Which of the following has included management of throughput time and pull manufacturing?

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
سؤال
Performing a detailed analysis of cost per unit and cost drivers is an essential prerequisite for using:

A)concurrent engineering
B)activity-based costing
C)computer-integrated manufacturing
D)flexible manufacturing
سؤال
Trends in cost management/cost accounting include all of the following except:

A)reductions in the administrative costs of gathering data
B)a trend toward job order cost systems and away from process cost systems
C)adding a fourth cost category called direct technology
D)reduction in the direct labor cost component
سؤال
Which of the following involves measuring the time from authorization of goods to be produced to when the goods are completed?

A)product life cycle management
B)throughput time
C)push manufacturing
D)pull manufacturing
سؤال
The objectives of computer-aided design (CAD) and computer-aided engineering (CAE) are all of the following except:

A)improve design productivity
B)reduce design lead time
C)increase redundant design effort
D)enhance design quality
سؤال
Which of the following statements is false?

A)With the pull approach to manufacturing, factory machinery typically is arranged in factory cells.
B)The pull approach to manufacturing should lead to reduced work in process and finished goods inventories.
C)The pull approach to manufacturing should lead to shorter production runs.
D)Enterprise resource planning (ERP) employs a pull approach to manufacturing.
سؤال
The Level 0 data flow diagram for the integrated production process includes all of the following process bubbles except

A)design product and production processes
B)generate master distribution schedule
C)determine needs for materials
D)record manufacturing events
سؤال
Which of the following often includes global inventory management?

A)design product and production processes
B)generate master production schedule
C)determine needs for materials
D)develop detailed production instructions
سؤال
The implementation features of just-in-time (JIT) manufacturing typically include all of the following except:

A)arranging the factory in work cells
B)assigning each worker to a single machine
C)allowing workers to stop the production line
D)requiring that the daily production schedule remain fairly constant
سؤال
Prevailing trends in production systems reflect all of the following except:

A)emphasis on customer satisfaction
B)shortened product life cycles
C)increased factory automation
D)the change from "pull" to "push" production scheduling
سؤال
Which of the following statements is true?

A)Japanese companies have accomplished much in the area of production process innovation, mainly by switching from pull to push manufacturing.
B)Cellular manufacturing organizes machines by department.
C)Adopting the pull approach to manufacturing requires an increase in floor space.
D)In the push approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
سؤال
Which of the following is a statement of specific production goals developed from forecasts of demand, actual sales orders, or inventory information?

A)a master production schedule (MPS)
B)materials requirements planning (MRP)
C)shop floor control (SFC)
D)just-in-time (JIT) manufacturing
سؤال
Activity-based-costing (ABC) systems are generally prevalent in companies seeking to increase ____ and ____.

A)cost accuracy and usefulness
B)cost accumulation and cost assignment
C)cost allocation and cost containment
D)product costing and cost allocation
سؤال
The objectives of just-in-time (JIT) manufacturing usually include all of the following except:

A)large lot sizes
B)zero defects
C)zero setup times
D)zero lead times
سؤال
Which of the following is used to develop detailed machine- and labor-use schedules that consider available capacity?

A)capacity requirements planning (CRP)
B)capable to promise planning (CTP)
C)computer-aided process planning (CAPP)
D)computer-aided manufacturing (CAM)
سؤال
Which of the following is an ERP add on system that organizes data by product, including designs, manufacturing specifications, quality and warranty performance?

A)product life cycle management
B)throughput
C)push manufacturing
D)pull manufacturing
سؤال
Which of the following involves short production runs, continuous flow of operations, cellular manufacturing, reduced floor space, and reduced WIP?

A)product life cycle management
B)throughput time
C)push manufacturing
D)pull manufacturing
سؤال
Which of the following lists the detailed specifications of each item of raw materials?

A)parts master
B)routing master
C)work center master
D)bill of materials
سؤال
Which of the following components is not part of a flexible manufacturing system (FMS):

A)manufacturing resource planning (MRP)
B)computer aided manufacturing (CAM)
C)automated storage and retrieval systems(AS/RS)
D)automated guided vehicle systems (AGVS)
سؤال
Which of the following specifies the operations necessary to complete a subassembly or finished good and the sequence of operations?

A)parts master
B)routing master
C)work center master
D)bill of materials
سؤال
Pull manufacturing should lead to all of the following except:

A)short production runs
B)increased work in process and finished goods inventories
C)continuous flow operations
D)a cellular arrangement of factory machinery
سؤال
The raw material quantity variance can be determined by:

A)an excess RM issue notice
B)an RM returned notice
C)both a and b
D)none of the above
سؤال
________________________________are ERP modules or enterprise systems add-ons that organize data by product, including designs, manufacturing specifications, quality, and warranty performance.
سؤال
This shows when a manufacturing order or purchase order should be released so that the subassemblies and raw materials will be available when needed.

A)bill of materials
B)routing sheet
C)time-phased order requirements schedule
D)parts master file
سؤال
The computer technology application that automates the product design process, including but not limited to the functions of geometric modeling, materials stress and strain analysis, drafting, storing product specifications, and mechanical simulation of a product's performance, is called ____________________________________________________________.
سؤال
_________________________ is the time it takes from when authorization is made for goods to be produced to when the goods are completed.
سؤال
The logic of the typical inventory system would likely include all of the following processes except:

A)prepare purchase requisition
B)record vendor payable
C)record receipt of inventory
D)record cost of inventory receipts
سؤال
In the ____________________ approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
سؤال
Supply chain management software provides ____________________ to promise planning and ____________________ to promise planning.
سؤال
_________________________ are the sum of costs to design, produce, market, deliver, and support a product from conception to ultimate discontinuance.
سؤال
Which of the following is not an inventory process control?

A)JIT materials acquisition
B)locked storerooms
C)periodic inventory systems
D)physical counts
سؤال
The AICPA's Practice Alert No.94-2: Auditing Inventories-Physical Observations describes several circumstances that constitute inventory fraud.Which of the following is not an example of inventory fraud?

A)including items in inventory when the corresponding payable has not been recorded
B)adjusting inventory to lower-of-cost-or-market
C)increasing counts for items that auditors did not test count
D)counting obsolete inventory as salable or usable
سؤال
____________________ systems facilitate the integration of all aspects of product design, manufacturing and marketing.
سؤال
The process of comparing actual information about input costs and usage to standards is:

A)standard costing
B)process costing
C)variance analysis
D)activity based costing
سؤال
A(n) _________________________ is a sequence of activities performed by an organization that add value or utility to the product produced or service rendered.
سؤال
What conveys authority for the manufacture of a specified product or subassembly in a specified quantity and describe the material, labor, and machine requirements for the job?

A)capacity requirements planning (CRP)
B)manufacturing orders (MO)
C)capable to promise planning (CTP)
D)computer-aided process planning (CAPP)
سؤال
Materials requirements planning (mrp) normally would use all of the following inputs except:

A)master production schedule (MPS)
B)bill of materials
C)routing file
D)raw materials inventory status data
سؤال
Theoretically, in the ____________________ approach to manufacturing, each batch or job consists of one unit.
سؤال
Which of the following inventory frauds is not identified by Practice Alert No.94-2: Auditing Inventories--Physical Observations.

A)double-counting inventory
B)counting obsolete inventory
C)including inventory for which the corresponding payable has not been recorded
D)employee theft of inventory item having high sales volume
سؤال
A(n) ___________________________________ attempts to assign costs to products based on the amount of service operations, such as purchase order preparation, material handling, storage time, wait time, and other nonvalue-added processes, that the products consume.
سؤال
With the pull approach to manufacturing, factory machinery is arranged in ____________________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/106
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Integrated Production Processes IPP
1
The computer technology application that automates the product design process, including but not limited to the functions of geometric modeling, materials stress and strain analysis, drafting, storing product specifications, and mechanical simulation of a product's performance, is called CAD/CAE.
True
2
Production systems facilitate integration of all aspects of product design, marketing, and manufacturing.
False
3
In the pull approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
False
4
Purchase orders convey authority for the manufacture of a specified product or subassembly in specified quantity and describe the material, labor, and machine requirements for the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
5
Theoretically, in the push approach to manufacturing, each batch or job consists of one unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
6
JIT is a manufacturing philosophy or business strategy for designing production systems that are more responsive to precisely timed customer delivery requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
7
With the pull approach to manufacturing, factory machinery is arranged in clusters or cells.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
8
A supply chain is a sequence of activities performed by an organization that add value or utility to the product produced or service rendered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
9
MRP is an integrated decision support system for planning, executing, and controlling manufacturing operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
10
An assembly line manufacturing system is a highly automated computer integrated manufacturing system that has its goal of achieving the ability to quickly produce wide varieties of products using the same equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
11
A cost driver is one of the main factors influencing total cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
12
MRP is a process that uses bills of material, raw material and WIP inventory status data, open order data, and the master production schedule to calculate a time-phased order requirements schedule for materials and subassemblies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
13
A process costing system attempts to assign costs to products based on the amount of service operations, such as purchase order preparation, material handling, storage time, wait time, and other nonvalue-added processes, that the products consume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
14
The capacity requirements planning (CRP) process that uses the information from the master production schedule and the time-phased order requirements schedule to develop detailed machine and labor use schedule based on available capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
15
The inventory production schedule is a statement of specific production goals developed from forecasts of demand, actual sales orders or inventory information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
16
Cycle time is the time it takes from when authorization is made for goods to be produced to when the goods are completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
17
Product life cycle management (PLM) systems are ERP modules or enterprise system add-ons that organize data by product, including design, manufacturing specifications, quality, and warranty performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
18
Lifecycle costs are the sum of costs to design, produce, market, deliver, and support a product from conception to ultimate discontinuance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
19
Supply chain management software provides available to promise planning and capable to promise planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
20
Continuous inventory management is an inventory management approach where inventory needs and production capabilities are matched across the entire global enterprise
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
21
The process of exploding the BOM involves extending a BOM to determine the total of each component required to manufacture a given quantity of an upper-level assembly or subassembly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
22
An automated storage and retrieval system (AS/RS) is a computer-based cart system capable of delivering parts and tools among multiple work centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is not one key characteristics of companies that are successful at managing the pressures resulting from global complexity according to the Deloitte Touche report?

A)improved internal business processes in the areas of customers, products, and supply chains
B)better use of technology to increase integration within and among the areas of customers, products and supply chain
C)pursuit of new lucrative marketing channels
D)better general capabilities in the areas of collaboration, flexibility, visibility, and technology
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
24
The final move ticket data marks the end of the conversion process and the movement of goods to the finished goods warehouse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
25
Designing new and creative products and getting them to market quickly is an example of:

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
26
A bill of material contains the standard material quantities that are required to produce one unit of end product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
27
Computer-aided manufacturing (CAM) is the application of computer and communications technology to improve productivity by linking computer numerical control (CNC) machines, monitoring production, and providing automatic feedback to control operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
28
The financial accounting system is concerned with the flow of costs through the factory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
29
The shop floor control process is devoted to monitoring and recording the status of manufacturing orders as they proceed through the factory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
30
Available to promise planning is the accumulation of data on current inventories, sales commitments, planned production and excess production capacity or other planned production capacity that could be quickly converted to production of the desired finished goods necessary to fulfill a sales order request.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
31
Capable to promise planning is the accumulation of the data on current inventories, sales commitments, and planned production to determine whether the production of finished goods will be sufficient to commit to additional sales orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is not one of the key drivers of complexity in manufacturing operations in the new millennium according to the Deloitte Touche survey?

A)facing the realities of globalization
B)the quickening pace of product innovation
C)pursuit of new lucrative markets and channels
D)pressure to reduce costs throughout the value chain
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is impacted heavily by flexible costing, ABC, shifting the cost structure more towards variable costs, and reducing direct labor costs?

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
34
An automated storage and retrieval system (AS/RS) is a computer-controlled machine that stores and retrieves parts and tools.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
35
The material, labor, and machine requirements for each job are reflected in a manufacturing order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
36
Variance analysis is the process of comparing actual information about input costs and usage to standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
37
The process of exploding the BOM results in a master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
38
A step master shows the necessary steps and the time to complete each operation to produce a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
39
Computer-aided process planning (CAPP) is an automated decision support system that generates manufacturing operations instructions and routings based on information about machining requirements and machine capabilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following has included management of throughput time and pull manufacturing?

A)product innovation
B)production process innovation
C)supply chain management
D)management accounting systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
41
Performing a detailed analysis of cost per unit and cost drivers is an essential prerequisite for using:

A)concurrent engineering
B)activity-based costing
C)computer-integrated manufacturing
D)flexible manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
42
Trends in cost management/cost accounting include all of the following except:

A)reductions in the administrative costs of gathering data
B)a trend toward job order cost systems and away from process cost systems
C)adding a fourth cost category called direct technology
D)reduction in the direct labor cost component
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following involves measuring the time from authorization of goods to be produced to when the goods are completed?

A)product life cycle management
B)throughput time
C)push manufacturing
D)pull manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
44
The objectives of computer-aided design (CAD) and computer-aided engineering (CAE) are all of the following except:

A)improve design productivity
B)reduce design lead time
C)increase redundant design effort
D)enhance design quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following statements is false?

A)With the pull approach to manufacturing, factory machinery typically is arranged in factory cells.
B)The pull approach to manufacturing should lead to reduced work in process and finished goods inventories.
C)The pull approach to manufacturing should lead to shorter production runs.
D)Enterprise resource planning (ERP) employs a pull approach to manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
46
The Level 0 data flow diagram for the integrated production process includes all of the following process bubbles except

A)design product and production processes
B)generate master distribution schedule
C)determine needs for materials
D)record manufacturing events
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following often includes global inventory management?

A)design product and production processes
B)generate master production schedule
C)determine needs for materials
D)develop detailed production instructions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
48
The implementation features of just-in-time (JIT) manufacturing typically include all of the following except:

A)arranging the factory in work cells
B)assigning each worker to a single machine
C)allowing workers to stop the production line
D)requiring that the daily production schedule remain fairly constant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
49
Prevailing trends in production systems reflect all of the following except:

A)emphasis on customer satisfaction
B)shortened product life cycles
C)increased factory automation
D)the change from "pull" to "push" production scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following statements is true?

A)Japanese companies have accomplished much in the area of production process innovation, mainly by switching from pull to push manufacturing.
B)Cellular manufacturing organizes machines by department.
C)Adopting the pull approach to manufacturing requires an increase in floor space.
D)In the push approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is a statement of specific production goals developed from forecasts of demand, actual sales orders, or inventory information?

A)a master production schedule (MPS)
B)materials requirements planning (MRP)
C)shop floor control (SFC)
D)just-in-time (JIT) manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
52
Activity-based-costing (ABC) systems are generally prevalent in companies seeking to increase ____ and ____.

A)cost accuracy and usefulness
B)cost accumulation and cost assignment
C)cost allocation and cost containment
D)product costing and cost allocation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
53
The objectives of just-in-time (JIT) manufacturing usually include all of the following except:

A)large lot sizes
B)zero defects
C)zero setup times
D)zero lead times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is used to develop detailed machine- and labor-use schedules that consider available capacity?

A)capacity requirements planning (CRP)
B)capable to promise planning (CTP)
C)computer-aided process planning (CAPP)
D)computer-aided manufacturing (CAM)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is an ERP add on system that organizes data by product, including designs, manufacturing specifications, quality and warranty performance?

A)product life cycle management
B)throughput
C)push manufacturing
D)pull manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following involves short production runs, continuous flow of operations, cellular manufacturing, reduced floor space, and reduced WIP?

A)product life cycle management
B)throughput time
C)push manufacturing
D)pull manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following lists the detailed specifications of each item of raw materials?

A)parts master
B)routing master
C)work center master
D)bill of materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following components is not part of a flexible manufacturing system (FMS):

A)manufacturing resource planning (MRP)
B)computer aided manufacturing (CAM)
C)automated storage and retrieval systems(AS/RS)
D)automated guided vehicle systems (AGVS)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following specifies the operations necessary to complete a subassembly or finished good and the sequence of operations?

A)parts master
B)routing master
C)work center master
D)bill of materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
60
Pull manufacturing should lead to all of the following except:

A)short production runs
B)increased work in process and finished goods inventories
C)continuous flow operations
D)a cellular arrangement of factory machinery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
61
The raw material quantity variance can be determined by:

A)an excess RM issue notice
B)an RM returned notice
C)both a and b
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
62
________________________________are ERP modules or enterprise systems add-ons that organize data by product, including designs, manufacturing specifications, quality, and warranty performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
63
This shows when a manufacturing order or purchase order should be released so that the subassemblies and raw materials will be available when needed.

A)bill of materials
B)routing sheet
C)time-phased order requirements schedule
D)parts master file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
64
The computer technology application that automates the product design process, including but not limited to the functions of geometric modeling, materials stress and strain analysis, drafting, storing product specifications, and mechanical simulation of a product's performance, is called ____________________________________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
65
_________________________ is the time it takes from when authorization is made for goods to be produced to when the goods are completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
66
The logic of the typical inventory system would likely include all of the following processes except:

A)prepare purchase requisition
B)record vendor payable
C)record receipt of inventory
D)record cost of inventory receipts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
67
In the ____________________ approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
68
Supply chain management software provides ____________________ to promise planning and ____________________ to promise planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
69
_________________________ are the sum of costs to design, produce, market, deliver, and support a product from conception to ultimate discontinuance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which of the following is not an inventory process control?

A)JIT materials acquisition
B)locked storerooms
C)periodic inventory systems
D)physical counts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
71
The AICPA's Practice Alert No.94-2: Auditing Inventories-Physical Observations describes several circumstances that constitute inventory fraud.Which of the following is not an example of inventory fraud?

A)including items in inventory when the corresponding payable has not been recorded
B)adjusting inventory to lower-of-cost-or-market
C)increasing counts for items that auditors did not test count
D)counting obsolete inventory as salable or usable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
72
____________________ systems facilitate the integration of all aspects of product design, manufacturing and marketing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
73
The process of comparing actual information about input costs and usage to standards is:

A)standard costing
B)process costing
C)variance analysis
D)activity based costing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
74
A(n) _________________________ is a sequence of activities performed by an organization that add value or utility to the product produced or service rendered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
75
What conveys authority for the manufacture of a specified product or subassembly in a specified quantity and describe the material, labor, and machine requirements for the job?

A)capacity requirements planning (CRP)
B)manufacturing orders (MO)
C)capable to promise planning (CTP)
D)computer-aided process planning (CAPP)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
76
Materials requirements planning (mrp) normally would use all of the following inputs except:

A)master production schedule (MPS)
B)bill of materials
C)routing file
D)raw materials inventory status data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
77
Theoretically, in the ____________________ approach to manufacturing, each batch or job consists of one unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following inventory frauds is not identified by Practice Alert No.94-2: Auditing Inventories--Physical Observations.

A)double-counting inventory
B)counting obsolete inventory
C)including inventory for which the corresponding payable has not been recorded
D)employee theft of inventory item having high sales volume
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
79
A(n) ___________________________________ attempts to assign costs to products based on the amount of service operations, such as purchase order preparation, material handling, storage time, wait time, and other nonvalue-added processes, that the products consume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
80
With the pull approach to manufacturing, factory machinery is arranged in ____________________.