Deck 3: Process Choice and Layout Decisions in Manufacturing and Services

ملء الشاشة (f)
exit full mode
سؤال
A supply chain can have ________ manufacturing processes linked together across multiple partners.

A)only one type of
B)at the most two different
C)three or fewer different types of
D)four different types of
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A cellular layout is another name for a functional layout.
سؤال
A manufacturing process decision affects:

A)the type of workforce needed.
B)the type of equipment needed.
C)the type of products that can be made.
D)All of the above are correct.
سؤال
Batch processing is less flexible than a production line and less efficient than a job shop.
سؤال
A customer service function at an insurance firm that handles claims based on the first letter of the customer's last name is an example of applying group technology to a service operation.
سؤال
The Devon Tower graces the Oklahoma City skyline and is officially the tallest building in the state. The manufacturing process used to produce this jewel is most likely:

A)a fixed-position layout.
B)a batch manufacturing process.
C)a hybrid process.
D)a job shop.
سؤال
________ gets its name from the fact that items are moved through the different manufacturing steps in groups.
سؤال
Highly automated batch processes that can reduce the cost of making similar groups of products are:

A)functional layouts.
B)flexible manufacturing systems.
C)make-to-stock.
D)adjacent processes.
سؤال
The product-process matrix illustrates that low volume, one-of-a-kind products are ideally suited to a job shop process.
سؤال
In a supply chain, the output from an upstream process is linked to the adjacent downstream process.
سؤال
An advantage of a production line process is:

A)higher volume of output needed to justify the investment.
B)greater degree of flexibility of the process.
C)lower per unit cost of items produced on the line.
D)higher range of output typically produced on such a process.
سؤال
Which of these manufacturing processes involves products that cannot be broken into discrete units?

A)job shop
B)batch
C)production line
D)continuous flow
سؤال
A sporting apparel manufacturer that produces t-shirts to commemorate significant athletic achievements for proud students and alumni probably uses:

A)a fixed position layout.
B)batch manufacturing.
C)a continuous flow process.
D)a production line.
سؤال
The time between completions of successive units on a production line is called:

A)cycle time.
B)takt time.
C)elapsed time.
D)work time.
سؤال
A(n)________ is a highly automated batch process that can reduce the cost of making groups of similar products.
سؤال
The manufacturing process used to make a wide variety of highly customized products in quantities as small as one is a:

A)production line.
B)continuous flow process.
C)job shop.
D)batch manufacturing.
سؤال
A job shop manufacturing process is better suited to make a variety of products than a continuous flow process.
سؤال
A batch manufacturing process may be linked only to another batch manufacturing process in a supply chain.
سؤال
A product-based layout arranges resources sequentially according to the steps required to make a product.
سؤال
No manufacturing process can be best at everything.
سؤال
According to the law of variability, the ________ the random variability either demanded of the process or inherent in the process itself or in the items processed, the ________ productive the process is.
سؤال
Products that are customized only at the very end of the manufacturing process are known as:

A)make-to-stock.
B)assemble-to-order.
C)make-to-order.
D)engineer-to-order.
سؤال
Draw the product-process matrix and discuss the placement of each process type
سؤال
What is a cellular layout and what are its advantages?
سؤال
According to the law of variability, converting from an assemble-to-order to a make-to-order production process should increase productivity of the manufacturing processes.
سؤال
Make-to-stock products are typically produced using a production line.
سؤال
In stark contrast to a product layout, a(n)________ layout is better suited to environments where the process steps can change dramatically from one job or customer to the next.
سؤال
An assemble-to-order process occurs upstream from:

A)design.
B)material sourcing.
C)fabrication.
D)assembly/finishing.
سؤال
________ are products that are customized only at the very end of the manufacturing process.
سؤال
Why are process decisions important?
سؤال
________ products involve no customization but ________ products are completely customized.
سؤال
A cellular layout is essentially the opposite of a(n)________ layout.
سؤال
How can a supply chain operate with multiple different manufacturing processes linked across supply chain partners?
سؤال
The product process matrix uses a scale of ________ and ________.
سؤال
Products that use standard components but the final configuration of those components is customer-specific are known as:

A)make-to-stock.
B)assemble-to-order.
C)make-to-order.
D)engineer-to-order.
سؤال
Provide an example (other than the one offered in the text)of a supply chain composed of manufacturers using at least three different types of manufacturing processes.
سؤال
Products that use standard components, but the final configuration of those components is customer-specific, are called make-to-order products.
سؤال
Activities that take place prior to the point of customization are called upstream activities.
سؤال
"My tour of the Duff Brewery was the greatest experience of my life," Homer recalled. Lenny's favorite part was the batch process that was evident during the fermenting stage but Carl's favorite part was the high speed continuous flow process evident in the bottling line. "You're both right," Homer declared, "Duff takes both elements to create a(n)________ process."
سؤال
What are the two types of product-based layouts? What are their similarities and differences and their advantages and disadvantages compared with other types of layouts and processes?
سؤال
What are the four levels of customization and at what place does each occur in the supply chain?
سؤال
As the degree of service customization decreases, managers have more opportunity to focus on cost and productivity.
سؤال
Capability variety is the difference in how customers view an identical service outcome. What some customers might view as economical and thrifty others might view as cheap and poor value.
سؤال
The back room refers to the part of the service process where the customer is not visible to the other customers waiting for service.
سؤال
The greater the emphasis on intangible activities, the more management's attention will be directed to:

A)buildings and property.
B)training employees.
C)truck fleets.
D)material costs.
سؤال
In a service blueprint, the two layers the customer is involved with are the ________ and the ________.
سؤال
The ________ includes all the value-added physical and intangible activities that a service organization provides to the customer.
سؤال
In a service package the greater the emphasis on intangible activities is, the more critical is the training and retention of skilled employees and the development and maintenance of the firm's knowledge assets.
سؤال
A complete makeover by Jose Eber on daytime TV for an unemployed daytime TV viewer that has pretty much given up probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and high on physical activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
سؤال
The point where the customer interfaces directly with the service organization is:

A)the front room.
B)the back room.
C)onstage.
D)the floor.
سؤال
Service positioning is based on the three axes of contact, customization, and cost.
سؤال
The three dimensions of service positioning are the nature of the service package, the degree of customization and the degree of customer contact.
سؤال
A mass lecture for 500 freshmen in the College of Business probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
سؤال
A legal service in a corporate acquisition probably scores:

A)low on customization and high on physical activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
سؤال
As the degree of customer contact decreases, more of the service package is provided by the ________ room.
سؤال
The service package continuum ranges from immediate to delayed.
سؤال
Define the term service package and describe management's focus for each activity.
سؤال
Service operations compete and position themselves in the marketplace based on the three dimensions - ________, ________, and ________.
سؤال
An independent study for a graduate student in the College of Business probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
سؤال
In a service blueprint, the line of internal interaction falls between the customer and the onstage service provider.
سؤال
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time and predecessor as shown in the table. They work a 7 hour day and want to produce at a rate of 360 units per day. What should their takt time be?  Task  Time (sec) Predecessor  A 45 B 50 A  C 40 A  D 55 B, C  E 40 D  F 65 D  G 25 E  H 35 F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 40 & \text { A } \\\hline \text { D } & 55 & \text { B, C } \\\hline \text { E } & 40 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { F, G } \\\hline\end{array}

A)70 seconds
B)65 seconds
C)52 seconds
D)25 seconds
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. Without using more than one worker per station, what is the maximum output achievable in the 7.5 hour work day?

A)1000 units
B)1800 units
C)1258 units
D)415 units
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What is the takt time?

A)53.3 seconds
B)67.5 seconds
C)75.8 seconds
D)90 seconds
سؤال
Name a service business that relies heavily on intangible activities. How does the level of intangibility fit with the degrees of contact and customization?
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. The process design team realizes that the potential spike in demand for this device requires increased output. They elect to add a seventh worker to their production team at the first station. What is the net effect of adding this worker?

A)Nothing-the output rate does not change.
B)The output rate increases by 20%.
C)The output rate increases by 10%.
D)The output rate increases by 5%.
سؤال
The table depicts a production line that has been balanced with a takt time of 2 minutes. What is the efficiency of this balance?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)82.5%
B)85%
C)87.5%
D)90%
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. What is the theoretical minimum number of stations?

A)four
B)five
C)six
D)seven
سؤال
Name two restaurants that score differently on at least two scales in the service positioning space and provide examples of how they differ.
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. The manager assigns tasks to workstations and breaks ties using a longest operation heuristic. That is, if two or three tasks could be assigned to a given station, the manager assigns the longest task first and then fills in the remaining time at the workstation as completely as possible. Using this approach, what task(s)would be assigned at the fourth station?

A)N, P
B)M
C)N, O
D)O, P
سؤال
The table depicts a production line that has been balanced with a takt time of 2 minutes. What is the percent idle time of this balance?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)5%
B)10%
C)15%
D)Cannot be determined from the information provided.
سؤال
The table depicts an production line that has been balanced with a takt time of 2 minutes. Where would you add a worker if you wanted to increase the output rate while keeping six work stations?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)station 1
B)station 2
C)station 3
D)station 6
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What task(s)should be assigned at the third workstation?

A)B and E
B)D
C)C, E, and G
D)F
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What is the theoretical minimum number of stations that will be used if the line is balanced using the appropriate takt time?

A)3
B)4
C)5
D)6
سؤال
Where should a business consultant position herself on the three axes of contact, customization, and cost.
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. How many workstations must be added to increase the output rate to one unit per minute?

A)1
B)2
C)3
D)4
سؤال
Champion Cooling has just signed a contract to assemble window air conditioners for another company. The list of tasks, including time requirements and immediate predecessors, follows. Each task may not be shortened. Initially, the plan was to make 300 units in an eight hour day but as the summer months approach, Champion Cooling finds themselves far behind in total production. They wish to reconfigure their production line in order to produce maximum output. What should their takt time be?  Task  Time (min)  Predecessor  Bolt compressor to base 5 None  Install coils and lines 6 Bolt compressor to base  Install fan motor 7 Install coils and lines  Install switch and thermostat 5 Install fan motor  Charge system and test 10 Install switch and thermostat  Cosmetic detailing 7 Charge system and test \begin{array} { | l | c | c | } \hline \text { Task } & \text { Time (min) } & \text { Predecessor } \\\hline \text { Bolt compressor to base } & 5 & \text { None } \\\hline \text { Install coils and lines } & 6 & \text { Bolt compressor to base } \\\hline \text { Install fan motor } & 7 & \text { Install coils and lines } \\\hline \text { Install switch and thermostat } & 5 & \text { Install fan motor } \\\hline \text { Charge system and test } & 10 & \text { Install switch and thermostat } \\\hline \text { Cosmetic detailing } & 7 & \text { Charge system and test } \\\hline\end{array}

A)5
B)6
C)7
D)10
سؤال
Which poses the greatest underlying managerial challenges - a service that is extremely high on customization, contact, and tangibility or perchance a service that is extremely low on contact, customization and tangibility? Provide an example of a service that fits each space and defend your answer.
سؤال
Define the terms front room and back room and describe the roles these processes play in service operations. What must operations managers take into consideration when setting up these two processes?
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. The process engineer calculates the takt time and examines the task times indicated in the table. He decides to use the minimum cycle time instead and have the workers leave early each day once they have built 400 units. How much earlier would the workers leave?

A)12 minutes and 53.3 seconds
B)14 minutes and 20 seconds
C)16 minutes and 40 seconds
D)18 minutes and 15 seconds
سؤال
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. Operations managers and process engineers design a line that contains seven stations. What is the percentage of idle time?

A)21.9%
B)14.3%
C)25.6%
D)17.8%
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: Process Choice and Layout Decisions in Manufacturing and Services
1
A supply chain can have ________ manufacturing processes linked together across multiple partners.

A)only one type of
B)at the most two different
C)three or fewer different types of
D)four different types of
four different types of
2
A cellular layout is another name for a functional layout.
False
3
A manufacturing process decision affects:

A)the type of workforce needed.
B)the type of equipment needed.
C)the type of products that can be made.
D)All of the above are correct.
All of the above are correct.
4
Batch processing is less flexible than a production line and less efficient than a job shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
5
A customer service function at an insurance firm that handles claims based on the first letter of the customer's last name is an example of applying group technology to a service operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
6
The Devon Tower graces the Oklahoma City skyline and is officially the tallest building in the state. The manufacturing process used to produce this jewel is most likely:

A)a fixed-position layout.
B)a batch manufacturing process.
C)a hybrid process.
D)a job shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
7
________ gets its name from the fact that items are moved through the different manufacturing steps in groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
8
Highly automated batch processes that can reduce the cost of making similar groups of products are:

A)functional layouts.
B)flexible manufacturing systems.
C)make-to-stock.
D)adjacent processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
9
The product-process matrix illustrates that low volume, one-of-a-kind products are ideally suited to a job shop process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
10
In a supply chain, the output from an upstream process is linked to the adjacent downstream process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
11
An advantage of a production line process is:

A)higher volume of output needed to justify the investment.
B)greater degree of flexibility of the process.
C)lower per unit cost of items produced on the line.
D)higher range of output typically produced on such a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of these manufacturing processes involves products that cannot be broken into discrete units?

A)job shop
B)batch
C)production line
D)continuous flow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
13
A sporting apparel manufacturer that produces t-shirts to commemorate significant athletic achievements for proud students and alumni probably uses:

A)a fixed position layout.
B)batch manufacturing.
C)a continuous flow process.
D)a production line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
14
The time between completions of successive units on a production line is called:

A)cycle time.
B)takt time.
C)elapsed time.
D)work time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
15
A(n)________ is a highly automated batch process that can reduce the cost of making groups of similar products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
16
The manufacturing process used to make a wide variety of highly customized products in quantities as small as one is a:

A)production line.
B)continuous flow process.
C)job shop.
D)batch manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
17
A job shop manufacturing process is better suited to make a variety of products than a continuous flow process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
18
A batch manufacturing process may be linked only to another batch manufacturing process in a supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
19
A product-based layout arranges resources sequentially according to the steps required to make a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
20
No manufacturing process can be best at everything.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
21
According to the law of variability, the ________ the random variability either demanded of the process or inherent in the process itself or in the items processed, the ________ productive the process is.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
22
Products that are customized only at the very end of the manufacturing process are known as:

A)make-to-stock.
B)assemble-to-order.
C)make-to-order.
D)engineer-to-order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
23
Draw the product-process matrix and discuss the placement of each process type
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
24
What is a cellular layout and what are its advantages?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
25
According to the law of variability, converting from an assemble-to-order to a make-to-order production process should increase productivity of the manufacturing processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
26
Make-to-stock products are typically produced using a production line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
27
In stark contrast to a product layout, a(n)________ layout is better suited to environments where the process steps can change dramatically from one job or customer to the next.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
28
An assemble-to-order process occurs upstream from:

A)design.
B)material sourcing.
C)fabrication.
D)assembly/finishing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
29
________ are products that are customized only at the very end of the manufacturing process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
30
Why are process decisions important?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
31
________ products involve no customization but ________ products are completely customized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
32
A cellular layout is essentially the opposite of a(n)________ layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
33
How can a supply chain operate with multiple different manufacturing processes linked across supply chain partners?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
34
The product process matrix uses a scale of ________ and ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
35
Products that use standard components but the final configuration of those components is customer-specific are known as:

A)make-to-stock.
B)assemble-to-order.
C)make-to-order.
D)engineer-to-order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
36
Provide an example (other than the one offered in the text)of a supply chain composed of manufacturers using at least three different types of manufacturing processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
37
Products that use standard components, but the final configuration of those components is customer-specific, are called make-to-order products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
38
Activities that take place prior to the point of customization are called upstream activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
39
"My tour of the Duff Brewery was the greatest experience of my life," Homer recalled. Lenny's favorite part was the batch process that was evident during the fermenting stage but Carl's favorite part was the high speed continuous flow process evident in the bottling line. "You're both right," Homer declared, "Duff takes both elements to create a(n)________ process."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
40
What are the two types of product-based layouts? What are their similarities and differences and their advantages and disadvantages compared with other types of layouts and processes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
41
What are the four levels of customization and at what place does each occur in the supply chain?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
42
As the degree of service customization decreases, managers have more opportunity to focus on cost and productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
43
Capability variety is the difference in how customers view an identical service outcome. What some customers might view as economical and thrifty others might view as cheap and poor value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
44
The back room refers to the part of the service process where the customer is not visible to the other customers waiting for service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
45
The greater the emphasis on intangible activities, the more management's attention will be directed to:

A)buildings and property.
B)training employees.
C)truck fleets.
D)material costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
46
In a service blueprint, the two layers the customer is involved with are the ________ and the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
47
The ________ includes all the value-added physical and intangible activities that a service organization provides to the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
48
In a service package the greater the emphasis on intangible activities is, the more critical is the training and retention of skilled employees and the development and maintenance of the firm's knowledge assets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
49
A complete makeover by Jose Eber on daytime TV for an unemployed daytime TV viewer that has pretty much given up probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and high on physical activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
50
The point where the customer interfaces directly with the service organization is:

A)the front room.
B)the back room.
C)onstage.
D)the floor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
51
Service positioning is based on the three axes of contact, customization, and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
52
The three dimensions of service positioning are the nature of the service package, the degree of customization and the degree of customer contact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
53
A mass lecture for 500 freshmen in the College of Business probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
54
A legal service in a corporate acquisition probably scores:

A)low on customization and high on physical activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
55
As the degree of customer contact decreases, more of the service package is provided by the ________ room.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
56
The service package continuum ranges from immediate to delayed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
57
Define the term service package and describe management's focus for each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
58
Service operations compete and position themselves in the marketplace based on the three dimensions - ________, ________, and ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
59
An independent study for a graduate student in the College of Business probably scores:

A)low on customization and high on intangible activities.
B)high on customer contact and low on intangible activities.
C)high on customization and high on intangible activities.
D)low on customer contact and low on intangible activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
60
In a service blueprint, the line of internal interaction falls between the customer and the onstage service provider.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
61
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time and predecessor as shown in the table. They work a 7 hour day and want to produce at a rate of 360 units per day. What should their takt time be?  Task  Time (sec) Predecessor  A 45 B 50 A  C 40 A  D 55 B, C  E 40 D  F 65 D  G 25 E  H 35 F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 40 & \text { A } \\\hline \text { D } & 55 & \text { B, C } \\\hline \text { E } & 40 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { F, G } \\\hline\end{array}

A)70 seconds
B)65 seconds
C)52 seconds
D)25 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
62
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. Without using more than one worker per station, what is the maximum output achievable in the 7.5 hour work day?

A)1000 units
B)1800 units
C)1258 units
D)415 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
63
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What is the takt time?

A)53.3 seconds
B)67.5 seconds
C)75.8 seconds
D)90 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
64
Name a service business that relies heavily on intangible activities. How does the level of intangibility fit with the degrees of contact and customization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
65
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. The process design team realizes that the potential spike in demand for this device requires increased output. They elect to add a seventh worker to their production team at the first station. What is the net effect of adding this worker?

A)Nothing-the output rate does not change.
B)The output rate increases by 20%.
C)The output rate increases by 10%.
D)The output rate increases by 5%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
66
The table depicts a production line that has been balanced with a takt time of 2 minutes. What is the efficiency of this balance?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)82.5%
B)85%
C)87.5%
D)90%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
67
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. What is the theoretical minimum number of stations?

A)four
B)five
C)six
D)seven
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
68
Name two restaurants that score differently on at least two scales in the service positioning space and provide examples of how they differ.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
69
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. The manager assigns tasks to workstations and breaks ties using a longest operation heuristic. That is, if two or three tasks could be assigned to a given station, the manager assigns the longest task first and then fills in the remaining time at the workstation as completely as possible. Using this approach, what task(s)would be assigned at the fourth station?

A)N, P
B)M
C)N, O
D)O, P
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
70
The table depicts a production line that has been balanced with a takt time of 2 minutes. What is the percent idle time of this balance?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)5%
B)10%
C)15%
D)Cannot be determined from the information provided.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
71
The table depicts an production line that has been balanced with a takt time of 2 minutes. Where would you add a worker if you wanted to increase the output rate while keeping six work stations?  Workstation 123456 Task A,BCD,E,FG,HIJ,K,L Time (min)1,11.81,0.5,0.40.9,0.81.80.5,0.5,0.6\begin{array} { | l | c | c | c | c | c | c | } \hline \text { Workstation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Task } & \mathrm { A } , \mathrm { B } & \mathrm { C } & \mathrm { D } , \mathrm { E } , \mathrm { F } & \mathrm { G } , \mathrm { H } & \mathrm { I } & \mathrm { J } , \mathrm { K } , \mathrm { L } \\\hline \text { Time } ( \mathrm { min } ) & 1,1 & 1.8 & 1,0.5,0.4 & 0.9,0.8 & 1.8 & 0.5,0.5,0.6 \\\hline\end{array}

A)station 1
B)station 2
C)station 3
D)station 6
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
72
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What task(s)should be assigned at the third workstation?

A)B and E
B)D
C)C, E, and G
D)F
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
73
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. What is the theoretical minimum number of stations that will be used if the line is balanced using the appropriate takt time?

A)3
B)4
C)5
D)6
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
74
Where should a business consultant position herself on the three axes of contact, customization, and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
75
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. How many workstations must be added to increase the output rate to one unit per minute?

A)1
B)2
C)3
D)4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
76
Champion Cooling has just signed a contract to assemble window air conditioners for another company. The list of tasks, including time requirements and immediate predecessors, follows. Each task may not be shortened. Initially, the plan was to make 300 units in an eight hour day but as the summer months approach, Champion Cooling finds themselves far behind in total production. They wish to reconfigure their production line in order to produce maximum output. What should their takt time be?  Task  Time (min)  Predecessor  Bolt compressor to base 5 None  Install coils and lines 6 Bolt compressor to base  Install fan motor 7 Install coils and lines  Install switch and thermostat 5 Install fan motor  Charge system and test 10 Install switch and thermostat  Cosmetic detailing 7 Charge system and test \begin{array} { | l | c | c | } \hline \text { Task } & \text { Time (min) } & \text { Predecessor } \\\hline \text { Bolt compressor to base } & 5 & \text { None } \\\hline \text { Install coils and lines } & 6 & \text { Bolt compressor to base } \\\hline \text { Install fan motor } & 7 & \text { Install coils and lines } \\\hline \text { Install switch and thermostat } & 5 & \text { Install fan motor } \\\hline \text { Charge system and test } & 10 & \text { Install switch and thermostat } \\\hline \text { Cosmetic detailing } & 7 & \text { Charge system and test } \\\hline\end{array}

A)5
B)6
C)7
D)10
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which poses the greatest underlying managerial challenges - a service that is extremely high on customization, contact, and tangibility or perchance a service that is extremely low on contact, customization and tangibility? Provide an example of a service that fits each space and defend your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
78
Define the terms front room and back room and describe the roles these processes play in service operations. What must operations managers take into consideration when setting up these two processes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
79
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
 Task  Time (sec) Predecessor  A 45 B 50 A  C 20 A  D 55 A  E 15 D  F 65 D  G 25 E  H 35 B, C, F, G \begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \text { A } & 45 & \cdots \\\hline \text { B } & 50 & \text { A } \\\hline \text { C } & 20 & \text { A } \\\hline \text { D } & 55 & \text { A } \\\hline \text { E } & 15 & \text { D } \\\hline \text { F } & 65 & \text { D } \\\hline \text { G } & 25 & \text { E } \\\hline \text { H } & 35 & \text { B, C, F, G } \\\hline\end{array}

-Refer to the scenario above. The process engineer calculates the takt time and examines the task times indicated in the table. He decides to use the minimum cycle time instead and have the workers leave early each day once they have built 400 units. How much earlier would the workers leave?

A)12 minutes and 53.3 seconds
B)14 minutes and 20 seconds
C)16 minutes and 40 seconds
D)18 minutes and 15 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
80
Use this scenario for the following question(s).
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 400 units. Use this information to answer the following question(s).
 Task  Time (sec) Predecessor J45 K 50 JL40 JM55 K, LN40MO65M P 25 N R 35O,P\begin{array} { | c | c | c | } \hline \text { Task } & \text { Time } ( \mathrm { sec } ) & \text { Predecessor } \\\hline \mathrm { J } & 45 & \cdots \\\hline \text { K } & 50 & \mathrm {~J} \\\hline \mathrm { L } & 40 & \mathrm {~J} \\\hline \mathrm { M } & 55 & \mathrm {~K} , \mathrm {~L} \\\hline \mathrm { N } & 40 & \mathrm { M } \\\hline \mathrm { O } & 65 & \mathrm { M } \\\hline \text { P } & 25 & \mathrm {~N} \\\hline \text { R } & 35 & \mathrm { O } , \mathrm { P } \\\hline\end{array}

-Refer to the scenario above. Operations managers and process engineers design a line that contains seven stations. What is the percentage of idle time?

A)21.9%
B)14.3%
C)25.6%
D)17.8%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.