Deck 11: Flexible Budgets and Overhead Analysis

ملء الشاشة (f)
exit full mode
سؤال
Activity-based budgeting builds a budget for each activity based on the resources needed to provide the required activity output levels.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An activity-based budgetary approach can be used to emphasize cost reduction and process management.
سؤال
Before-the-fact flexible budgets give expected outcomes for a range of activity levels.
سؤال
Static budgets are the best benchmarks for preparing a performance report.
سؤال
The fixed overhead spending variance is affected primarily by changes in production levels.
سؤال
Responsibility for variable overhead spending and efficiency variances is generally assigned to production departments.
سؤال
Activity-based budgeting focuses on estimating the costs of activities rather than the costs of departments and plants.
سؤال
A static budget is a budget for a particular level of activity.
سؤال
Although general responsibility for the volume variance is usually assigned to the purchasing department, responsibility on occasion may be assigned to the production department.
سؤال
Activity flexible budgeting is the prediction of what activity costs will be as related output changes.
سؤال
The volume variance is often interpreted as a measure of capacity utilization.
سؤال
Activity-based budgeting supports continuous improvement and process management.
سؤال
The variable overhead spending variance is conceptually identical to the price variances of materials and labor.
سؤال
A static budget compares actual cost with budgeted costs.
سؤال
The variable overhead variance is affected by input price changes only.
سؤال
When overhead is applied on the basis of direct labor hours, the variable overhead efficiency variance always has the same sign as the labor efficiency variance.
سؤال
Practical capacity is always used to calculate fixed overhead rates
سؤال
An after-the-fact flexible budget allows managers to generate financial results from a number of potential scenarios.
سؤال
Price changes of variable overhead items are easily controlled by production supervisors.
سؤال
Fixed overhead costs are resources acquired as used and needed.
سؤال
For a static activity budget in a company already using an ABC or ABM system, the activities within the organization must be identified.
سؤال
Match the following terms with the items below:
a.(Actual hours Standard hours)SVOR
b.Prediction of what activity costs will be as activity output changes
c.A measure of capacity utilization
d.Actual variable overhead (SVOR Actual hours)
e.Difference between the actual amount and the flexible budget amount
f.A budget that specifies costs for a range of activity
g.A budget for a particular level of activity
h.Estimating activity output and then assessing the cost of resources to produce this output
i.A report that compares actual with planned costs
j.Difference between actual and budgeted fixed overhead
A _____________________ compares actual costs with budgeted costs.
سؤال
Match the following terms with the items below:

-Performance report

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Match the following terms with the items below:

-Fixed overhead volume variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Match the following terms with the items below:

-Static budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
A _______________ is a budget created in advance that is based on a particular level of activity.
سؤال
Match the following terms with the items below:

-Flexible budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead -(SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
An activity-based budgeting system may help support continuous improvement and process management.
سؤال
Because activities are what consume resources, activity-based budgeting may prove to be a much more powerful planning and control tool than the traditional approach.
سؤال
In an activity framework, controlling costs is equivalent to managing activities.
سؤال
Activity-based budgeting classifies costs as variable or fixed with respect to the activity output measure.
سؤال
Match the following terms with the items below:

-Fixed overhead spending variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR *Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Activity flexible budgeting is the prediction of what activity costs will be as production output changes.
سؤال
The first step of building an activity-based budget is to identify the activities within an organization.
سؤال
Match the following terms with the items below:

-Variable overhead efficiency variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Match the following terms with the items below:

-Activity-based budgeting

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
An activity-based budgetary approach can be used to emphasize cost increases through the reduction of wasteful activities and improving the efficiency of necessary activities.
سؤال
Match the following terms with the items below:

-Variable overhead spending variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Match the following terms with the items below:

-Activity flexible budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead -(SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
Match the following terms with the items below:

-Flexible budget variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
سؤال
The ________________________ measures the change in the actual variable overhead cost that occurs because of efficient (or inefficient) use of direct labor
سؤال
The variable overhead efficiency variance is directly related to the __________________ or usage variance.
سؤال
Budgeted costs change because total variable costs go up as output increases, therefore flexible budgets are sometimes referred to as _______________.
سؤال
Activity-based budgeting begins with the _____________ and _______________ budgets.
سؤال
A difference between the actual amount and the flexible budget amount is known as the ____________________.
سؤال
The _________________________ focuses on the estimation of the costs of activities rather than the costs of departments and plants.
سؤال
_______________________ is the difference between the actual variable overhead and applied variable overhead.
سؤال
A _________________ enables a firm to compute expected costs for a range of activity levels.
سؤال
The ______________________ is the difference between the actual fixed overhead and the budgeted fixed overhead.
سؤال
The _____________________ measures the aggregate effect of differences between the actual variable overhead rate and the standard variable overhead rate.
سؤال
______________________ is a prerequisite for assigning responsibility.
سؤال
The ________________ budget is based on the actual level of activity.
سؤال
A static budget is

A) considered a good choice for benchmarks in preparing a performance report.
B) computes expected costs for a range of activity levels.
C) compares actual costs with budgeted costs.
D) prepared for a particular level of activity.
E) None of these are correct.
سؤال
The ____________________ budget gives expected outcomes for a range of activity levels.
سؤال
Which budget should be used to determine managerial effectiveness?

A) before-the-fact flexible budget
B) after-the-fact flexible budget
C) static budget
D) financial budget
E) cash budget
سؤال
_______________________ is the prediction of what activity costs will be as related output changes.
سؤال
The ____________________ is the difference between budgeted fixed overhead and applied fixed overhead.
سؤال
Often, the flexible budget formulas are based on ________________ instead of units.
سؤال
The _____________________ is the difference between actual fixed overhead and applied fixed overhead.
سؤال
_________________ are capacity costs acquired in advance of usage.
سؤال
<strong>  Refer to Figure 11-2. Comparing the static budget to the actual costs, we can conclude that</strong> A) the manager spent more than should have been spent. B) immediate action is needed to reduce costs. C) the plant manager was clearly not efficient. D) the plant manager should be dismissed. E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-2. Comparing the static budget to the actual costs, we can conclude that

A) the manager spent more than should have been spent.
B) immediate action is needed to reduce costs.
C) the plant manager was clearly not efficient.
D) the plant manager should be dismissed.
E) None of these.
سؤال
Which budget is used to assess managerial efficiency?

A) sales budget
B) production budget
C) static budget
D) flexible budget
E) cash budget
سؤال
To create a meaningful performance report,

A) actual costs are compared with the expected costs found in the static budget.
B) actual costs are calculated as a percentage of sales.
C) actual costs are compared with the prior year's actual costs.
D) expected costs of the static budget are compared with the expected costs of the flexible budget.
E) actual costs are compared with the expected costs at the same level of activity.
سؤال
The variable overhead spending variance measures the aggregate effect of differences between the

A) the total variable overhead and the applied variable overhead.
B) the total variable overhead and total budgeted overhead costs.
C) the total variable overhead and the budgeted overhead for the expected activity.
D) the actual variable overhead rate and the standard variable overhead rate.
E) None of these.
سؤال
A budget that allows the determination of expected costs for various levels of activity is a(n)

A) operational budget.
B) sales budget.
C) production budget.
D) financial budget.
E) flexible budget.
سؤال
An after-the-fact flexible budget

A) is a budget for the actual level of activity.
B) is used for performance reports.
C) calculates what costs should have been for the actual level of activity.
D) is used to compare expected costs with actual costs.
E) All of these.
سؤال
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.</strong> A) $91,600 B) $115,000 C) $118,600 D) $77,400 E) None of these. <div style=padding-top: 35px> Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.</strong> A) $91,600 B) $115,000 C) $118,600 D) $77,400 E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.

A) $91,600
B) $115,000
C) $118,600
D) $77,400
E) None of these.
سؤال
<strong>  Refer to Figure 11-1. What is the flexible budget variance for the first quarter?</strong> A) $1,000 U B) $23,000 U C) $23,000 F D) $1,000 F E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-1. What is the flexible budget variance for the first quarter?

A) $1,000 U
B) $23,000 U
C) $23,000 F
D) $1,000 F
E) None of these.
سؤال
A budget prepared for a particular level of activity is a(n)

A) operational budget.
B) ABB budget.
C) static budget.
D) flexible budget.
E) variable budget.
سؤال
<strong>  Refer to Figure 11-2. What is the flexible budget for July?</strong> A) $142,000 B) $159,000 C) $171,000 D) $165,000 E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-2. What is the flexible budget for July?

A) $142,000
B) $159,000
C) $171,000
D) $165,000
E) None of these.
سؤال
<strong>  Refer to Figure 11-1. Comparing the static budget to the actual outcomes, we can say the following:</strong> A) the manager had more direct labor hours. B) the variances are all unfavorable. C) the comparison is not useful for assessing managerial efficiency. D) a flexible budget should be used for assessing efficiency. E) All of these. <div style=padding-top: 35px>
Refer to Figure 11-1. Comparing the static budget to the actual outcomes, we can say the following:

A) the manager had more direct labor hours.
B) the variances are all unfavorable.
C) the comparison is not useful for assessing managerial efficiency.
D) a flexible budget should be used for assessing efficiency.
E) All of these.
سؤال
A performance report

A) always uses static budgets.
B) compares actual costs with budgeted costs.
C) uses a static or a flexible budget.
D) both compares actual costs with budgeted costs and always uses static budget.
E) both always uses static budgets and usually uses flexible budgets.
سؤال
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is</strong> A) $139,400. B) $64,400. C) $124,000. D) $12,400. E) None of these. <div style=padding-top: 35px> Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is</strong> A) $139,400. B) $64,400. C) $124,000. D) $12,400. E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is

A) $139,400.
B) $64,400.
C) $124,000.
D) $12,400.
E) None of these.
سؤال
A static budget is best used to

A) measure whether or not a manager accomplishes his or her goals.
B) compare expected costs at the actual level of activity with the actual costs.
C) assess how well costs were controlled during the year.
D) determine managerial efficiency.
E) None of these.
سؤال
Flexible budgets are powerful control tools because

A) they allow managers to deal with uncertainty.
B) they allow the calculation of what cost should be for the actual level of activity.
C) they allow the preparation of meaningful performance reports.
D) they help measure managerial efficiency.
E) All of these.
سؤال
<strong>  Refer to Figure 11-2. What is the flexible budget variance for July?</strong> A) $12,000 U B) $12,000 F C) $29,000 U D) $29,000 F E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-2. What is the flexible budget variance for July?

A) $12,000 U
B) $12,000 F
C) $29,000 U
D) $29,000 F
E) None of these.
سؤال
<strong>  Refer to Figure 11-1. What is the flexible budget amount for the first quarter?</strong> A) $288,000 B) $311,000 C) $312,000 D) $261,000 E) Cannot be determined. <div style=padding-top: 35px>
Refer to Figure 11-1. What is the flexible budget amount for the first quarter?

A) $288,000
B) $311,000
C) $312,000
D) $261,000
E) Cannot be determined.
سؤال
A before-the-fact flexible budget

A) calculates expected costs for various levels of activity.
B) allows managers to deal with uncertainty.
C) can be used to generate results for a number of plausible scenarios.
D) is a useful planning tool.
E) All of these.
سؤال
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.</strong> A) $13,000 U B) $13,100 F C) $11,000 U D) $1,000 F E) None of these. <div style=padding-top: 35px> Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.</strong> A) $13,000 U B) $13,100 F C) $11,000 U D) $1,000 F E) None of these. <div style=padding-top: 35px>
Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.

A) $13,000 U
B) $13,100 F
C) $11,000 U
D) $1,000 F
E) None of these.
سؤال
Assume that the expectations on the static budget were met. We can conclude that

A) the static budget was ill conceived.
B) the effectiveness of the manager is not in question.
C) the manager is very efficient.
D) there is no need for a flexible budget.
E) None of these.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/172
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Flexible Budgets and Overhead Analysis
1
Activity-based budgeting builds a budget for each activity based on the resources needed to provide the required activity output levels.
True
2
An activity-based budgetary approach can be used to emphasize cost reduction and process management.
True
3
Before-the-fact flexible budgets give expected outcomes for a range of activity levels.
True
4
Static budgets are the best benchmarks for preparing a performance report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
5
The fixed overhead spending variance is affected primarily by changes in production levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
6
Responsibility for variable overhead spending and efficiency variances is generally assigned to production departments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
7
Activity-based budgeting focuses on estimating the costs of activities rather than the costs of departments and plants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
8
A static budget is a budget for a particular level of activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
9
Although general responsibility for the volume variance is usually assigned to the purchasing department, responsibility on occasion may be assigned to the production department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
10
Activity flexible budgeting is the prediction of what activity costs will be as related output changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
11
The volume variance is often interpreted as a measure of capacity utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
12
Activity-based budgeting supports continuous improvement and process management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
13
The variable overhead spending variance is conceptually identical to the price variances of materials and labor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
14
A static budget compares actual cost with budgeted costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
15
The variable overhead variance is affected by input price changes only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
16
When overhead is applied on the basis of direct labor hours, the variable overhead efficiency variance always has the same sign as the labor efficiency variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
17
Practical capacity is always used to calculate fixed overhead rates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
18
An after-the-fact flexible budget allows managers to generate financial results from a number of potential scenarios.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
19
Price changes of variable overhead items are easily controlled by production supervisors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
20
Fixed overhead costs are resources acquired as used and needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
21
For a static activity budget in a company already using an ABC or ABM system, the activities within the organization must be identified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
22
Match the following terms with the items below:
a.(Actual hours Standard hours)SVOR
b.Prediction of what activity costs will be as activity output changes
c.A measure of capacity utilization
d.Actual variable overhead (SVOR Actual hours)
e.Difference between the actual amount and the flexible budget amount
f.A budget that specifies costs for a range of activity
g.A budget for a particular level of activity
h.Estimating activity output and then assessing the cost of resources to produce this output
i.A report that compares actual with planned costs
j.Difference between actual and budgeted fixed overhead
A _____________________ compares actual costs with budgeted costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
23
Match the following terms with the items below:

-Performance report

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
24
Match the following terms with the items below:

-Fixed overhead volume variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
25
Match the following terms with the items below:

-Static budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
26
A _______________ is a budget created in advance that is based on a particular level of activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
27
Match the following terms with the items below:

-Flexible budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead -(SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
28
An activity-based budgeting system may help support continuous improvement and process management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
29
Because activities are what consume resources, activity-based budgeting may prove to be a much more powerful planning and control tool than the traditional approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
30
In an activity framework, controlling costs is equivalent to managing activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
31
Activity-based budgeting classifies costs as variable or fixed with respect to the activity output measure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
32
Match the following terms with the items below:

-Fixed overhead spending variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR *Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
33
Activity flexible budgeting is the prediction of what activity costs will be as production output changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
34
The first step of building an activity-based budget is to identify the activities within an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
35
Match the following terms with the items below:

-Variable overhead efficiency variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
36
Match the following terms with the items below:

-Activity-based budgeting

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
37
An activity-based budgetary approach can be used to emphasize cost increases through the reduction of wasteful activities and improving the efficiency of necessary activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
38
Match the following terms with the items below:

-Variable overhead spending variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
39
Match the following terms with the items below:

-Activity flexible budget

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead -(SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
40
Match the following terms with the items below:

-Flexible budget variance

A)(Actual hours - Standard hours)SVOR
B)Prediction of what activity costs will be as activity output changes
C)A measure of capacity utilization
D)Actual variable overhead - (SVOR * Actual hours)
E)Difference between the actual amount and the flexible budget amount
F)A budget that specifies costs for a range of activity
G)A budget for a particular level of activity
H)Estimating activity output and then assessing the cost of resources to produce this output
I)A report that compares actual with planned costs
J)Difference between actual and budgeted fixed overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
41
The ________________________ measures the change in the actual variable overhead cost that occurs because of efficient (or inefficient) use of direct labor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
42
The variable overhead efficiency variance is directly related to the __________________ or usage variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
43
Budgeted costs change because total variable costs go up as output increases, therefore flexible budgets are sometimes referred to as _______________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
44
Activity-based budgeting begins with the _____________ and _______________ budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
45
A difference between the actual amount and the flexible budget amount is known as the ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
46
The _________________________ focuses on the estimation of the costs of activities rather than the costs of departments and plants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
47
_______________________ is the difference between the actual variable overhead and applied variable overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
48
A _________________ enables a firm to compute expected costs for a range of activity levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
49
The ______________________ is the difference between the actual fixed overhead and the budgeted fixed overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
50
The _____________________ measures the aggregate effect of differences between the actual variable overhead rate and the standard variable overhead rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
51
______________________ is a prerequisite for assigning responsibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
52
The ________________ budget is based on the actual level of activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
53
A static budget is

A) considered a good choice for benchmarks in preparing a performance report.
B) computes expected costs for a range of activity levels.
C) compares actual costs with budgeted costs.
D) prepared for a particular level of activity.
E) None of these are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
54
The ____________________ budget gives expected outcomes for a range of activity levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which budget should be used to determine managerial effectiveness?

A) before-the-fact flexible budget
B) after-the-fact flexible budget
C) static budget
D) financial budget
E) cash budget
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
56
_______________________ is the prediction of what activity costs will be as related output changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
57
The ____________________ is the difference between budgeted fixed overhead and applied fixed overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
58
Often, the flexible budget formulas are based on ________________ instead of units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
59
The _____________________ is the difference between actual fixed overhead and applied fixed overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
60
_________________ are capacity costs acquired in advance of usage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
61
<strong>  Refer to Figure 11-2. Comparing the static budget to the actual costs, we can conclude that</strong> A) the manager spent more than should have been spent. B) immediate action is needed to reduce costs. C) the plant manager was clearly not efficient. D) the plant manager should be dismissed. E) None of these.
Refer to Figure 11-2. Comparing the static budget to the actual costs, we can conclude that

A) the manager spent more than should have been spent.
B) immediate action is needed to reduce costs.
C) the plant manager was clearly not efficient.
D) the plant manager should be dismissed.
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which budget is used to assess managerial efficiency?

A) sales budget
B) production budget
C) static budget
D) flexible budget
E) cash budget
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
63
To create a meaningful performance report,

A) actual costs are compared with the expected costs found in the static budget.
B) actual costs are calculated as a percentage of sales.
C) actual costs are compared with the prior year's actual costs.
D) expected costs of the static budget are compared with the expected costs of the flexible budget.
E) actual costs are compared with the expected costs at the same level of activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
64
The variable overhead spending variance measures the aggregate effect of differences between the

A) the total variable overhead and the applied variable overhead.
B) the total variable overhead and total budgeted overhead costs.
C) the total variable overhead and the budgeted overhead for the expected activity.
D) the actual variable overhead rate and the standard variable overhead rate.
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
65
A budget that allows the determination of expected costs for various levels of activity is a(n)

A) operational budget.
B) sales budget.
C) production budget.
D) financial budget.
E) flexible budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
66
An after-the-fact flexible budget

A) is a budget for the actual level of activity.
B) is used for performance reports.
C) calculates what costs should have been for the actual level of activity.
D) is used to compare expected costs with actual costs.
E) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
67
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.</strong> A) $91,600 B) $115,000 C) $118,600 D) $77,400 E) None of these. Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.</strong> A) $91,600 B) $115,000 C) $118,600 D) $77,400 E) None of these.
Refer to Figure 11-3. Calculate the after-the-fact budget for the actual level of activity.

A) $91,600
B) $115,000
C) $118,600
D) $77,400
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
68
<strong>  Refer to Figure 11-1. What is the flexible budget variance for the first quarter?</strong> A) $1,000 U B) $23,000 U C) $23,000 F D) $1,000 F E) None of these.
Refer to Figure 11-1. What is the flexible budget variance for the first quarter?

A) $1,000 U
B) $23,000 U
C) $23,000 F
D) $1,000 F
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
69
A budget prepared for a particular level of activity is a(n)

A) operational budget.
B) ABB budget.
C) static budget.
D) flexible budget.
E) variable budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
70
<strong>  Refer to Figure 11-2. What is the flexible budget for July?</strong> A) $142,000 B) $159,000 C) $171,000 D) $165,000 E) None of these.
Refer to Figure 11-2. What is the flexible budget for July?

A) $142,000
B) $159,000
C) $171,000
D) $165,000
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
71
<strong>  Refer to Figure 11-1. Comparing the static budget to the actual outcomes, we can say the following:</strong> A) the manager had more direct labor hours. B) the variances are all unfavorable. C) the comparison is not useful for assessing managerial efficiency. D) a flexible budget should be used for assessing efficiency. E) All of these.
Refer to Figure 11-1. Comparing the static budget to the actual outcomes, we can say the following:

A) the manager had more direct labor hours.
B) the variances are all unfavorable.
C) the comparison is not useful for assessing managerial efficiency.
D) a flexible budget should be used for assessing efficiency.
E) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
72
A performance report

A) always uses static budgets.
B) compares actual costs with budgeted costs.
C) uses a static or a flexible budget.
D) both compares actual costs with budgeted costs and always uses static budget.
E) both always uses static budgets and usually uses flexible budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
73
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is</strong> A) $139,400. B) $64,400. C) $124,000. D) $12,400. E) None of these. Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is</strong> A) $139,400. B) $64,400. C) $124,000. D) $12,400. E) None of these.
Refer to Figure 11-3. Prepare an overhead budget for the expected activity level of 10,000 units. The total budgeted overhead is

A) $139,400.
B) $64,400.
C) $124,000.
D) $12,400.
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
74
A static budget is best used to

A) measure whether or not a manager accomplishes his or her goals.
B) compare expected costs at the actual level of activity with the actual costs.
C) assess how well costs were controlled during the year.
D) determine managerial efficiency.
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
75
Flexible budgets are powerful control tools because

A) they allow managers to deal with uncertainty.
B) they allow the calculation of what cost should be for the actual level of activity.
C) they allow the preparation of meaningful performance reports.
D) they help measure managerial efficiency.
E) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
76
<strong>  Refer to Figure 11-2. What is the flexible budget variance for July?</strong> A) $12,000 U B) $12,000 F C) $29,000 U D) $29,000 F E) None of these.
Refer to Figure 11-2. What is the flexible budget variance for July?

A) $12,000 U
B) $12,000 F
C) $29,000 U
D) $29,000 F
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
77
<strong>  Refer to Figure 11-1. What is the flexible budget amount for the first quarter?</strong> A) $288,000 B) $311,000 C) $312,000 D) $261,000 E) Cannot be determined.
Refer to Figure 11-1. What is the flexible budget amount for the first quarter?

A) $288,000
B) $311,000
C) $312,000
D) $261,000
E) Cannot be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
78
A before-the-fact flexible budget

A) calculates expected costs for various levels of activity.
B) allows managers to deal with uncertainty.
C) can be used to generate results for a number of plausible scenarios.
D) is a useful planning tool.
E) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
79
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.</strong> A) $13,000 U B) $13,100 F C) $11,000 U D) $1,000 F E) None of these. Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:
<strong>  Montgomery normally produces 15,000 units (each unit requires 0.30 direct labor hours); however this year 19,000 units were produced with the following actual costs:   Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.</strong> A) $13,000 U B) $13,100 F C) $11,000 U D) $1,000 F E) None of these.
Refer to Figure 11-3. Calculate the variance for maintenance using an after-the-fact flexible budget.

A) $13,000 U
B) $13,100 F
C) $11,000 U
D) $1,000 F
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
80
Assume that the expectations on the static budget were met. We can conclude that

A) the static budget was ill conceived.
B) the effectiveness of the manager is not in question.
C) the manager is very efficient.
D) there is no need for a flexible budget.
E) None of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 172 في هذه المجموعة.