Deck 14: Operations Scheduling and Sequencing

ملء الشاشة (f)
exit full mode
سؤال
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average tardiness for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the first come, first served (FCFS) rule to sequence these jobs, the average waiting (flow) time is _____.

A) more than 20 but less than or equal to 30 minutes
B) more than 30 but less than or equal to 40 minutes
C) more than 40 but less than or equal to 50 minutes
D) more than 50 minutes
سؤال
Triage by nurses in an emergency room would be an example of:

A) scheduling.
B) sequencing.
C) appointments.
D) work shifts.
سؤال
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence the patients, and if your uncle is patient B, he will be finished with surgery in _____.

A) less than or equal to 5 hours
B) more than 5 but less than or equal to 10 hours
C) more than 10 but less than or equal to 15 hours
D) more than 15 but less than or equal to 20 hours
سؤال
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average flow time for the five jobs is _____.

A) more than 10 but less than or equal to 20 days
B) more than 20 but less than or equal to 30 days
C) more than 30 but less than or equal to 40 days
D) more than 40 days
سؤال
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using the staff scheduling method, the solution minimizes the number of employees required to meet this demand with _____ number of employees.

A) 3 employees
B) 4 employees
C) 5 employees
D) 6 employees
سؤال
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
سؤال
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the shortest processing time (SPT) rule to sequence these jobs, the final sequence is_____, if A is the first person to arrive and D is the last.

A) A, B, C, D
B) C, B, A, D
C) C, D, B, A
D) A, B, D, C
سؤال
Staff scheduling needs all of the following EXCEPT:

A) flow time estimates.
B) accurate forecasting.
C) staffing levels required by time period.
D) determining available personnel.
سؤال
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average flow time for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
سؤال
Scheduling refers to specifying:

A) the sequence in which jobs must be completed.
B) the due date for each job.
C) the start and completion times of jobs.
D) the makespan of each job.
سؤال
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence these patients, the makespan is _____.

A) less than or equal to 5 hours
B) more than 5 but less than or equal to 10 hours
C) more than 10 but less than or equal to 15 hours
D) more than 15 but less than or equal to 20 hours
سؤال
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using staff scheduling method, the most overstaffed day is _____.

A) Friday only
B) Monday only
C) Tuesday only
D) Thursday only
سؤال
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence these patients, the final patient sequence is _____ considering "A" as the first patient and "E" as the last.

A) A, B, C, D, E
B) B, E, A, C, D
C) C, A, B, E, D
D) D, A, B, E, C
سؤال
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using staff scheduling method, the days on which demand equals staff capacity are _____.

A) Tuesday and Wednesday
B) Wednesday and Sunday
C) Thursday and Friday
D) Friday and Saturday
سؤال
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average tardiness for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
سؤال
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the shortest processing time (SPT) rule, the average flow time for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
سؤال
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the shortest processing time (SPT) rule to sequence these jobs, the average waiting (flow) time is _____.

A) less than or equal to 20 minutes
B) more than 20 but less than or equal to 30 minutes
C) more than 30 but less than or equal to 40 minutes
D) more than 40 but less than or equal to 50 minutes
سؤال
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
سؤال
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the shortest processing time (SPT) rule, the average flow time for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
سؤال
Which of the following is an example of a situation for which a Gantt chart would be appropriate?

A) Developing a factory layout
B) Tracking inventory levels over time
C) Monitoring job schedules
D) Forecasting personnel requirements in a two-shift operation
سؤال
Scheduling refers to determining the order in which jobs or tasks are processed.
سؤال
Johnson's sequencing rule is used to sequence:

A) several jobs through five work centers.
B) several jobs through one work center.
C) two jobs through several work centers.
D) several jobs through two work centers.
سؤال
The numerical difference between the completion time and the due date is called:

A) flow time
B) lateness
C) makespan
D) tardiness
سؤال
The time to rest and travel between games for baseball umpire crews is an important factor in developing their schedule.
سؤال
A requirement of Johnson's two-resource sequencing rule is:

A) all jobs must begin at the same time.
B) jobs must be processed through each work center in the same job sequence.
C) only two jobs can be processed at a time through each work center.
D) total processing time must be minimized.
سؤال
Gantt charts can be used to:

A) determine the appointment time interval.
B) determine how to handle overbooking for each day of the week.
C) display the two-resource sequencing solution using Johnson's Rule.
D) display minimizing maximum tardiness.
سؤال
Scheduling and sequencing methods used in manufacturing are more beneficial in low-contact, than high-contact, service processes.
سؤال
If the highest priority is to minimize the average job lateness, then the job sequence should begin with those jobs requiring:

A) the shortest processing time.
B) the smallest critical ratio.
C) the least remaining operations.
D) the longest processing time.
سؤال
Which of the following is NOT a criterion for evaluating job sequencing rules?

A) Average flow time
B) Lateness
C) Tardiness
D) Sum of processing times
سؤال
Telling an umpire crew to work baseball games in Chicago, then Milwaukee, and then Cleveland is an example of a sequence.
سؤال
The shortest processing time (SPT) rule:

A) maximizes the number of jobs in the system.
B) maximizes average flow time.
C) minimizes resource utilization.
D) minimizes work-in-process inventory.
سؤال
Scheduling problems occur almost exclusively in manufacturing.
سؤال
In a two-resource sequencing problem:

A) the makespan is the same for any sequence of jobs.
B) flow time is maximized.
C) the goal is to minimize makespan.
D) each job can be processed by either resource first.
سؤال
ScheduleAnywhere.com, an online software, helps clients do all the following EXCEPT:

A) schedule employees from any computer with Internet access.
B) decide how much to overbook for each day of the week.
C) see who's scheduled and who's available.
D) avoid scheduling conflicts.
سؤال
Scheduling applies to all aspects of the value chain.
سؤال
The sequencing rule that minimizes the maximum number of jobs that are past due from a given set of jobs is:

A) shortest processing time (SPT).
B) earliest due date (EDD).
C) first come, first served (FCFS).
D) least amount of work at the next process queue (LWNQ).
سؤال
Which of the following is NOT a consideration when designing an appointment system?

A) Determining the appointment time interval
B) Determining the appropriate sequencing rule
C) Determining the length of each workday and the time off-duty
D) Deciding on an overbooking policy
سؤال
The time needed to process a given set of jobs is called:

A) flow time.
B) ready time.
C) makespan.
D) due date.
سؤال
The chief disadvantage of the shortest processing time (SPT) rule is:

A) it maximizes the average flow time.
B) it maximizes the number of jobs in the system.
C) long-duration jobs may have excessive completion times.
D) average job lateness and average job tardiness are excessive.
سؤال
Sequencing is not as much of a concern when several activities use a common resource.
سؤال
Two examples of process-focused performance measures for sequencing rules are tardiness and lateness.
سؤال
In sequencing a set of jobs on a single processor, different sequences will have different makespans but the same average flow times.
سؤال
A tardiness measure can be either zero (0) or a positive number.
سؤال
The earliest due date (EDD) rule minimizes the maximum of jobs past due but doesn't perform well on average flow time, work-in-process (WIP) inventory, or resource utilization.
سؤال
Since all jobs eventually get done, job sequencing has no effect on resource utilization.
سؤال
Appointments can be viewed as a reservation of service time and capacity.
سؤال
For a single processor, a first come, first served (FCFS) rule minimizes the average flow time because it considers both the job and customer criterion.
سؤال
Tardiness measures the amount of time by which the completion time exceeds the due date.
سؤال
Appointments systems usually overbook to maximize revenue when no-show percentage reaches 10 percent or more.
سؤال
High flow times reduce work-in-process (WIP) inventory.
سؤال
A lateness measure can only be zero (0) or a positive number.
سؤال
Indirectly, appointments reduce the cost of providing a service because the service provider is idle less each workday.
سؤال
UPS, the world's largest package delivery company, is highly dependent on scheduling but not sequencing.
سؤال
Like the shortest processing time (SPT) rule, the earliest due date (EDD) rule minimizes the average flow time.
سؤال
The shortest processing time (SPT) sequencing rule will maximize the average flow time.
سؤال
In practice, whenever processing times of a set of jobs are almost equal, managers typically use a first come, first served (FCFS) rule.
سؤال
The makespan is the sum of flow times of a given set of jobs.
سؤال
The shortest processing time (SPT) rule and the earliest due date (EDD) rule will always provide the same sequence.
سؤال
Flow time is the amount of time a job spends in a shop or factory.
سؤال
Explain the three categories of criteria used to evaluate job sequencing performance. For each category, provide two example measures.
سؤال
Which one of the following statements about the Balloons Aloha case study on scheduling and sequencing is TRUE?

A) The sequencing rule used did not impact average flow time but it did change tardiness.
B) The earliest due date (EDD) rule was the best sequencing rule to use for this case situation.
C) The shortest processing time (SPT) rule was the best sequencing rule to use for this case situation.
D) Johnson's rule was the best sequencing rule to use for this case situation.
سؤال
At the end of each month, a research and development team writes status reports for the projects worked on during the month. The team leaders, Andrew and Julie, submit the reports to the R&D director on the first Monday of each month. It is late Friday evening and to their surprise, they discover that the month ends on Sunday, and the reports are due on Monday morning. They decide to come to work early Saturday morning, so they can finish the reports before Monday morning. They split the work as follows: Andrew will write and edit the reports, while Julie collates data and draws all the necessary graphs. Assume that Julie starts her work on a report as soon as Andrew is finished with it and that Andrew works continuously. Times for the reports (in hours) are as follows:
At the end of each month, a research and development team writes status reports for the projects worked on during the month. The team leaders, Andrew and Julie, submit the reports to the R&D director on the first Monday of each month. It is late Friday evening and to their surprise, they discover that the month ends on Sunday, and the reports are due on Monday morning. They decide to come to work early Saturday morning, so they can finish the reports before Monday morning. They split the work as follows: Andrew will write and edit the reports, while Julie collates data and draws all the necessary graphs. Assume that Julie starts her work on a report as soon as Andrew is finished with it and that Andrew works continuously. Times for the reports (in hours) are as follows:   a.What is the order of the projects using Johnson's rule? b.How many hours will it take them to finish all the reports? c.How many hours is Andrew idle? d.How many hours is Julie idle?<div style=padding-top: 35px>
a.What is the order of the projects using Johnson's rule?
b.How many hours will it take them to finish all the reports?
c.How many hours is Andrew idle?
d.How many hours is Julie idle?
سؤال
Give at least five examples of service organizations (and employee types) where, due to high variability in customer demand, staff-scheduling problems are prevalent.
سؤال
Describe the algorithm that defines Johnson's sequencing rule for the two-resource sequencing problem.
سؤال
Rescheduling rarely occurs unless customers change their requested due dates.
سؤال
A print shop has five large commercial printing jobs to finish. They are trying to decide whether to use the shortest processing time (SPT) or the first come, first served (FCFS) sequencing rule. Data on estimated processing time (in hours) and time to promised completion (in hours) is as follows (jobs shown in order of arrival):
A print shop has five large commercial printing jobs to finish. They are trying to decide whether to use the shortest processing time (SPT) or the first come, first served (FCFS) sequencing rule. Data on estimated processing time (in hours) and time to promised completion (in hours) is as follows (jobs shown in order of arrival):   a.What is the average flow time in hours using the FCFS rule? b.What is the average job lateness in hours using the FCFS rule? c.What is the average flow time in hours using the SPT rule? d.What is the average job lateness in hours using the SPT rule?<div style=padding-top: 35px>
a.What is the average flow time in hours using the FCFS rule?
b.What is the average job lateness in hours using the FCFS rule?
c.What is the average flow time in hours using the SPT rule?
d.What is the average job lateness in hours using the SPT rule?
سؤال
Compare and contrast the advantages and disadvantages of the shortest processing time (SPT) and the earliest due date (EDD) sequencing rules.
سؤال
A company is faced with seven tasks that have to be processed through two work centers, work center I and then center II. Assume work center I works continuously and that they are using Johnson's rule. Work centers need not change over to new jobs at the same time. Data appears below in hours:
A company is faced with seven tasks that have to be processed through two work centers, work center I and then center II. Assume work center I works continuously and that they are using Johnson's rule. Work centers need not change over to new jobs at the same time. Data appears below in hours:   a.What is the sequence of tasks? b.What is the time in hours to complete all the tasks in both work centers? c.What is the total idle time (in hours) for work center I? d.What is the total idle time (in hours) for work center II?<div style=padding-top: 35px>
a.What is the sequence of tasks?
b.What is the time in hours to complete all the tasks in both work centers?
c.What is the total idle time (in hours) for work center I?
d.What is the total idle time (in hours) for work center II?
سؤال
What are the four steps involved in staff scheduling that attempt to match available personnel with the needs of the organization?
سؤال
In sequencing jobs in a flow shop with two resources, Johnson's rule finds a sequence that has the smallest makespan.
سؤال
When several products share common facilities, product sequencing affects cost.
سؤال
An airplane repair facility has a contract to repair cargo aircrafts for a regional airline. There are 62 planes in the airline company's fleet of planes. Because of the punishing workload, the planes require a considerable amount of maintenance. The repair facility is trying to determine how to schedule the needed repairs. They want to compare the shortest processing time (SPT) rule and the first come, first served (FCFS) rule. Currently, the following planes need repair and are in the repair facility (data given is in the order of plane arrival, only one plane is worked on at a time, and the shop is open 24 hours a day, 7 days a week).
An airplane repair facility has a contract to repair cargo aircrafts for a regional airline. There are 62 planes in the airline company's fleet of planes. Because of the punishing workload, the planes require a considerable amount of maintenance. The repair facility is trying to determine how to schedule the needed repairs. They want to compare the shortest processing time (SPT) rule and the first come, first served (FCFS) rule. Currently, the following planes need repair and are in the repair facility (data given is in the order of plane arrival, only one plane is worked on at a time, and the shop is open 24 hours a day, 7 days a week).   a.In what order should the planes be repaired using the shortest processing time rule (use first letter of plane)? b.What is the average time (in hours) in the shop using the shortest processing time (SPT) rule? c.What is the average time (in hours) in the shop using the first come, first served (FCFS) rule?<div style=padding-top: 35px>
a.In what order should the planes be repaired using the shortest processing time rule (use first letter of plane)?
b.What is the average time (in hours) in the shop using the shortest processing time (SPT) rule?
c.What is the average time (in hours) in the shop using the first come, first served (FCFS) rule?
سؤال
Explain why any sequence chosen in the single-machine scheduling problem will not change makespan time.
سؤال
A restaurant needs the following number of wait staff to serve its evening guests. A restaurant needs the following number of wait staff to serve its evening guests.   How many employees are needed so that each has two consecutive days off? Construct a work schedule for these employees.<div style=padding-top: 35px> How many employees are needed so that each has two consecutive days off? Construct a work schedule for these employees.
سؤال
Differentiate between scheduling and sequencing.
سؤال
What are the four decisions that are considered in designing an appointment system?
سؤال
Short-term capacity fluctuations necessitate changes in schedules. List at least five factors affecting short-term capacity.
سؤال
Gantt charts can show what jobs are ahead of schedule, behind schedule, and on schedule.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/79
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Operations Scheduling and Sequencing
1
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average tardiness for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
less than or equal to 5 days
2
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the first come, first served (FCFS) rule to sequence these jobs, the average waiting (flow) time is _____.

A) more than 20 but less than or equal to 30 minutes
B) more than 30 but less than or equal to 40 minutes
C) more than 40 but less than or equal to 50 minutes
D) more than 50 minutes
D
3
Triage by nurses in an emergency room would be an example of:

A) scheduling.
B) sequencing.
C) appointments.
D) work shifts.
B
4
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence the patients, and if your uncle is patient B, he will be finished with surgery in _____.

A) less than or equal to 5 hours
B) more than 5 but less than or equal to 10 hours
C) more than 10 but less than or equal to 15 hours
D) more than 15 but less than or equal to 20 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
5
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average flow time for the five jobs is _____.

A) more than 10 but less than or equal to 20 days
B) more than 20 but less than or equal to 30 days
C) more than 30 but less than or equal to 40 days
D) more than 40 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
6
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using the staff scheduling method, the solution minimizes the number of employees required to meet this demand with _____ number of employees.

A) 3 employees
B) 4 employees
C) 5 employees
D) 6 employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
7
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
8
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the shortest processing time (SPT) rule to sequence these jobs, the final sequence is_____, if A is the first person to arrive and D is the last.

A) A, B, C, D
B) C, B, A, D
C) C, D, B, A
D) A, B, D, C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
9
Staff scheduling needs all of the following EXCEPT:

A) flow time estimates.
B) accurate forecasting.
C) staffing levels required by time period.
D) determining available personnel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
10
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average flow time for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
11
Scheduling refers to specifying:

A) the sequence in which jobs must be completed.
B) the due date for each job.
C) the start and completion times of jobs.
D) the makespan of each job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
12
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence these patients, the makespan is _____.

A) less than or equal to 5 hours
B) more than 5 but less than or equal to 10 hours
C) more than 10 but less than or equal to 15 hours
D) more than 15 but less than or equal to 20 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
13
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using staff scheduling method, the most overstaffed day is _____.

A) Friday only
B) Monday only
C) Tuesday only
D) Thursday only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
14
A new surgical facility called Cut & Sew is opening in neighborhoods throughout the United States. They are job shops that handle a variety of outpatient surgical procedures. Their process is set up so that one doctor cuts and another sews. They have five patients to sequence for tomorrow. Since the weather forecast is for a warm and sunny day, they would also like to play golf tomorrow. They want to sequence their patients with the objective of minimizing the time from the beginning of the first job until the finish of the last job. The patients and estimated times are as follows:
 Patient  Cut Time (hours)  Sew Time (hours)  A 2.32.8 B 2.53.0 C 2.01.5 D 0.61.0 E 3.62.6\begin{array}{|c|c|c|}\hline \text { Patient } & \text { Cut Time (hours) } & \text { Sew Time (hours) } \\\hline \text { A } & 2.3 & 2.8 \\\hline \text { B } & 2.5 & 3.0 \\\hline \text { C } & 2.0 & 1.5 \\\hline \text { D } & 0.6 & 1.0 \\\hline \text { E } & 3.6 & 2.6 \\\hline\end{array}

-Using Johnson's rule to sequence these patients, the final patient sequence is _____ considering "A" as the first patient and "E" as the last.

A) A, B, C, D, E
B) B, E, A, C, D
C) C, A, B, E, D
D) D, A, B, E, C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
15
A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.
 Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array}

-Using staff scheduling method, the days on which demand equals staff capacity are _____.

A) Tuesday and Wednesday
B) Wednesday and Sunday
C) Thursday and Friday
D) Friday and Saturday
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
16
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the earliest due date (EDD) rule, the average tardiness for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
17
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the shortest processing time (SPT) rule, the average flow time for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
18
A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order): Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
Using the shortest processing time (SPT) rule to sequence these jobs, the average waiting (flow) time is _____.

A) less than or equal to 20 minutes
B) more than 20 but less than or equal to 30 minutes
C) more than 30 but less than or equal to 40 minutes
D) more than 40 but less than or equal to 50 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
19
The following five jobs, along with their processing time and due dates, are given below.
 Processing  Days Due  Job  Time (days)  From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array}


-Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.

A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
20
The table below includes processing times and due dates for five jobs.
 Processing  Days Due  Job  Time (days)  From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array}

-Using the shortest processing time (SPT) rule, the average flow time for the five jobs is _____.

A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is an example of a situation for which a Gantt chart would be appropriate?

A) Developing a factory layout
B) Tracking inventory levels over time
C) Monitoring job schedules
D) Forecasting personnel requirements in a two-shift operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
22
Scheduling refers to determining the order in which jobs or tasks are processed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
23
Johnson's sequencing rule is used to sequence:

A) several jobs through five work centers.
B) several jobs through one work center.
C) two jobs through several work centers.
D) several jobs through two work centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
24
The numerical difference between the completion time and the due date is called:

A) flow time
B) lateness
C) makespan
D) tardiness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
25
The time to rest and travel between games for baseball umpire crews is an important factor in developing their schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
26
A requirement of Johnson's two-resource sequencing rule is:

A) all jobs must begin at the same time.
B) jobs must be processed through each work center in the same job sequence.
C) only two jobs can be processed at a time through each work center.
D) total processing time must be minimized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
27
Gantt charts can be used to:

A) determine the appointment time interval.
B) determine how to handle overbooking for each day of the week.
C) display the two-resource sequencing solution using Johnson's Rule.
D) display minimizing maximum tardiness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
28
Scheduling and sequencing methods used in manufacturing are more beneficial in low-contact, than high-contact, service processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
29
If the highest priority is to minimize the average job lateness, then the job sequence should begin with those jobs requiring:

A) the shortest processing time.
B) the smallest critical ratio.
C) the least remaining operations.
D) the longest processing time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is NOT a criterion for evaluating job sequencing rules?

A) Average flow time
B) Lateness
C) Tardiness
D) Sum of processing times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
31
Telling an umpire crew to work baseball games in Chicago, then Milwaukee, and then Cleveland is an example of a sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
32
The shortest processing time (SPT) rule:

A) maximizes the number of jobs in the system.
B) maximizes average flow time.
C) minimizes resource utilization.
D) minimizes work-in-process inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
33
Scheduling problems occur almost exclusively in manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
34
In a two-resource sequencing problem:

A) the makespan is the same for any sequence of jobs.
B) flow time is maximized.
C) the goal is to minimize makespan.
D) each job can be processed by either resource first.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
35
ScheduleAnywhere.com, an online software, helps clients do all the following EXCEPT:

A) schedule employees from any computer with Internet access.
B) decide how much to overbook for each day of the week.
C) see who's scheduled and who's available.
D) avoid scheduling conflicts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
36
Scheduling applies to all aspects of the value chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
37
The sequencing rule that minimizes the maximum number of jobs that are past due from a given set of jobs is:

A) shortest processing time (SPT).
B) earliest due date (EDD).
C) first come, first served (FCFS).
D) least amount of work at the next process queue (LWNQ).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is NOT a consideration when designing an appointment system?

A) Determining the appointment time interval
B) Determining the appropriate sequencing rule
C) Determining the length of each workday and the time off-duty
D) Deciding on an overbooking policy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
39
The time needed to process a given set of jobs is called:

A) flow time.
B) ready time.
C) makespan.
D) due date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
40
The chief disadvantage of the shortest processing time (SPT) rule is:

A) it maximizes the average flow time.
B) it maximizes the number of jobs in the system.
C) long-duration jobs may have excessive completion times.
D) average job lateness and average job tardiness are excessive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
41
Sequencing is not as much of a concern when several activities use a common resource.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
42
Two examples of process-focused performance measures for sequencing rules are tardiness and lateness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
43
In sequencing a set of jobs on a single processor, different sequences will have different makespans but the same average flow times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
44
A tardiness measure can be either zero (0) or a positive number.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
45
The earliest due date (EDD) rule minimizes the maximum of jobs past due but doesn't perform well on average flow time, work-in-process (WIP) inventory, or resource utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
46
Since all jobs eventually get done, job sequencing has no effect on resource utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
47
Appointments can be viewed as a reservation of service time and capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
48
For a single processor, a first come, first served (FCFS) rule minimizes the average flow time because it considers both the job and customer criterion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
49
Tardiness measures the amount of time by which the completion time exceeds the due date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
50
Appointments systems usually overbook to maximize revenue when no-show percentage reaches 10 percent or more.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
51
High flow times reduce work-in-process (WIP) inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
52
A lateness measure can only be zero (0) or a positive number.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
53
Indirectly, appointments reduce the cost of providing a service because the service provider is idle less each workday.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
54
UPS, the world's largest package delivery company, is highly dependent on scheduling but not sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
55
Like the shortest processing time (SPT) rule, the earliest due date (EDD) rule minimizes the average flow time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
56
The shortest processing time (SPT) sequencing rule will maximize the average flow time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
57
In practice, whenever processing times of a set of jobs are almost equal, managers typically use a first come, first served (FCFS) rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
58
The makespan is the sum of flow times of a given set of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
59
The shortest processing time (SPT) rule and the earliest due date (EDD) rule will always provide the same sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
60
Flow time is the amount of time a job spends in a shop or factory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
61
Explain the three categories of criteria used to evaluate job sequencing performance. For each category, provide two example measures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which one of the following statements about the Balloons Aloha case study on scheduling and sequencing is TRUE?

A) The sequencing rule used did not impact average flow time but it did change tardiness.
B) The earliest due date (EDD) rule was the best sequencing rule to use for this case situation.
C) The shortest processing time (SPT) rule was the best sequencing rule to use for this case situation.
D) Johnson's rule was the best sequencing rule to use for this case situation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
63
At the end of each month, a research and development team writes status reports for the projects worked on during the month. The team leaders, Andrew and Julie, submit the reports to the R&D director on the first Monday of each month. It is late Friday evening and to their surprise, they discover that the month ends on Sunday, and the reports are due on Monday morning. They decide to come to work early Saturday morning, so they can finish the reports before Monday morning. They split the work as follows: Andrew will write and edit the reports, while Julie collates data and draws all the necessary graphs. Assume that Julie starts her work on a report as soon as Andrew is finished with it and that Andrew works continuously. Times for the reports (in hours) are as follows:
At the end of each month, a research and development team writes status reports for the projects worked on during the month. The team leaders, Andrew and Julie, submit the reports to the R&D director on the first Monday of each month. It is late Friday evening and to their surprise, they discover that the month ends on Sunday, and the reports are due on Monday morning. They decide to come to work early Saturday morning, so they can finish the reports before Monday morning. They split the work as follows: Andrew will write and edit the reports, while Julie collates data and draws all the necessary graphs. Assume that Julie starts her work on a report as soon as Andrew is finished with it and that Andrew works continuously. Times for the reports (in hours) are as follows:   a.What is the order of the projects using Johnson's rule? b.How many hours will it take them to finish all the reports? c.How many hours is Andrew idle? d.How many hours is Julie idle?
a.What is the order of the projects using Johnson's rule?
b.How many hours will it take them to finish all the reports?
c.How many hours is Andrew idle?
d.How many hours is Julie idle?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
64
Give at least five examples of service organizations (and employee types) where, due to high variability in customer demand, staff-scheduling problems are prevalent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
65
Describe the algorithm that defines Johnson's sequencing rule for the two-resource sequencing problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
66
Rescheduling rarely occurs unless customers change their requested due dates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
67
A print shop has five large commercial printing jobs to finish. They are trying to decide whether to use the shortest processing time (SPT) or the first come, first served (FCFS) sequencing rule. Data on estimated processing time (in hours) and time to promised completion (in hours) is as follows (jobs shown in order of arrival):
A print shop has five large commercial printing jobs to finish. They are trying to decide whether to use the shortest processing time (SPT) or the first come, first served (FCFS) sequencing rule. Data on estimated processing time (in hours) and time to promised completion (in hours) is as follows (jobs shown in order of arrival):   a.What is the average flow time in hours using the FCFS rule? b.What is the average job lateness in hours using the FCFS rule? c.What is the average flow time in hours using the SPT rule? d.What is the average job lateness in hours using the SPT rule?
a.What is the average flow time in hours using the FCFS rule?
b.What is the average job lateness in hours using the FCFS rule?
c.What is the average flow time in hours using the SPT rule?
d.What is the average job lateness in hours using the SPT rule?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
68
Compare and contrast the advantages and disadvantages of the shortest processing time (SPT) and the earliest due date (EDD) sequencing rules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
69
A company is faced with seven tasks that have to be processed through two work centers, work center I and then center II. Assume work center I works continuously and that they are using Johnson's rule. Work centers need not change over to new jobs at the same time. Data appears below in hours:
A company is faced with seven tasks that have to be processed through two work centers, work center I and then center II. Assume work center I works continuously and that they are using Johnson's rule. Work centers need not change over to new jobs at the same time. Data appears below in hours:   a.What is the sequence of tasks? b.What is the time in hours to complete all the tasks in both work centers? c.What is the total idle time (in hours) for work center I? d.What is the total idle time (in hours) for work center II?
a.What is the sequence of tasks?
b.What is the time in hours to complete all the tasks in both work centers?
c.What is the total idle time (in hours) for work center I?
d.What is the total idle time (in hours) for work center II?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
70
What are the four steps involved in staff scheduling that attempt to match available personnel with the needs of the organization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
71
In sequencing jobs in a flow shop with two resources, Johnson's rule finds a sequence that has the smallest makespan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
72
When several products share common facilities, product sequencing affects cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
73
An airplane repair facility has a contract to repair cargo aircrafts for a regional airline. There are 62 planes in the airline company's fleet of planes. Because of the punishing workload, the planes require a considerable amount of maintenance. The repair facility is trying to determine how to schedule the needed repairs. They want to compare the shortest processing time (SPT) rule and the first come, first served (FCFS) rule. Currently, the following planes need repair and are in the repair facility (data given is in the order of plane arrival, only one plane is worked on at a time, and the shop is open 24 hours a day, 7 days a week).
An airplane repair facility has a contract to repair cargo aircrafts for a regional airline. There are 62 planes in the airline company's fleet of planes. Because of the punishing workload, the planes require a considerable amount of maintenance. The repair facility is trying to determine how to schedule the needed repairs. They want to compare the shortest processing time (SPT) rule and the first come, first served (FCFS) rule. Currently, the following planes need repair and are in the repair facility (data given is in the order of plane arrival, only one plane is worked on at a time, and the shop is open 24 hours a day, 7 days a week).   a.In what order should the planes be repaired using the shortest processing time rule (use first letter of plane)? b.What is the average time (in hours) in the shop using the shortest processing time (SPT) rule? c.What is the average time (in hours) in the shop using the first come, first served (FCFS) rule?
a.In what order should the planes be repaired using the shortest processing time rule (use first letter of plane)?
b.What is the average time (in hours) in the shop using the shortest processing time (SPT) rule?
c.What is the average time (in hours) in the shop using the first come, first served (FCFS) rule?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
74
Explain why any sequence chosen in the single-machine scheduling problem will not change makespan time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
75
A restaurant needs the following number of wait staff to serve its evening guests. A restaurant needs the following number of wait staff to serve its evening guests.   How many employees are needed so that each has two consecutive days off? Construct a work schedule for these employees. How many employees are needed so that each has two consecutive days off? Construct a work schedule for these employees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
76
Differentiate between scheduling and sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
77
What are the four decisions that are considered in designing an appointment system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
78
Short-term capacity fluctuations necessitate changes in schedules. List at least five factors affecting short-term capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
79
Gantt charts can show what jobs are ahead of schedule, behind schedule, and on schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.