Deck 14: The Production Cycle

ملء الشاشة (f)
exit full mode
سؤال
The risks associated with over-production are likely of greatest concern to which company below?

A)a cereal manufacturer
B)a manufacturer that produces designer clothing
C)a manufacturer of printer paper
D)a mailbox manufacturer
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Identify one control that can be used to mitigate the threat of under-production.

A)production planning systems
B)analysis of warranty and repair costs
C)encryption
D)insurance
سؤال
Which of the following is not a product design objective?

A)Design a product that meets customer requirements.
B)Design a quality product.
C)Minimize production costs.
D)Make the design easy to track for cost accounting purposes.
سؤال
Which of the following organization controls should be implemented and maintained to counteract the general threat that the loss of production data will greatly slow or halt production activity?

A)Store key master inventory and production order files on-site only to prevent their theft.
B)Back up data files only after a production run has been physically completed.
C)Access controls should apply to all terminals within the organization.
D)Allow access to inventory records from any terminal within the organization to provide efficient data entry.
سؤال
The best control procedure for accurate data entry is

A)the use of on-line terminals.
B)an access control matrix.
C)passwords and user IDs.
D)automation of data collection.
سؤال
Identify one control that can be used to mitigate the threat of poor product design that results in excess costs.

A)production planning systems
B)analysis of warranty and repair costs
C)encryption
D)insurance
سؤال
To control for risks associated with the threat of inventory loss,who should have primary responsibility for work-in-process inventories?

A)a factory supervisor
B)the inventory stores department
C)purchasing
D)the receiving department
سؤال
What specific control can help restrict the rights of authorized users to only the portion of a database needed to complete their specific job duties?

A)an access control matrix
B)passwords and user IDs
C)closed-loop verification
D)specific authorization
سؤال
Which of the following controls can minimize the threat of unauthorized disclosure of sensitive information?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
سؤال
The operations list shows

A)the labor and machine requirements.
B)the steps and operations in the production cycle.
C)the time expected to complete each step or operation.
D)all of the above
سؤال
Yasamin Roshni owns and operates a small deli in Miami,Florida..She maintains a file that lists the steps required to make each of her famous subs.These step-by-step instructions are examples of a(n)

A)operations list.
B)bill of materials.
C)production order.
D)materials requisition.
سؤال
The AIS compiles and feeds information among the business cycles.What is the relationship between the revenue and production cycles regarding the exchange of information?

A)The revenue cycle provides sales forecast and customer order information to the production cycle, but the production cycle sends information back to revenue about finished goods production.
B)The revenue cycle receives information from the production cycle about raw materials needs.
C)The production cycle sends cost of goods manufactured information back to the revenue cycle.
D)The production cycle does not exchange information with the revenue cycle.
سؤال
Describe five threats in the production cycle and the applicable control procedures used to mitigate each threat.
سؤال
Which of the following controls can minimize the threat of theft of inventory?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
سؤال
The threat of loss of data exposes the company to

A)the loss of assets.
B)ineffective decision making.
C)inefficient manufacturing.
D)All of the above are correct.
سؤال
Discuss two measures that can address the threats of inefficiencies and quality controls problems.
سؤال
An organization can implement which of the following controls to reduce the threat of inventory theft or damage?

A)review and approval of fixed asset acquisitions
B)improved and more timely reporting
C)better production and planning systems
D)document all movement of inventory through the production process
سؤال
Which of the following controls can minimize the threat of over- and underproduction?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
سؤال
The production cycle differs from the revenue and expenditure cycles for all the following reasons except

A)cost accounting is involved in all activities.
B)not all organizations have a production cycle.
C)there are no direct external data sources or destinations.
D)very little technology exists to make activities more efficient.
سؤال
Which of the following controls can minimize the threat of misleading reports?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
سؤال
The ________ authorizes the transfer of raw materials from the storeroom to the production floor.

A)bill of materials
B)production order
C)materials requisition
D)move ticket
سؤال
How can CAD software help improve the efficiency and effectiveness of the product design process?

A)It can eliminate the costs associated with creating and destroying physical prototypes.
B)It can simulate how new products will be manufactured.
C)It can store all the data associated with all products.
D)All of the above
سؤال
What information is necessary to create the master production schedule?

A)engineering department specifications and inventory levels
B)engineering department specifications and sales forecasts
C)special orders information and engineering department specifications
D)sales forecasts, special orders information, and inventory levels
سؤال
A master production schedule is used to develop detailed

A)timetables of daily production and determine raw material needs.
B)reports on daily production and material usage.
C)daily reports on direct labor needs.
D)inventory charts.
سؤال
What is PLM and how management can use it to improve product design?
سؤال
"Pull manufacturing" is also known as

A)manufacturing resource planning (MRP).
B)just-in-time manufacturing system (JIT).
C)the economic order quantity (EOQ)system.
D)ahead-of-time production implementation (ATPI).
سؤال
The ________ is the production cycle document that specifies the quantity of each product to be produced and when production should begin.

A)receiving report
B)bill of lading
C)master production schedule
D)operations list
سؤال
"Push manufacturing" is also known as

A)manufacturing resource planning (MRP).
B)just-in-time manufacturing system (JIT).
C)the economic order quantity (EOQ)system.
D)ahead-of-time production implementation (ATPI).
سؤال
Yasamin Roshni owns and operates a small deli in Miami,Florida.Each afternoon,she prepares a shopping list that describes the quantity and variety of ingredients that she will purchase in the evening from her wholesaler.The shopping list is an example of a(n)

A)bill of materials.
B)materials requisition.
C)operations list.
D)production order.
سؤال
Identify a key feature associated with materials requirements planning.

A)determining economic order quantity for all materials
B)minimizing or eliminating carrying and stockout costs
C)determining the optimal reorder points for all materials
D)reducing required inventory levels by scheduling production, rather than estimating needs
سؤال
This document appears to be a <strong>This document appears to be a  </strong> A)Materials Requisition. B)Production Order. C)Bill of Materials. D)Move Ticket between production and warehouse functions. <div style=padding-top: 35px>

A)Materials Requisition.
B)Production Order.
C)Bill of Materials.
D)Move Ticket between production and warehouse functions.
سؤال
Sule Technologies initiated a just-in-time inventory system in 2013.Now the production manager,Chan Ziaou,wants to apply the same principles to the entire production process.His recommendation is that Sule adopt a

A)master production scheduling system.
B)lean manufacturing system.
C)manufacturing resource planning system.
D)computer-integrated manufacturing system.
سؤال
How can PLM software improve the efficiency and effectiveness of the product design process?

A)It can eliminate the costs associated with creating and destroying physical prototypes.
B)It can simulate how new products will be manufactured.
C)It can store all the data associated with all products.
D)All of the above
سؤال
How does an MRP inventory system reduces inventory levels?

A)by reducing the uncertainty regarding when materials are needed
B)by receiving materials exactly when needed and in exact quantities
C)by computing the exact costs of purchasing and carrying inventory
D)none of the above
سؤال
________ is an efficient way to track and process information about raw materials used in production.

A)A just-in-time inventory system
B)Identifying materials with bar codes or RFID tags
C)A materials resources planning inventory system
D)Job-order costing
سؤال
Identify and discuss the two documents that are the result of product design activities.
سؤال
Yasamin Roshni owns and operates a small deli in Miami,Florida.Each morning she prepares a list that describes the quantity and variety of subs that will be prepared during the day.This list is an example of a(n)

A)bill of materials.
B)operations list.
C)materials requisition.
D)production order.
سؤال
65% to 80% of product costs are determined at the product design stage of the production process.
سؤال
What is the main difference between MRP-II and JIT manufacturing systems?

A)The length of the planning horizon
B)JIT uses long-term customer demand for planning purposes, but MRP-II uses short-term customer demand for planning purposes.
C)MRP-II relies on EDI, but JIT does not.
D)There are no significant differences between MRP-II and JIT.
سؤال
What issue did Airbus encounter when using CAD software to help design the A380 Superjumbo airliner?

A)The actual A380 was heavier than the CAD model.
B)The actual A380 was not able to carry as much weight as the CAD model.
C)Design teams used different versions of the same CAD software, resulting in key information loss.
D)The CAD software was not advanced enough to help design the A380.
سؤال
The VP of Manufacturing at Roshanak Incorporated wants to buy a new die cast machine for production.The die cast machine is expected to cost around $1,000,000.Which document will most likely be used to solicit bids from suppliers?

A)RFP
B)eVoice
C)RFJ
D)RFB
سؤال
Which type of information below should not be maintained by the AIS in accounting for fixed assets?

A)Identification/serial number .
B)Cost.
C)Improvements.
D)Market value.
سؤال
What is a RFP and how can management use it to improve its production operations?
سؤال
Which objective listed below is not a cost accounting objective for the production cycle?

A)Provide information for planning, controlling, and evaluating the performance of production operations.
B)Provide cost data about products used in pricing and product mix decisions.
C)Collect and process the information used to calculate inventory and cost of goods sold amounts that appear in the financial statements.
D)Provide tests of audit control functions as part of the AIS.
سؤال
The use of various forms of information technology in the production process is referred to as

A)computerized investments and machines.
B)computerized integration of machines.
C)computer-integrated manufacturing.
D)computer intense manufacturing.
سؤال
________ are incurred to ensure that products are created without defects the first time.

A)External failure costs
B)Inspection costs
C)Internal failure costs
D)Prevention costs
سؤال
Using technology such as robots and computer-controlled machinery to shift from mass production to custom order manufacturing is referred to as

A)computer integrated manufacturing (CIM).
B)lean manufacturing.
C)Six Sigma.
D)computer-aided design (CAD).
سؤال
What does the first term in the throughput formula,productive capacity,represent?

A)The maximum number of units that can be produced given current technology.
B)The percentage of total production time used to manufacture a product.
C)The percentage of "good" units produced given current technology.
D)The minimum number of units that can be produced given current technology.
سؤال
Which process or activity relates to overproduction?

A)product design
B)planning and scheduling
C)production operations
D)cost accounting
سؤال
In an Activity-Based Costing (ABC)system,a cause-and-effect relationship is known as a

A)cost stimulator.
B)overhead stimulator.
C)cost driver.
D)cost catalyst.
سؤال
The acronym "RFP" stands for what?

A)Request for Project
B)Request for Processing
C)Request for Proposal
D)Request for Purchase
سؤال
Maintaining physical custody of the raw materials and finished goods inventories is the responsibility
of the accounting department.
سؤال
Identify and discuss the two common methods of production planning.
سؤال
For replacement of inventories and assets destroyed by fire or other disasters,an organization needs

A)stand-by facilities.
B)adequate insurance coverage.
C)source data automation.
D)All of the above are correct.
سؤال
MRP-II is to MRP,as lean manufacturing is to

A)EOQ.
B)JIT.
C)push manufacturing.
D)reorder point.
سؤال
Detailed data about reasons for warranty and repair costs is considered an applicable control used to mitigate the threat of

A)underproduction.
B)overproduction.
C)poor product design.
D)suboptimal investment of fixed assets.
سؤال
________ identifies costs with the corporation's strategy for production of goods and services.

A)Activity-based costing
B)Job-order costing
C)Process costing
D)Manufacturing costing
سؤال
Explain what CIM means and its benefits.
سؤال
What is the primary drawback to using a volume-driven base,such as direct labor or machine hours,to apply overhead to products in a traditional cost accounting system?

A)The cost accountant may not fully understand how to track direct labor or machine hours.
B)It is difficult for an AIS to incorporate such a measurement into its system.
C)It is difficult for an ERP to incorporate such a measurement into its integrated system.
D)Many overhead costs are incorrectly allocated to products since they do not vary with production volume.
سؤال
________ are associated with testing to ensure that products meet quality standards.

A)External failure costs
B)Inspection costs
C)Internal failure costs
D)Prevention costs
سؤال
Which of the following is not proposed to be an advantage of activity-based costing?

A)Better product mix decisions.
B)Better product pricing decisions.
C)Less complex than traditional cost systems.
D)Better decision.
سؤال
Which of the following is not a benefit of activity-based costing?

A)Lower cost.
B)Better decisions.
C)Improved cost management.
D)Identification of cost drivers.
سؤال
Implementing a modern costing approach often results in short-term declines in profitability.
سؤال
What are the two major types of cost accounting systems and what are the differences between the two?
سؤال
Discuss the role the accountant can play in the production cycle.
سؤال
Grizzly Delivery calculates the cost per delivery by identifying variables as cost drivers,and allocating overhead accordingly.What costing approach does Grizzly Delivery use?

A)job-order
B)activity-based
C)unit-based
D)process
سؤال
Grizzly Delivery determines the cost per delivery by averaging total cost over the number of deliveries.What costing approach does Grizzly Delivery use?

A)unit-based
B)job-order
C)process
D)activity-based
سؤال
In activity-based costing,the expenses associated with planning and design of new products are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)expenditure-based
سؤال
In activity-based costing,expenses associated with the purchase of health care insurance for employees are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)expenditure-based
سؤال
Manufacturing overhead is best described as

A)costs that cannot be traced directly to specific jobs or processes.
B)costs that are economically feasible to trace directly to specific jobs or processes.
C)costs that are not economically feasible to trace directly to specific jobs or processes.
D)costs that management has decided not to trace directly to specific jobs or processes.
سؤال
What types of data are accumulated by cost accounting? What is the accountant's role in cost accounting?
سؤال
Identify the cost below most likely to be classified as manufacturing overhead.

A)Production workers' pay.
B)Raw materials used in production.
C)Insurance cost.
D)Research and development cost.
سؤال
The cost of a product liability claim can be classified as a(n)

A)prevention cost.
B)inspection cost.
C)internal failure cost.
D)external failure cost.
سؤال
What role does the AIS play in the production cycle?
سؤال
What is activity-based costing (ABC)? How does it compare with the traditional costing methods? What are the benefits of activity-based costing?
سؤال
At the end of each production run,preventive maintenance is done on the assembly line.The expenses associated with this maintenance are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)department-based
سؤال
Traditionally,what did manufacturing firms use to track the amount of time a worker spends on each specific task?

A)Job-time ticket.
B)Sign-in sheet.
C)Punch card.
D)RFID tags.
سؤال
Grizzly Delivery determines the cost per delivery by summing the average cost of loading,unloading,transporting,and maintenance.What costing approach does Grizzly Delivery use?

A)job-order
B)unit-based
C)process
D)activity-based
سؤال
ERP systems make it easier for an organization to implement an activity based costing approach.
سؤال
Discuss the criticisms of traditional cost accounting methods.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/95
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: The Production Cycle
1
The risks associated with over-production are likely of greatest concern to which company below?

A)a cereal manufacturer
B)a manufacturer that produces designer clothing
C)a manufacturer of printer paper
D)a mailbox manufacturer
B
2
Identify one control that can be used to mitigate the threat of under-production.

A)production planning systems
B)analysis of warranty and repair costs
C)encryption
D)insurance
A
3
Which of the following is not a product design objective?

A)Design a product that meets customer requirements.
B)Design a quality product.
C)Minimize production costs.
D)Make the design easy to track for cost accounting purposes.
D
4
Which of the following organization controls should be implemented and maintained to counteract the general threat that the loss of production data will greatly slow or halt production activity?

A)Store key master inventory and production order files on-site only to prevent their theft.
B)Back up data files only after a production run has been physically completed.
C)Access controls should apply to all terminals within the organization.
D)Allow access to inventory records from any terminal within the organization to provide efficient data entry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
5
The best control procedure for accurate data entry is

A)the use of on-line terminals.
B)an access control matrix.
C)passwords and user IDs.
D)automation of data collection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
6
Identify one control that can be used to mitigate the threat of poor product design that results in excess costs.

A)production planning systems
B)analysis of warranty and repair costs
C)encryption
D)insurance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
7
To control for risks associated with the threat of inventory loss,who should have primary responsibility for work-in-process inventories?

A)a factory supervisor
B)the inventory stores department
C)purchasing
D)the receiving department
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
8
What specific control can help restrict the rights of authorized users to only the portion of a database needed to complete their specific job duties?

A)an access control matrix
B)passwords and user IDs
C)closed-loop verification
D)specific authorization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following controls can minimize the threat of unauthorized disclosure of sensitive information?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
10
The operations list shows

A)the labor and machine requirements.
B)the steps and operations in the production cycle.
C)the time expected to complete each step or operation.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
11
Yasamin Roshni owns and operates a small deli in Miami,Florida..She maintains a file that lists the steps required to make each of her famous subs.These step-by-step instructions are examples of a(n)

A)operations list.
B)bill of materials.
C)production order.
D)materials requisition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
12
The AIS compiles and feeds information among the business cycles.What is the relationship between the revenue and production cycles regarding the exchange of information?

A)The revenue cycle provides sales forecast and customer order information to the production cycle, but the production cycle sends information back to revenue about finished goods production.
B)The revenue cycle receives information from the production cycle about raw materials needs.
C)The production cycle sends cost of goods manufactured information back to the revenue cycle.
D)The production cycle does not exchange information with the revenue cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
13
Describe five threats in the production cycle and the applicable control procedures used to mitigate each threat.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following controls can minimize the threat of theft of inventory?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
15
The threat of loss of data exposes the company to

A)the loss of assets.
B)ineffective decision making.
C)inefficient manufacturing.
D)All of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
16
Discuss two measures that can address the threats of inefficiencies and quality controls problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
17
An organization can implement which of the following controls to reduce the threat of inventory theft or damage?

A)review and approval of fixed asset acquisitions
B)improved and more timely reporting
C)better production and planning systems
D)document all movement of inventory through the production process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following controls can minimize the threat of over- and underproduction?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
19
The production cycle differs from the revenue and expenditure cycles for all the following reasons except

A)cost accounting is involved in all activities.
B)not all organizations have a production cycle.
C)there are no direct external data sources or destinations.
D)very little technology exists to make activities more efficient.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following controls can minimize the threat of misleading reports?

A)The use of innovative performance metrics.
B)The use of periodic physical counts of inventory and reconciliation of those counts to recorded quantities.
C)The use of encryption.
D)The use of production planning systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
21
The ________ authorizes the transfer of raw materials from the storeroom to the production floor.

A)bill of materials
B)production order
C)materials requisition
D)move ticket
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
22
How can CAD software help improve the efficiency and effectiveness of the product design process?

A)It can eliminate the costs associated with creating and destroying physical prototypes.
B)It can simulate how new products will be manufactured.
C)It can store all the data associated with all products.
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
23
What information is necessary to create the master production schedule?

A)engineering department specifications and inventory levels
B)engineering department specifications and sales forecasts
C)special orders information and engineering department specifications
D)sales forecasts, special orders information, and inventory levels
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
24
A master production schedule is used to develop detailed

A)timetables of daily production and determine raw material needs.
B)reports on daily production and material usage.
C)daily reports on direct labor needs.
D)inventory charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
25
What is PLM and how management can use it to improve product design?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
26
"Pull manufacturing" is also known as

A)manufacturing resource planning (MRP).
B)just-in-time manufacturing system (JIT).
C)the economic order quantity (EOQ)system.
D)ahead-of-time production implementation (ATPI).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
27
The ________ is the production cycle document that specifies the quantity of each product to be produced and when production should begin.

A)receiving report
B)bill of lading
C)master production schedule
D)operations list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
28
"Push manufacturing" is also known as

A)manufacturing resource planning (MRP).
B)just-in-time manufacturing system (JIT).
C)the economic order quantity (EOQ)system.
D)ahead-of-time production implementation (ATPI).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
29
Yasamin Roshni owns and operates a small deli in Miami,Florida.Each afternoon,she prepares a shopping list that describes the quantity and variety of ingredients that she will purchase in the evening from her wholesaler.The shopping list is an example of a(n)

A)bill of materials.
B)materials requisition.
C)operations list.
D)production order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
30
Identify a key feature associated with materials requirements planning.

A)determining economic order quantity for all materials
B)minimizing or eliminating carrying and stockout costs
C)determining the optimal reorder points for all materials
D)reducing required inventory levels by scheduling production, rather than estimating needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
31
This document appears to be a <strong>This document appears to be a  </strong> A)Materials Requisition. B)Production Order. C)Bill of Materials. D)Move Ticket between production and warehouse functions.

A)Materials Requisition.
B)Production Order.
C)Bill of Materials.
D)Move Ticket between production and warehouse functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
32
Sule Technologies initiated a just-in-time inventory system in 2013.Now the production manager,Chan Ziaou,wants to apply the same principles to the entire production process.His recommendation is that Sule adopt a

A)master production scheduling system.
B)lean manufacturing system.
C)manufacturing resource planning system.
D)computer-integrated manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
33
How can PLM software improve the efficiency and effectiveness of the product design process?

A)It can eliminate the costs associated with creating and destroying physical prototypes.
B)It can simulate how new products will be manufactured.
C)It can store all the data associated with all products.
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
34
How does an MRP inventory system reduces inventory levels?

A)by reducing the uncertainty regarding when materials are needed
B)by receiving materials exactly when needed and in exact quantities
C)by computing the exact costs of purchasing and carrying inventory
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
35
________ is an efficient way to track and process information about raw materials used in production.

A)A just-in-time inventory system
B)Identifying materials with bar codes or RFID tags
C)A materials resources planning inventory system
D)Job-order costing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
36
Identify and discuss the two documents that are the result of product design activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
37
Yasamin Roshni owns and operates a small deli in Miami,Florida.Each morning she prepares a list that describes the quantity and variety of subs that will be prepared during the day.This list is an example of a(n)

A)bill of materials.
B)operations list.
C)materials requisition.
D)production order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
38
65% to 80% of product costs are determined at the product design stage of the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
39
What is the main difference between MRP-II and JIT manufacturing systems?

A)The length of the planning horizon
B)JIT uses long-term customer demand for planning purposes, but MRP-II uses short-term customer demand for planning purposes.
C)MRP-II relies on EDI, but JIT does not.
D)There are no significant differences between MRP-II and JIT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
40
What issue did Airbus encounter when using CAD software to help design the A380 Superjumbo airliner?

A)The actual A380 was heavier than the CAD model.
B)The actual A380 was not able to carry as much weight as the CAD model.
C)Design teams used different versions of the same CAD software, resulting in key information loss.
D)The CAD software was not advanced enough to help design the A380.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
41
The VP of Manufacturing at Roshanak Incorporated wants to buy a new die cast machine for production.The die cast machine is expected to cost around $1,000,000.Which document will most likely be used to solicit bids from suppliers?

A)RFP
B)eVoice
C)RFJ
D)RFB
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which type of information below should not be maintained by the AIS in accounting for fixed assets?

A)Identification/serial number .
B)Cost.
C)Improvements.
D)Market value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is a RFP and how can management use it to improve its production operations?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which objective listed below is not a cost accounting objective for the production cycle?

A)Provide information for planning, controlling, and evaluating the performance of production operations.
B)Provide cost data about products used in pricing and product mix decisions.
C)Collect and process the information used to calculate inventory and cost of goods sold amounts that appear in the financial statements.
D)Provide tests of audit control functions as part of the AIS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
45
The use of various forms of information technology in the production process is referred to as

A)computerized investments and machines.
B)computerized integration of machines.
C)computer-integrated manufacturing.
D)computer intense manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
46
________ are incurred to ensure that products are created without defects the first time.

A)External failure costs
B)Inspection costs
C)Internal failure costs
D)Prevention costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
47
Using technology such as robots and computer-controlled machinery to shift from mass production to custom order manufacturing is referred to as

A)computer integrated manufacturing (CIM).
B)lean manufacturing.
C)Six Sigma.
D)computer-aided design (CAD).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
48
What does the first term in the throughput formula,productive capacity,represent?

A)The maximum number of units that can be produced given current technology.
B)The percentage of total production time used to manufacture a product.
C)The percentage of "good" units produced given current technology.
D)The minimum number of units that can be produced given current technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which process or activity relates to overproduction?

A)product design
B)planning and scheduling
C)production operations
D)cost accounting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
50
In an Activity-Based Costing (ABC)system,a cause-and-effect relationship is known as a

A)cost stimulator.
B)overhead stimulator.
C)cost driver.
D)cost catalyst.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
51
The acronym "RFP" stands for what?

A)Request for Project
B)Request for Processing
C)Request for Proposal
D)Request for Purchase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
52
Maintaining physical custody of the raw materials and finished goods inventories is the responsibility
of the accounting department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
53
Identify and discuss the two common methods of production planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
54
For replacement of inventories and assets destroyed by fire or other disasters,an organization needs

A)stand-by facilities.
B)adequate insurance coverage.
C)source data automation.
D)All of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
55
MRP-II is to MRP,as lean manufacturing is to

A)EOQ.
B)JIT.
C)push manufacturing.
D)reorder point.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
56
Detailed data about reasons for warranty and repair costs is considered an applicable control used to mitigate the threat of

A)underproduction.
B)overproduction.
C)poor product design.
D)suboptimal investment of fixed assets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
57
________ identifies costs with the corporation's strategy for production of goods and services.

A)Activity-based costing
B)Job-order costing
C)Process costing
D)Manufacturing costing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
58
Explain what CIM means and its benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
59
What is the primary drawback to using a volume-driven base,such as direct labor or machine hours,to apply overhead to products in a traditional cost accounting system?

A)The cost accountant may not fully understand how to track direct labor or machine hours.
B)It is difficult for an AIS to incorporate such a measurement into its system.
C)It is difficult for an ERP to incorporate such a measurement into its integrated system.
D)Many overhead costs are incorrectly allocated to products since they do not vary with production volume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
60
________ are associated with testing to ensure that products meet quality standards.

A)External failure costs
B)Inspection costs
C)Internal failure costs
D)Prevention costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is not proposed to be an advantage of activity-based costing?

A)Better product mix decisions.
B)Better product pricing decisions.
C)Less complex than traditional cost systems.
D)Better decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following is not a benefit of activity-based costing?

A)Lower cost.
B)Better decisions.
C)Improved cost management.
D)Identification of cost drivers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
63
Implementing a modern costing approach often results in short-term declines in profitability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
64
What are the two major types of cost accounting systems and what are the differences between the two?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
65
Discuss the role the accountant can play in the production cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
66
Grizzly Delivery calculates the cost per delivery by identifying variables as cost drivers,and allocating overhead accordingly.What costing approach does Grizzly Delivery use?

A)job-order
B)activity-based
C)unit-based
D)process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
67
Grizzly Delivery determines the cost per delivery by averaging total cost over the number of deliveries.What costing approach does Grizzly Delivery use?

A)unit-based
B)job-order
C)process
D)activity-based
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
68
In activity-based costing,the expenses associated with planning and design of new products are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)expenditure-based
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
69
In activity-based costing,expenses associated with the purchase of health care insurance for employees are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)expenditure-based
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
70
Manufacturing overhead is best described as

A)costs that cannot be traced directly to specific jobs or processes.
B)costs that are economically feasible to trace directly to specific jobs or processes.
C)costs that are not economically feasible to trace directly to specific jobs or processes.
D)costs that management has decided not to trace directly to specific jobs or processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
71
What types of data are accumulated by cost accounting? What is the accountant's role in cost accounting?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
72
Identify the cost below most likely to be classified as manufacturing overhead.

A)Production workers' pay.
B)Raw materials used in production.
C)Insurance cost.
D)Research and development cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
73
The cost of a product liability claim can be classified as a(n)

A)prevention cost.
B)inspection cost.
C)internal failure cost.
D)external failure cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
74
What role does the AIS play in the production cycle?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
75
What is activity-based costing (ABC)? How does it compare with the traditional costing methods? What are the benefits of activity-based costing?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
76
At the end of each production run,preventive maintenance is done on the assembly line.The expenses associated with this maintenance are ________ overhead.

A)batch-related
B)product-related
C)company wide
D)department-based
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
77
Traditionally,what did manufacturing firms use to track the amount of time a worker spends on each specific task?

A)Job-time ticket.
B)Sign-in sheet.
C)Punch card.
D)RFID tags.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
78
Grizzly Delivery determines the cost per delivery by summing the average cost of loading,unloading,transporting,and maintenance.What costing approach does Grizzly Delivery use?

A)job-order
B)unit-based
C)process
D)activity-based
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
79
ERP systems make it easier for an organization to implement an activity based costing approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
80
Discuss the criticisms of traditional cost accounting methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.