Deck 11: Transaction Cycle The Production Cycle

ملء الشاشة (f)
exit full mode
سؤال
The purchase order:

A)is an evidence of purchases
B)is a binding contract between the firm and the vendor
C)is prepared by the purchasing department
D)All of the options are correct.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The document that allows the store to release the raw materials and work-in-process so that the production process can start is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
سؤال
Which of the following is an unlikely task overseen by the director of logistics?

A)Inventory control
B)Purchasing
C)Billing
D)Shipping
سؤال
Staff involved in the production planning phase need to understand: (i)the individual product-level requirements necessary to produce each product (ii)the overall goals relating to future production scheduling (iii)the overall constraints relating to future production scheduling

A)(i)only
B)(i)(ii)only
C)(i)(iii)only
D)(i)(ii)(iii)
سؤال
The objective of the execution phase in the production cycle does NOT contain:

A)Ensure that the planned production activities are carried out accurately.
B)Ensure that the planned production activities are carried out effectively.
C)Ensure that all production records are reconciled regularly.
D)Ensure that all production records are correctly updated
سؤال
The objective of the planning phase in the production cycle is to:

A)effectively plan production at both the management and floor level
B)effectively plan production at both the internal and external level
C)effectively plan production at both the product and schedule level
D)Consult with the senior management group regarding company production performances.
سؤال
The document that details the raw material and work-in-process that is required to produce the finished good is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
سؤال
The document that details the machines and employees who will be involved in each stage of production is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
سؤال
The document that serves to authorise the store to release the raw materials and work-in-process inventory to the production department is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
سؤال
A sound,well-controlled production cycle can provide a competitive advantage by:

A)providing high-quality,lower cost products
B)manufacturing a unique product range in-house
C)providing price leadership
D)All of the options are correct.
سؤال
Failing to accurately execute production plans can lead to: (i)undersupply issue for finished goods (ii)undersupply issues for raw materials inventories (iii)oversupply issue for finished goods (iv)oversupply issues for raw materials inventories.

A)(i)(ii)only
B)(iii)(iv)only
C)(i)(iv)only
D)(i)(ii)(iii)(iv)
سؤال
A company does a forecast of which products will be sold over the next 12 months.The forecast is used to produce a plan that will ensure that there are sufficient finished goods to meet demand.What is this plan called?

A)Production plan
B)Work order
C)Strategic plan
D)Production schedule
سؤال
The primary responsibility of the production cycle is to ensure that:

A)goods produced are of good quality
B)production costs are brought to the minimum
C)sufficient goods are manufactured in time to meet the demand
D)All of the options are correct.
سؤال
Which of the following is an unlikely task overseen by the director of finance and accounting?

A)Funds disbursement
B)Tax planning
C)Budgeting
D)Remuneration processing
سؤال
Staff involved in execution phase in the production cycle need to: (i)understand the requirements and the nature of the execution plans devised (ii)have the ability to manage the execution plans (iii)the overall goals relating to future production scheduling (iv)the overall constraints relating to future production scheduling

A)(i)(ii)only
B)(i)(ii)(iii)only
C)(i)(ii)(iv)only
D)(i)(ii)(iii)(iv)
سؤال
Which of the following best describes the execution phase of the production cycle?

A)Raw material usage is recorded
B)Customer orders are produced
C)Planned production activities are carried out and all records maintained accurately.
D)A production schedule is planned and executed
سؤال
The typical production cycle commences when:

A)the organisation is low in finished goods inventory
B)a new product has been designed
C)all production costs have been recorded
D)needed raw materials have arrived
سؤال
The typical production cycle ends when:

A)the organisation has a large volume of finished goods inventory
B)all products in the finished goods inventory are sold
C)all production costs have been recorded
D)all raw materials are consumed in the production process
سؤال
In the production cycle,there is a document that details the manufacturing costs related to the manufacture of a finished good.This document is:

A)the production schedule file
B)the work-in-progress file
C)the bill of material file
D)the work order file
سؤال
The document that details when the raw materials will be used,when the work-in-process goods will be stored and finally when the finished goods will be available at the end of the production process is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
سؤال
Planning production schedule does not involve:

A)creating production schedule
B)calculating production requirements
C)identify material requirements
D)None of the options are correct.
سؤال
Flexible manufacturing systems are used:

A)during raw material acquisition and they are designed to respond to any changes detected in raw material costs
B)during production execution and they are designed to respond to any changes detected during production
C)during production and they are designed to respond to any changes detected in market demand
D)None of the options are correct.
سؤال
A specialised software that is used to calculate demand for products,and identify the raw materials required to produce those products is:

A)MRP
B)CAM
C)RFID
D)JIT
سؤال
When checking and assembling required resources prior to starting production,________ are needed.

A)production schedule,bill of materials,and work-in-progress data
B)production schedule,bill of materials,and inventory and labour data
C)bill of materials,work-in-progress data,and inventory and labour data
D)None of the options are correct.
سؤال
What are the two systems that are closely associated with product design?

A)ABC and FMS
B)CAM and CAD
C)CAM and ABC
D)FMS and CAD
سؤال
The report that identifies all new designs created but not actioned within a reasonable period of time in the production cycle is:

A)a production planning and control report
B)an exception report
C)a product costing report
D)a production requirement report
سؤال
The most important data created during the production planning process is:

A)The data in the bill of materials
B)The production schedule data
C)Work-in-progress data
D)None of the options are correct.
سؤال
During the production cycle,a bill of materials must be created for each product based on data obtained from:

A)the raw material inventory and the production schedule
B)production sequence and the product specification
C)the raw material inventory and the product specification
D)production sequence and the production schedule
سؤال
What are the two main factors that need to be considered when automatic reorder points are being set?

A)Production capabilities and lead times.
B)Inventory storage capacity and cash flow.
C)Product availability and price.
D)None of the options are correct.
سؤال
Production scheduling decisions do not include:

A)Determining what types of products to produce.
B)Determining how many of each product to produce.
C)Determining the costing methods for products produced.
D)Scheduling production to align with demand.
سؤال
Forecasted demand for products can be received from the revenue cycle,where it is calculated based on previous sales history.This document is called:

A)production forecast report
B)demand forecast report
C)work order
D)None of the options are correct.
سؤال
The production cycle starts with:

A)production schedule planning
B)product costing
C)product production requirement determination
D)product production
سؤال
Which of the following does not concern inventory management?

A)FMS
B)Agile manufacturing
C)JIT
D)CAD
سؤال
Which of the following is less likely to be a product level decision during the production cycle?

A)Material requirements.
B)Labour requirements.
C)Equipment requirements.
D)Customer specification requirements.
سؤال
The production cycle describes the stage when physical products are manufactured.Which of the following technologies automates control of the manufacturing process?

A)CRM
B)ERP
C)SCM
D)CAM
سؤال
Product planning staff use data from ________ to create a bill of materials.

A)customer order and sales order
B)product specification and raw materials inventory data
C)production schedule and product costing data
D)None of the options are correct.
سؤال
Which of the following factors is not relevant to the decision about which inventory management technique to employ?

A)The nature of the inventory item.
B)The demand for the inventory item.
C)The extent of computerisation in the warehouse.
D)The availability of raw materials.
سؤال
The following process business decisions must be made during the production cycle EXCEPT:

A)Which market strategy to adopt?
B)What materials are required?
C)How much labour is required?
D)Is there sufficient equipment time?
سؤال
What is the role of a bar code scanner or RFID tags in the production cycle?

A)Production workers use this to tag-on/ tag-off the job for their timesheets
B)Boxes of finished goods have RFID tags added before despatch as part of the stock control systems for large customers like Target or Woolworths.
C)These tracking devices are used to record the movement of raw material,WIP and finished goods so that inventories of these remain accurate.
D)These tags are used with the picking slips to locate the goods in the warehouse.
سؤال
What are the two systems that are closely associated with inventory maintenance?

A)FMS and JIT
B)CAD and CAM
C)ABC and JIT
D)ABC and CAM
سؤال
Which of the following is unlikely to be a KPI used to measure the objective "To ensure all production runs are accurately scheduled,conducted,recorded and costed"?

A)Production cycle times
B)Inventory costs per product
C)Production cost budget overruns
D)Variations in manufacturing variances
سؤال
List at least six KPI that can be used to measure the objective "To ensure all production runs are accurately scheduled,conducted,recorded and costed".
سؤال
Explain why the production cycle is strategically important to a manufacturing organisation.
سؤال
A company estimates that its overhead costs are $2 000 000.It decides that the best way of apportioning this is according to the amount of time spent on a specialist machine in production.Total machine time is 2000 hours.How much overhead should a product carry if it spends 3 hours on the machine?

A)$1000
B)$2000
C)$3000
D)$300
سؤال
To identify material requirements,information needs to be read from:

A)the production schedule database and the finished goods inventory database
B)the production schedule database and the bill of materials database
C)the raw materials inventory database and the production schedule database
D)the bill of materials database and the raw materials inventory database
سؤال
Which of the following is not counted as manufacturing overheads?

A)costs for electricity used to operate the production equipment
B)depreciation on the production equipment and buildings
C)miscellaneous factory supplies such as oil or cleaning products
D)payment made to production staff for overtime work
سؤال
Give at least three examples of product level decisions in the production cycle.
سؤال
The risk of having to shut down production because of manufacturing machine failure can be minimised using which of the following:

A)Installing an uninterrupted power supply (UPS)
B)Performing regular planned maintenance and replacement
C)Reducing the number of items produced in a production cycle
D)Restricting access to the production area
سؤال
How does the flexible manufacturing system (FMS)help in reducing the risk of under or overestimated product demand?
سؤال
How often should production-related decisions be made? Give at least two examples.
سؤال
To create a production schedule,information needs to be extracted from:

A)the production schedule database and the finished goods inventory database
B)the production schedule database and the bill of materials database
C)the raw materials inventory database and the production schedule database
D)the bill of materials database and the raw materials inventory database
سؤال
Typical risks encountered in planning the production schedule include

A)under/overestimating product demand
B)underutilisation of available resource
C)under/overestimating materials requirements
D)All of the options are correct.
سؤال
What is the objective of the planning phase in the production cycle?
سؤال
Explain how a sound,well control production cycle can provide an organisation with competitive advantages.
سؤال
What is the objective of the execution phase in the production cycle? What happens if errors occur in the execution phase?
سؤال
Describe in details how product specification is used by product planning staff to determine raw material needs.
سؤال
A bike company has a pile of bicycle frames that it purchased from a supplier.These frames would best be classified as:

A)raw materials
B)work in process
C)finished goods
D)inventory
سؤال
Which of the following is not helpful to reduce risks around incorrect cost allocations?

A)Use appropriate overhead allocation algorithms.
B)Independent review and approval of overhead cost allocations.
C)Use technologies such as bar code or RFID to support accurate and timely tracking and recording of inventor movements.
D)Insist on using activity-based costing.
سؤال
What could happen if the planning phase and the costing phase in the production cycle are poorly managed and executed?
سؤال
An example of a suitable key performance indicator (KPI)for the objective of ensuring that production runs are efficiently conducted is:

A)Inventory costs per product
B)Production cycle times
C)Level of inspection and testing costs incurred
D)Number of quality complaints
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/60
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Transaction Cycle The Production Cycle
1
The purchase order:

A)is an evidence of purchases
B)is a binding contract between the firm and the vendor
C)is prepared by the purchasing department
D)All of the options are correct.
D
2
The document that allows the store to release the raw materials and work-in-process so that the production process can start is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
B
3
Which of the following is an unlikely task overseen by the director of logistics?

A)Inventory control
B)Purchasing
C)Billing
D)Shipping
C
4
Staff involved in the production planning phase need to understand: (i)the individual product-level requirements necessary to produce each product (ii)the overall goals relating to future production scheduling (iii)the overall constraints relating to future production scheduling

A)(i)only
B)(i)(ii)only
C)(i)(iii)only
D)(i)(ii)(iii)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
5
The objective of the execution phase in the production cycle does NOT contain:

A)Ensure that the planned production activities are carried out accurately.
B)Ensure that the planned production activities are carried out effectively.
C)Ensure that all production records are reconciled regularly.
D)Ensure that all production records are correctly updated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
6
The objective of the planning phase in the production cycle is to:

A)effectively plan production at both the management and floor level
B)effectively plan production at both the internal and external level
C)effectively plan production at both the product and schedule level
D)Consult with the senior management group regarding company production performances.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
7
The document that details the raw material and work-in-process that is required to produce the finished good is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
8
The document that details the machines and employees who will be involved in each stage of production is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
9
The document that serves to authorise the store to release the raw materials and work-in-process inventory to the production department is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
10
A sound,well-controlled production cycle can provide a competitive advantage by:

A)providing high-quality,lower cost products
B)manufacturing a unique product range in-house
C)providing price leadership
D)All of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
11
Failing to accurately execute production plans can lead to: (i)undersupply issue for finished goods (ii)undersupply issues for raw materials inventories (iii)oversupply issue for finished goods (iv)oversupply issues for raw materials inventories.

A)(i)(ii)only
B)(iii)(iv)only
C)(i)(iv)only
D)(i)(ii)(iii)(iv)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
12
A company does a forecast of which products will be sold over the next 12 months.The forecast is used to produce a plan that will ensure that there are sufficient finished goods to meet demand.What is this plan called?

A)Production plan
B)Work order
C)Strategic plan
D)Production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
13
The primary responsibility of the production cycle is to ensure that:

A)goods produced are of good quality
B)production costs are brought to the minimum
C)sufficient goods are manufactured in time to meet the demand
D)All of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is an unlikely task overseen by the director of finance and accounting?

A)Funds disbursement
B)Tax planning
C)Budgeting
D)Remuneration processing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
15
Staff involved in execution phase in the production cycle need to: (i)understand the requirements and the nature of the execution plans devised (ii)have the ability to manage the execution plans (iii)the overall goals relating to future production scheduling (iv)the overall constraints relating to future production scheduling

A)(i)(ii)only
B)(i)(ii)(iii)only
C)(i)(ii)(iv)only
D)(i)(ii)(iii)(iv)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following best describes the execution phase of the production cycle?

A)Raw material usage is recorded
B)Customer orders are produced
C)Planned production activities are carried out and all records maintained accurately.
D)A production schedule is planned and executed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
17
The typical production cycle commences when:

A)the organisation is low in finished goods inventory
B)a new product has been designed
C)all production costs have been recorded
D)needed raw materials have arrived
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
18
The typical production cycle ends when:

A)the organisation has a large volume of finished goods inventory
B)all products in the finished goods inventory are sold
C)all production costs have been recorded
D)all raw materials are consumed in the production process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
19
In the production cycle,there is a document that details the manufacturing costs related to the manufacture of a finished good.This document is:

A)the production schedule file
B)the work-in-progress file
C)the bill of material file
D)the work order file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
20
The document that details when the raw materials will be used,when the work-in-process goods will be stored and finally when the finished goods will be available at the end of the production process is:

A)Bill of material
B)Work order
C)Material requisition
D)Production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
21
Planning production schedule does not involve:

A)creating production schedule
B)calculating production requirements
C)identify material requirements
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
22
Flexible manufacturing systems are used:

A)during raw material acquisition and they are designed to respond to any changes detected in raw material costs
B)during production execution and they are designed to respond to any changes detected during production
C)during production and they are designed to respond to any changes detected in market demand
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
23
A specialised software that is used to calculate demand for products,and identify the raw materials required to produce those products is:

A)MRP
B)CAM
C)RFID
D)JIT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
24
When checking and assembling required resources prior to starting production,________ are needed.

A)production schedule,bill of materials,and work-in-progress data
B)production schedule,bill of materials,and inventory and labour data
C)bill of materials,work-in-progress data,and inventory and labour data
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
25
What are the two systems that are closely associated with product design?

A)ABC and FMS
B)CAM and CAD
C)CAM and ABC
D)FMS and CAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
26
The report that identifies all new designs created but not actioned within a reasonable period of time in the production cycle is:

A)a production planning and control report
B)an exception report
C)a product costing report
D)a production requirement report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
27
The most important data created during the production planning process is:

A)The data in the bill of materials
B)The production schedule data
C)Work-in-progress data
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
28
During the production cycle,a bill of materials must be created for each product based on data obtained from:

A)the raw material inventory and the production schedule
B)production sequence and the product specification
C)the raw material inventory and the product specification
D)production sequence and the production schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
29
What are the two main factors that need to be considered when automatic reorder points are being set?

A)Production capabilities and lead times.
B)Inventory storage capacity and cash flow.
C)Product availability and price.
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
30
Production scheduling decisions do not include:

A)Determining what types of products to produce.
B)Determining how many of each product to produce.
C)Determining the costing methods for products produced.
D)Scheduling production to align with demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
31
Forecasted demand for products can be received from the revenue cycle,where it is calculated based on previous sales history.This document is called:

A)production forecast report
B)demand forecast report
C)work order
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
32
The production cycle starts with:

A)production schedule planning
B)product costing
C)product production requirement determination
D)product production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following does not concern inventory management?

A)FMS
B)Agile manufacturing
C)JIT
D)CAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is less likely to be a product level decision during the production cycle?

A)Material requirements.
B)Labour requirements.
C)Equipment requirements.
D)Customer specification requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
35
The production cycle describes the stage when physical products are manufactured.Which of the following technologies automates control of the manufacturing process?

A)CRM
B)ERP
C)SCM
D)CAM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
36
Product planning staff use data from ________ to create a bill of materials.

A)customer order and sales order
B)product specification and raw materials inventory data
C)production schedule and product costing data
D)None of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following factors is not relevant to the decision about which inventory management technique to employ?

A)The nature of the inventory item.
B)The demand for the inventory item.
C)The extent of computerisation in the warehouse.
D)The availability of raw materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
38
The following process business decisions must be made during the production cycle EXCEPT:

A)Which market strategy to adopt?
B)What materials are required?
C)How much labour is required?
D)Is there sufficient equipment time?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
39
What is the role of a bar code scanner or RFID tags in the production cycle?

A)Production workers use this to tag-on/ tag-off the job for their timesheets
B)Boxes of finished goods have RFID tags added before despatch as part of the stock control systems for large customers like Target or Woolworths.
C)These tracking devices are used to record the movement of raw material,WIP and finished goods so that inventories of these remain accurate.
D)These tags are used with the picking slips to locate the goods in the warehouse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
40
What are the two systems that are closely associated with inventory maintenance?

A)FMS and JIT
B)CAD and CAM
C)ABC and JIT
D)ABC and CAM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following is unlikely to be a KPI used to measure the objective "To ensure all production runs are accurately scheduled,conducted,recorded and costed"?

A)Production cycle times
B)Inventory costs per product
C)Production cost budget overruns
D)Variations in manufacturing variances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
42
List at least six KPI that can be used to measure the objective "To ensure all production runs are accurately scheduled,conducted,recorded and costed".
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
43
Explain why the production cycle is strategically important to a manufacturing organisation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
44
A company estimates that its overhead costs are $2 000 000.It decides that the best way of apportioning this is according to the amount of time spent on a specialist machine in production.Total machine time is 2000 hours.How much overhead should a product carry if it spends 3 hours on the machine?

A)$1000
B)$2000
C)$3000
D)$300
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
45
To identify material requirements,information needs to be read from:

A)the production schedule database and the finished goods inventory database
B)the production schedule database and the bill of materials database
C)the raw materials inventory database and the production schedule database
D)the bill of materials database and the raw materials inventory database
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following is not counted as manufacturing overheads?

A)costs for electricity used to operate the production equipment
B)depreciation on the production equipment and buildings
C)miscellaneous factory supplies such as oil or cleaning products
D)payment made to production staff for overtime work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
47
Give at least three examples of product level decisions in the production cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
48
The risk of having to shut down production because of manufacturing machine failure can be minimised using which of the following:

A)Installing an uninterrupted power supply (UPS)
B)Performing regular planned maintenance and replacement
C)Reducing the number of items produced in a production cycle
D)Restricting access to the production area
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
49
How does the flexible manufacturing system (FMS)help in reducing the risk of under or overestimated product demand?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
50
How often should production-related decisions be made? Give at least two examples.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
51
To create a production schedule,information needs to be extracted from:

A)the production schedule database and the finished goods inventory database
B)the production schedule database and the bill of materials database
C)the raw materials inventory database and the production schedule database
D)the bill of materials database and the raw materials inventory database
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
52
Typical risks encountered in planning the production schedule include

A)under/overestimating product demand
B)underutilisation of available resource
C)under/overestimating materials requirements
D)All of the options are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
53
What is the objective of the planning phase in the production cycle?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
54
Explain how a sound,well control production cycle can provide an organisation with competitive advantages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
55
What is the objective of the execution phase in the production cycle? What happens if errors occur in the execution phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
56
Describe in details how product specification is used by product planning staff to determine raw material needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
57
A bike company has a pile of bicycle frames that it purchased from a supplier.These frames would best be classified as:

A)raw materials
B)work in process
C)finished goods
D)inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following is not helpful to reduce risks around incorrect cost allocations?

A)Use appropriate overhead allocation algorithms.
B)Independent review and approval of overhead cost allocations.
C)Use technologies such as bar code or RFID to support accurate and timely tracking and recording of inventor movements.
D)Insist on using activity-based costing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
59
What could happen if the planning phase and the costing phase in the production cycle are poorly managed and executed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
60
An example of a suitable key performance indicator (KPI)for the objective of ensuring that production runs are efficiently conducted is:

A)Inventory costs per product
B)Production cycle times
C)Level of inspection and testing costs incurred
D)Number of quality complaints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.