سؤال
Fixed budgets are also known as flexible budgets.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A cost variance can be further separated into the quantity variance and the price variance.
سؤال
Management by exception means studying industry standards to define normal conditions.
سؤال
Management by exception means that managers focus on the most significant differences between actual costs and standard costs.
سؤال
When computing a price variance,the quantity is held constant.
سؤال
A budget performance report shows budgeted amounts,actual amounts,and differences between budgeted and actual amounts.
سؤال
A flexible budget is based on a single predicted amount of sales or other activity measure.
سؤال
While companies strive to achieve ideal standards,reality implies that some loss of materials usually occurs with any process.
سؤال
A fixed budget is based on a single predicted amount of sales or other activity measure.
سؤال
When computing a price variance,the price is held constant.
سؤال
Fixed budget performance reports compare actual results with the results expected under a fixed budget.
سؤال
Standard costs can be used by management to assess the reasonableness of actual costs incurred.
سؤال
Standard costs are preset costs for delivering a product or service under normal conditions.
سؤال
Variable budget is another name for a flexible budget.
سؤال
Another name for a static budget is a variable budget.
سؤال
Within the same flexible budget performance report,it is impossible to have both favorable and unfavorable variances.
سؤال
A cost variance is the difference between actual cost and standard cost.
سؤال
Cost variances are ignored under management by exception.
سؤال
When standard costs are used,factory overhead is assigned to products with a predetermined standard overhead rate.
سؤال
Standard material costs,standard labor costs,and standard overhead costs can be obtained from standard cost tables published by the Institute of Management Accountants.
سؤال
An overhead cost variance is the difference between the total overhead actually incurred for the period and the standard overhead applied to products.
سؤال
A volume variance occurs when the company operates at a different capacity level than was expected.
سؤال
A flexible budget expresses all costs on a per unit basis,regardless of cost behavior.
سؤال
The total sales variance can be divided into the sales price variance and the sales volume variance.
سؤال
The purchasing department is responsible for the price paid for materials.
سؤال
One possible explanation for direct labor rate and efficiency variances is the use of workers with different skill levels.
سؤال
A favorable direct materials price variance might lead to an unfavorable direct materials quantity variance because the company purchased inferior materials.
سؤال
In sales variance analysis,the budgeted amount of unit sales is the predicted activity level and the budgeted cost of the goods sold can be treated as a "standard" price.
سؤال
A flexible budget expresses variable costs on a per unit basis and fixed costs on a total basis.
سؤال
When the actual price per unit of direct materials used exceeds the standard price per unit,the company has an unfavorable direct materials price variance.
سؤال
A variable or flexible budget is so named because it only focuses on variable costs.
سؤال
If ending variance account balances are immaterial,they can be closed directly to Cost of Goods Sold.
سؤال
A fixed budget performance report never provides useful information for evaluating variances.
سؤال
The process of closing ending variance account balances increases Cost of Goods Sold.
سؤال
Standard costs are:

A)Actual costs incurred to produce a specific product or perform a service.
B)Preset costs for delivering a product or service under normal conditions.
C)Established by the IMA.
D)Rarely achieved.
E)Uniform among companies within an industry.
سؤال
A direct labor cost variance can be divided into price and quantity variances,which are almost always called controllable and volume variances.
سؤال
A flexible budget is useful both before and after the period's activities are complete.
سؤال
An unfavorable variance is recorded with a debit because it reflects additional costs higher than the standard cost.
سؤال
A volume variance is the difference between overhead at maximum volume of production and the standard volume of production.
سؤال
The anticipated costs incurred under normal conditions to produce a specific product or to perform a specific service are:

A)Variable costs.
B)Fixed costs.
C)Standard costs.
D)Product costs.
E)Period costs.
سؤال
A budget based on several different levels of activity,often including both a best-case and worst-case scenario,is called a:

A)Rolling budget.
B)Production budget.
C)Flexible budget.
D)Merchandise purchases budget.
E)Fixed budget.
سؤال
An internal report that helps management analyze the difference between actual performance and budgeted performance based on the actual sales volume (or other level of activity)is called a(n):

A)Sales budget performance report.
B)Flexible budget performance report.
C)Master budget performance report.
D)Static budget performance report.
E)Operating budget performance report.
سؤال
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The variable costs expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
سؤال
In this type of budget,the master budget is based on a single prediction for sales volume,and the budgeted amount for each cost essentially assumes that a specific amount of sales will occur:

A)Sales budget.
B)Standard budget.
C)Flexible budget.
D)Fixed budget.
E)Variable budget.
سؤال
Which of the following is not part of the flow of events in variance analysis:

A)Preparing a standard cost performance report.
B)Identifying questions and their answers.
C)Taking corrective and strategic actions.
D)Computing and analyzing variances.
E)Working to ensure that all variances are favorable.
سؤال
A company provided the following direct materials cost information.Compute the direct materials price variance. <strong>A company provided the following direct materials cost information.Compute the direct materials price variance.  </strong> A)$81,000 Favorable. B)$81,000 Unfavorable. C)$80,750 Unfavorable. D)$80,750 Favorable. E)$78,250 Favorable. <div style=padding-top: 35px>

A)$81,000 Favorable.
B)$81,000 Unfavorable.
C)$80,750 Unfavorable.
D)$80,750 Favorable.
E)$78,250 Favorable.
سؤال
Variable budget is another name for:

A)Cash budget.
B)Flexible budget.
C)Fixed budget.
D)Manufacturing budget.
E)Rolling budget.
سؤال
An analytical technique used by management to focus attention on the most significant variances and give less attention to the areas where performance is reasonably close to standard is known as:

A)Controllable management.
B)Management by variance.
C)Performance management.
D)Management by objectives.
E)Management by exception.
سؤال
Static budget is another name for:

A)Standard budget.
B)Flexible budget.
C)Variable budget.
D)Fixed budget.
E)Master budget.
سؤال
Sales variance analysis is used by managers for:

A)Planning purposes only.
B)Budgeting purposes only.
C)Control purposes only.
D)Planning and control purposes.
E)Planning and budgeting purposes.
سؤال
The difference between actual price per unit of input and the standard price per unit of input results in a:

A)Standard variance.
B)Quantity variance.
C)Volume variance.
D)Controllable variance.
E)Price variance.
سؤال
A flexible budget may be prepared:

A)Before the operating period only.
B)After the operating period only.
C)During the operating period only.
D)At any time in the planning period.
E)Only when the company encounters excessive costs.
سؤال
The difference between actual quantity of input used and the standard quantity of input used results in a:

A)Controllable variance.
B)Standard variance.
C)Budget variance.
D)Quantity variance.
E)Price variance.
سؤال
The difference between the total actual cost incurred and the total standard cost is called the:

A)Flexible variance.
B)Usage variance.
C)Cost variance.
D)Controllable variance.
E)Volume variance.
سؤال
Identify the situation below that will result in a favorable variance.

A)Actual revenue is higher than budgeted revenue.
B)Actual revenue is lower than budgeted revenue.
C)Actual income is lower than expected income.
D)Actual costs are higher than budgeted costs.
E)Actual expenses are higher than budgeted expenses.
سؤال
Standard costs are used in the calculation of:

A)Price and quantity variances.
B)Price variances only.
C)Quantity variances only.
D)Price,quantity,and sales variances.
E)Quantity and sales variances.
سؤال
A flexible budget performance report compares the differences between:

A)Actual performance and budgeted performance based on actual sales volume.
B)Actual performance over several periods.
C)Budgeted performance over several periods.
D)Actual performance and budgeted performance based on budgeted sales volume.
E)Actual performance and standard costs at the budgeted sales volume.
سؤال
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The sales expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
سؤال
A company provided the following direct materials cost information.Compute the total direct materials cost variance. <strong>A company provided the following direct materials cost information.Compute the total direct materials cost variance.  </strong> A)$2,500 Favorable. B)$78,250 Favorable. C)$78,250 Unfavorable. D)$80,750 Favorable. E)$80,750 Unfavorable. <div style=padding-top: 35px>

A)$2,500 Favorable.
B)$78,250 Favorable.
C)$78,250 Unfavorable.
D)$80,750 Favorable.
E)$80,750 Unfavorable.
سؤال
A company provided the following direct materials cost information.Compute the direct materials quantity variance. <strong>A company provided the following direct materials cost information.Compute the direct materials quantity variance.  </strong> A)$78,250 Favorable. B)$2,750 Unfavorable. C)$2,750 Favorable. D)$2,500 Favorable. E)$2,500 Unfavorable. <div style=padding-top: 35px>

A)$78,250 Favorable.
B)$2,750 Unfavorable.
C)$2,750 Favorable.
D)$2,500 Favorable.
E)$2,500 Unfavorable.
سؤال
A company's flexible budget for 10,000 units of production reflects sales of $200,000; variable costs of $40,000; and fixed costs of $75,000.Calculate the expected level of operating income if the company produces and sells 13,000 units.

A)$110,500.
B)$85,000.
C)$133,000.
D)$100,000.
E)$50,500.
سؤال
Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is:  </strong> A)$13,750 unfavorable. B)$16,250 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$33,000 favorable. <div style=padding-top: 35px>

A)$13,750 unfavorable.
B)$16,250 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$33,000 favorable.
سؤال
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of operating income for 20,000 units would be:

A)$30,000.
B)$60,000.
C)$69,000.
D)$150,000.
E)$32,727.
سؤال
Based on a predicted level of production and sales of 30,000 units,a company anticipates total contribution margin of $105,000,fixed costs of $40,000,and operating income of $65,000.Based on this information,the budgeted operating income for 28,000 units would be:

A)$52,000.
B)$135,333.
C)$58,000.
D)$72,500.
E)$105,000.
سؤال
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of variable costs for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$30,000.
E)$150,000.
سؤال
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The contribution margin expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
سؤال
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of sales for 20,000 units would be:

A)$165,000.
B)$150,000.
C)$117,272.
D)$181,500.
E)$141,900.
سؤال
Product A has a sales price of $10 per unit.Based on a 10,000-unit production level,the variable costs are $6 per unit and the fixed costs are $3 per unit.Using a flexible budget for 12,500 units,what is the budgeted operating income from Product A?

A)$12,500.
B)$25,000.
C)$20,000.
D)$30,000.
E)$35,000.
سؤال
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of contribution margin for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$150,000.
E)$60,000.
سؤال
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The operating income expected if the company produces and sells 16,000 units is:

A)$2,667.
B)$14,000.
C)$18,667.
D)$24,000.
E)$35,000.
سؤال
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorable. <div style=padding-top: 35px>

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorable.
سؤال
A company's flexible budget for 12,000 units of production showed per unit contribution margin of $3.00 and fixed costs,$20,000.The operating income expected if the company produces and sells 18,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$16,000.
E)$24,000.
سؤال
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The fixed costs expected if the company produces and sells 16,000 units is:

A)$16,000.
B)$64,000.
C)$48,000.
D)$24,000.
E)$18,000.
سؤال
Georgia,Inc.has collected the following data on one of its products.The actual cost of direct materials used is: <strong>Georgia,Inc.has collected the following data on one of its products.The actual cost of direct materials used is:  </strong> A)$133,750. B)$150,000. C)$106,250. D)$158,750. E)$120,000. <div style=padding-top: 35px>

A)$133,750.
B)$150,000.
C)$106,250.
D)$158,750.
E)$120,000.
سؤال
Which department is often responsible for the direct materials price variance?

A)The accounting department.
B)The production department.
C)The purchasing department.
D)The finance department.
E)The budgeting department.
سؤال
Based on predicted production of 12,000 units,a company anticipates $150,000 of fixed costs and $123,000 of variable costs.The flexible budget amounts of fixed and variable costs for 10,000 units are:

A)$125,000 fixed and $102,500 variable.
B)$125,000 fixed and $123,000 variable.
C)$102,500 fixed and $150,000 variable.
D)$150,000 fixed and $123,000 variable.
E)$150,000 fixed and $102,500 variable.
سؤال
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of fixed costs for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$30,000.
E)$150,000.
سؤال
Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is:  </strong> A)$30,000 favorable. B)$13,750 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$13,750 favorable. <div style=padding-top: 35px>

A)$30,000 favorable.
B)$13,750 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$13,750 favorable.
سؤال
Based on a predicted level of production and sales of 12,000 units,a company anticipates reporting operating income of $26,000 after deducting variable costs of $72,000 and fixed costs of $10,000.Based on this information,the budgeted amounts of fixed and variable costs for 15,000 units would be:

A)$10,000 of fixed costs and $72,000 of variable costs.
B)$10,000 of fixed costs and $90,000 of variable costs.
C)$12,500 of fixed costs and $90,000 of variable costs.
D)$12,500 of fixed costs and $72,000 of variable costs.
E)$10,000 of fixed costs and $81,000 of variable costs.
سؤال
A company's flexible budget for 12,000 units of production showed total contribution margin of $24,000 and fixed costs,$16,000.The operating income expected if the company produces and sells 15,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$8,000.
E)$14,000.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/223
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 21: Flexible Budgets and Standard Costs
1
Fixed budgets are also known as flexible budgets.
False
2
A cost variance can be further separated into the quantity variance and the price variance.
True
3
Management by exception means studying industry standards to define normal conditions.
False
4
Management by exception means that managers focus on the most significant differences between actual costs and standard costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
5
When computing a price variance,the quantity is held constant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
6
A budget performance report shows budgeted amounts,actual amounts,and differences between budgeted and actual amounts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
7
A flexible budget is based on a single predicted amount of sales or other activity measure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
8
While companies strive to achieve ideal standards,reality implies that some loss of materials usually occurs with any process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
9
A fixed budget is based on a single predicted amount of sales or other activity measure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
10
When computing a price variance,the price is held constant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
11
Fixed budget performance reports compare actual results with the results expected under a fixed budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
12
Standard costs can be used by management to assess the reasonableness of actual costs incurred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
13
Standard costs are preset costs for delivering a product or service under normal conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
14
Variable budget is another name for a flexible budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
15
Another name for a static budget is a variable budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
16
Within the same flexible budget performance report,it is impossible to have both favorable and unfavorable variances.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
17
A cost variance is the difference between actual cost and standard cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
18
Cost variances are ignored under management by exception.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
19
When standard costs are used,factory overhead is assigned to products with a predetermined standard overhead rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
20
Standard material costs,standard labor costs,and standard overhead costs can be obtained from standard cost tables published by the Institute of Management Accountants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
21
An overhead cost variance is the difference between the total overhead actually incurred for the period and the standard overhead applied to products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
22
A volume variance occurs when the company operates at a different capacity level than was expected.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
23
A flexible budget expresses all costs on a per unit basis,regardless of cost behavior.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
24
The total sales variance can be divided into the sales price variance and the sales volume variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
25
The purchasing department is responsible for the price paid for materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
26
One possible explanation for direct labor rate and efficiency variances is the use of workers with different skill levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
27
A favorable direct materials price variance might lead to an unfavorable direct materials quantity variance because the company purchased inferior materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
28
In sales variance analysis,the budgeted amount of unit sales is the predicted activity level and the budgeted cost of the goods sold can be treated as a "standard" price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
29
A flexible budget expresses variable costs on a per unit basis and fixed costs on a total basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
30
When the actual price per unit of direct materials used exceeds the standard price per unit,the company has an unfavorable direct materials price variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
31
A variable or flexible budget is so named because it only focuses on variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
32
If ending variance account balances are immaterial,they can be closed directly to Cost of Goods Sold.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
33
A fixed budget performance report never provides useful information for evaluating variances.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
34
The process of closing ending variance account balances increases Cost of Goods Sold.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
35
Standard costs are:

A)Actual costs incurred to produce a specific product or perform a service.
B)Preset costs for delivering a product or service under normal conditions.
C)Established by the IMA.
D)Rarely achieved.
E)Uniform among companies within an industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
36
A direct labor cost variance can be divided into price and quantity variances,which are almost always called controllable and volume variances.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
37
A flexible budget is useful both before and after the period's activities are complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
38
An unfavorable variance is recorded with a debit because it reflects additional costs higher than the standard cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
39
A volume variance is the difference between overhead at maximum volume of production and the standard volume of production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
40
The anticipated costs incurred under normal conditions to produce a specific product or to perform a specific service are:

A)Variable costs.
B)Fixed costs.
C)Standard costs.
D)Product costs.
E)Period costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
41
A budget based on several different levels of activity,often including both a best-case and worst-case scenario,is called a:

A)Rolling budget.
B)Production budget.
C)Flexible budget.
D)Merchandise purchases budget.
E)Fixed budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
42
An internal report that helps management analyze the difference between actual performance and budgeted performance based on the actual sales volume (or other level of activity)is called a(n):

A)Sales budget performance report.
B)Flexible budget performance report.
C)Master budget performance report.
D)Static budget performance report.
E)Operating budget performance report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
43
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The variable costs expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
44
In this type of budget,the master budget is based on a single prediction for sales volume,and the budgeted amount for each cost essentially assumes that a specific amount of sales will occur:

A)Sales budget.
B)Standard budget.
C)Flexible budget.
D)Fixed budget.
E)Variable budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is not part of the flow of events in variance analysis:

A)Preparing a standard cost performance report.
B)Identifying questions and their answers.
C)Taking corrective and strategic actions.
D)Computing and analyzing variances.
E)Working to ensure that all variances are favorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
46
A company provided the following direct materials cost information.Compute the direct materials price variance. <strong>A company provided the following direct materials cost information.Compute the direct materials price variance.  </strong> A)$81,000 Favorable. B)$81,000 Unfavorable. C)$80,750 Unfavorable. D)$80,750 Favorable. E)$78,250 Favorable.

A)$81,000 Favorable.
B)$81,000 Unfavorable.
C)$80,750 Unfavorable.
D)$80,750 Favorable.
E)$78,250 Favorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
47
Variable budget is another name for:

A)Cash budget.
B)Flexible budget.
C)Fixed budget.
D)Manufacturing budget.
E)Rolling budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
48
An analytical technique used by management to focus attention on the most significant variances and give less attention to the areas where performance is reasonably close to standard is known as:

A)Controllable management.
B)Management by variance.
C)Performance management.
D)Management by objectives.
E)Management by exception.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
49
Static budget is another name for:

A)Standard budget.
B)Flexible budget.
C)Variable budget.
D)Fixed budget.
E)Master budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
50
Sales variance analysis is used by managers for:

A)Planning purposes only.
B)Budgeting purposes only.
C)Control purposes only.
D)Planning and control purposes.
E)Planning and budgeting purposes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
51
The difference between actual price per unit of input and the standard price per unit of input results in a:

A)Standard variance.
B)Quantity variance.
C)Volume variance.
D)Controllable variance.
E)Price variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
52
A flexible budget may be prepared:

A)Before the operating period only.
B)After the operating period only.
C)During the operating period only.
D)At any time in the planning period.
E)Only when the company encounters excessive costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
53
The difference between actual quantity of input used and the standard quantity of input used results in a:

A)Controllable variance.
B)Standard variance.
C)Budget variance.
D)Quantity variance.
E)Price variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
54
The difference between the total actual cost incurred and the total standard cost is called the:

A)Flexible variance.
B)Usage variance.
C)Cost variance.
D)Controllable variance.
E)Volume variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
55
Identify the situation below that will result in a favorable variance.

A)Actual revenue is higher than budgeted revenue.
B)Actual revenue is lower than budgeted revenue.
C)Actual income is lower than expected income.
D)Actual costs are higher than budgeted costs.
E)Actual expenses are higher than budgeted expenses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
56
Standard costs are used in the calculation of:

A)Price and quantity variances.
B)Price variances only.
C)Quantity variances only.
D)Price,quantity,and sales variances.
E)Quantity and sales variances.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
57
A flexible budget performance report compares the differences between:

A)Actual performance and budgeted performance based on actual sales volume.
B)Actual performance over several periods.
C)Budgeted performance over several periods.
D)Actual performance and budgeted performance based on budgeted sales volume.
E)Actual performance and standard costs at the budgeted sales volume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
58
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The sales expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
59
A company provided the following direct materials cost information.Compute the total direct materials cost variance. <strong>A company provided the following direct materials cost information.Compute the total direct materials cost variance.  </strong> A)$2,500 Favorable. B)$78,250 Favorable. C)$78,250 Unfavorable. D)$80,750 Favorable. E)$80,750 Unfavorable.

A)$2,500 Favorable.
B)$78,250 Favorable.
C)$78,250 Unfavorable.
D)$80,750 Favorable.
E)$80,750 Unfavorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
60
A company provided the following direct materials cost information.Compute the direct materials quantity variance. <strong>A company provided the following direct materials cost information.Compute the direct materials quantity variance.  </strong> A)$78,250 Favorable. B)$2,750 Unfavorable. C)$2,750 Favorable. D)$2,500 Favorable. E)$2,500 Unfavorable.

A)$78,250 Favorable.
B)$2,750 Unfavorable.
C)$2,750 Favorable.
D)$2,500 Favorable.
E)$2,500 Unfavorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
61
A company's flexible budget for 10,000 units of production reflects sales of $200,000; variable costs of $40,000; and fixed costs of $75,000.Calculate the expected level of operating income if the company produces and sells 13,000 units.

A)$110,500.
B)$85,000.
C)$133,000.
D)$100,000.
E)$50,500.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
62
Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is:  </strong> A)$13,750 unfavorable. B)$16,250 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$33,000 favorable.

A)$13,750 unfavorable.
B)$16,250 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$33,000 favorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
63
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of operating income for 20,000 units would be:

A)$30,000.
B)$60,000.
C)$69,000.
D)$150,000.
E)$32,727.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
64
Based on a predicted level of production and sales of 30,000 units,a company anticipates total contribution margin of $105,000,fixed costs of $40,000,and operating income of $65,000.Based on this information,the budgeted operating income for 28,000 units would be:

A)$52,000.
B)$135,333.
C)$58,000.
D)$72,500.
E)$105,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
65
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of variable costs for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$30,000.
E)$150,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
66
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The contribution margin expected if the company produces and sells 16,000 units is:

A)$48,000.
B)$64,000.
C)$40,000.
D)$24,000.
E)$18,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
67
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of sales for 20,000 units would be:

A)$165,000.
B)$150,000.
C)$117,272.
D)$181,500.
E)$141,900.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
68
Product A has a sales price of $10 per unit.Based on a 10,000-unit production level,the variable costs are $6 per unit and the fixed costs are $3 per unit.Using a flexible budget for 12,500 units,what is the budgeted operating income from Product A?

A)$12,500.
B)$25,000.
C)$20,000.
D)$30,000.
E)$35,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
69
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of contribution margin for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$150,000.
E)$60,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
70
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The operating income expected if the company produces and sells 16,000 units is:

A)$2,667.
B)$14,000.
C)$18,667.
D)$24,000.
E)$35,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
71
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorable.

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
72
A company's flexible budget for 12,000 units of production showed per unit contribution margin of $3.00 and fixed costs,$20,000.The operating income expected if the company produces and sells 18,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$16,000.
E)$24,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
73
A company's flexible budget for 12,000 units of production showed sales,$48,000; variable costs,$18,000; and fixed costs,$16,000.The fixed costs expected if the company produces and sells 16,000 units is:

A)$16,000.
B)$64,000.
C)$48,000.
D)$24,000.
E)$18,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
74
Georgia,Inc.has collected the following data on one of its products.The actual cost of direct materials used is: <strong>Georgia,Inc.has collected the following data on one of its products.The actual cost of direct materials used is:  </strong> A)$133,750. B)$150,000. C)$106,250. D)$158,750. E)$120,000.

A)$133,750.
B)$150,000.
C)$106,250.
D)$158,750.
E)$120,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
75
Which department is often responsible for the direct materials price variance?

A)The accounting department.
B)The production department.
C)The purchasing department.
D)The finance department.
E)The budgeting department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
76
Based on predicted production of 12,000 units,a company anticipates $150,000 of fixed costs and $123,000 of variable costs.The flexible budget amounts of fixed and variable costs for 10,000 units are:

A)$125,000 fixed and $102,500 variable.
B)$125,000 fixed and $123,000 variable.
C)$102,500 fixed and $150,000 variable.
D)$150,000 fixed and $123,000 variable.
E)$150,000 fixed and $102,500 variable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
77
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of fixed costs for 20,000 units would be:

A)$99,000.
B)$90,000.
C)$66,000.
D)$30,000.
E)$150,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
78
Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is:  </strong> A)$30,000 favorable. B)$13,750 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$13,750 favorable.

A)$30,000 favorable.
B)$13,750 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$13,750 favorable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
79
Based on a predicted level of production and sales of 12,000 units,a company anticipates reporting operating income of $26,000 after deducting variable costs of $72,000 and fixed costs of $10,000.Based on this information,the budgeted amounts of fixed and variable costs for 15,000 units would be:

A)$10,000 of fixed costs and $72,000 of variable costs.
B)$10,000 of fixed costs and $90,000 of variable costs.
C)$12,500 of fixed costs and $90,000 of variable costs.
D)$12,500 of fixed costs and $72,000 of variable costs.
E)$10,000 of fixed costs and $81,000 of variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
80
A company's flexible budget for 12,000 units of production showed total contribution margin of $24,000 and fixed costs,$16,000.The operating income expected if the company produces and sells 15,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$8,000.
E)$14,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.