سؤال
The degree of success for a new system development project is affected by the adequacy of training given to employees.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project leader uses a project accounting system to fulfill his or her project control responsibilities.
سؤال
The test data approach should not be designed to "break" the computer program.
سؤال
A project is a specific application that has been approved for development.
سؤال
Delays are routine during implementation because it is impossible to anticipate all potential problems during the systems design process.
سؤال
Selecting and training personnel is one of the implementation activities that are carried out based on the design plan.
سؤال
Typically 30 to 40 percent of total project time is spent in the analysis phase of the systems development life cycle.
سؤال
One training method that makes use of current technological advances is computer-assisted training.
سؤال
The task completion schedule,based on task time estimates,should be maintained without revision if at all possible.
سؤال
Purposely or inadvertently submitting unreasonably low time or cost estimates is known as lowballing.
سؤال
An important criterion used in selecting projects for development is the project's expected return on investment.
سؤال
The basic resource in any systems project is time.
سؤال
It is a good assumption that employees will learn to use a new system by themselves.
سؤال
Timely project cost data is useful,but not essential,to track the costs incurred to date on a project.
سؤال
Almost all project accounting systems are automated.
سؤال
A weekly cost report that is available three weeks after the report date is still an effective tool for overall project control purposes.
سؤال
New computer equipment generally does not require special provisions for complex wiring schemes.
سؤال
The cutoff point is the point at which individual segments of the new system are phased in according to a specific time schedule.
سؤال
Time estimate standards developed in-house generally are less effective than standards or estimates available in current project management literature.
سؤال
One powerful means of testing computer programs involves processing test data.
سؤال
If data are input into the project accounting system that is both accurate and timely,it can produce revised cost estimates that are both accurate and timely.
سؤال
Within the project development environment the software application framework provides a structured environment in which to develop software.
سؤال
The amount of testing of a system by an auditor is directly proportional to the degree to which adequate internal controls exist and are operating effectively.
سؤال
The BPEL service engine needs a roadmap which is a set of visual diagrams based on the Unified Modeling Language and/or Business Process Modeling Notation.
سؤال
All modifications to a system's software and data schema should be formally reviewed and approved.
سؤال
Programmers making changes to system software should use the operational copy of the software to test the changes in a "real world environment."
سؤال
The SPICE approach categorizes processes into five broad areas and scores "capability level" on a 10-point scale.
سؤال
A software versioning system keeps only the current version of software source code available so version control issues are minimized.
سؤال
Within the project development environment the project collaboration platform serves to optimize management of the implementation of a systems development life cycle.
سؤال
From a control point of view,virtually all factors that relate to information systems are measured in terms of dollars.
سؤال
In service-oriented architecture (SOA),an important part of the application development framework is the business process execution language (BPEL)service engine.
سؤال
The appropriate level of detail to be obtained from a project accounting system is generally decided by the chief information officer.
سؤال
The ratio of actual CPU time used to CPU time available is one measure of system utilization.
سؤال
A Web application framework that has received considerable attention is Ruby on Rails.
سؤال
Audits of information systems often focus on internal control.
سؤال
The level of detail produced in a project accounting system is proportionate to the overhead cost of running the system.
سؤال
Two major software versioning systems are Subversion (SVN)and Current Version System (CVS).
سؤال
ISO 15504 (SPICE)is a process-based development approach that focuses on the "maturity" of the process being developed.
سؤال
A project development environment refers to the tools and technologies used to implement a given project.
سؤال
The integrated development environment is a software platform for diagrams and models.
سؤال
In the design and implementation of a system,it is almost always necessary to do additional work during the ________ phase.
سؤال
The development of computer software without ________ is an almost worthless exercise.
سؤال
To determine the activities that are critical to keeping a project on schedule,________ ________ must be obtained for each individual activity of the project.
سؤال
Regarding project costs,project resources tend to be spent at a(n)________ rate as a project proceeds toward completion.
سؤال
A major problem with a system that is down too much is ________ ________ for the company.
سؤال
Any successful systems implementation requires that considerable attention be given to employee ________.
سؤال
A project accounting system operates much like a conventional ________ accounting system.
سؤال
A major drawback of the ________ ________ process is that it can involve a greatly extended check-out period.
سؤال
________ is a successive refinement to the project plan.
سؤال
Many experts believe that eventually,in the future,all end-user software will run in ________ browsers.
سؤال
________ is necessary to ensure that the new system operates as planned.
سؤال
The BPEL service engine needs a roadmap which is a set of ________ diagrams based on Unified Modeling Language and/or Business Process Modeling Notation.
سؤال
________ ________ Environment refers to the tools and technologies used to implement a given project.
سؤال
An expensive,time-consuming problem in systems implementation is ________ ________.
سؤال
A(n)________ chart is an ideal way to factor a project into phases and tasks and to document such a plan.
سؤال
Good testing should do everything possible to ________ computer programs before they are implemented.
سؤال
The Project ________ Platform serves to optimize management of the communication chain.
سؤال
An announcement by management regarding project execution will have the benefit of minimizing ________.
سؤال
________ ________ should be submitted to the steering committee in writing.
سؤال
The ________ ________ Framework provides a structured environment in which to develop software.
سؤال
The execution of the systems implementation should begin with

A) conversion.
B) a formal announcement to employees.
C) employee training.
D) programming.
سؤال
The document that shows the order in which activities may be performed and may be expanded to include estimated times for each individual activity is the

A) Gantt chart.
B) network diagram.
C) PERT diagram.
D) CPM diagram.
سؤال
Perhaps the most important step regarding the success of a systems development project is

A) employee training.
B) conversion.
C) detailed system design.
D) operational training.
سؤال
The first major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) evaluate the new system.
D) execute activities.
سؤال
When implementing a new system,management often has to decide whether to train existing employees or hire new employees.Many times it is best to retain and retrain current employees because

A) current employees are already familiar with the firm's operations.
B) overall employee morale is enhanced.
C) current employees are already familiar with the firm's operations and overall employee morale is enhanced.
D) None of these answers is correct.
سؤال
Which of the following groups of individuals should be on the special project team that executes the implementation of the design plan?

A) Systems technical personnel
B) Accountants and auditors
C) Individuals who also participated in the design
D) Design team members and affected managers
سؤال
Which of the following can serve as both a training tool for new employees and a help for future computer programming?

A) Testing
B) Evaluation
C) Systems analysis
D) Documentation
سؤال
________ ________ Environment is a software platform for actually writing program code which provides specialized tools for testing and debugging programs and deploying them to servers for testing or release.
سؤال
Which of the following activities occurs during the detailed systems design phase?

A) Computer programming
B) File conversion
C) Documentation
D) Evaluation
سؤال
The process of changing input data into a format readable by the new system hardware is called

A) testing.
B) file conversion.
C) evaluation.
D) documentation.
سؤال
The design specifications for a computer program are determined by

A) top management.
B) users.
C) the design team.
D) the computer programmer.
سؤال
A list of activities that is strategic to the project to keep it on schedule is called

A) the critical path.
B) a PERT diagram.
C) a Gantt chart.
D) the manager's priority matrix.
سؤال
The testing approach in which the old system is abandoned and the processing is switched to the new system is called

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
سؤال
The second major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) execute activities.
D) evaluate the new system.
سؤال
What standard should be used to evaluate the quality of documentation produced by a programmer?

A) The number of pages produced
B) The number of logical flow diagrams and analytic flowcharts produced
C) The amount of time spent to produce the documentation
D) Whether a different programmer can use the documentation at a later date to modify the program
سؤال
One of the most important parts of systems implementation that is often overlooked or minimized is

A) testing.
B) documentation.
C) data conversion.
D) evaluation.
سؤال
The testing approach in which the new system is phased in a segment at a time is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
سؤال
The most expensive approach to final systems testing is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
سؤال
To provide the proper environment for computer equipment operations,the company must control

A) security.
B) wiring.
C) access.
D) temperature and humidity.
سؤال
Good project management uses plans for implementing a system.The plans should provide

A) specific budget information.
B) a breakdown of the project into various phases.
C) specific timetables for completion.
D) All of these answers are correct.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/133
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Systems Project Management, implementation, operation, control
1
The degree of success for a new system development project is affected by the adequacy of training given to employees.
True
2
The project leader uses a project accounting system to fulfill his or her project control responsibilities.
True
3
The test data approach should not be designed to "break" the computer program.
False
4
A project is a specific application that has been approved for development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
5
Delays are routine during implementation because it is impossible to anticipate all potential problems during the systems design process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
6
Selecting and training personnel is one of the implementation activities that are carried out based on the design plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
7
Typically 30 to 40 percent of total project time is spent in the analysis phase of the systems development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
8
One training method that makes use of current technological advances is computer-assisted training.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
9
The task completion schedule,based on task time estimates,should be maintained without revision if at all possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
10
Purposely or inadvertently submitting unreasonably low time or cost estimates is known as lowballing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
11
An important criterion used in selecting projects for development is the project's expected return on investment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
12
The basic resource in any systems project is time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
13
It is a good assumption that employees will learn to use a new system by themselves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
14
Timely project cost data is useful,but not essential,to track the costs incurred to date on a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
15
Almost all project accounting systems are automated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
16
A weekly cost report that is available three weeks after the report date is still an effective tool for overall project control purposes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
17
New computer equipment generally does not require special provisions for complex wiring schemes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
18
The cutoff point is the point at which individual segments of the new system are phased in according to a specific time schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
19
Time estimate standards developed in-house generally are less effective than standards or estimates available in current project management literature.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
20
One powerful means of testing computer programs involves processing test data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
21
If data are input into the project accounting system that is both accurate and timely,it can produce revised cost estimates that are both accurate and timely.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
22
Within the project development environment the software application framework provides a structured environment in which to develop software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
23
The amount of testing of a system by an auditor is directly proportional to the degree to which adequate internal controls exist and are operating effectively.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
24
The BPEL service engine needs a roadmap which is a set of visual diagrams based on the Unified Modeling Language and/or Business Process Modeling Notation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
25
All modifications to a system's software and data schema should be formally reviewed and approved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
26
Programmers making changes to system software should use the operational copy of the software to test the changes in a "real world environment."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
27
The SPICE approach categorizes processes into five broad areas and scores "capability level" on a 10-point scale.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
28
A software versioning system keeps only the current version of software source code available so version control issues are minimized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
29
Within the project development environment the project collaboration platform serves to optimize management of the implementation of a systems development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
30
From a control point of view,virtually all factors that relate to information systems are measured in terms of dollars.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
31
In service-oriented architecture (SOA),an important part of the application development framework is the business process execution language (BPEL)service engine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
32
The appropriate level of detail to be obtained from a project accounting system is generally decided by the chief information officer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
33
The ratio of actual CPU time used to CPU time available is one measure of system utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
34
A Web application framework that has received considerable attention is Ruby on Rails.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
35
Audits of information systems often focus on internal control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
36
The level of detail produced in a project accounting system is proportionate to the overhead cost of running the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
37
Two major software versioning systems are Subversion (SVN)and Current Version System (CVS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
38
ISO 15504 (SPICE)is a process-based development approach that focuses on the "maturity" of the process being developed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
39
A project development environment refers to the tools and technologies used to implement a given project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
40
The integrated development environment is a software platform for diagrams and models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
41
In the design and implementation of a system,it is almost always necessary to do additional work during the ________ phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
42
The development of computer software without ________ is an almost worthless exercise.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
43
To determine the activities that are critical to keeping a project on schedule,________ ________ must be obtained for each individual activity of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
44
Regarding project costs,project resources tend to be spent at a(n)________ rate as a project proceeds toward completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
45
A major problem with a system that is down too much is ________ ________ for the company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
46
Any successful systems implementation requires that considerable attention be given to employee ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
47
A project accounting system operates much like a conventional ________ accounting system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
48
A major drawback of the ________ ________ process is that it can involve a greatly extended check-out period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
49
________ is a successive refinement to the project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
50
Many experts believe that eventually,in the future,all end-user software will run in ________ browsers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
51
________ is necessary to ensure that the new system operates as planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
52
The BPEL service engine needs a roadmap which is a set of ________ diagrams based on Unified Modeling Language and/or Business Process Modeling Notation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
53
________ ________ Environment refers to the tools and technologies used to implement a given project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
54
An expensive,time-consuming problem in systems implementation is ________ ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
55
A(n)________ chart is an ideal way to factor a project into phases and tasks and to document such a plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
56
Good testing should do everything possible to ________ computer programs before they are implemented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
57
The Project ________ Platform serves to optimize management of the communication chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
58
An announcement by management regarding project execution will have the benefit of minimizing ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
59
________ ________ should be submitted to the steering committee in writing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
60
The ________ ________ Framework provides a structured environment in which to develop software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
61
The execution of the systems implementation should begin with

A) conversion.
B) a formal announcement to employees.
C) employee training.
D) programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
62
The document that shows the order in which activities may be performed and may be expanded to include estimated times for each individual activity is the

A) Gantt chart.
B) network diagram.
C) PERT diagram.
D) CPM diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
63
Perhaps the most important step regarding the success of a systems development project is

A) employee training.
B) conversion.
C) detailed system design.
D) operational training.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
64
The first major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) evaluate the new system.
D) execute activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
65
When implementing a new system,management often has to decide whether to train existing employees or hire new employees.Many times it is best to retain and retrain current employees because

A) current employees are already familiar with the firm's operations.
B) overall employee morale is enhanced.
C) current employees are already familiar with the firm's operations and overall employee morale is enhanced.
D) None of these answers is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following groups of individuals should be on the special project team that executes the implementation of the design plan?

A) Systems technical personnel
B) Accountants and auditors
C) Individuals who also participated in the design
D) Design team members and affected managers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following can serve as both a training tool for new employees and a help for future computer programming?

A) Testing
B) Evaluation
C) Systems analysis
D) Documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
68
________ ________ Environment is a software platform for actually writing program code which provides specialized tools for testing and debugging programs and deploying them to servers for testing or release.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following activities occurs during the detailed systems design phase?

A) Computer programming
B) File conversion
C) Documentation
D) Evaluation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
70
The process of changing input data into a format readable by the new system hardware is called

A) testing.
B) file conversion.
C) evaluation.
D) documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
71
The design specifications for a computer program are determined by

A) top management.
B) users.
C) the design team.
D) the computer programmer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
72
A list of activities that is strategic to the project to keep it on schedule is called

A) the critical path.
B) a PERT diagram.
C) a Gantt chart.
D) the manager's priority matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
73
The testing approach in which the old system is abandoned and the processing is switched to the new system is called

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
74
The second major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) execute activities.
D) evaluate the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
75
What standard should be used to evaluate the quality of documentation produced by a programmer?

A) The number of pages produced
B) The number of logical flow diagrams and analytic flowcharts produced
C) The amount of time spent to produce the documentation
D) Whether a different programmer can use the documentation at a later date to modify the program
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
76
One of the most important parts of systems implementation that is often overlooked or minimized is

A) testing.
B) documentation.
C) data conversion.
D) evaluation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
77
The testing approach in which the new system is phased in a segment at a time is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
78
The most expensive approach to final systems testing is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
79
To provide the proper environment for computer equipment operations,the company must control

A) security.
B) wiring.
C) access.
D) temperature and humidity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
80
Good project management uses plans for implementing a system.The plans should provide

A) specific budget information.
B) a breakdown of the project into various phases.
C) specific timetables for completion.
D) All of these answers are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 133 في هذه المجموعة.