In evaluating input design,the design team must identify

A)a single view so data can be shared.
B)organization and access.
C)types of data input and optimal input methods.
D)what is relevant,complete,and useful.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
All of the four categories of output have pre-specified content and format except for

A)demand reports.
B)scheduled reports.
C)special-purpose reports.
D)triggered exception reports.
سؤال
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A)input,data storage,processing procedures and operations,and output
B)input,output,data storage,and processing procedures and operations
C)output,data storage,input,and processing procedures and operations
D)processing procedures and operations,input,data storage,and output
سؤال
A part of the conceptual design phase is the evaluation of design alternatives.The design team should identify a variety of design alternatives and evaluate them based on several standards.Who is responsible for approving the final design that best meets the organization's needs?

A)IS management
B)the end-users of the system
C)the steering committee
D)the system analyst design team
سؤال
Who is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs?

A)design team
B)implementation committee
C)steering committee
D)systems analysts
سؤال
Who is responsible for identifying and evaluating a variety of design alternatives?

A)design team
B)implementation committee
C)steering committee
D)systems analysts
سؤال
Structured programming divides the program into small,well-defined modules.Which of the following statements below is correct?

A)Modules interact with each other directly and also through the control module.
B)Modules interact with each other directly.
C)Modules interact with only the control module.
D)Modules primarily,but not always,interact with the control module.
سؤال
Once a design alternative has been chosen,the project team is responsible for the development of several conceptual design elements.A decision about how often to produce a certain report falls under the category of which design element?

A)data storage
B)input
C)output
D)processing procedures and operations
سؤال
Developing a general framework for implementing user requirements and solving problems identified in the analysis phase occurs in which phase of the SDLC?

A)conceptual systems design
B)implementation and conversion
C)operations and maintenance .
D)physical design
سؤال
One of the purposes of the __________ is to guide physical systems design activities.

A)conceptual systems design report
B)physical systems design report
C)program design
D)systems analysis report
سؤال
Everyone who interacts with the newly designed AIS should follow __________ that answer the who,what,where,why,and how questions related to all AIS activities.

A)procedures
B)programs
C)standards
D)none of the above
سؤال
The objective of __________ is to determine the nature,format,content,and timing of printed reports,documents,and screen displays.

A)input design
B)output design
C)report design
D)None of the above are correct.
سؤال
In the file and database design step of the physical systems design phase,it is advantageous to have

A)a compatible format.
B)easy access.
C)timely queries.
D)various capabilities.
سؤال
The project team wants to find the most efficient way to collect data in order to prepare a report on sales per store.Which element in design specifications will deal with the decision?

A)data collection
B)input
C)output
D)processing procedures
سؤال
The conceptual design phase is the second phase in the systems design life cycle.There are several steps in this phase.Which step listed below is not a valid step made in the second phase of the SDLC?

A)evaluate design alternatives
B)physical systems design
C)prepare a conceptual systems design report
D)prepare design specifications
سؤال
At the end of the conceptual design phase the development team prepares a conceptual systems design report.What item below is not considered a rationale for issuing the report?

A)it can be used to guide physical systems design activities
B)it communicates how management and user information needs will be met
C)it discusses the design alternatives that were not selected for the project
D)it helps the steering committee assess system feasibility
سؤال
Which consideration below is not considered important to output design?

A)format
B)location
C)medium
D)source
سؤال
Rules for writing programs are called

A)applications.
B)basic code.
C)common routines.
D)programming standards.
سؤال
What is one activity that is not one of the responsibilities of accountants to help keep a project on track?

A)ensuring that the project is on schedule
B)evaluating and measuring benefits
C)helping programmers write code
D)monitoring costs
سؤال
Program development can be improved by

A)having special codes for input,output,and file maintenance.
B)having users code the programs.
C)using standards to find incorrect logic errors,omissions,or other problems.
D)using structured programming.
سؤال
The initial visual and mental review to discover keying or programming errors is called

A)desk checking.
B)desk correction.
C)desk debugging.
D)desk imaging.
سؤال
The sales department wants to make sure that all customer inquiries are answered in real-time.Which of the following controls design considerations will deal with this concern?

A)security
B)authorization
C)accuracy
D)audit trail
سؤال
Effective AIS training involves

A)instruction on new hardware and software.
B)orientation to new policies and operations.
C)planning and scheduling so it occurs before system testing and conversion.
D)All of the above are correct.
سؤال
Which consideration is not of concern in controls design?

A)security
B)alphabetical control
C)audit trail
D)validity
سؤال
__________ is the process of installing hardware and software and getting the AIS up and running.

A)Conceptual design
B)Physical design
C)Systems analysis
D)Systems implementation
سؤال
An implementation plan consists of the various implementation tasks to be accomplished along with a variety of other data and information,such as expected completion dates,cost estimates,and identification of the individuals responsible for each task.The plan should also address the area of risks to successful implementation.Who is responsible for identifying such risk factors?

A)the implementation team
B)the steering committee
C)the systems analysis team
D)the systems development team
سؤال
Flowcharts,record layouts,decision tables,and related items are part of

A)determining user needs.
B)documenting the program.
C)testing the program.
D)training program users.
سؤال
Several types of documentation must be prepared for a new system.The type of documentation that includes operating schedules and file retention requirements is called

A)development documentation.
B)operations documentation.
C)reference documentation.
D)user documentation.
سؤال
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation planning and conversion phase of the SDLC?

A)a conceptual system design report
B)a physical systems design report
C)a systems design report
D)an implementation planning design report
سؤال
The physical design stage of the SDLC is the point at which the broad,user-oriented AIS requirements of conceptual design are translated into detailed specifications that are used to code and test the various computer programs.What is the most time-consuming activity found in this phase,or even in the entire SDLC process?

A)controls design
B)input design
C)output design
D)program design
سؤال
Control design considerations are important to the physical systems design phase of the SDLC.One concern of control design relates to the pre-numbering of documents to prevent errors or intentional abuse.What is the control design consideration related to this concern?

A)accuracy
B)audit trail
C)numerical control
D)validity
سؤال
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A)the conceptual design phase
B)the implementation and conversion phase
C)the physical design phase
D)the systems analysis phase
سؤال
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A)acceptance tests.
B)operating tests.
C)processing of test transactions.
D)walk-throughs.
سؤال
Which consideration listed below applies to file and database design?

A)form size
B)format
C)medium
D)organization and access
سؤال
The implementation planning and conversion phase of the SDLC incorporates many systems implementation elements.One such element is the development and testing of software programs.One process used to uncover and eliminate program errors is known as

A)black box testing.
B)debugging.
C)desk checking.
D)white box testing.
سؤال
A software program must be changed to accommodate new tax rate values.What is the name of the process used to make such a change?

A)debugging
B)desk checking
C)program maintenance
D)programming
سؤال
The accountant wants to make sure that all cash disbursements are made only to legitimate vendors.Which of the following control considerations will deal with this concern?

A)security
B)accuracy
C)authorization
D)validity
سؤال
Within the implementation planning and conversion phase of the SDLC,analysts must __________ before they can __________.

A)complete documentation; test software programs
B)install and test software; test software programs
C)test software programs; test the system
D)test the system; select and train personnel
سؤال
The first step in developing software is to

A)determine user needs.
B)develop a plan.
C)hire program users.
D)write program instructions.
سؤال
Inadequate testing can lead to serious systems failures.Part of the SDLC process is to adequately test the system being implemented.What is the type of test that determines whether a program is operating as designed?

A)acceptance testing
B)debugging
C)processing of test transactions
D)program walk-through
سؤال
What is the name for the type of testing where copies of real transaction and file records are used rather than hypothetical ones?

A)acceptance testing
B)debugging
C)desk checking
D)program walk-through
سؤال
There are several steps in the data conversion process that must take place in a certain sequence.What is the last step in this process?

A)actual data conversion
B)checking the files for completeness and removing any data inaccuracies or inconsistencies
C)documentation of conversion activities
D)monitoring of the system after the actual data conversion
سؤال
Which factor is not investigated during the post-implementation review?

A)accuracy
B)benefits
C)completion
D)costs
سؤال
The method of system conversion that implements the new AIS system selectively by system is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
سؤال
Acceptance tests involve

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
سؤال
Which of the following activities does not pertain to the area of data conversion?

A)changing the data content
B)changing the database
C)changing the file format
D)moving files to a new medium
سؤال
What is a phase-in conversion?

A)both the old and new AIS are operated simultaneously
B)elements of the old AIS are replaced gradually with elements of the new AIS
C)the new AIS is introduced into one part of the organization,such as a branch
D)the old AIS is terminated as the new AIS is introduced
سؤال
Data conversion requires data to be modified in several ways.Which of the following is not one of the ways?

A)Remove data inconsistencies
B)Validate the new files
C)Identify the files that need to be converted
D)Remove extraneous fields
سؤال
The method of system conversion that immediately terminates the old AIS then the new one is introduced is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
سؤال
A company wishes to introduce and test a new AIS at a branch location before company-wide adoption.This approach is called

A)direct conversion.
B)parallel conversion.
C)phase-in conversion.
D)pilot conversion.
سؤال
Walk-throughs are system tests that involve

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
سؤال
Some investigation must occur during the postimplementation review process to prepare the report and wrap-up systems development activities.An analyst who asks the question,"Does the system produce actual and complete data?" is investigating what postimplementation factor?

A)accuracy
B)compatibility
C)goals and objectives
D)reliability
سؤال
The method of system conversion that implements the new AIS system in one branch of an organization is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
سؤال
The data conversion process of the implementation planning and conversion phase of the SDLC can be a tedious and time-consuming task.Data files may need to be modified in any of several ways.What is an example of modifying the medium of data files?

A)adding or deleting fields or records
B)changing from tapes to disks
C)changing the file format
D)changing the storage capacity of the file format
سؤال
Test transaction processing involves

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
سؤال
"Conversion" in the implementation planning and conversion phase of the SDLC is the task of changing from an old system to a new system.What is the name for the type of conversion where the old AIS is immediately terminated as the new AIS is introduced?

A)direct conversion
B)parallel conversion
C)phase-in conversion
D)pilot conversion
سؤال
The method of system conversion that operates the old and the new AIS systems simultaneously is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
سؤال
The final step in the SDLC is that of the operation and maintenance of the new system.What is the final activity in the systems development process?

A)monitoring of the system
B)ongoing maintenance activities
C)preparation of the post-implementation review report
D)user acceptance of the post-implementation review report
سؤال
The final step in the data conversion process is to

A)remove extraneous fields.
B)document the conversion activities.
C)validate the new files.
D)update files with transactions that have taken place during the conversion.
سؤال
In __________,old and new systems are operated simultaneously for a period of time.

A)direct conversion
B)parallel conversion
C)phase-in conversion
D)pilot conversion
سؤال
Phil in Marketing got a call from Chuck in ITS ."Phil,the system just generated a stock-out report.I wanted to give you a heads up.I'm sending it right over." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
سؤال
Chuck in ITS got a call from Phil in Marketing."Chuck,I need you to do something for me.Query sales data for the first quarter and pull out all of the invoices that include the snow blower discount.I need a count and the total amount of the discount.Thanks." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
سؤال
Debugging is an activity that is most closely related to which of the following?

A)Desk checking
B)Structured programming
C)Program maintenance
D)Hierarchical program design
سؤال
How can accountants help in the SDLC process?
سؤال
What output design considerations should be analyzed as part of the physical system design phase?
سؤال
Which of the following is not one of the types of documentation that should be prepared for a new system?

A)Management
B)Operations
C)User
D)Development
سؤال
Which of the following is the least costly and most risky method of converting from one system to another?

A)Direct
B)Parallel
C)Pilot
D)Phase-in
سؤال
Which of the following is the most costly and least risky method of converting from one system to another?

A)Direct
B)Parallel
C)Pilot
D)Phase-in
سؤال
Chuck in ITS got a call from Phil in Marketing."Chuck,you know that inventory report I had you guys prepare for me last year? Well,I need you to run it again and send it over in hard copy.Thanks." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
سؤال
Performing revisions to existing program code is an example of

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
سؤال
What is the purpose of a conceptual systems design report?
سؤال
Subdividing program code into small,well-defined modules is

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
سؤال
What are the different methods of testing a system?
سؤال
Phil in Marketing got a call from Fred at regional headquarters."Phil,I just got the quarterly sales report for your district.You beat your quota again,you son of a gun!" This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
سؤال
What factors does a steering committee consider when evaluating different system designs?
سؤال
What are the different types of documentation that should be prepared for a new system?
سؤال
What are the controls design considerations in a new AIS?
سؤال
What is a post-implementation review? What are the activities involved in a post-implementation review?
سؤال
What is systems implementation? How do you plan for it?
سؤال
Developing program code by adding successively more detail is

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/86
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 20: Systems Design, Implementation and Operation
1
In evaluating input design,the design team must identify

A)a single view so data can be shared.
B)organization and access.
C)types of data input and optimal input methods.
D)what is relevant,complete,and useful.
C
2
All of the four categories of output have pre-specified content and format except for

A)demand reports.
B)scheduled reports.
C)special-purpose reports.
D)triggered exception reports.
C
3
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A)input,data storage,processing procedures and operations,and output
B)input,output,data storage,and processing procedures and operations
C)output,data storage,input,and processing procedures and operations
D)processing procedures and operations,input,data storage,and output
C
4
A part of the conceptual design phase is the evaluation of design alternatives.The design team should identify a variety of design alternatives and evaluate them based on several standards.Who is responsible for approving the final design that best meets the organization's needs?

A)IS management
B)the end-users of the system
C)the steering committee
D)the system analyst design team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
5
Who is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs?

A)design team
B)implementation committee
C)steering committee
D)systems analysts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
6
Who is responsible for identifying and evaluating a variety of design alternatives?

A)design team
B)implementation committee
C)steering committee
D)systems analysts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
7
Structured programming divides the program into small,well-defined modules.Which of the following statements below is correct?

A)Modules interact with each other directly and also through the control module.
B)Modules interact with each other directly.
C)Modules interact with only the control module.
D)Modules primarily,but not always,interact with the control module.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
8
Once a design alternative has been chosen,the project team is responsible for the development of several conceptual design elements.A decision about how often to produce a certain report falls under the category of which design element?

A)data storage
B)input
C)output
D)processing procedures and operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
9
Developing a general framework for implementing user requirements and solving problems identified in the analysis phase occurs in which phase of the SDLC?

A)conceptual systems design
B)implementation and conversion
C)operations and maintenance .
D)physical design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
10
One of the purposes of the __________ is to guide physical systems design activities.

A)conceptual systems design report
B)physical systems design report
C)program design
D)systems analysis report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
11
Everyone who interacts with the newly designed AIS should follow __________ that answer the who,what,where,why,and how questions related to all AIS activities.

A)procedures
B)programs
C)standards
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
12
The objective of __________ is to determine the nature,format,content,and timing of printed reports,documents,and screen displays.

A)input design
B)output design
C)report design
D)None of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
13
In the file and database design step of the physical systems design phase,it is advantageous to have

A)a compatible format.
B)easy access.
C)timely queries.
D)various capabilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
14
The project team wants to find the most efficient way to collect data in order to prepare a report on sales per store.Which element in design specifications will deal with the decision?

A)data collection
B)input
C)output
D)processing procedures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
15
The conceptual design phase is the second phase in the systems design life cycle.There are several steps in this phase.Which step listed below is not a valid step made in the second phase of the SDLC?

A)evaluate design alternatives
B)physical systems design
C)prepare a conceptual systems design report
D)prepare design specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
16
At the end of the conceptual design phase the development team prepares a conceptual systems design report.What item below is not considered a rationale for issuing the report?

A)it can be used to guide physical systems design activities
B)it communicates how management and user information needs will be met
C)it discusses the design alternatives that were not selected for the project
D)it helps the steering committee assess system feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which consideration below is not considered important to output design?

A)format
B)location
C)medium
D)source
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
18
Rules for writing programs are called

A)applications.
B)basic code.
C)common routines.
D)programming standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
19
What is one activity that is not one of the responsibilities of accountants to help keep a project on track?

A)ensuring that the project is on schedule
B)evaluating and measuring benefits
C)helping programmers write code
D)monitoring costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
20
Program development can be improved by

A)having special codes for input,output,and file maintenance.
B)having users code the programs.
C)using standards to find incorrect logic errors,omissions,or other problems.
D)using structured programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
21
The initial visual and mental review to discover keying or programming errors is called

A)desk checking.
B)desk correction.
C)desk debugging.
D)desk imaging.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
22
The sales department wants to make sure that all customer inquiries are answered in real-time.Which of the following controls design considerations will deal with this concern?

A)security
B)authorization
C)accuracy
D)audit trail
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
23
Effective AIS training involves

A)instruction on new hardware and software.
B)orientation to new policies and operations.
C)planning and scheduling so it occurs before system testing and conversion.
D)All of the above are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which consideration is not of concern in controls design?

A)security
B)alphabetical control
C)audit trail
D)validity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
25
__________ is the process of installing hardware and software and getting the AIS up and running.

A)Conceptual design
B)Physical design
C)Systems analysis
D)Systems implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
26
An implementation plan consists of the various implementation tasks to be accomplished along with a variety of other data and information,such as expected completion dates,cost estimates,and identification of the individuals responsible for each task.The plan should also address the area of risks to successful implementation.Who is responsible for identifying such risk factors?

A)the implementation team
B)the steering committee
C)the systems analysis team
D)the systems development team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
27
Flowcharts,record layouts,decision tables,and related items are part of

A)determining user needs.
B)documenting the program.
C)testing the program.
D)training program users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
28
Several types of documentation must be prepared for a new system.The type of documentation that includes operating schedules and file retention requirements is called

A)development documentation.
B)operations documentation.
C)reference documentation.
D)user documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
29
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation planning and conversion phase of the SDLC?

A)a conceptual system design report
B)a physical systems design report
C)a systems design report
D)an implementation planning design report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
30
The physical design stage of the SDLC is the point at which the broad,user-oriented AIS requirements of conceptual design are translated into detailed specifications that are used to code and test the various computer programs.What is the most time-consuming activity found in this phase,or even in the entire SDLC process?

A)controls design
B)input design
C)output design
D)program design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
31
Control design considerations are important to the physical systems design phase of the SDLC.One concern of control design relates to the pre-numbering of documents to prevent errors or intentional abuse.What is the control design consideration related to this concern?

A)accuracy
B)audit trail
C)numerical control
D)validity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
32
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A)the conceptual design phase
B)the implementation and conversion phase
C)the physical design phase
D)the systems analysis phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
33
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A)acceptance tests.
B)operating tests.
C)processing of test transactions.
D)walk-throughs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which consideration listed below applies to file and database design?

A)form size
B)format
C)medium
D)organization and access
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
35
The implementation planning and conversion phase of the SDLC incorporates many systems implementation elements.One such element is the development and testing of software programs.One process used to uncover and eliminate program errors is known as

A)black box testing.
B)debugging.
C)desk checking.
D)white box testing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
36
A software program must be changed to accommodate new tax rate values.What is the name of the process used to make such a change?

A)debugging
B)desk checking
C)program maintenance
D)programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
37
The accountant wants to make sure that all cash disbursements are made only to legitimate vendors.Which of the following control considerations will deal with this concern?

A)security
B)accuracy
C)authorization
D)validity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
38
Within the implementation planning and conversion phase of the SDLC,analysts must __________ before they can __________.

A)complete documentation; test software programs
B)install and test software; test software programs
C)test software programs; test the system
D)test the system; select and train personnel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
39
The first step in developing software is to

A)determine user needs.
B)develop a plan.
C)hire program users.
D)write program instructions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
40
Inadequate testing can lead to serious systems failures.Part of the SDLC process is to adequately test the system being implemented.What is the type of test that determines whether a program is operating as designed?

A)acceptance testing
B)debugging
C)processing of test transactions
D)program walk-through
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is the name for the type of testing where copies of real transaction and file records are used rather than hypothetical ones?

A)acceptance testing
B)debugging
C)desk checking
D)program walk-through
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
42
There are several steps in the data conversion process that must take place in a certain sequence.What is the last step in this process?

A)actual data conversion
B)checking the files for completeness and removing any data inaccuracies or inconsistencies
C)documentation of conversion activities
D)monitoring of the system after the actual data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which factor is not investigated during the post-implementation review?

A)accuracy
B)benefits
C)completion
D)costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
44
The method of system conversion that implements the new AIS system selectively by system is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
45
Acceptance tests involve

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following activities does not pertain to the area of data conversion?

A)changing the data content
B)changing the database
C)changing the file format
D)moving files to a new medium
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
47
What is a phase-in conversion?

A)both the old and new AIS are operated simultaneously
B)elements of the old AIS are replaced gradually with elements of the new AIS
C)the new AIS is introduced into one part of the organization,such as a branch
D)the old AIS is terminated as the new AIS is introduced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
48
Data conversion requires data to be modified in several ways.Which of the following is not one of the ways?

A)Remove data inconsistencies
B)Validate the new files
C)Identify the files that need to be converted
D)Remove extraneous fields
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
49
The method of system conversion that immediately terminates the old AIS then the new one is introduced is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
50
A company wishes to introduce and test a new AIS at a branch location before company-wide adoption.This approach is called

A)direct conversion.
B)parallel conversion.
C)phase-in conversion.
D)pilot conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
51
Walk-throughs are system tests that involve

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
52
Some investigation must occur during the postimplementation review process to prepare the report and wrap-up systems development activities.An analyst who asks the question,"Does the system produce actual and complete data?" is investigating what postimplementation factor?

A)accuracy
B)compatibility
C)goals and objectives
D)reliability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
53
The method of system conversion that implements the new AIS system in one branch of an organization is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
54
The data conversion process of the implementation planning and conversion phase of the SDLC can be a tedious and time-consuming task.Data files may need to be modified in any of several ways.What is an example of modifying the medium of data files?

A)adding or deleting fields or records
B)changing from tapes to disks
C)changing the file format
D)changing the storage capacity of the file format
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
55
Test transaction processing involves

A)managers observing the operation of the system by "walking through" the IT department.
B)processing hypothetical data that are designed to identify errors in the system.
C)processing copies of real transactions in order to determine whether or not the system meets requirements.
D)a thorough review of the procedures and program logic of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
56
"Conversion" in the implementation planning and conversion phase of the SDLC is the task of changing from an old system to a new system.What is the name for the type of conversion where the old AIS is immediately terminated as the new AIS is introduced?

A)direct conversion
B)parallel conversion
C)phase-in conversion
D)pilot conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
57
The method of system conversion that operates the old and the new AIS systems simultaneously is called _____ conversion.

A)direct
B)parallel
C)pilot
D)phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
58
The final step in the SDLC is that of the operation and maintenance of the new system.What is the final activity in the systems development process?

A)monitoring of the system
B)ongoing maintenance activities
C)preparation of the post-implementation review report
D)user acceptance of the post-implementation review report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
59
The final step in the data conversion process is to

A)remove extraneous fields.
B)document the conversion activities.
C)validate the new files.
D)update files with transactions that have taken place during the conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
60
In __________,old and new systems are operated simultaneously for a period of time.

A)direct conversion
B)parallel conversion
C)phase-in conversion
D)pilot conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
61
Phil in Marketing got a call from Chuck in ITS ."Phil,the system just generated a stock-out report.I wanted to give you a heads up.I'm sending it right over." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
62
Chuck in ITS got a call from Phil in Marketing."Chuck,I need you to do something for me.Query sales data for the first quarter and pull out all of the invoices that include the snow blower discount.I need a count and the total amount of the discount.Thanks." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
63
Debugging is an activity that is most closely related to which of the following?

A)Desk checking
B)Structured programming
C)Program maintenance
D)Hierarchical program design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
64
How can accountants help in the SDLC process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
65
What output design considerations should be analyzed as part of the physical system design phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following is not one of the types of documentation that should be prepared for a new system?

A)Management
B)Operations
C)User
D)Development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is the least costly and most risky method of converting from one system to another?

A)Direct
B)Parallel
C)Pilot
D)Phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following is the most costly and least risky method of converting from one system to another?

A)Direct
B)Parallel
C)Pilot
D)Phase-in
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
69
Chuck in ITS got a call from Phil in Marketing."Chuck,you know that inventory report I had you guys prepare for me last year? Well,I need you to run it again and send it over in hard copy.Thanks." This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
70
Performing revisions to existing program code is an example of

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
71
What is the purpose of a conceptual systems design report?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
72
Subdividing program code into small,well-defined modules is

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
73
What are the different methods of testing a system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
74
Phil in Marketing got a call from Fred at regional headquarters."Phil,I just got the quarterly sales report for your district.You beat your quota again,you son of a gun!" This is an example of a

A)scheduled report.
B)special-purpose analysis report.
C)triggered exception report.
D)demand report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
75
What factors does a steering committee consider when evaluating different system designs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
76
What are the different types of documentation that should be prepared for a new system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
77
What are the controls design considerations in a new AIS?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
78
What is a post-implementation review? What are the activities involved in a post-implementation review?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
79
What is systems implementation? How do you plan for it?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
80
Developing program code by adding successively more detail is

A)debugging.
B)structured programming.
C)program maintenance.
D)hierarchical program design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 86 في هذه المجموعة.