Deck 22: Systems Design, implementation, and Operation

ملء الشاشة (f)
exit full mode
سؤال
What is the most time-consuming activity in the physical design stage of the systems development life cycle (SDLC),or perhaps even in the entire SDLC process?

A) controls design
B) input design
C) output design
D) program design
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A) the conceptual design phase
B) the implementation and conversion phase
C) the physical design phase
D) the systems analysis phase
سؤال
Which of the following statements is true?

A) Structured programming divides programs into well-defined segments to reduce complexity.
B) Structured programming is used to debug logic errors in programs.
C) Structured programming is accomplished by using a flowchart to guide design.
D) Structured programming pieces together standard code strings into a completed program.
سؤال
Developing a general framework for implementing user requirements and solving problems identified in the analysis phase occurs in which phase of the SDLC?

A) conceptual systems design
B) implementation and conversion
C) operations and maintenance
D) physical design
سؤال
Which of the following statements below is correct about modules of computer code created during program design?

A) Modules interact with each other directly and also through the control module.
B) Modules interact with each other directly.
C) Modules interact with only the control module.
D) Modules primarily, but not always, interact with the control module.
سؤال
All of the following reports have pre-specified content and format except

A) demand reports.
B) scheduled reports.
C) special-purpose analysis reports.
D) triggered exception reports.
سؤال
Physical input design considerations include

A) which transactions to enter.
B) layout of source documents.
C) types of data input and optimal input methods.
D) cost of collecting and storing data.
سؤال
Who is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs?

A) design team
B) implementation committee
C) steering committee
D) systems analysts
سؤال
The decision about how often to produce a certain report is part of which conceptual design specification element?

A) data storage
B) input
C) output
D) processing procedures and operations
سؤال
Which of the following is not a reason for preparing the conceptual systems design report?

A) It can be used to guide physical systems design activities.
B) It communicates how management and user information needs will be met.
C) It discusses the design alternatives that were not selected for the project.
D) It helps the steering committee assess system feasibility.
سؤال
Program design

A) spans all five stages of the system development life cycle.
B) includes writing computer code.
C) includes debugging logic errors.
D) is described by all the above.
سؤال
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A) input, data storage, processing procedures and operations, and output
B) input, output, data storage, and processing procedures and operations
C) output, data storage, input, and processing procedures and operations
D) processing procedures and operations, input, data storage, and output
سؤال
Which of the following is not a consideration in procedures and controls design?

A) Are customer data stored in alphabetical order in a master file?
B) Are payments made only to legitimate vendors?
C) Are data processed and stored accurately?
D) Can the system be modified without affecting system availability?
سؤال
Which consideration below is not considered important to output design?

A) format
B) location
C) medium
D) source
سؤال
The project team wants to find the most efficient way to collect data in order to prepare a report on sales per store.Which element in design specifications will deal with the decision?

A) data collection
B) input
C) output
D) processing procedures
سؤال
One of the purposes of the ________ is to guide physical systems design activities.

A) conceptual systems design report
B) physical systems design report
C) program design
D) systems analysis report
سؤال
For file and database design,it is advantageous to have

A) all data in compatible format.
B) easy access to the system.
C) a printout of the data dictionary.
D) copies of necessary reports.
سؤال
The sales department wants to make sure that all customer inquiries are answered in real-time.Which of the following controls design considerations will deal with this concern?

A) security
B) authorization
C) accuracy
D) audit trail
سؤال
Which of the following is a consideration during file and database design?

A) form size
B) format
C) medium
D) organization
سؤال
The accountant wants to make sure that all cash disbursements are made only to legitimate vendors.Which of the following control considerations will deal with this concern?

A) security
B) accuracy
C) authorization
D) validity
سؤال
Which of the following describes a phase-in conversion?

A) Both the old and new AIS are operated simultaneously.
B) Elements of the old AIS are replaced gradually with elements of the new AIS.
C) The new AIS is introduced into a segment, rather than the whole organization.
D) The old AIS is terminated as the new AIS is introduced.
سؤال
Which of the following is the final step in the data conversion process?

A) data conversion
B) testing the system
C) documentation of conversion activities
D) monitoring of the system after data conversion
سؤال
Which factor is not investigated during the post-implementation review?

A) accuracy
B) benefits
C) completion
D) costs
سؤال
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A) acceptance tests.
B) operating tests.
C) processing of test transactions.
D) walk-throughs.
سؤال
Flowcharts,record layouts,decision tables,and related items are part of

A) determining user needs.
B) documenting the program.
C) testing the program.
D) training program users.
سؤال
In which phase of the systems development life cycle would changing tax rates in a software program be accomplished?

A) maintenance
B) operations
C) program design
D) implementation
سؤال
What type of system test uses copies of real transaction and file records?

A) acceptance test
B) debugging
C) process test data
D) walk-through
سؤال
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation and conversion phase of the systems development life cycle?

A) conceptual system design report
B) physical systems design report
C) systems design report
D) implementation planning design report
سؤال
Within the implementation planning and conversion phase of the systems development life cycle,analysts must ________ before they can ________.

A) complete documentation; test software programs
B) install and test software; test software programs
C) test software programs; test the system
D) test the system; select and train personnel
سؤال
In what type of conversion are old and new systems operated simultaneously for a period of time?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
سؤال
Who is responsible for identifying such risk factors in an implementation plan?

A) implementation team
B) steering committee
C) systems analysis team
D) systems development team
سؤال
Effective AIS training involves

A) instruction on new hardware and software.
B) orientation to new policies and operations.
C) planning and scheduling so it occurs before system testing and conversion.
D) All of the above are correct.
سؤال
What type of system test determines whether a program is operating as designed?

A) acceptance test
B) debugging
C) process test data
D) walk-through
سؤال
The first step in program design is to

A) determine user needs.
B) develop a plan.
C) hire program users.
D) write program instructions.
سؤال
Several types of documentation must be prepared for a new system.The type of documentation that includes the files and databases accessed and file retention requirements is called

A) development documentation.
B) operations documentation.
C) reference documentation.
D) user documentation.
سؤال
________ is the process of installing hardware and software and getting the AIS up and running.

A) Conceptual design
B) Physical design
C) Systems analysis
D) Systems implementation
سؤال
What type of conversion terminates the old system as soon as the new system is ready?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
سؤال
Which of the following activities is not part of data conversion?

A) changing data content
B) moving file servers
C) changing file formats
D) moving files to a new storage medium
سؤال
One process used to uncover and eliminate program errors is known as

A) black box testing.
B) debugging.
C) desk checking.
D) white box testing.
سؤال
Implementing a new system at a branch location before company-wide adoption is called

A) direct conversion.
B) parallel conversion.
C) phase-in conversion.
D) pilot conversion.
سؤال
What factors does a steering committee consider when evaluating different system designs?
سؤال
Which of the following is not one of the types of documentation that should be prepared for a new system?

A) Management
B) Operations
C) User
D) Development
سؤال
Which of the following is the final activity in the systems development life cycle?

A) monitoring of the system
B) ongoing maintenance activities
C) preparation of the post-implementation review report
D) user acceptance of the post-implementation review report
سؤال
What are the purposes of a conceptual systems design report?
سؤال
Acceptance tests involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
سؤال
Chuck in ITS got a call from Phil in Marketing."Chuck,I need you to do something for me.Query sales data for the first quarter and pull out all of the invoices that include the snow blower discount.I need a count and the total amount of the discount.Thanks." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
سؤال
Phil in Marketing got a call from Fred at regional headquarters."Phil,I just got the quarterly sales report for your district.You beat your quota again,you son of a gun!" This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
سؤال
Walk-throughs are system tests that involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
سؤال
Subdividing program code into small,well-defined modules is

A) called debugging.
B) known as structured programming.
C) part of program maintenance.
D) done during testing.
سؤال
What is systems implementation? How do you plan for it?
سؤال
Performing revisions to existing program code is an example of

A) debugging.
B) structured programming.
C) program maintenance.
D) walk through.
سؤال
How can accountants help in the systems development life cycle (SDLC)process?
سؤال
Phil in Marketing got a call from Chuck in ITS."Phil,the system just generated a stock-out report.I wanted to give you a heads up.I'm sending it right over." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
سؤال
Chuck in ITS got a call from Phil in Marketing."Chuck,you know that inventory report I had you guys prepare for me last year? Well,I need you to run it again and send it over in hard copy.Thanks." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
سؤال
Processing test data involves

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
سؤال
Which of the following is the most costly and least risky method of converting from one system to another?

A) Direct
B) Parallel
C) Pilot
D) Phase-in
سؤال
Which of the following is the least costly and most risky method of converting from one system to another?

A) Direct
B) Parallel
C) Pilot
D) Phase-in
سؤال
An analyst who asks the question,"Does the system produce actual and complete data?" is investigating what postimplementation factor?

A) accuracy
B) compatibility
C) goals and objectives
D) reliability
سؤال
Describe at least four considerations during controls design.
سؤال
Which of the following is not one of the ways data may need to be modified during data conversion?

A) Resolve data inconsistencies
B) Validate new files
C) Identify files to be converted
D) Remove unnecessary fields from data files
سؤال
Describe the eight basic steps in program design.
سؤال
Describe the different types of documentation that should be prepared for a new system.
سؤال
Describe the post-implementation review activity.
سؤال
What is the objective of output design? What are the output design considerations? What are the various categories of outputs?
سؤال
Describe structured programming.
سؤال
Write one question that should be asked about each of the controls design considerations.
سؤال
Describe the approaches to system conversion.
سؤال
Describe the different methods of testing a system.
سؤال
What output design considerations should be analyzed as part of the physical system design phase?
سؤال
Describe the conceptual systems design phase and identify the elements of conceptual design specifications?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/70
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 22: Systems Design, implementation, and Operation
1
What is the most time-consuming activity in the physical design stage of the systems development life cycle (SDLC),or perhaps even in the entire SDLC process?

A) controls design
B) input design
C) output design
D) program design
D
2
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A) the conceptual design phase
B) the implementation and conversion phase
C) the physical design phase
D) the systems analysis phase
C
3
Which of the following statements is true?

A) Structured programming divides programs into well-defined segments to reduce complexity.
B) Structured programming is used to debug logic errors in programs.
C) Structured programming is accomplished by using a flowchart to guide design.
D) Structured programming pieces together standard code strings into a completed program.
A
4
Developing a general framework for implementing user requirements and solving problems identified in the analysis phase occurs in which phase of the SDLC?

A) conceptual systems design
B) implementation and conversion
C) operations and maintenance
D) physical design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following statements below is correct about modules of computer code created during program design?

A) Modules interact with each other directly and also through the control module.
B) Modules interact with each other directly.
C) Modules interact with only the control module.
D) Modules primarily, but not always, interact with the control module.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
6
All of the following reports have pre-specified content and format except

A) demand reports.
B) scheduled reports.
C) special-purpose analysis reports.
D) triggered exception reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
7
Physical input design considerations include

A) which transactions to enter.
B) layout of source documents.
C) types of data input and optimal input methods.
D) cost of collecting and storing data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
8
Who is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs?

A) design team
B) implementation committee
C) steering committee
D) systems analysts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
9
The decision about how often to produce a certain report is part of which conceptual design specification element?

A) data storage
B) input
C) output
D) processing procedures and operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is not a reason for preparing the conceptual systems design report?

A) It can be used to guide physical systems design activities.
B) It communicates how management and user information needs will be met.
C) It discusses the design alternatives that were not selected for the project.
D) It helps the steering committee assess system feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
11
Program design

A) spans all five stages of the system development life cycle.
B) includes writing computer code.
C) includes debugging logic errors.
D) is described by all the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A) input, data storage, processing procedures and operations, and output
B) input, output, data storage, and processing procedures and operations
C) output, data storage, input, and processing procedures and operations
D) processing procedures and operations, input, data storage, and output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following is not a consideration in procedures and controls design?

A) Are customer data stored in alphabetical order in a master file?
B) Are payments made only to legitimate vendors?
C) Are data processed and stored accurately?
D) Can the system be modified without affecting system availability?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which consideration below is not considered important to output design?

A) format
B) location
C) medium
D) source
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
15
The project team wants to find the most efficient way to collect data in order to prepare a report on sales per store.Which element in design specifications will deal with the decision?

A) data collection
B) input
C) output
D) processing procedures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
16
One of the purposes of the ________ is to guide physical systems design activities.

A) conceptual systems design report
B) physical systems design report
C) program design
D) systems analysis report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
17
For file and database design,it is advantageous to have

A) all data in compatible format.
B) easy access to the system.
C) a printout of the data dictionary.
D) copies of necessary reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
18
The sales department wants to make sure that all customer inquiries are answered in real-time.Which of the following controls design considerations will deal with this concern?

A) security
B) authorization
C) accuracy
D) audit trail
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is a consideration during file and database design?

A) form size
B) format
C) medium
D) organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
20
The accountant wants to make sure that all cash disbursements are made only to legitimate vendors.Which of the following control considerations will deal with this concern?

A) security
B) accuracy
C) authorization
D) validity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following describes a phase-in conversion?

A) Both the old and new AIS are operated simultaneously.
B) Elements of the old AIS are replaced gradually with elements of the new AIS.
C) The new AIS is introduced into a segment, rather than the whole organization.
D) The old AIS is terminated as the new AIS is introduced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is the final step in the data conversion process?

A) data conversion
B) testing the system
C) documentation of conversion activities
D) monitoring of the system after data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which factor is not investigated during the post-implementation review?

A) accuracy
B) benefits
C) completion
D) costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
24
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A) acceptance tests.
B) operating tests.
C) processing of test transactions.
D) walk-throughs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
25
Flowcharts,record layouts,decision tables,and related items are part of

A) determining user needs.
B) documenting the program.
C) testing the program.
D) training program users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
26
In which phase of the systems development life cycle would changing tax rates in a software program be accomplished?

A) maintenance
B) operations
C) program design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
27
What type of system test uses copies of real transaction and file records?

A) acceptance test
B) debugging
C) process test data
D) walk-through
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
28
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation and conversion phase of the systems development life cycle?

A) conceptual system design report
B) physical systems design report
C) systems design report
D) implementation planning design report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
29
Within the implementation planning and conversion phase of the systems development life cycle,analysts must ________ before they can ________.

A) complete documentation; test software programs
B) install and test software; test software programs
C) test software programs; test the system
D) test the system; select and train personnel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
30
In what type of conversion are old and new systems operated simultaneously for a period of time?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
31
Who is responsible for identifying such risk factors in an implementation plan?

A) implementation team
B) steering committee
C) systems analysis team
D) systems development team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
32
Effective AIS training involves

A) instruction on new hardware and software.
B) orientation to new policies and operations.
C) planning and scheduling so it occurs before system testing and conversion.
D) All of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
33
What type of system test determines whether a program is operating as designed?

A) acceptance test
B) debugging
C) process test data
D) walk-through
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
34
The first step in program design is to

A) determine user needs.
B) develop a plan.
C) hire program users.
D) write program instructions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
35
Several types of documentation must be prepared for a new system.The type of documentation that includes the files and databases accessed and file retention requirements is called

A) development documentation.
B) operations documentation.
C) reference documentation.
D) user documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
36
________ is the process of installing hardware and software and getting the AIS up and running.

A) Conceptual design
B) Physical design
C) Systems analysis
D) Systems implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
37
What type of conversion terminates the old system as soon as the new system is ready?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following activities is not part of data conversion?

A) changing data content
B) moving file servers
C) changing file formats
D) moving files to a new storage medium
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
39
One process used to uncover and eliminate program errors is known as

A) black box testing.
B) debugging.
C) desk checking.
D) white box testing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
40
Implementing a new system at a branch location before company-wide adoption is called

A) direct conversion.
B) parallel conversion.
C) phase-in conversion.
D) pilot conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
41
What factors does a steering committee consider when evaluating different system designs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following is not one of the types of documentation that should be prepared for a new system?

A) Management
B) Operations
C) User
D) Development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is the final activity in the systems development life cycle?

A) monitoring of the system
B) ongoing maintenance activities
C) preparation of the post-implementation review report
D) user acceptance of the post-implementation review report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
44
What are the purposes of a conceptual systems design report?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
45
Acceptance tests involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
46
Chuck in ITS got a call from Phil in Marketing."Chuck,I need you to do something for me.Query sales data for the first quarter and pull out all of the invoices that include the snow blower discount.I need a count and the total amount of the discount.Thanks." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
47
Phil in Marketing got a call from Fred at regional headquarters."Phil,I just got the quarterly sales report for your district.You beat your quota again,you son of a gun!" This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
48
Walk-throughs are system tests that involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
49
Subdividing program code into small,well-defined modules is

A) called debugging.
B) known as structured programming.
C) part of program maintenance.
D) done during testing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
50
What is systems implementation? How do you plan for it?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
51
Performing revisions to existing program code is an example of

A) debugging.
B) structured programming.
C) program maintenance.
D) walk through.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
52
How can accountants help in the systems development life cycle (SDLC)process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
53
Phil in Marketing got a call from Chuck in ITS."Phil,the system just generated a stock-out report.I wanted to give you a heads up.I'm sending it right over." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
54
Chuck in ITS got a call from Phil in Marketing."Chuck,you know that inventory report I had you guys prepare for me last year? Well,I need you to run it again and send it over in hard copy.Thanks." This is an example of a

A) scheduled report.
B) special-purpose analysis report.
C) triggered exception report.
D) demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
55
Processing test data involves

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following is the most costly and least risky method of converting from one system to another?

A) Direct
B) Parallel
C) Pilot
D) Phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following is the least costly and most risky method of converting from one system to another?

A) Direct
B) Parallel
C) Pilot
D) Phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
58
An analyst who asks the question,"Does the system produce actual and complete data?" is investigating what postimplementation factor?

A) accuracy
B) compatibility
C) goals and objectives
D) reliability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
59
Describe at least four considerations during controls design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following is not one of the ways data may need to be modified during data conversion?

A) Resolve data inconsistencies
B) Validate new files
C) Identify files to be converted
D) Remove unnecessary fields from data files
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
61
Describe the eight basic steps in program design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
62
Describe the different types of documentation that should be prepared for a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
63
Describe the post-implementation review activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
64
What is the objective of output design? What are the output design considerations? What are the various categories of outputs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
65
Describe structured programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
66
Write one question that should be asked about each of the controls design considerations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
67
Describe the approaches to system conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
68
Describe the different methods of testing a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
69
What output design considerations should be analyzed as part of the physical system design phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
70
Describe the conceptual systems design phase and identify the elements of conceptual design specifications?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 70 في هذه المجموعة.