Deck 15: Developing Products and Services

ملء الشاشة (f)
exit full mode
سؤال
Which of these is NOT commonly cited as a motivation to produce new products or services?

A)to exploit existing capabilities
B)to fully utilize the R&D function
C)to provide benefits to the firm
D)to block out competitors
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
How might a company benefit from its own new product?

A)by increasing product complexity
B)by increasing cost of components
C)by decreasing component commonality with their other offerings
D)by decreasing assembly time
سؤال
Provide an example from industry of a product or service that was duplicated by a competitor. Was this considered successful from the perspective of the first company? The competitor?
سؤال
New products or services provide benefits to the firm.
سؤال
Which of the following functions is NOT typically involved in a cross-functional product development effort?

A)marketing
B)operations
C)finance
D)All of these functions are involved.
سؤال
The ease with which parts can be replaced or evaluated is:

A)repeatability.
B)serviceability.
C)testability.
D)functionality.
سؤال
A revision to a drawing or design released by designers to correct a part is called a(n):

A)engineering change.
B)part mod.
C)tweak.
D)lock-in.
سؤال
________ refers to the ease with which critical components or functions can be tested during production.
سؤال
If a company is capable of delivering the service over and over again in the volumes needed it is said to have a high level of scalability.
سؤال
Product design refers to the characteristics or features of a product or service that determine its ability to meet the needs of the user.
سؤال
The unexpected expenses associated with overhead and engineering change notices are ________.
سؤال
An airline specifies a wider monitor for installation on their overseas flights. The airframe manufacturer will accommodate this order by issuing an engineering change.
سؤال
A box of cake mix can be the basis for a tasty cake even if the novice baker adds olive oil instead of vegetable oil and forgets to set a timer. The cake recipe has probably been developed using:

A)value analysis.
B)the development funnel.
C)robust design.
D)Design for the Environment.
سؤال
All product development efforts directly benefit the consumer.
سؤال
The ease with which parts can be replaced, checked or evaluated is testability.
سؤال
Robust design is the design of products to be less sensitive to manufacturing variation and misuse.
سؤال
The operations function is more tightly coupled with new service designs than with new product designs because the new service designs are often the operations process itself.
سؤال
What are the four reasons that a company might develop new products and services?
سؤال
What are robust design, testability, and serviceability and how are they related?
سؤال
New product designs are quickly copied so there is virtually no advantage to new products.
سؤال
Which of the following occurs during a sequential development process?

A)Activities in different development stages overlap with one another.
B)Constant communication is required between participants at various stages in the development effort.
C)Prototypes can begin before product characteristics are finalized.
D)The development funnel process takes place.
سؤال
The company begins to address the feasibility of a product or service in the ________ phase of the development process.
سؤال
What is the operations and supply chain function responsible for in each of the product development phases?
سؤال
In high tech firms, the group most likely to be taking the lead in being responsible for the success of a product development process is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
سؤال
Customers are often brought in to lend their thoughts during the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
سؤال
The feasibility of a product or service is evaluated during the:

A)planning phase.
B)evaluation phase.
C)launch phase.
D)concept development phase.
سؤال
In most firms, the group that addresses the questions of who buys the company's product and what they are likely to pay is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
سؤال
Products developed using a concurrent engineering process can be developed more quickly than those using a sequential development process.
سؤال
The development of specifications for the manufacturing equipment needed to make the product is the responsibility of what function?

A)engineering
B)marketing
C)accounting
D)purchasing
سؤال
The operations and supply chain functions develop detailed process maps of the operations and supply chain flows and test new processes in the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
سؤال
The concept development phase addresses the feasibility of a product or service.
سؤال
The ________ process occurs because many ideas are considered at the concept development phase but few ideas make it to the commercial development and launch phases.
سؤال
What are the phases of the product development process and what takes place in each?
سؤال
In most firms, the group that addresses the cost and performance information that companies need to make good business decisions is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting
سؤال
In most firms, the group that tracks forecasts of prices and long term supplies of key materials is:

A)suppliers.
B)marketing.
C)purchasing.
D)accounting/finance.
سؤال
The development funnel demonstrates that while initial conceptual development takes a long time, product design can progress quickly through the final phases of development.
سؤال
The process of preapproving suppliers for specific commodities or parts is known as:

A)screening.
B)presourcing.
C)presaging.
D)certifying.
سؤال
________ allows activities in different development stages to overlap with one another.
سؤال
In the launch phase of product development it is typically the marketing department's responsibility to fill the downstream supply chain.
سؤال
In the planning phase, the operations and supply chain function develops initial cost estimates and identifies key supply chain partners.
سؤال
The DMADV process for improving product and service designs is rooted in what methodology?

A)Project management
B)Optimization
C)Lean
D)Six Sigma
سؤال
ABC Corporation knew that XYZ Industries could provide the casings needed for their new line of typewriters like they had for the previous generations of typewriters. Therefore, they designated XYZ as the supplier for that key element, a practice known as ________.
سؤال
What role does the purchasing function play in product and service design?
سؤال
What role does the finance function play in product and service design?
سؤال
Black box design works best when:

A)the manufacturer is the expert.
B)the supplier is the expert.
C)the design is innovative.
D)the product is simply being redesigned, not newly developed.
سؤال
Your supplier works closely with you to jointly design a product in:

A)gray box design.
B)black box design.
C)white box design.
D)red box design.
سؤال
The left side of the quality function deployment house of quality contains:

A)product characteristics.
B)relationships between product characteristics.
C)customer requirements.
D)product specifications.
سؤال
What does the M represent in the acronym DMADV?

A)Metrics
B)Measure
C)Monitor
D)Market
سؤال
Which of the following acronyms is a process that involves the systematic consideration of manufacturing issues in the design and development process?

A)DFE.
B)CAM.
C)QFD.
D)DFM.
سؤال
What are the implications of an empty column (i.e., one with no check marks or x's)in the main body of the matrix of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy among the product characteristics.
C)Product characteristics are potentially unnecessary.
D)Customer requirements are potentially not being met by the product.
سؤال
What are the implications of an empty row (i.e., one with no check marks or x's)in the roof portion of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy for that product characteristic with other product characteristics.
C)Product characteristics are potentially superfluous.
D)Customer requirements are potentially not being met by the product.
سؤال
What are the implications of an empty row (i.e., one with no check marks or x's)in the main body of the matrix of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy among the product characteristics.
C)Product characteristics are potentially superfluous.
D)Customer requirements are potentially not being met by the product.
سؤال
Presourcing is the process of preapproving suppliers for specific commodities or parts.
سؤال
In ________, the supplier works with the customer to jointly design the product.
سؤال
The finance group typically help in new product development by:

A)determining how much it will cost.
B)acquiring the needed capital to develop a product or service.
C)locating reliable and solvent suppliers.
D)create an identity for the product.
سؤال
The DMADV process relies on:

A)benchmarking competitors' products.
B)intuitive design championed by contractors external to the company.
C)rigorous data analysis by teams of black belts, green belts and champions.
D)black box design or gray box design.
سؤال
What does the A represent in the acronym DMADV?

A)Analyze
B)Assign
C)Advise
D)Agenda
سؤال
Which of these matrix combinations is a correct pairing for quality function deployment?

A)customer requirements and process specifications
B)product characteristics and process characteristics
C)product specifications and process characteristics
D)process specifications and product specifications
سؤال
What role do supply chain partners play in product and service design?
سؤال
An example of black box design would be a producer of automotive brakes working at the design table with an automobile manufacturer through all phases of product development.
سؤال
The oil could be changed at the push of a button without dirtying your hands or peering underneath the new Chrysler Crepitus. This is an important achievement in their Design for Six Sigma program.
سؤال
A process that involves examining all elements of a component, assembly, end product, or service to make sure it fulfills its intended function at the lowest total cost is:

A)target costing.
B)design to cost.
C)value analysis.
D)examination costing.
سؤال
Parts standardization typically does NOT:

A)reduce the time to develop a new product.
B)reduce the cost of final products.
C)reduce the profit of a new product.
D)reduce the cost of developing new products.
سؤال
The initial generation of DeLorean boasted of its stainless steel skin, gull-wing doors, and 273 sizes of fasteners. The engineers lowered the product's overall inventory level and product complexity by settling on only 12 different sizes of fasteners thanks to their ________ program.
سؤال
The roof of the quality function deployment house of quality displays synergies among the ________.
سؤال
A modular architecture improves:

A)design for Six Sigma and design for the environment.
B)design for manufacturability and design for susceptibility.
C)design for maintainability and design for the environment.
D)design for Six Sigma and design for manufacturability.
سؤال
Companies can reduce the time and cost of developing new products and reduce the cost of final products by using parts standardization.
سؤال
Quality function deployment can be used to show linkages between customer requirements and product characteristics.
سؤال
________ is a product design in which each functional element maps into its own physical chunk.
سؤال
The relationship between product functionality and product cost is quantified as ________.
سؤال
Safety and health issues over the product's projected life cycle are addressed by the ________ approach.
سؤال
No poultry farmer in his right mind was going to pay more than $1 for a rooster helmet, so the ________ program for Rooster Boosters set that as the goal for their new product.
سؤال
Which of these features would contribute to a design for the environment (DFE)program?

A)using one model of fan motor across the entire product line that uses fan motors
B)using more reliable parts that are in areas that are difficult to access
C)standardizing on two or three fasteners where there were ten different kinds before
D)using recyclable parts whenever possible
سؤال
The output from the first QFD matrix that feeds into the second QFD matrix is the product characteristics information.
سؤال
Target costing is the process of designing a process to meet a specific cost objective.
سؤال
The fast food restaurant switched from wrapping their hamburgers in Styrofoam containers, which had a half-life of several thousand years, to wrapping them in a thin film of kelp and plankton, which could be used as a healthy snack for fish. This move was part of a broad approach entitled a design for ________ initiative.
سؤال
CAD systems allow engineers to develop, modify, share, and test designs in a virtual world.
سؤال
The roof of the house of quality displays conflicts between the voice of the customer and product characteristics and permits designers to rapidly identify trade-offs.
سؤال
Value may be increased by simultaneously increasing cost and decreasing functionality.
سؤال
Using less packaging or biodegradable batteries would be components of a design for manufacturability initiative.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/88
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Developing Products and Services
1
Which of these is NOT commonly cited as a motivation to produce new products or services?

A)to exploit existing capabilities
B)to fully utilize the R&D function
C)to provide benefits to the firm
D)to block out competitors
to fully utilize the R&D function
2
How might a company benefit from its own new product?

A)by increasing product complexity
B)by increasing cost of components
C)by decreasing component commonality with their other offerings
D)by decreasing assembly time
by decreasing assembly time
3
Provide an example from industry of a product or service that was duplicated by a competitor. Was this considered successful from the perspective of the first company? The competitor?
Examples and opinions will vary.
4
New products or services provide benefits to the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following functions is NOT typically involved in a cross-functional product development effort?

A)marketing
B)operations
C)finance
D)All of these functions are involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
6
The ease with which parts can be replaced or evaluated is:

A)repeatability.
B)serviceability.
C)testability.
D)functionality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
7
A revision to a drawing or design released by designers to correct a part is called a(n):

A)engineering change.
B)part mod.
C)tweak.
D)lock-in.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
8
________ refers to the ease with which critical components or functions can be tested during production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
9
If a company is capable of delivering the service over and over again in the volumes needed it is said to have a high level of scalability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
10
Product design refers to the characteristics or features of a product or service that determine its ability to meet the needs of the user.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
11
The unexpected expenses associated with overhead and engineering change notices are ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
12
An airline specifies a wider monitor for installation on their overseas flights. The airframe manufacturer will accommodate this order by issuing an engineering change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
13
A box of cake mix can be the basis for a tasty cake even if the novice baker adds olive oil instead of vegetable oil and forgets to set a timer. The cake recipe has probably been developed using:

A)value analysis.
B)the development funnel.
C)robust design.
D)Design for the Environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
14
All product development efforts directly benefit the consumer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ease with which parts can be replaced, checked or evaluated is testability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
16
Robust design is the design of products to be less sensitive to manufacturing variation and misuse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
17
The operations function is more tightly coupled with new service designs than with new product designs because the new service designs are often the operations process itself.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
18
What are the four reasons that a company might develop new products and services?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
19
What are robust design, testability, and serviceability and how are they related?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
20
New product designs are quickly copied so there is virtually no advantage to new products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following occurs during a sequential development process?

A)Activities in different development stages overlap with one another.
B)Constant communication is required between participants at various stages in the development effort.
C)Prototypes can begin before product characteristics are finalized.
D)The development funnel process takes place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
22
The company begins to address the feasibility of a product or service in the ________ phase of the development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
23
What is the operations and supply chain function responsible for in each of the product development phases?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
24
In high tech firms, the group most likely to be taking the lead in being responsible for the success of a product development process is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
25
Customers are often brought in to lend their thoughts during the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
26
The feasibility of a product or service is evaluated during the:

A)planning phase.
B)evaluation phase.
C)launch phase.
D)concept development phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
27
In most firms, the group that addresses the questions of who buys the company's product and what they are likely to pay is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
28
Products developed using a concurrent engineering process can be developed more quickly than those using a sequential development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
29
The development of specifications for the manufacturing equipment needed to make the product is the responsibility of what function?

A)engineering
B)marketing
C)accounting
D)purchasing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
30
The operations and supply chain functions develop detailed process maps of the operations and supply chain flows and test new processes in the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
31
The concept development phase addresses the feasibility of a product or service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
32
The ________ process occurs because many ideas are considered at the concept development phase but few ideas make it to the commercial development and launch phases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
33
What are the phases of the product development process and what takes place in each?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
34
In most firms, the group that addresses the cost and performance information that companies need to make good business decisions is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
35
In most firms, the group that tracks forecasts of prices and long term supplies of key materials is:

A)suppliers.
B)marketing.
C)purchasing.
D)accounting/finance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
36
The development funnel demonstrates that while initial conceptual development takes a long time, product design can progress quickly through the final phases of development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
37
The process of preapproving suppliers for specific commodities or parts is known as:

A)screening.
B)presourcing.
C)presaging.
D)certifying.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
38
________ allows activities in different development stages to overlap with one another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
39
In the launch phase of product development it is typically the marketing department's responsibility to fill the downstream supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
40
In the planning phase, the operations and supply chain function develops initial cost estimates and identifies key supply chain partners.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
41
The DMADV process for improving product and service designs is rooted in what methodology?

A)Project management
B)Optimization
C)Lean
D)Six Sigma
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
42
ABC Corporation knew that XYZ Industries could provide the casings needed for their new line of typewriters like they had for the previous generations of typewriters. Therefore, they designated XYZ as the supplier for that key element, a practice known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
43
What role does the purchasing function play in product and service design?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
44
What role does the finance function play in product and service design?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
45
Black box design works best when:

A)the manufacturer is the expert.
B)the supplier is the expert.
C)the design is innovative.
D)the product is simply being redesigned, not newly developed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
46
Your supplier works closely with you to jointly design a product in:

A)gray box design.
B)black box design.
C)white box design.
D)red box design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
47
The left side of the quality function deployment house of quality contains:

A)product characteristics.
B)relationships between product characteristics.
C)customer requirements.
D)product specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
48
What does the M represent in the acronym DMADV?

A)Metrics
B)Measure
C)Monitor
D)Market
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following acronyms is a process that involves the systematic consideration of manufacturing issues in the design and development process?

A)DFE.
B)CAM.
C)QFD.
D)DFM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
50
What are the implications of an empty column (i.e., one with no check marks or x's)in the main body of the matrix of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy among the product characteristics.
C)Product characteristics are potentially unnecessary.
D)Customer requirements are potentially not being met by the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
51
What are the implications of an empty row (i.e., one with no check marks or x's)in the roof portion of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy for that product characteristic with other product characteristics.
C)Product characteristics are potentially superfluous.
D)Customer requirements are potentially not being met by the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
52
What are the implications of an empty row (i.e., one with no check marks or x's)in the main body of the matrix of the house of quality?

A)Nothing, it's just a sparse row.
B)There is no synergy among the product characteristics.
C)Product characteristics are potentially superfluous.
D)Customer requirements are potentially not being met by the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
53
Presourcing is the process of preapproving suppliers for specific commodities or parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
54
In ________, the supplier works with the customer to jointly design the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
55
The finance group typically help in new product development by:

A)determining how much it will cost.
B)acquiring the needed capital to develop a product or service.
C)locating reliable and solvent suppliers.
D)create an identity for the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
56
The DMADV process relies on:

A)benchmarking competitors' products.
B)intuitive design championed by contractors external to the company.
C)rigorous data analysis by teams of black belts, green belts and champions.
D)black box design or gray box design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
57
What does the A represent in the acronym DMADV?

A)Analyze
B)Assign
C)Advise
D)Agenda
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of these matrix combinations is a correct pairing for quality function deployment?

A)customer requirements and process specifications
B)product characteristics and process characteristics
C)product specifications and process characteristics
D)process specifications and product specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
59
What role do supply chain partners play in product and service design?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
60
An example of black box design would be a producer of automotive brakes working at the design table with an automobile manufacturer through all phases of product development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
61
The oil could be changed at the push of a button without dirtying your hands or peering underneath the new Chrysler Crepitus. This is an important achievement in their Design for Six Sigma program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
62
A process that involves examining all elements of a component, assembly, end product, or service to make sure it fulfills its intended function at the lowest total cost is:

A)target costing.
B)design to cost.
C)value analysis.
D)examination costing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
63
Parts standardization typically does NOT:

A)reduce the time to develop a new product.
B)reduce the cost of final products.
C)reduce the profit of a new product.
D)reduce the cost of developing new products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
64
The initial generation of DeLorean boasted of its stainless steel skin, gull-wing doors, and 273 sizes of fasteners. The engineers lowered the product's overall inventory level and product complexity by settling on only 12 different sizes of fasteners thanks to their ________ program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
65
The roof of the quality function deployment house of quality displays synergies among the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
66
A modular architecture improves:

A)design for Six Sigma and design for the environment.
B)design for manufacturability and design for susceptibility.
C)design for maintainability and design for the environment.
D)design for Six Sigma and design for manufacturability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
67
Companies can reduce the time and cost of developing new products and reduce the cost of final products by using parts standardization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
68
Quality function deployment can be used to show linkages between customer requirements and product characteristics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
69
________ is a product design in which each functional element maps into its own physical chunk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
70
The relationship between product functionality and product cost is quantified as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
71
Safety and health issues over the product's projected life cycle are addressed by the ________ approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
72
No poultry farmer in his right mind was going to pay more than $1 for a rooster helmet, so the ________ program for Rooster Boosters set that as the goal for their new product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of these features would contribute to a design for the environment (DFE)program?

A)using one model of fan motor across the entire product line that uses fan motors
B)using more reliable parts that are in areas that are difficult to access
C)standardizing on two or three fasteners where there were ten different kinds before
D)using recyclable parts whenever possible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
74
The output from the first QFD matrix that feeds into the second QFD matrix is the product characteristics information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
75
Target costing is the process of designing a process to meet a specific cost objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
76
The fast food restaurant switched from wrapping their hamburgers in Styrofoam containers, which had a half-life of several thousand years, to wrapping them in a thin film of kelp and plankton, which could be used as a healthy snack for fish. This move was part of a broad approach entitled a design for ________ initiative.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
77
CAD systems allow engineers to develop, modify, share, and test designs in a virtual world.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
78
The roof of the house of quality displays conflicts between the voice of the customer and product characteristics and permits designers to rapidly identify trade-offs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
79
Value may be increased by simultaneously increasing cost and decreasing functionality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
80
Using less packaging or biodegradable batteries would be components of a design for manufacturability initiative.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 88 في هذه المجموعة.