Deck 10: Standard Costs and Overhead Analysis

ملء الشاشة (f)
exit full mode
سؤال
A favourable materials price variance coupled with an unfavourable materials quantity variance would MOST likely result from which of the following?

A) Problems with processing machines.
B) Purchase of low quality materials.
C) Problems with labour efficiency.
D) Changes in the product mix.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Dahl Company,a clothing manufacturer,uses a standard costing system.Each unit of a finished product contains 2 metres of cloth.However,there is unavoidable waste of 20%,calculated on input quantities,when the cloth is cut for assembly.The cost of the cloth is $3 per metre.What is the standard direct material cost for cloth per unit of finished product?

A) $4.80.
B) $6.00.
C) $7.00.
D) $7.50.
سؤال
Tower Company planned to produce 3,000 units of its single product,Titactium,during November.The standards for one unit of Titactium specify six kilograms of materials at $0.30 per kilogram.Actual production in November was 3,100 units of Titactium.There was a favourable materials price variance of $380 and an unfavourable materials quantity variance of $120.Based on these variances,what could one assume?

A) That more materials were purchased than were used.
B) That more materials were used than were purchased.
C) That the actual cost per kilogram for materials was less than the standard cost per kilogram.
D) That the actual usage of materials was less than the standard allowed.
سؤال
Which department is usually held responsible for an unfavourable materials quantity variance?

A) Marketing.
B) Purchasing.
C) Engineering.
D) Production.
سؤال
Drake Company purchased materials on account.The entry to record the purchase of materials having a standard cost of $1.50 per kilogram from a supplier at $1.60 per kilogram would include which of the following?

A) A credit to Raw Materials Inventory.
B) A debit to Work in Process.
C) A credit to Materials Price Variance.
D) A debit to Materials Price Variance.
سؤال
Cox Company's direct material costs for the month of January were as follows;
 Actual quantity purchased $18,000 kilograms  Actual unit purchase price $3.60 per kilogram  Materials price variance-  Unfavourable (based on purchases) $3,600 Standard quantity allowed  For actual production 16,000 kilograms  Actual quantity used 15,000 kilograms \begin{array}{|l|r|}\hline \text { Actual quantity purchased } & \$ 18,000 \text { kilograms } \\\hline \text { Actual unit purchase price } & \$ 3.60 \text { per kilogram } \\\hline \text { Materials price variance- } & \\\hline \text { Unfavourable (based on purchases) } & \$ 3,600 \\\hline \text { Standard quantity allowed } & \\\hline \text { For actual production } &16,000 \text { kilograms } \\\hline \text { Actual quantity used } & 15,000 \text { kilograms } \\\hline\end{array}
What was the favourable direct materials quantity variance for January?

A) $3,360.
B) $3,375.
C) $3,400.
D) $3,800.
سؤال
What does a favourable labour rate variance indicate?

A) Actual hours exceed standard hours.
B) Standard hours exceed actual hours.
C) The actual rate exceeds the standard rate.
D) The standard rate exceeds the actual rate.
سؤال
The Porter Company has a standard cost system.In July,the company purchased and used 22,500 kilograms of direct material at an actual cost of $53,000,the materials quantity variance was $1,875 unfavourable,and the standard quantity of materials allowed for July production was 21,750 kilograms.What was the materials price variance for July?

A) $2,725 favourable.
B) $2,725 unfavourable.
C) $3,250 favourable.
D) $3,250 unfavourable.
سؤال
To measure controllable production inefficiencies,which of the following is the best basis for a company to use in establishing the standard hours allowed for the output of one unit of product?

A) Average historical performance for the last several years.
B) Engineering estimates based on ideal performance.
C) Engineering estimates based on attainable performance.
D) The hours per unit that would be required for the present workforce to satisfy expected demand over the long run.
سؤال
What do the terms "standard quantity allowed" or "standard hours allowed" mean?

A) The actual output in units multiplied by the standard output allowed.
B) The actual input in units multiplied by the standard output allowed.
C) The actual output in units multiplied by the standard input allowed.
D) The standard output in units multiplied by the standard input allowed.
سؤال
A labour efficiency variance resulting from the use of poor quality materials should be charged to which/whom?

A) The production manager.
B) The purchasing agent.
C) Manufacturing overhead.
D) The engineering department.
سؤال
If a company follows a practice of isolating variances at the earliest point in time,what would be the appropriate time to isolate and recognize a direct material price variance?

A) When material is issued.
B) When material is purchased.
C) When material is used in production.
D) When production is completed.
سؤال
What does an unfavourable labour efficiency variance indicate?

A) The actual labour rate was higher than the standard labour rate.
B) The labour rate variance must also be unfavourable.
C) Actual labour hours worked exceeded standard labour hours for the production level achieved.
D) Overtime labour was used during the period.
سؤال
What does a credit balance in a direct labour efficiency variance account indicate?

A) The average wage rate paid to direct labour employees was less than the standard rate.
B) The standard hours allowed for the units produced were greater than actual direct labour hours used.
C) The actual total direct labour costs incurred were less than standard direct labour costs allowed for the units produced.
D) The number of units produced was less than the number of units budgeted for the period.
سؤال
Which of the following statements concerning practical standards is NOT correct?

A) Practical standards can be used for product costing and cash budgeting.
B) Practical standards can be attained by the average worker.
C) When practical standards are used; there is no reason to adjust standards if an old machine is replaced by a newer, faster machine.
D) Under practical standards, large variances are less likely than under ideal standards.
سؤال
Which of the following entries would correctly record the charging of direct labour costs to Work in Process given an unfavourable labour efficiency variance and a favourable labour rate variance?

A) A debit to Work in Process, and credits to Labour Efficiency Variance, Labour Rate Variance, and Wages Payable.
B) A debit to Work in Process and an equal credit to Wages Payable.
C) Debits to Work in Process and Labour Efficiency Variance, and credits to Labour Rate Variance and Wages Payable.
D) Debits to Work in Process and Labour Rate Variance, and credits to Labour Efficiency Variance and Wages Payable.
سؤال
Which of the following is the most probable reason a company would experience an unfavourable labour rate variance and a favourable labour efficiency variance?

A) The mix of workers assigned to the particular job was heavily weighted towards the use of higher paid, experienced individuals.
B) The mix of workers assigned to the particular job was heavily weighted towards the use of new, relatively low-paid, unskilled workers.
C) Because of the production schedule, workers from other production areas were assigned to assist this particular process.
D) Defective materials caused more labour to be used in order to produce a standard unit.
سؤال
Under a standard cost system,who is usually held responsible for the materials price variances?

A) The production manager.
B) The sales manager.
C) The purchasing manager.
D) The engineering manager.
سؤال
If the actual labour hours worked exceed the standard labour hours allowed,what type of variance will occur?

A) Favourable labour efficiency variance.
B) Favourable labour rate variance.
C) Unfavourable labour efficiency variance.
D) Unfavourable labour rate variance.
سؤال
Which of the following refers to standards that allow for no machine breakdowns or other work interruptions and that require peak efficiency at all times?

A) Normal standards.
B) Practical standards.
C) Ideal standards.
D) Budgeted standards.
سؤال
Borden Enterprises uses standard costing.For the month of April,the company reported the following data:
 Standard direct labour rate $10 per hour  Standard hours allowed for actual production 8,000 Actual direct labour rate $9.50 per hour  Labour efficiency variance $4,800 favourable \begin{array}{|l|r|}\hline \text { Standard direct labour rate } & \$ 10 \text { per hour } \\\hline \text { Standard hours allowed for actual production } & 8,000 \\\hline \text { Actual direct labour rate } & \$ 9.50 \text { per hour } \\\hline \text { Labour efficiency variance } & \$ 4,800 \text { favourable } \\\hline\end{array}
What was the labour rate variance for April?

A) $2,850 favourable.
B) $2,850 unfavourable.
C) $3,760 favourable.
D) $3,760 unfavourable.
سؤال
The Fletcher Company uses standard costing.The following data are available for October:
 Actual quantity of direct materials used 23,500 kilograms  Standard price of direct materials $2 per kilogram  Materials quantity variance $1,000 favourable \begin{array}{|l|r|}\hline \text { Actual quantity of direct materials used } & 23,500 \text { kilograms } \\\hline \text { Standard price of direct materials } & \$ 2 \text { per kilogram } \\\hline \text { Materials quantity variance } & \$ 1,000 \text { favourable } \\\hline\end{array}
What was the standard quantity of material allowed for October production?

A) 23,000 kilograms.
B) 24,000 kilograms.
C) 24,500 kilograms.
D) 25,000 kilograms.
سؤال
The following standards for variable manufacturing overhead have been established for a company that makes only one product:
 Standard hours per unit of output 5.6 hours  Standard variable overhead rate $12.00 per hour \begin{array}{|l|r|}\hline \text { Standard hours per unit of output } & 5.6 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 12.00 \text { per hour } \\\hline\end{array}
The following data pertain to operations for the last month:
 Actual hours 2,600 hours  Actual total variable overhead cost $31,330 Actual output 400 units \begin{array}{|l|r|}\hline \text { Actual hours } & 2,600 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 31,330 \\\hline \text { Actual output } & 400 \text { units } \\\hline\end{array}
What was the variable overhead spending variance for the month?

A) $130 favourable.
B) $130 unfavourable.
C) $4,338 unfavourable.
D) $4,450 unfavourable.
سؤال
Last month,75,000 kilograms of direct materials were purchased,and 71,000 kilograms were used.If the actual purchase price per kilogram was $0.50 more than the standard purchase price per kilogram,what was the materials price variance?

A) $2,000 favourable.
B) $35,500 unfavourable.
C) $37,500 favourable.
D) $37,500 unfavourable.
سؤال
The following labour standards have been established for a particular product:
 Standard labour hours per unit of output 1.7 hours  Standard labour rate $14.05 per hour \begin{array}{|l|r|}\hline \text { Standard labour hours per unit of output } & 1.7 \text { hours } \\\hline \text { Standard labour rate } & \$ 14.05 \text { per hour } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual hours worked 3,700 hours  Actual total labour cost $50,690 Actual output 2,300 units \begin{array}{|l|r|}\hline \text { Actual hours worked } & 3,700 \text { hours } \\\hline \text { Actual total labour cost } & \$ 50,690 \\\hline \text { Actual output } & 2,300 \text { units } \\\hline\end{array}
What was the labour rate variance for the month?

A) $1,295 favourable.
B) $1,295 unfavourable.
C) $2,950 favourable.
D) $2950 unfavourable.
سؤال
Information on Fleming Company's direct material costs follows:
 Actual amount of direct materials purchased and used 20,000 kilograms  Actual direct material costs $40,000 Standard price of direct materials $2.10 per kilogram  Direct materials quantity variance-favourable $3,000\begin{array}{|l|r|}\hline \text { Actual amount of direct materials purchased and used } & 20,000 \text { kilograms } \\\hline \text { Actual direct material costs } & \$ 40,000 \\\hline \text { Standard price of direct materials } & \$ 2.10 \text { per kilogram } \\\hline \text { Direct materials quantity variance-favourable } & \$ 3,000 \\\hline\end{array}
What was the company's direct material price variance?

A) $1,000 favourable.
B) $1,000 unfavourable.
C) $2,000 favourable.
D) $2,000 unfavourable.
سؤال
For the month of April,Thorp Co.'s records disclosed the following data relating to direct labour:
 Actual cost $10,000 Rate variance $1,000 favourable  Efficiency variance $1,500 unfavourable \begin{array}{|l|r|}\hline \text { Actual cost } & \$ 10,000 \\\hline \text { Rate variance } & \$ 1,000 \text { favourable } \\\hline \text { Efficiency variance } & \$ 1,500 \text { unfavourable } \\\hline\end{array}
For the month of April,actual direct labour hours amounted to 2,000.In April,what was Thorp's standard direct labour rate per hour?

A) $4.50.
B) $4.75.
C) $5.00.
D) $5.50.
سؤال
The following labour standards have been established for a particular product:
 Standard labour hours per unit of output 8.3 hours  Standard labour rate $12.10 per hour \begin{array}{|l|r|}\hline \text { Standard labour hours per unit of output } & 8.3 \text { hours } \\\hline \text { Standard labour rate } & \$ 12.10 \text { per hour } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual hours worked 6,100 hours  Actual total labour cost $71,370 Actual output 900 units \begin{array}{|l|r|}\hline \text { Actual hours worked } & 6,100 \text { hours } \\\hline \text { Actual total labour cost } & \$ 71,370 \\\hline \text { Actual output } & 900 \text { units } \\\hline\end{array}
What was the labour efficiency variance for the month?

A) $16,029 favourable.
B) $16,577 favourable.
C) $19,017 favourable.
D) $19,017 unfavourable.
سؤال
The standards for direct labour for a product are 2.5 hours at $8 per hour.Last month,9,000 units of the product were made,and the labour efficiency variance was $8,000 favourable.What was the actual number of hours worked during the past period?

A) 20,500 hours.
B) 21,500 hours.
C) 22,500 hours.
D) 23,500 hours.
سؤال
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 1.7 metres  Standard price $19.80 per metre \begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.7 \text { metres } \\\hline \text { Standard price } & \$ 19.80 \text { per metre } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 5,800 metres  Actual cost of materials purchased $113,680 Actual materials used in production 5,100 metres  Actual output 3,200 wits \begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 113,680 \\\hline \text { Actual materials used in production } & 5,100 \text { metres } \\\hline \text { Actual output } & 3,200 \text { wits } \\\hline\end{array}
What was the materials quantity variance for the month?

A) $6,664 favourable.
B) $6,732 favourable.
C) $13,720 unfavourable.
D) $13,860 unfavourable.
سؤال
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the price variance for the direct materials acquired by the company during March?

A) $7,550 favourable.
B) $7,550 unfavourable.
C) $8,250 favourable.
D) $8,250 unfavourable.
سؤال
Yola Company manufactures a product with standards for direct labour of 4 direct labour-hours per unit at a cost of $12.00 per direct labour-hour.During June,1,000 units were produced using 4,100 hours at $12.20 per hour.What was the direct labour efficiency variance?

A) $1,200 favourable.
B) $1,200 unfavourable.
C) $2,020 favourable.
D) $2,020 unfavourable.
سؤال
The Reedy Company uses a standard costing system.The following data are available for November:
 Actual direct labour hours worked 5,800 Standard direct labour rate $9 per hour  Labour rate variance $1,160 favourable \begin{array}{|l|r|}\hline \text { Actual direct labour hours worked } & 5,800 \\\hline \text { Standard direct labour rate } & \$ 9 \text { per hour } \\\hline \text { Labour rate variance } & \$ 1,160 \text { favourable } \\\hline\end{array}
What was the actual direct labour rate for November?

A) $8.80.
B) $8.90.
C) $9.00
D) $9.20.
سؤال
The following standards for variable manufacturing overhead have been established for a company that makes only one product:
 Standard hours per unit of output 7.8 hours  Standard variable overhead rate $12.55 per hour \begin{array}{|l|r|}\hline \text { Standard hours per unit of output } & 7.8 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 12.55 \text { per hour } \\\hline\end{array}
The following data pertain to operations for the last month:
 Actual hours 2,900 hours  Actual total variable overhead cost $36,975 Actual output 200 units \begin{array}{|l|r|}\hline \text { Actual hours } & 2,900 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 36,975 \\\hline \text { Actual output } & 200 \text { units } \\\hline\end{array}
What was the variable overhead efficiency variance for the month?

A) $0.
B) $16,817 unfavourable.
C) $580 unfavourable.
D) $17,397 unfavourable.
سؤال
In a certain standard costing system,the following results occurred last period: labour rate variance,$1,000 unfavourable; labour efficiency variance,$2,800 favourable; and the actual labour rate was $0.20 more per hour than the standard labour rate.What number of actual direct labour hours was used last period?

A) 4,800 hours.
B) 5,000 hours.
C) 5,400 hours.
D) 9,000 hours.
سؤال
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 8.3 grams  Standard price $19.15 per gram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 8.3 \text { grams } \\\hline \text { Standard price } & \$ 19.15 \text { per gram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 7,500 grams  Actual cost of materials purchased $141,375 Actual materials used in production 7,100 grams  Actual output 700 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 7,500 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 141,375 \\\hline \text { Actual materials used in production } & 7,100 \text { grams } \\\hline \text { Actual output } & 700 \text { units } \\\hline\end{array}
What was the materials price variance for the month?

A) $2,250 favourable.
B) $7,540 unfavourable.
C) $7,660 unfavourable.
D) $24,317 unfavourable.
سؤال
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct materials quantity variance for March?

A) $3,500 favourable.
B) $3,500 unfavourable.
C) $52,500 favourable.
D) $52,500 unfavourable.
سؤال
During March,Younger Company's direct material costs for product T were as follows:
 Actual unit purchase price $6.50 per metre  Standard quantity allowed for actual Production 2,100 metres  Quantity purchased and used for actual Production 2,300 metres  Standard unit price $6.25 per metre \begin{array}{|l|r|}\hline \text { Actual unit purchase price } & \$ 6.50 \text { per metre } \\\hline \text { Standard quantity allowed for actual Production } & 2,100 \text { metres } \\\hline \text { Quantity purchased and used for actual Production } & 2,300 \text { metres } \\\hline \text { Standard unit price } & \$ 6.25 \text { per metre } \\\hline\end{array}
What was Younger's material quantity variance for March?

A) $1,250 unfavourable.
B) $1,250 favourable.
C) $1,300 unfavourable.
D) $1,300 favourable.
سؤال
Information on Kennedy Company's direct material costs follows:
 Standard price per kilogram of raw materials $3.60 Actual quantity of raw materials purchased 1,600 kilograms  Standard quantity allowed for actual production 1,450 kilograms  Materials purchase price variance-favourable $240\begin{array}{|l|r|}\hline \text { Standard price per kilogram of raw materials } & \$ 3.60 \\\hline \text { Actual quantity of raw materials purchased } & 1,600 \text { kilograms } \\\hline \text { Standard quantity allowed for actual production } & 1,450 \text { kilograms } \\\hline \text { Materials purchase price variance-favourable } & \$ 240 \\\hline\end{array}
What was the actual purchase price per unit,rounded to the nearest cent?

A) $3.06.
B) $3.11.
C) $3.45.
D) $3.75.
سؤال
Lab Corp.uses a standard cost system.Direct labour information for Product CER for the month of October follows:
 Standard direct labour rate $6.00 per hour  Actual direct labour rate paid $6.10 per hour  Standard hours allowed for actual production 1,500 hours  Labour efficiency variance-unfavourable $600\begin{array}{|l|r|}\hline \text { Standard direct labour rate } & \$ 6.00 \text { per hour } \\\hline \text { Actual direct labour rate paid } & \$ 6.10 \text { per hour } \\\hline \text { Standard hours allowed for actual production } & 1,500 \text { hours } \\\hline \text { Labour efficiency variance-unfavourable } & \$ 600 \\\hline\end{array}
What were the actual hours worked?

A) 1,400 hours.
B) 1,402 hours.
C) 1,598 hours.
D) 1,600 hours.
سؤال
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the purchase of direct materials,the general ledger would include what entry to the Materials Price Variance account?

A) $1,500 credit.
B) $1,500 debit.
C) $6,000 credit.
D) $6,000 debit.
سؤال
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the total variable overhead variance for November?

A) $175 unfavourable.
B) $225 favourable.
C) $225 unfavourable.
D) $400 unfavourable.
سؤال
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct labour efficiency variance for March?

A) $5,500 favourable.
B) $5,500 unfavourable.
C) $5,625 favourable.
D) $5,625 unfavourable.
سؤال
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the labour rate variance for January?

A) $475 favourable.
B) $475 unfavourable.
C) $585 favourable.
D) $585 unfavourable.
سؤال
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the use of direct materials in production,the general ledger would include what entry to the Materials Quantity Variance account?

A) $900 debit.
B) $900 credit.
C) $3,600 debit.
D) $3,600 credit.
سؤال
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour rate variance for November?

A) $550 unfavourable.
B) $1,050 unfavourable.
C) $2,150 favourable.
D) $2,150 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the variable overhead spending variance?

A) $220 favourable.
B) $220 unfavourable.
C) $240 favourable.
D) $240 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour rate variance?

A) $480 favourable.
B) $480 unfavourable.
C) $440 favourable.
D) $440 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials price variance?

A) $400 favourable.
B) $400 unfavourable.
C) $600 favourable.
D) $600 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the variable overhead efficiency variance?

A) $500 favourable.
B) $500 unfavourable.
C) $520 favourable.
D) $520 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour efficiency variance?

A) $800 favourable.
B) $800 unfavourable.
C) $840 favourable.
D) $840 unfavourable.
سؤال
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the labour efficiency variance for January? Do not round intermediate calculations.

A) $110 favourable.
B) $130 unfavourable.
C) $350 unfavourable.
D) $475 favourable.
سؤال
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials quantity variance for November?

A) $300 unfavourable.
B) $1,200 favourable.
C) $1,200 unfavourable.
D) $1,500 favourable.
سؤال
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the total variance for variable overhead for January?

A) $40 favourable.
B) $85 favourable.
C) $100 unfavourable.
D) $125 favourable.
سؤال
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct labour rate variance for March?

A) $8,000 favourable.
B) $8,000 unfavourable.
C) $48,000 favourable.
D) $48,000 unfavourable.
سؤال
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the materials quantity variance for January?

A) $300 favourable.
B) $300 unfavourable.
C) $750 favourable.
D) $800 unfavourable.
سؤال
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the materials price variance for January?

A) $1,300 unfavourable.
B) $1,640 favourable.
C) $1,640 unfavourable.
D) $1,700 favourable.
سؤال
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour efficiency variance for November?

A) $550 unfavourable.
B) $1,050 unfavourable.
C) $1,600 favourable.
D) $1,600 unfavourable.
سؤال
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials price variance for November?

A) $810 favourable.
B) $810 unfavourable.
C) $2,310 favourable.
D) $2,310 unfavourable.
سؤال
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials quantity variance?

A) $760 favourable.
B) $760 unfavourable.
C) $800 unfavourable.
D) $4,000 unfavourable.
سؤال
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 4.4 kilograms  Standard price $13.20 per kilogram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 4.4 \text { kilograms } \\\hline \text { Standard price } & \$ 13.20 \text { per kilogram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 4,800 kilograms  Actual cost of materials purchased $62,880 Actual materials used in production 4,300 kilograms  Actual output 70 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 4,800 \text { kilograms } \\\hline \text { Actual cost of materials purchased } & \$ 62,880 \\\hline \text { Actual materials used in production } & 4,300 \text { kilograms } \\\hline \text { Actual output } & 70 \text { units } \\\hline\end{array}

-What was the materials price variance for the month?

A) $430 favourable.
B) $430 unfavourable.
C) $480 favourable.
D) $480 unfavourable.
سؤال
The following standards for variable manufacturing overhead have been established for a company that makes only one product:

 Standard hours per unit of output 1.6 hours  Standard variable overhead rate $11.55 per hour  The following data pertain to operations for the last month:  Actual hours 4,900 hours  Actual total variable overhead cost $58,310 Actual output 3,000 units \begin{array}{l}\begin{array} { | l | r | } \hline \text { Standard hours per unit of output } & 1.6 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 11.55 \text { per hour } \\\hline\end{array}\\\text { The following data pertain to operations for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours } & 4,900 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 58,310 \\\hline \text { Actual output } & 3,000 \text { units } \\\hline\end{array}\end{array}

-What was the variable overhead spending variance for the month?

A) $1,715 favourable.
B) $1,715 unfavourable.
C) $2,870 favourable.
D) $2,870 unfavourable.
سؤال
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 4.4 kilograms  Standard price $13.20 per kilogram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 4.4 \text { kilograms } \\\hline \text { Standard price } & \$ 13.20 \text { per kilogram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 4,800 kilograms  Actual cost of materials purchased $62,880 Actual materials used in production 4,300 kilograms  Actual output 70 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 4,800 \text { kilograms } \\\hline \text { Actual cost of materials purchased } & \$ 62,880 \\\hline \text { Actual materials used in production } & 4,300 \text { kilograms } \\\hline \text { Actual output } & 70 \text { units } \\\hline\end{array}

-What was the materials quantity variance for the month?

A) $6,550 unfavourable.
B) $6,600 unfavourable.
C) $15,982 unfavourable.
D) $16,104 unfavourable.
سؤال
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the variable overhead spending variance for May?

A) $1,710 favourable.
B) $1,710 unfavourable.
C) $2,290 favourable.
D) $2,290 unfavourable.
سؤال
 The following labour standards have been established for a particular product:  Standard labour hours per unit of output 7.5 hours  Standard labour rate $15.25 per hour \begin{array}{l}\text { The following labour standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard labour hours per unit of output } & 7.5 \text { hours } \\\hline \text { Standard labour rate } & \$ 15.25 \text { per hour } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual hours worked 9,600 hours  Actual total labour cost $144,480 Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours worked } & 9,600 \text { hours } \\\hline \text { Actual total labour cost } & \$ 144,480 \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the labour efficiency variance for the month?

A) $7,230 favourable.
B) $7,230 unfavourable.
C) $9,030 unfavourable.
D) $9,150 unfavourable.
سؤال
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the total standard cost for variable overhead for May?

A) $40,000.
B) $50,000.
C) $56,000.
D) $60,000.
سؤال
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the materials quantity variance?

A) $1,120 favourable.
B) $1,120 unfavourable.
C) $1,820 favourable.
D) $1,820 unfavourable.
سؤال
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 6.8 metres  Standard price $17.10 per metre \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 6.8 \text { metres } \\\hline \text { Standard price } & \$ 17.10 \text { per metre } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 9,000 metres  Actual cost of materials purchased $156,600 Actual materials used in production 8,500 metres  Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 9,000 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 156,600 \\\hline \text { Actual materials used in production } & 8,500 \text { metres } \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the materials price variance for the month?

A) $2,550 favourable.
B) $2,550 unfavourable.
C) $2,700 favourable.
D) $2,700 unfavourable.
سؤال
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 1.9 grams  Standard price $18.00 per gram \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.9 \text { grams } \\\hline \text { Standard price } & \$ 18.00 \text { per gram } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 5,800 grams  Actual cost of materials purchased $108,460 Actual materials used in production 5,200 grams  Actual output 2,700 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 108,460 \\\hline \text { Actual materials used in production } & 5,200 \text { grams } \\\hline \text { Actual output } & 2,700 \text { units } \\\hline\end{array}\end{array}

-What was the materials quantity variance for the month?

A) $1,260 unfavourable.
B) $1,309 unfavourable.
C) $10,880 unfavourable.
D) $11,220 unfavourable.
سؤال
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the incurrence of direct labour costs and its use in production,the general ledger would include what entry to the Labour Efficiency Variance account?

A) $240 debit.
B) $480 credit.
C) $1,200 debit.
D) $1,200 credit.
سؤال
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the labour rate variance?

A) $1,125 favourable.
B) $1,125 unfavourable.
C) $2,500 favourable.
D) $2,500 unfavourable.
سؤال
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 1.9 grams  Standard price $18.00 per gram \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.9 \text { grams } \\\hline \text { Standard price } & \$ 18.00 \text { per gram } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 5,800 grams  Actual cost of materials purchased $108,460 Actual materials used in production 5,200 grams  Actual output 2,700 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 108,460 \\\hline \text { Actual materials used in production } & 5,200 \text { grams } \\\hline \text { Actual output } & 2,700 \text { units } \\\hline\end{array}\end{array}

-What was the materials price variance for the month?

A) $3,640 favourable.
B) $3,640 unfavourable.
C) $4,060 favourable.
D) $4,060 unfavourable.
سؤال
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the materials price variance?

A) $420 favourable.
B) $420 unfavourable.
C) $700 favourable.
D) $700 unfavourable.
سؤال
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What are the standard hours allowed to make one unit of finished product?

A) 1.0 hours.
B) 1.2 hours.
C) 1.5 hours.
D) 2.0 hours.
سؤال
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the incurrence of direct labour cost and its use in production,the general ledger would include what entry to the Labour Rate Variance account?

A) $240 credit.
B) $240 debit.
C) $340 debit.
D) $340 credit.
سؤال
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the actual direct labour rate for May in dollars per hour?

A) $11.50.
B) $11.75.
C) $12.00.
D) $12.50.
سؤال
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 6.8 metres  Standard price $17.10 per metre \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 6.8 \text { metres } \\\hline \text { Standard price } & \$ 17.10 \text { per metre } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 9,000 metres  Actual cost of materials purchased $156,600 Actual materials used in production 8,500 metres  Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 9,000 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 156,600 \\\hline \text { Actual materials used in production } & 8,500 \text { metres } \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the materials quantity variance for the month?

A) $5,814 unfavourable.
B) $5,916 unfavourable.
C) $8,550 unfavourable.
D) $8,700 unfavourable.
سؤال
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the total standard cost for direct labour for May?

A) $120,000.
B) $161,000.
C) $168,000.
D) $180,000.
سؤال
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the labour efficiency variance?

A) $1,375 favourable.
B) $1,375 unfavourable.
C) $1,600 favourable.
D) $1,600 unfavourable.
سؤال
 The following labour standards have been established for a particular product:  Standard labour hours per unit of output 7.5 hours  Standard labour rate $15.25 per hour \begin{array}{l}\text { The following labour standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard labour hours per unit of output } & 7.5 \text { hours } \\\hline \text { Standard labour rate } & \$ 15.25 \text { per hour } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual hours worked 9,600 hours  Actual total labour cost $144,480 Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours worked } & 9,600 \text { hours } \\\hline \text { Actual total labour cost } & \$ 144,480 \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the labour rate variance for the month?

A) $240 favourable.
B) $240 unfavourable.
C) $1,920 favourable.
D) $1,920 unfavourable.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/234
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Standard Costs and Overhead Analysis
1
A favourable materials price variance coupled with an unfavourable materials quantity variance would MOST likely result from which of the following?

A) Problems with processing machines.
B) Purchase of low quality materials.
C) Problems with labour efficiency.
D) Changes in the product mix.
B
2
Dahl Company,a clothing manufacturer,uses a standard costing system.Each unit of a finished product contains 2 metres of cloth.However,there is unavoidable waste of 20%,calculated on input quantities,when the cloth is cut for assembly.The cost of the cloth is $3 per metre.What is the standard direct material cost for cloth per unit of finished product?

A) $4.80.
B) $6.00.
C) $7.00.
D) $7.50.
D
3
Tower Company planned to produce 3,000 units of its single product,Titactium,during November.The standards for one unit of Titactium specify six kilograms of materials at $0.30 per kilogram.Actual production in November was 3,100 units of Titactium.There was a favourable materials price variance of $380 and an unfavourable materials quantity variance of $120.Based on these variances,what could one assume?

A) That more materials were purchased than were used.
B) That more materials were used than were purchased.
C) That the actual cost per kilogram for materials was less than the standard cost per kilogram.
D) That the actual usage of materials was less than the standard allowed.
C
4
Which department is usually held responsible for an unfavourable materials quantity variance?

A) Marketing.
B) Purchasing.
C) Engineering.
D) Production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
5
Drake Company purchased materials on account.The entry to record the purchase of materials having a standard cost of $1.50 per kilogram from a supplier at $1.60 per kilogram would include which of the following?

A) A credit to Raw Materials Inventory.
B) A debit to Work in Process.
C) A credit to Materials Price Variance.
D) A debit to Materials Price Variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
6
Cox Company's direct material costs for the month of January were as follows;
 Actual quantity purchased $18,000 kilograms  Actual unit purchase price $3.60 per kilogram  Materials price variance-  Unfavourable (based on purchases) $3,600 Standard quantity allowed  For actual production 16,000 kilograms  Actual quantity used 15,000 kilograms \begin{array}{|l|r|}\hline \text { Actual quantity purchased } & \$ 18,000 \text { kilograms } \\\hline \text { Actual unit purchase price } & \$ 3.60 \text { per kilogram } \\\hline \text { Materials price variance- } & \\\hline \text { Unfavourable (based on purchases) } & \$ 3,600 \\\hline \text { Standard quantity allowed } & \\\hline \text { For actual production } &16,000 \text { kilograms } \\\hline \text { Actual quantity used } & 15,000 \text { kilograms } \\\hline\end{array}
What was the favourable direct materials quantity variance for January?

A) $3,360.
B) $3,375.
C) $3,400.
D) $3,800.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
7
What does a favourable labour rate variance indicate?

A) Actual hours exceed standard hours.
B) Standard hours exceed actual hours.
C) The actual rate exceeds the standard rate.
D) The standard rate exceeds the actual rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
8
The Porter Company has a standard cost system.In July,the company purchased and used 22,500 kilograms of direct material at an actual cost of $53,000,the materials quantity variance was $1,875 unfavourable,and the standard quantity of materials allowed for July production was 21,750 kilograms.What was the materials price variance for July?

A) $2,725 favourable.
B) $2,725 unfavourable.
C) $3,250 favourable.
D) $3,250 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
9
To measure controllable production inefficiencies,which of the following is the best basis for a company to use in establishing the standard hours allowed for the output of one unit of product?

A) Average historical performance for the last several years.
B) Engineering estimates based on ideal performance.
C) Engineering estimates based on attainable performance.
D) The hours per unit that would be required for the present workforce to satisfy expected demand over the long run.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
10
What do the terms "standard quantity allowed" or "standard hours allowed" mean?

A) The actual output in units multiplied by the standard output allowed.
B) The actual input in units multiplied by the standard output allowed.
C) The actual output in units multiplied by the standard input allowed.
D) The standard output in units multiplied by the standard input allowed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
11
A labour efficiency variance resulting from the use of poor quality materials should be charged to which/whom?

A) The production manager.
B) The purchasing agent.
C) Manufacturing overhead.
D) The engineering department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
12
If a company follows a practice of isolating variances at the earliest point in time,what would be the appropriate time to isolate and recognize a direct material price variance?

A) When material is issued.
B) When material is purchased.
C) When material is used in production.
D) When production is completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
13
What does an unfavourable labour efficiency variance indicate?

A) The actual labour rate was higher than the standard labour rate.
B) The labour rate variance must also be unfavourable.
C) Actual labour hours worked exceeded standard labour hours for the production level achieved.
D) Overtime labour was used during the period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
14
What does a credit balance in a direct labour efficiency variance account indicate?

A) The average wage rate paid to direct labour employees was less than the standard rate.
B) The standard hours allowed for the units produced were greater than actual direct labour hours used.
C) The actual total direct labour costs incurred were less than standard direct labour costs allowed for the units produced.
D) The number of units produced was less than the number of units budgeted for the period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following statements concerning practical standards is NOT correct?

A) Practical standards can be used for product costing and cash budgeting.
B) Practical standards can be attained by the average worker.
C) When practical standards are used; there is no reason to adjust standards if an old machine is replaced by a newer, faster machine.
D) Under practical standards, large variances are less likely than under ideal standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following entries would correctly record the charging of direct labour costs to Work in Process given an unfavourable labour efficiency variance and a favourable labour rate variance?

A) A debit to Work in Process, and credits to Labour Efficiency Variance, Labour Rate Variance, and Wages Payable.
B) A debit to Work in Process and an equal credit to Wages Payable.
C) Debits to Work in Process and Labour Efficiency Variance, and credits to Labour Rate Variance and Wages Payable.
D) Debits to Work in Process and Labour Rate Variance, and credits to Labour Efficiency Variance and Wages Payable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is the most probable reason a company would experience an unfavourable labour rate variance and a favourable labour efficiency variance?

A) The mix of workers assigned to the particular job was heavily weighted towards the use of higher paid, experienced individuals.
B) The mix of workers assigned to the particular job was heavily weighted towards the use of new, relatively low-paid, unskilled workers.
C) Because of the production schedule, workers from other production areas were assigned to assist this particular process.
D) Defective materials caused more labour to be used in order to produce a standard unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
18
Under a standard cost system,who is usually held responsible for the materials price variances?

A) The production manager.
B) The sales manager.
C) The purchasing manager.
D) The engineering manager.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
19
If the actual labour hours worked exceed the standard labour hours allowed,what type of variance will occur?

A) Favourable labour efficiency variance.
B) Favourable labour rate variance.
C) Unfavourable labour efficiency variance.
D) Unfavourable labour rate variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following refers to standards that allow for no machine breakdowns or other work interruptions and that require peak efficiency at all times?

A) Normal standards.
B) Practical standards.
C) Ideal standards.
D) Budgeted standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
21
Borden Enterprises uses standard costing.For the month of April,the company reported the following data:
 Standard direct labour rate $10 per hour  Standard hours allowed for actual production 8,000 Actual direct labour rate $9.50 per hour  Labour efficiency variance $4,800 favourable \begin{array}{|l|r|}\hline \text { Standard direct labour rate } & \$ 10 \text { per hour } \\\hline \text { Standard hours allowed for actual production } & 8,000 \\\hline \text { Actual direct labour rate } & \$ 9.50 \text { per hour } \\\hline \text { Labour efficiency variance } & \$ 4,800 \text { favourable } \\\hline\end{array}
What was the labour rate variance for April?

A) $2,850 favourable.
B) $2,850 unfavourable.
C) $3,760 favourable.
D) $3,760 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
22
The Fletcher Company uses standard costing.The following data are available for October:
 Actual quantity of direct materials used 23,500 kilograms  Standard price of direct materials $2 per kilogram  Materials quantity variance $1,000 favourable \begin{array}{|l|r|}\hline \text { Actual quantity of direct materials used } & 23,500 \text { kilograms } \\\hline \text { Standard price of direct materials } & \$ 2 \text { per kilogram } \\\hline \text { Materials quantity variance } & \$ 1,000 \text { favourable } \\\hline\end{array}
What was the standard quantity of material allowed for October production?

A) 23,000 kilograms.
B) 24,000 kilograms.
C) 24,500 kilograms.
D) 25,000 kilograms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
23
The following standards for variable manufacturing overhead have been established for a company that makes only one product:
 Standard hours per unit of output 5.6 hours  Standard variable overhead rate $12.00 per hour \begin{array}{|l|r|}\hline \text { Standard hours per unit of output } & 5.6 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 12.00 \text { per hour } \\\hline\end{array}
The following data pertain to operations for the last month:
 Actual hours 2,600 hours  Actual total variable overhead cost $31,330 Actual output 400 units \begin{array}{|l|r|}\hline \text { Actual hours } & 2,600 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 31,330 \\\hline \text { Actual output } & 400 \text { units } \\\hline\end{array}
What was the variable overhead spending variance for the month?

A) $130 favourable.
B) $130 unfavourable.
C) $4,338 unfavourable.
D) $4,450 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
24
Last month,75,000 kilograms of direct materials were purchased,and 71,000 kilograms were used.If the actual purchase price per kilogram was $0.50 more than the standard purchase price per kilogram,what was the materials price variance?

A) $2,000 favourable.
B) $35,500 unfavourable.
C) $37,500 favourable.
D) $37,500 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
25
The following labour standards have been established for a particular product:
 Standard labour hours per unit of output 1.7 hours  Standard labour rate $14.05 per hour \begin{array}{|l|r|}\hline \text { Standard labour hours per unit of output } & 1.7 \text { hours } \\\hline \text { Standard labour rate } & \$ 14.05 \text { per hour } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual hours worked 3,700 hours  Actual total labour cost $50,690 Actual output 2,300 units \begin{array}{|l|r|}\hline \text { Actual hours worked } & 3,700 \text { hours } \\\hline \text { Actual total labour cost } & \$ 50,690 \\\hline \text { Actual output } & 2,300 \text { units } \\\hline\end{array}
What was the labour rate variance for the month?

A) $1,295 favourable.
B) $1,295 unfavourable.
C) $2,950 favourable.
D) $2950 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
26
Information on Fleming Company's direct material costs follows:
 Actual amount of direct materials purchased and used 20,000 kilograms  Actual direct material costs $40,000 Standard price of direct materials $2.10 per kilogram  Direct materials quantity variance-favourable $3,000\begin{array}{|l|r|}\hline \text { Actual amount of direct materials purchased and used } & 20,000 \text { kilograms } \\\hline \text { Actual direct material costs } & \$ 40,000 \\\hline \text { Standard price of direct materials } & \$ 2.10 \text { per kilogram } \\\hline \text { Direct materials quantity variance-favourable } & \$ 3,000 \\\hline\end{array}
What was the company's direct material price variance?

A) $1,000 favourable.
B) $1,000 unfavourable.
C) $2,000 favourable.
D) $2,000 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
27
For the month of April,Thorp Co.'s records disclosed the following data relating to direct labour:
 Actual cost $10,000 Rate variance $1,000 favourable  Efficiency variance $1,500 unfavourable \begin{array}{|l|r|}\hline \text { Actual cost } & \$ 10,000 \\\hline \text { Rate variance } & \$ 1,000 \text { favourable } \\\hline \text { Efficiency variance } & \$ 1,500 \text { unfavourable } \\\hline\end{array}
For the month of April,actual direct labour hours amounted to 2,000.In April,what was Thorp's standard direct labour rate per hour?

A) $4.50.
B) $4.75.
C) $5.00.
D) $5.50.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
28
The following labour standards have been established for a particular product:
 Standard labour hours per unit of output 8.3 hours  Standard labour rate $12.10 per hour \begin{array}{|l|r|}\hline \text { Standard labour hours per unit of output } & 8.3 \text { hours } \\\hline \text { Standard labour rate } & \$ 12.10 \text { per hour } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual hours worked 6,100 hours  Actual total labour cost $71,370 Actual output 900 units \begin{array}{|l|r|}\hline \text { Actual hours worked } & 6,100 \text { hours } \\\hline \text { Actual total labour cost } & \$ 71,370 \\\hline \text { Actual output } & 900 \text { units } \\\hline\end{array}
What was the labour efficiency variance for the month?

A) $16,029 favourable.
B) $16,577 favourable.
C) $19,017 favourable.
D) $19,017 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
29
The standards for direct labour for a product are 2.5 hours at $8 per hour.Last month,9,000 units of the product were made,and the labour efficiency variance was $8,000 favourable.What was the actual number of hours worked during the past period?

A) 20,500 hours.
B) 21,500 hours.
C) 22,500 hours.
D) 23,500 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
30
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 1.7 metres  Standard price $19.80 per metre \begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.7 \text { metres } \\\hline \text { Standard price } & \$ 19.80 \text { per metre } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 5,800 metres  Actual cost of materials purchased $113,680 Actual materials used in production 5,100 metres  Actual output 3,200 wits \begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 113,680 \\\hline \text { Actual materials used in production } & 5,100 \text { metres } \\\hline \text { Actual output } & 3,200 \text { wits } \\\hline\end{array}
What was the materials quantity variance for the month?

A) $6,664 favourable.
B) $6,732 favourable.
C) $13,720 unfavourable.
D) $13,860 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
31
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the price variance for the direct materials acquired by the company during March?

A) $7,550 favourable.
B) $7,550 unfavourable.
C) $8,250 favourable.
D) $8,250 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
32
Yola Company manufactures a product with standards for direct labour of 4 direct labour-hours per unit at a cost of $12.00 per direct labour-hour.During June,1,000 units were produced using 4,100 hours at $12.20 per hour.What was the direct labour efficiency variance?

A) $1,200 favourable.
B) $1,200 unfavourable.
C) $2,020 favourable.
D) $2,020 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
33
The Reedy Company uses a standard costing system.The following data are available for November:
 Actual direct labour hours worked 5,800 Standard direct labour rate $9 per hour  Labour rate variance $1,160 favourable \begin{array}{|l|r|}\hline \text { Actual direct labour hours worked } & 5,800 \\\hline \text { Standard direct labour rate } & \$ 9 \text { per hour } \\\hline \text { Labour rate variance } & \$ 1,160 \text { favourable } \\\hline\end{array}
What was the actual direct labour rate for November?

A) $8.80.
B) $8.90.
C) $9.00
D) $9.20.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
34
The following standards for variable manufacturing overhead have been established for a company that makes only one product:
 Standard hours per unit of output 7.8 hours  Standard variable overhead rate $12.55 per hour \begin{array}{|l|r|}\hline \text { Standard hours per unit of output } & 7.8 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 12.55 \text { per hour } \\\hline\end{array}
The following data pertain to operations for the last month:
 Actual hours 2,900 hours  Actual total variable overhead cost $36,975 Actual output 200 units \begin{array}{|l|r|}\hline \text { Actual hours } & 2,900 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 36,975 \\\hline \text { Actual output } & 200 \text { units } \\\hline\end{array}
What was the variable overhead efficiency variance for the month?

A) $0.
B) $16,817 unfavourable.
C) $580 unfavourable.
D) $17,397 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
35
In a certain standard costing system,the following results occurred last period: labour rate variance,$1,000 unfavourable; labour efficiency variance,$2,800 favourable; and the actual labour rate was $0.20 more per hour than the standard labour rate.What number of actual direct labour hours was used last period?

A) 4,800 hours.
B) 5,000 hours.
C) 5,400 hours.
D) 9,000 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
36
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 8.3 grams  Standard price $19.15 per gram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 8.3 \text { grams } \\\hline \text { Standard price } & \$ 19.15 \text { per gram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 7,500 grams  Actual cost of materials purchased $141,375 Actual materials used in production 7,100 grams  Actual output 700 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 7,500 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 141,375 \\\hline \text { Actual materials used in production } & 7,100 \text { grams } \\\hline \text { Actual output } & 700 \text { units } \\\hline\end{array}
What was the materials price variance for the month?

A) $2,250 favourable.
B) $7,540 unfavourable.
C) $7,660 unfavourable.
D) $24,317 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
37
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct materials quantity variance for March?

A) $3,500 favourable.
B) $3,500 unfavourable.
C) $52,500 favourable.
D) $52,500 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
38
During March,Younger Company's direct material costs for product T were as follows:
 Actual unit purchase price $6.50 per metre  Standard quantity allowed for actual Production 2,100 metres  Quantity purchased and used for actual Production 2,300 metres  Standard unit price $6.25 per metre \begin{array}{|l|r|}\hline \text { Actual unit purchase price } & \$ 6.50 \text { per metre } \\\hline \text { Standard quantity allowed for actual Production } & 2,100 \text { metres } \\\hline \text { Quantity purchased and used for actual Production } & 2,300 \text { metres } \\\hline \text { Standard unit price } & \$ 6.25 \text { per metre } \\\hline\end{array}
What was Younger's material quantity variance for March?

A) $1,250 unfavourable.
B) $1,250 favourable.
C) $1,300 unfavourable.
D) $1,300 favourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
39
Information on Kennedy Company's direct material costs follows:
 Standard price per kilogram of raw materials $3.60 Actual quantity of raw materials purchased 1,600 kilograms  Standard quantity allowed for actual production 1,450 kilograms  Materials purchase price variance-favourable $240\begin{array}{|l|r|}\hline \text { Standard price per kilogram of raw materials } & \$ 3.60 \\\hline \text { Actual quantity of raw materials purchased } & 1,600 \text { kilograms } \\\hline \text { Standard quantity allowed for actual production } & 1,450 \text { kilograms } \\\hline \text { Materials purchase price variance-favourable } & \$ 240 \\\hline\end{array}
What was the actual purchase price per unit,rounded to the nearest cent?

A) $3.06.
B) $3.11.
C) $3.45.
D) $3.75.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
40
Lab Corp.uses a standard cost system.Direct labour information for Product CER for the month of October follows:
 Standard direct labour rate $6.00 per hour  Actual direct labour rate paid $6.10 per hour  Standard hours allowed for actual production 1,500 hours  Labour efficiency variance-unfavourable $600\begin{array}{|l|r|}\hline \text { Standard direct labour rate } & \$ 6.00 \text { per hour } \\\hline \text { Actual direct labour rate paid } & \$ 6.10 \text { per hour } \\\hline \text { Standard hours allowed for actual production } & 1,500 \text { hours } \\\hline \text { Labour efficiency variance-unfavourable } & \$ 600 \\\hline\end{array}
What were the actual hours worked?

A) 1,400 hours.
B) 1,402 hours.
C) 1,598 hours.
D) 1,600 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
41
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the purchase of direct materials,the general ledger would include what entry to the Materials Price Variance account?

A) $1,500 credit.
B) $1,500 debit.
C) $6,000 credit.
D) $6,000 debit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
42
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the total variable overhead variance for November?

A) $175 unfavourable.
B) $225 favourable.
C) $225 unfavourable.
D) $400 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
43
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct labour efficiency variance for March?

A) $5,500 favourable.
B) $5,500 unfavourable.
C) $5,625 favourable.
D) $5,625 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
44
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the labour rate variance for January?

A) $475 favourable.
B) $475 unfavourable.
C) $585 favourable.
D) $585 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
45
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the use of direct materials in production,the general ledger would include what entry to the Materials Quantity Variance account?

A) $900 debit.
B) $900 credit.
C) $3,600 debit.
D) $3,600 credit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
46
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour rate variance for November?

A) $550 unfavourable.
B) $1,050 unfavourable.
C) $2,150 favourable.
D) $2,150 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
47
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the variable overhead spending variance?

A) $220 favourable.
B) $220 unfavourable.
C) $240 favourable.
D) $240 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
48
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour rate variance?

A) $480 favourable.
B) $480 unfavourable.
C) $440 favourable.
D) $440 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
49
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials price variance?

A) $400 favourable.
B) $400 unfavourable.
C) $600 favourable.
D) $600 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
50
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the variable overhead efficiency variance?

A) $500 favourable.
B) $500 unfavourable.
C) $520 favourable.
D) $520 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
51
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour efficiency variance?

A) $800 favourable.
B) $800 unfavourable.
C) $840 favourable.
D) $840 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
52
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the labour efficiency variance for January? Do not round intermediate calculations.

A) $110 favourable.
B) $130 unfavourable.
C) $350 unfavourable.
D) $475 favourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
53
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials quantity variance for November?

A) $300 unfavourable.
B) $1,200 favourable.
C) $1,200 unfavourable.
D) $1,500 favourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
54
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the total variance for variable overhead for January?

A) $40 favourable.
B) $85 favourable.
C) $100 unfavourable.
D) $125 favourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
55
Bryan Company employs a standard cost system in which direct materials inventory is carried at standard cost. Bryan has established the following standards for the prime costs of one unit of product:
 Standard Quantity  Standard Price  Standard Cost  Direct Materials 6 kilograms $3.50/ kilogram $21.00 Direct Labour 1.3 hours $11.00/ hour $14.30$35.30\begin{array} { | l | r | r | r | } \hline & \text { Standard Quantity } & \text { Standard Price } & \text { Standard Cost } \\\hline \text { Direct Materials } & 6 \text { kilograms } & \$ 3.50 / \text { kilogram } & \$ 21.00 \\\hline \text { Direct Labour } & 1.3 \text { hours } & \$ 11.00 / \text { hour } & \$ 14.30 \\\hline & & & \$ 35.30 \\\hline\end{array} During March, Bryan purchased 165,000 kilograms of direct materials at a total cost of $585,750. The total factory wages for March were $400,000, 90 percent of which were for direct labour. Bryan manufactured 25,000 units of product during March, using 151,000 kilograms of direct materials and 32,000 direct labour hours.




-What was the direct labour rate variance for March?

A) $8,000 favourable.
B) $8,000 unfavourable.
C) $48,000 favourable.
D) $48,000 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
56
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the materials quantity variance for January?

A) $300 favourable.
B) $300 unfavourable.
C) $750 favourable.
D) $800 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
57
Cole Laboratories makes and sells a lawn fertilizer called Fastgro. The company has developed standard costs for one bag of Fastgro as follows:
 Standard Quantity  Standard Cost per Bag  Direct Materials 20 kilograms $8.00 Direct Labour 0.1 hours 1.10 Variable Manufacturing Overhead 0.1 hours .40\begin{array}{|l|r|r|}\hline & \text { Standard Quantity } & \text { Standard Cost per Bag } \\\hline \text { Direct Materials } & 20 \text { kilograms } & \$ 8.00 \\\hline \text { Direct Labour } & 0.1 \text { hours } & 1.10 \\\hline \text { Variable Manufacturing Overhead } & 0.1 \text { hours } & .40\\\hline \end{array}
The company had no beginning inventories of any kind on January 1. Variable manufacturing overhead is applied to production on the basis of direct labour hours. The results of the company's operations during January are as follows:
 Production of Fastgro: 4,000 bags  Direct Materials Purchased 85,000 kilograms at a cost of $32,300 Direct Labour Used 390 hours at a cost of $4,875 Variable Manufacturing Overhead Incurred $1,475 Inventory of Direct Materials on January 313,000 kilograms \begin{array}{|l|r|}\hline \text { Production of Fastgro: } & 4,000 \text { bags } \\\hline \text { Direct Materials Purchased } & 85,000 \text { kilograms at a cost of } \$ 32,300 \\\hline \text { Direct Labour Used } & 390 \text { hours at a cost of } \$ 4,875 \\\hline \text { Variable Manufacturing Overhead Incurred } & \$ 1,475 \\\hline \text { Inventory of Direct Materials on January } 31 & 3,000 \text { kilograms } \\\hline\end{array}

-What was the materials price variance for January?

A) $1,300 unfavourable.
B) $1,640 favourable.
C) $1,640 unfavourable.
D) $1,700 favourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
58
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the labour efficiency variance for November?

A) $550 unfavourable.
B) $1,050 unfavourable.
C) $1,600 favourable.
D) $1,600 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
59
The Albright Company uses standard costing and has established the following standards ff its single product:
 Direct Materials 2 litres at $3 per litre  Direct Labour 0.5 hours at $8 per hour  Variable Manufacturing Overhead 0.5 hours at $2 per hour \begin{array}{|l|r|}\hline \text { Direct Materials } & 2 \text { litres at \$3 per litre } \\\hline \text { Direct Labour } & 0.5 \text { hours at \$8 per hour } \\\hline \text { Variable Manufacturing Overhead } & 0.5 \text { hours at \$2 per hour } \\\hline\end{array}
During November, the company made 4,000 units and incurred the following costs:
 Direct Materials Purchased 8,100 litres at $3.10 per litre  Direct Materials Used 7,600 litres  Direct Labour Used 2,200 hours at $8.25 per hour  Actual Variable Manufacturing Overhead $4,175\begin{array}{|l|r|}\hline \text { Direct Materials Purchased } & 8,100 \text { litres at } \$ 3.10 \text { per litre } \\\hline \text { Direct Materials Used } & 7,600 \text { litres } \\\hline \text { Direct Labour Used } & 2,200 \text { hours at } \$ 8.25 \text { per hour } \\\hline \text { Actual Variable Manufacturing Overhead } & \$ 4,175 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials price variance for November?

A) $810 favourable.
B) $810 unfavourable.
C) $2,310 favourable.
D) $2,310 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
60
 The Litton Company has established standards as follows: \text { The Litton Company has established standards as follows: }
 Direct Material 3kgs@@4/kg.=$12 per unit  Direct Labour 2hrs@$8/hr.=$16 per unit  Variable Manufacturing Overhead 2 hrs. @ $5/hr.=$10 per unit \begin{array}{|l|r|}\hline \text { Direct Material } & 3 \mathrm{kgs} @ @ 4 / \mathrm{kg} .=\$ 12 \text { per unit } \\\hline \text { Direct Labour } & 2 \mathrm{hrs} @ \$ 8 / \mathrm{hr} .=\$ 16 \text { per unit } \\\hline \text { Variable Manufacturing Overhead } & 2 \text { hrs. @ } \$ 5 / \mathrm{hr} .=\$ 10 \text { per unit } \\\hline\end{array}
Actual production figures for the past year are given below. The company records the materials price variance when materials are purchased.
 Units Produced 600 Direct Material Used 2,000kgs. Direct Material Purcahsed (3,000 kgs.) $11,400 Direct Labour Cost (1,100 hrs. )$9,240 Variable Manufacturing Overhead Cost Incurred $5,720\begin{array}{|l|r|}\hline \text { Units Produced } & 600 \\\hline \text { Direct Material Used } & 2,000 \mathrm{kgs} . \\\hline \text { Direct Material Purcahsed (3,000 kgs.) } & \$ 11,400 \\\hline \text { Direct Labour Cost }(1,100 \text { hrs. }) & \$ 9,240 \\\hline \text { Variable Manufacturing Overhead Cost Incurred } & \$ 5,720 \\\hline\end{array}
The company applies variable manufacturing overhead to products on the basis of direct labour hours.

-What was the materials quantity variance?

A) $760 favourable.
B) $760 unfavourable.
C) $800 unfavourable.
D) $4,000 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
61
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 4.4 kilograms  Standard price $13.20 per kilogram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 4.4 \text { kilograms } \\\hline \text { Standard price } & \$ 13.20 \text { per kilogram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 4,800 kilograms  Actual cost of materials purchased $62,880 Actual materials used in production 4,300 kilograms  Actual output 70 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 4,800 \text { kilograms } \\\hline \text { Actual cost of materials purchased } & \$ 62,880 \\\hline \text { Actual materials used in production } & 4,300 \text { kilograms } \\\hline \text { Actual output } & 70 \text { units } \\\hline\end{array}

-What was the materials price variance for the month?

A) $430 favourable.
B) $430 unfavourable.
C) $480 favourable.
D) $480 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
62
The following standards for variable manufacturing overhead have been established for a company that makes only one product:

 Standard hours per unit of output 1.6 hours  Standard variable overhead rate $11.55 per hour  The following data pertain to operations for the last month:  Actual hours 4,900 hours  Actual total variable overhead cost $58,310 Actual output 3,000 units \begin{array}{l}\begin{array} { | l | r | } \hline \text { Standard hours per unit of output } & 1.6 \text { hours } \\\hline \text { Standard variable overhead rate } & \$ 11.55 \text { per hour } \\\hline\end{array}\\\text { The following data pertain to operations for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours } & 4,900 \text { hours } \\\hline \text { Actual total variable overhead cost } & \$ 58,310 \\\hline \text { Actual output } & 3,000 \text { units } \\\hline\end{array}\end{array}

-What was the variable overhead spending variance for the month?

A) $1,715 favourable.
B) $1,715 unfavourable.
C) $2,870 favourable.
D) $2,870 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
63
The following materials standards have been established for a particular product:
 Standard quantity per unit of output 4.4 kilograms  Standard price $13.20 per kilogram \begin{array}{|l|r|}\hline \text { Standard quantity per unit of output } & 4.4 \text { kilograms } \\\hline \text { Standard price } & \$ 13.20 \text { per kilogram } \\\hline\end{array}
The following data pertain to operations concerning the product for the last month:
 Actual materials purchased 4,800 kilograms  Actual cost of materials purchased $62,880 Actual materials used in production 4,300 kilograms  Actual output 70 units \begin{array}{|l|r|}\hline \text { Actual materials purchased } & 4,800 \text { kilograms } \\\hline \text { Actual cost of materials purchased } & \$ 62,880 \\\hline \text { Actual materials used in production } & 4,300 \text { kilograms } \\\hline \text { Actual output } & 70 \text { units } \\\hline\end{array}

-What was the materials quantity variance for the month?

A) $6,550 unfavourable.
B) $6,600 unfavourable.
C) $15,982 unfavourable.
D) $16,104 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
64
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the variable overhead spending variance for May?

A) $1,710 favourable.
B) $1,710 unfavourable.
C) $2,290 favourable.
D) $2,290 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
65
 The following labour standards have been established for a particular product:  Standard labour hours per unit of output 7.5 hours  Standard labour rate $15.25 per hour \begin{array}{l}\text { The following labour standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard labour hours per unit of output } & 7.5 \text { hours } \\\hline \text { Standard labour rate } & \$ 15.25 \text { per hour } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual hours worked 9,600 hours  Actual total labour cost $144,480 Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours worked } & 9,600 \text { hours } \\\hline \text { Actual total labour cost } & \$ 144,480 \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the labour efficiency variance for the month?

A) $7,230 favourable.
B) $7,230 unfavourable.
C) $9,030 unfavourable.
D) $9,150 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
66
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the total standard cost for variable overhead for May?

A) $40,000.
B) $50,000.
C) $56,000.
D) $60,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
67
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the materials quantity variance?

A) $1,120 favourable.
B) $1,120 unfavourable.
C) $1,820 favourable.
D) $1,820 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
68
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 6.8 metres  Standard price $17.10 per metre \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 6.8 \text { metres } \\\hline \text { Standard price } & \$ 17.10 \text { per metre } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 9,000 metres  Actual cost of materials purchased $156,600 Actual materials used in production 8,500 metres  Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 9,000 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 156,600 \\\hline \text { Actual materials used in production } & 8,500 \text { metres } \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the materials price variance for the month?

A) $2,550 favourable.
B) $2,550 unfavourable.
C) $2,700 favourable.
D) $2,700 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
69
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 1.9 grams  Standard price $18.00 per gram \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.9 \text { grams } \\\hline \text { Standard price } & \$ 18.00 \text { per gram } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 5,800 grams  Actual cost of materials purchased $108,460 Actual materials used in production 5,200 grams  Actual output 2,700 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 108,460 \\\hline \text { Actual materials used in production } & 5,200 \text { grams } \\\hline \text { Actual output } & 2,700 \text { units } \\\hline\end{array}\end{array}

-What was the materials quantity variance for the month?

A) $1,260 unfavourable.
B) $1,309 unfavourable.
C) $10,880 unfavourable.
D) $11,220 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
70
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the incurrence of direct labour costs and its use in production,the general ledger would include what entry to the Labour Efficiency Variance account?

A) $240 debit.
B) $480 credit.
C) $1,200 debit.
D) $1,200 credit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
71
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the labour rate variance?

A) $1,125 favourable.
B) $1,125 unfavourable.
C) $2,500 favourable.
D) $2,500 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
72
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 1.9 grams  Standard price $18.00 per gram \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 1.9 \text { grams } \\\hline \text { Standard price } & \$ 18.00 \text { per gram } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 5,800 grams  Actual cost of materials purchased $108,460 Actual materials used in production 5,200 grams  Actual output 2,700 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 5,800 \text { grams } \\\hline \text { Actual cost of materials purchased } & \$ 108,460 \\\hline \text { Actual materials used in production } & 5,200 \text { grams } \\\hline \text { Actual output } & 2,700 \text { units } \\\hline\end{array}\end{array}

-What was the materials price variance for the month?

A) $3,640 favourable.
B) $3,640 unfavourable.
C) $4,060 favourable.
D) $4,060 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
73
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the materials price variance?

A) $420 favourable.
B) $420 unfavourable.
C) $700 favourable.
D) $700 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
74
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What are the standard hours allowed to make one unit of finished product?

A) 1.0 hours.
B) 1.2 hours.
C) 1.5 hours.
D) 2.0 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
75
The Dexon Company makes and sells a single product, called a Mip, and employs a standard costing system. The following standards have been established for one unit of Mip:  Standard Quantity or Hours  Standard Cost per Mip  Direct Materials 6 board metre $9.00 Direct Labour 0.8 hours $9.60\begin{array}{|l|r|r|}\hline & \text { Standard Quantity or Hours } & \text { Standard Cost per Mip } \\\hline \text { Direct Materials } & 6 \text { board metre } & \$ 9.00 \\\hline \text { Direct Labour } & 0.8 \text { hours } & \$ 9.60 \\\hline\end{array}
There were no inventories of any kind on August 1. During August, the following events occurred:
Purchased 15,000 board metres at the total cost of $24,000\$ 24,000 .
Used 12,000 board metres to produce 2,100 Mips.
Used 1,700 hours of direct labour time at a total cost of $20,060\$ 20,060 .

- To record the incurrence of direct labour cost and its use in production,the general ledger would include what entry to the Labour Rate Variance account?

A) $240 credit.
B) $240 debit.
C) $340 debit.
D) $340 credit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
76
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the actual direct labour rate for May in dollars per hour?

A) $11.50.
B) $11.75.
C) $12.00.
D) $12.50.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
77
 The following materials standards have been established for a particular product:  Standard quantity per unit of output 6.8 metres  Standard price $17.10 per metre \begin{array}{l}\text { The following materials standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard quantity per unit of output } & 6.8 \text { metres } \\\hline \text { Standard price } & \$ 17.10 \text { per metre } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual materials purchased 9,000 metres  Actual cost of materials purchased $156,600 Actual materials used in production 8,500 metres  Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual materials purchased } & 9,000 \text { metres } \\\hline \text { Actual cost of materials purchased } & \$ 156,600 \\\hline \text { Actual materials used in production } & 8,500 \text { metres } \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the materials quantity variance for the month?

A) $5,814 unfavourable.
B) $5,916 unfavourable.
C) $8,550 unfavourable.
D) $8,700 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
78
The Clark Company makes a single product and uses standard costing. Some data concerning this product for the month of May follow:
 Labour rate variance $7,000 favourable  Labour efficiency variance $12,000 favourable  Variable overhead efficiency variance $4,000 favourable  Number of units produced 10,000 Standard labour rate per direct labour hour $12 Standard variable overhead rate per direct labour hour $4 Actual labour hours used 14,000 Actual variable manufacturing overhead costs $58,290\begin{array} { | l | r | } \hline \text { Labour rate variance } & \$ 7,000 \text { favourable } \\\hline \text { Labour efficiency variance } & \$ 12,000 \text { favourable } \\\hline \text { Variable overhead efficiency variance } & \$ 4,000 \text { favourable } \\\hline \text { Number of units produced } & 10,000 \\\hline \text { Standard labour rate per direct labour hour } & \$ 12 \\\hline \text { Standard variable overhead rate per direct labour hour } & \$ 4 \\\hline \text { Actual labour hours used } & 14,000 \\\hline \text { Actual variable manufacturing overhead costs } & \$ 58,290 \\\hline\end{array}



-What was the total standard cost for direct labour for May?

A) $120,000.
B) $161,000.
C) $168,000.
D) $180,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
79
The Alpha Company produces toys for national distribution. Standards for a particular toy are:

Materials: 12 grams per unit at 56?per gram.
Labour: 2 hours per unit at $2.75 per hour.

During the month of December, the company produced 1,000 units. Information for the month follows:

Materials: 14,000 grams were purchased and used at a total cost of $7,140.
Labour: 2,500 hours worked at a total cost of $8,000.



-What was the labour efficiency variance?

A) $1,375 favourable.
B) $1,375 unfavourable.
C) $1,600 favourable.
D) $1,600 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
80
 The following labour standards have been established for a particular product:  Standard labour hours per unit of output 7.5 hours  Standard labour rate $15.25 per hour \begin{array}{l}\text { The following labour standards have been established for a particular product: }\\\begin{array} { | l | r | } \hline \text { Standard labour hours per unit of output } & 7.5 \text { hours } \\\hline \text { Standard labour rate } & \$ 15.25 \text { per hour } \\\hline\end{array}\end{array}
 The following data pertain to operations concerning the product for the last month:  Actual hours worked 9,600 hours  Actual total labour cost $144,480 Actual output 1,200 units \begin{array}{l}\text { The following data pertain to operations concerning the product for the last month: }\\\begin{array} { | l | r | } \hline \text { Actual hours worked } & 9,600 \text { hours } \\\hline \text { Actual total labour cost } & \$ 144,480 \\\hline \text { Actual output } & 1,200 \text { units } \\\hline\end{array}\end{array}

-What was the labour rate variance for the month?

A) $240 favourable.
B) $240 unfavourable.
C) $1,920 favourable.
D) $1,920 unfavourable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 234 في هذه المجموعة.