Deck 15: Appendix: Quality Management

ملء الشاشة (f)
exit full mode
سؤال
For an 80 percent learning rate, if the first unit requires 100 labor-hours, the 8th unit will require 64 hours.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The people best suited to set work standards are managers with input from industrial engineers.
سؤال
Job and process analysis should follow work measurement.
سؤال
Regression analysis is used to predict times based on different attributes of work.
سؤال
The learning curve does not apply to supervisory personnel, some skilled craftspeople, or jobs that have non-repetitive job tasks.
سؤال
Personal fatigue and delay allowances are added to _____ to arrive at _____.

A) standard time; normal time
B) standard time; desired time
C) normal time; desired time
D) normal time; standard time
سؤال
Unavoidable delays should not be included in time studies.
سؤال
For a time study, it is assumed that distribution of task times follows a Poisson distribution.
سؤال
A performance rating factor (PRF) of 130 percent means that a worker is slow and needs 30 percent more time.
سؤال
The performance rating factor and allowances are based on human judgment.
سؤال
Predetermined time standards are advantageous since they avoid needing multiple performance ratings.
سؤال
In the sample size for work sampling, "p" will never be known exactly since it is the population parameter that is being estimated.
سؤال
A 90 percent learning curve implies faster learning than an 80 percent learning curve.
سؤال
After developing a predetermined standard, stopwatch or work-sampling time studies need not be performed.
سؤال
Allowances include time for all of the following EXCEPT:

A) fatigue.
B) equipment breakdowns.
C) rest periods.
D) poor scheduling.
سؤال
A performance rating factor (PRF) of 1.15 means:

A) a worker is working at a pace that is 15 percent faster than normal.
B) a worker is working at a pace that is 15 percent slower than normal.
C) a worker is working at a pace that is 15 percent faster than standard time.
D) a worker needs to add 15 percent to the standard time.
سؤال
The outputs from a work measurement study lead to the development of labor and equipment standards that are used for all of the following EXCEPT:

A) estimating workforce capacity.
B) determining fatigue and personal need allowances.
C) determining the cost of new work procedures.
D) providing accurate information for scheduling and sequencing.
سؤال
When timing a work activity with multiple tasks, the general rule is to take the largest sample size estimate and use it for all activities or tasks.
سؤال
Normal time needs to be adjusted for personal time and avoidable delays.
سؤال
Which of the following is NOT part of the general approach to time study?

A) Define and evaluate each task and activity.
B) Measure and record the time needed to perform each activity over a number of cycles.
C) Randomly observe work over a period of time to obtain a distribution of activities.
D) Determine the allowance factor for the work activity.
سؤال
Work standards _____.

A) improve motivation if set by managers
B) increase variability if set by workers
C) are best set informally
D) work best when designed by workers
سؤال
Define and relate normal time and standard time.
سؤال
A method of randomly observing work over a period of time to obtain a distribution of the activities that an individual or a group of employees performs is called _____.

A) learning curve analysis
B) time study
C) work sampling
D) work measurement
سؤال
The _____ states that the cost of doing any repetitive task, work activity, or project decreases as the accumulated experience of doing the job increases.

A) learning curve
B) experience curve
C) Deming philosophy
D) regression method
سؤال
Work sampling _____.

A) is based on normal distribution
B) is used for repetitive work activities
C) determines the proportion of time spent doing certain activities
D) requires a systematic (non-random) sample to obtain a distribution of activities
سؤال
Discuss several factors that can affect the applicability of the learning curve or experience curve and/or the amount of learning that occurs.
سؤال
Which of the following is NOT a practical issue when using learning curves?

A) Incentive systems and bonus plans may increase learning.
B) Complex, intellectual learning will be faster than learning simple tasks.
C) A contract phaseout may result in a lengthening of process times.
D) Keeping groups of employees together reaps a productivity benefit.
سؤال
All of following are true of learning curves EXCEPT:

A) they are not used for a pricing strategy.
B) they are affected by the ratio of manual to machine work.
C) 80 percent learning curves exhibit a step initial decline and then level off.
D) they are used in defense industries.
سؤال
All of the following are advantages of using regression analysis to determine standard time EXCEPT:

A) a smaller cycle time.
B) the assumption of additive task times.
C) statistically significant variables.
D) confidence intervals for the prediction.
سؤال
Define work sampling. Give examples of both manufacturing and service applications.
سؤال
How are predetermined time standards useful?
سؤال
Describe an experience curve.
سؤال
Define work measurement and what it leads to from an operations perspective.
سؤال
Explain the use of regression analysis in establishing standard times with an example.
سؤال
Explain the concept of learning curves using an 80 percent learning curve as an example.
سؤال
Define time study and describe the basic procedures for conducting a time study.
سؤال
A job had a normal time of 2.43 minutes, an allowance of 20 percent, and a forecast demand of 120 units per day. How long should it take to produce one day's output?
سؤال
Predetermined time standards are _____.

A) macromovements
B) available in books and electronic tables
C) a quick way to directly add up and get standard time
D) best suited for old and stable manufactured goods
سؤال
Discuss the two different sides of the debate over work standards.
سؤال
Consider the following time study data. Consider the following time study data.   a. If the performance rating factor for A = 1.15, B = 1.0, and C = 0.85, determine the normal time for the job. b. If personal allowance is 7 percent, fatigue allowance is 12 percent, personal delay allowance is 9 percent, and avoidable delay is 4 minutes, determine the standard time for the job.<div style=padding-top: 35px>
a. If the performance rating factor for A = 1.15, B = 1.0, and C = 0.85, determine the normal time for the job.
b. If personal allowance is 7 percent, fatigue allowance is 12 percent, personal delay allowance is 9 percent, and avoidable delay is 4 minutes, determine the standard time for the job.
سؤال
For a work-sampling study, there is a 95 percent probability that the processing time of an activity has an error of less than 0.06 minutes. The best estimate we have for "p" is 0.30. Determine the sample size needed for a work-sampling study if no estimate of "p" is available.
سؤال
The Chester Table Company mass produces quality end tables for motels. They produce 5,000 end tables per week. The owner is trying to determine how many workers he needs. The workers work 40 hours per week but are idle about three percent of the time because of the cleaning of their area. Their performance rating is equal to one. The owner has developed these time standards for operations per table:
Transporting the table through the plant = 2 minutes
Table top = 10 minutes
One leg = 4 minutes
Finishing = 5 minutes
a. How long does it take (in minutes) to produce one table?
b. What is the labor standard (in minutes) for this operation?
c. What is the minimum number of workers needed to produce 5000 tables in one week?
سؤال
Determine the sample size for the following time study given a standard deviation of four minutes and a 98 percent probability that the value of the sample mean is within 1.5 minutes?
سؤال
Consider the work sampling information below. Consider the work sampling information below.   a. If the performance rating factor for Q = 0.80, R = 1.10, and S = 1.10 and the total allowance is 17 percent, determine the normal time for the job. b. With the allowance of 17 percent, determine the output per hour.<div style=padding-top: 35px>
a. If the performance rating factor for Q = 0.80, R = 1.10, and S = 1.10 and the total allowance is 17 percent, determine the normal time for the job.
b. With the allowance of 17 percent, determine the output per hour.
سؤال
A yacht manufacturer signed a contract to build five sailboats for a California resort. Assuming an 85 percent learning curve, how many labor-hours will it take to build all five sailboats if it took 7,000 standard hours to build the original sailboat?
سؤال
An employee was observed over an extended period of time for a work-sampling study with the following results:
An employee was observed over an extended period of time for a work-sampling study with the following results:   While doing her job in a 40-hour workweek, the employee helped 120 face-to-face, walk-in customers. Determine the standard time in minutes that it took her to help each customer.<div style=padding-top: 35px> While doing her job in a 40-hour workweek, the employee helped 120 face-to-face, walk-in customers. Determine the standard time in minutes that it took her to help each customer.
سؤال
A fast-food stand has a thriving business in downtown Portland. They serve 3,500 burgers; 3,000 orders of fries; and 4,000 soft drinks per week. The workers work 40 hours per week but are idle two percent of the time. The manager wants to try to become more efficient. He has done a time study and found:
A fast-food stand has a thriving business in downtown Portland. They serve 3,500 burgers; 3,000 orders of fries; and 4,000 soft drinks per week. The workers work 40 hours per week but are idle two percent of the time. The manager wants to try to become more efficient. He has done a time study and found:   It takes 1 additional minute per additional item. The average order size is 3 items. a. What is the average number of orders per week? b. What is the average cycle time (in minutes) per order? c. What is the labor standard (in minutes) per order? d. How many workers does the manager need per week?<div style=padding-top: 35px> It takes 1 additional minute per additional item. The average order size is 3 items.
a. What is the average number of orders per week?
b. What is the average cycle time (in minutes) per order?
c. What is the labor standard (in minutes) per order?
d. How many workers does the manager need per week?
سؤال
The manager at a sewing factory uses a piece?rate pay system. She has just received an order for 600 dresses from a discount house downtown. She is trying to figure out what her costs are for the project. She has conducted a time study and found the following times for operations:
2 minutes to sew one sleeve
3 minutes to sew body of the dress
3.5 minutes to hem all unfinished edges
1 minute to attach the collar
3 minutes to attach all buttons
The workers must sit idle while they wait for supplies on the conveyor belt for an average of 30 seconds. Their performance rating is equal to one. She pays the workers $6.00 per hour.
a. What is the allowance factor for the operation?
b. What is the labor standard (in minutes) per dress?
c. What is the labor cost per dress?
d. What is the labor cost for the entire order of 600 dresses?
سؤال
A manufacturer made a commitment to supply 20 units of a product. The first unit took 1,200 hours to make, the second unit took 900 hours, and the third unit took 768 hours. Determine the total number of hours required to make the first ten (10) items.
سؤال
Determine the sample size for the following time study given a standard deviation of three ounces and a 92 percent probability that the value of the sample mean is within two ounces?
سؤال
A manufacturer made a commitment to supply 20 units of a product. The first unit took 1,200 hours to make, the second unit took 900 hours, and the third unit took 768 hours. How many hours should it take to make the 20th unit?
سؤال
A company manufactures tractors and lawnmowers. They have received an order for six deluxe custom riding lawnmowers for a local golf course. They must develop a cost estimate for the order. It is estimated that the first lawnmower will take 90 hours of shop time and a 75 per-cent learning curve is expected. The labor rate is $18.00 per hour, and the pricing policy of the company is to charge 2.5 times the cost of labor for the order.
a. How many hours should the sixth lawnmower take?
b. How many labor-hours should the whole order take?
c. What is the customer's price for the whole order?
d. What is the price per lawnmower?
e. If the original time estimate for the first lawnmower is too low, and it actually takes 80 hours for the third lawnmower, what is the labor hour estimate for the first unit?
f. If it actually really takes 80 hours for the third lawnmower, what is the new total labor cost for the entire order?
سؤال
Locksmith Inc. has an order from a bank for 50 specially designed safes, one for each branch. It is estimated that the first safe will require 75 hours of shop time and a 90 percent learning curve is expected. The labor rate is $15.00 per hour and the pricing policy of the company is to triple the labor cost of the order.
a. How many labor-hours should the 50th unit require?
b. How many labor-hours will the whole order require?
c. What is the customer's price for each safe?
سؤال
A company manufactures computer parts. They have received an order for 100 custom disc drives. It is estimated that the first drive will take 20 hours of shop time and an 80 percent learning curve is expected. The labor rate is $15.00, and the pricing policy is to charge 3 times the labor cost.
a. How many hours will the 100th disc drive take?
b. How many hours will the entire order take?
c. What is the price of the entire order?
d. What is the price per unit?
سؤال
Based on data from a work-sampling study, an office worker spends 21.5 percent of his time filing. Over the work-sampling period, he was idle 12 percent of the time. If the worker filed 420 items in a 40-hour workweek while performing other activities, and if his performance rating factor for filing was 0.95, determine the standard time, in minutes, he took to file an item.
سؤال
A furniture manufacturer has an order for 20 custom wine cabinets for a large hotel in Hawaii. It is estimated that the first cabinet will take 100 hours of shop time. An 85 percent learning curve is expected. The labor rate is $12.00 per hour. The pricing policy is to charge two times the labor cost for the order.
a. How many hours will the 20th wine cabinet take?
b. How many hours should the whole order take?
c. What is the price of each cabinet?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/56
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Appendix: Quality Management
1
For an 80 percent learning rate, if the first unit requires 100 labor-hours, the 8th unit will require 64 hours.
False
2
The people best suited to set work standards are managers with input from industrial engineers.
False
3
Job and process analysis should follow work measurement.
False
4
Regression analysis is used to predict times based on different attributes of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
5
The learning curve does not apply to supervisory personnel, some skilled craftspeople, or jobs that have non-repetitive job tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
6
Personal fatigue and delay allowances are added to _____ to arrive at _____.

A) standard time; normal time
B) standard time; desired time
C) normal time; desired time
D) normal time; standard time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
7
Unavoidable delays should not be included in time studies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
8
For a time study, it is assumed that distribution of task times follows a Poisson distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
9
A performance rating factor (PRF) of 130 percent means that a worker is slow and needs 30 percent more time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
10
The performance rating factor and allowances are based on human judgment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
11
Predetermined time standards are advantageous since they avoid needing multiple performance ratings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the sample size for work sampling, "p" will never be known exactly since it is the population parameter that is being estimated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
13
A 90 percent learning curve implies faster learning than an 80 percent learning curve.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
14
After developing a predetermined standard, stopwatch or work-sampling time studies need not be performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
15
Allowances include time for all of the following EXCEPT:

A) fatigue.
B) equipment breakdowns.
C) rest periods.
D) poor scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
16
A performance rating factor (PRF) of 1.15 means:

A) a worker is working at a pace that is 15 percent faster than normal.
B) a worker is working at a pace that is 15 percent slower than normal.
C) a worker is working at a pace that is 15 percent faster than standard time.
D) a worker needs to add 15 percent to the standard time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
17
The outputs from a work measurement study lead to the development of labor and equipment standards that are used for all of the following EXCEPT:

A) estimating workforce capacity.
B) determining fatigue and personal need allowances.
C) determining the cost of new work procedures.
D) providing accurate information for scheduling and sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
18
When timing a work activity with multiple tasks, the general rule is to take the largest sample size estimate and use it for all activities or tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
19
Normal time needs to be adjusted for personal time and avoidable delays.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following is NOT part of the general approach to time study?

A) Define and evaluate each task and activity.
B) Measure and record the time needed to perform each activity over a number of cycles.
C) Randomly observe work over a period of time to obtain a distribution of activities.
D) Determine the allowance factor for the work activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
21
Work standards _____.

A) improve motivation if set by managers
B) increase variability if set by workers
C) are best set informally
D) work best when designed by workers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
22
Define and relate normal time and standard time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
23
A method of randomly observing work over a period of time to obtain a distribution of the activities that an individual or a group of employees performs is called _____.

A) learning curve analysis
B) time study
C) work sampling
D) work measurement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
24
The _____ states that the cost of doing any repetitive task, work activity, or project decreases as the accumulated experience of doing the job increases.

A) learning curve
B) experience curve
C) Deming philosophy
D) regression method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
25
Work sampling _____.

A) is based on normal distribution
B) is used for repetitive work activities
C) determines the proportion of time spent doing certain activities
D) requires a systematic (non-random) sample to obtain a distribution of activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
26
Discuss several factors that can affect the applicability of the learning curve or experience curve and/or the amount of learning that occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is NOT a practical issue when using learning curves?

A) Incentive systems and bonus plans may increase learning.
B) Complex, intellectual learning will be faster than learning simple tasks.
C) A contract phaseout may result in a lengthening of process times.
D) Keeping groups of employees together reaps a productivity benefit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
28
All of following are true of learning curves EXCEPT:

A) they are not used for a pricing strategy.
B) they are affected by the ratio of manual to machine work.
C) 80 percent learning curves exhibit a step initial decline and then level off.
D) they are used in defense industries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
29
All of the following are advantages of using regression analysis to determine standard time EXCEPT:

A) a smaller cycle time.
B) the assumption of additive task times.
C) statistically significant variables.
D) confidence intervals for the prediction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
30
Define work sampling. Give examples of both manufacturing and service applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
31
How are predetermined time standards useful?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
32
Describe an experience curve.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
33
Define work measurement and what it leads to from an operations perspective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
34
Explain the use of regression analysis in establishing standard times with an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
35
Explain the concept of learning curves using an 80 percent learning curve as an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
36
Define time study and describe the basic procedures for conducting a time study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
37
A job had a normal time of 2.43 minutes, an allowance of 20 percent, and a forecast demand of 120 units per day. How long should it take to produce one day's output?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
38
Predetermined time standards are _____.

A) macromovements
B) available in books and electronic tables
C) a quick way to directly add up and get standard time
D) best suited for old and stable manufactured goods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
39
Discuss the two different sides of the debate over work standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
40
Consider the following time study data. Consider the following time study data.   a. If the performance rating factor for A = 1.15, B = 1.0, and C = 0.85, determine the normal time for the job. b. If personal allowance is 7 percent, fatigue allowance is 12 percent, personal delay allowance is 9 percent, and avoidable delay is 4 minutes, determine the standard time for the job.
a. If the performance rating factor for A = 1.15, B = 1.0, and C = 0.85, determine the normal time for the job.
b. If personal allowance is 7 percent, fatigue allowance is 12 percent, personal delay allowance is 9 percent, and avoidable delay is 4 minutes, determine the standard time for the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
41
For a work-sampling study, there is a 95 percent probability that the processing time of an activity has an error of less than 0.06 minutes. The best estimate we have for "p" is 0.30. Determine the sample size needed for a work-sampling study if no estimate of "p" is available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
42
The Chester Table Company mass produces quality end tables for motels. They produce 5,000 end tables per week. The owner is trying to determine how many workers he needs. The workers work 40 hours per week but are idle about three percent of the time because of the cleaning of their area. Their performance rating is equal to one. The owner has developed these time standards for operations per table:
Transporting the table through the plant = 2 minutes
Table top = 10 minutes
One leg = 4 minutes
Finishing = 5 minutes
a. How long does it take (in minutes) to produce one table?
b. What is the labor standard (in minutes) for this operation?
c. What is the minimum number of workers needed to produce 5000 tables in one week?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
43
Determine the sample size for the following time study given a standard deviation of four minutes and a 98 percent probability that the value of the sample mean is within 1.5 minutes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
44
Consider the work sampling information below. Consider the work sampling information below.   a. If the performance rating factor for Q = 0.80, R = 1.10, and S = 1.10 and the total allowance is 17 percent, determine the normal time for the job. b. With the allowance of 17 percent, determine the output per hour.
a. If the performance rating factor for Q = 0.80, R = 1.10, and S = 1.10 and the total allowance is 17 percent, determine the normal time for the job.
b. With the allowance of 17 percent, determine the output per hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
45
A yacht manufacturer signed a contract to build five sailboats for a California resort. Assuming an 85 percent learning curve, how many labor-hours will it take to build all five sailboats if it took 7,000 standard hours to build the original sailboat?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
46
An employee was observed over an extended period of time for a work-sampling study with the following results:
An employee was observed over an extended period of time for a work-sampling study with the following results:   While doing her job in a 40-hour workweek, the employee helped 120 face-to-face, walk-in customers. Determine the standard time in minutes that it took her to help each customer. While doing her job in a 40-hour workweek, the employee helped 120 face-to-face, walk-in customers. Determine the standard time in minutes that it took her to help each customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
47
A fast-food stand has a thriving business in downtown Portland. They serve 3,500 burgers; 3,000 orders of fries; and 4,000 soft drinks per week. The workers work 40 hours per week but are idle two percent of the time. The manager wants to try to become more efficient. He has done a time study and found:
A fast-food stand has a thriving business in downtown Portland. They serve 3,500 burgers; 3,000 orders of fries; and 4,000 soft drinks per week. The workers work 40 hours per week but are idle two percent of the time. The manager wants to try to become more efficient. He has done a time study and found:   It takes 1 additional minute per additional item. The average order size is 3 items. a. What is the average number of orders per week? b. What is the average cycle time (in minutes) per order? c. What is the labor standard (in minutes) per order? d. How many workers does the manager need per week? It takes 1 additional minute per additional item. The average order size is 3 items.
a. What is the average number of orders per week?
b. What is the average cycle time (in minutes) per order?
c. What is the labor standard (in minutes) per order?
d. How many workers does the manager need per week?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
48
The manager at a sewing factory uses a piece?rate pay system. She has just received an order for 600 dresses from a discount house downtown. She is trying to figure out what her costs are for the project. She has conducted a time study and found the following times for operations:
2 minutes to sew one sleeve
3 minutes to sew body of the dress
3.5 minutes to hem all unfinished edges
1 minute to attach the collar
3 minutes to attach all buttons
The workers must sit idle while they wait for supplies on the conveyor belt for an average of 30 seconds. Their performance rating is equal to one. She pays the workers $6.00 per hour.
a. What is the allowance factor for the operation?
b. What is the labor standard (in minutes) per dress?
c. What is the labor cost per dress?
d. What is the labor cost for the entire order of 600 dresses?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
49
A manufacturer made a commitment to supply 20 units of a product. The first unit took 1,200 hours to make, the second unit took 900 hours, and the third unit took 768 hours. Determine the total number of hours required to make the first ten (10) items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
50
Determine the sample size for the following time study given a standard deviation of three ounces and a 92 percent probability that the value of the sample mean is within two ounces?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
51
A manufacturer made a commitment to supply 20 units of a product. The first unit took 1,200 hours to make, the second unit took 900 hours, and the third unit took 768 hours. How many hours should it take to make the 20th unit?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
52
A company manufactures tractors and lawnmowers. They have received an order for six deluxe custom riding lawnmowers for a local golf course. They must develop a cost estimate for the order. It is estimated that the first lawnmower will take 90 hours of shop time and a 75 per-cent learning curve is expected. The labor rate is $18.00 per hour, and the pricing policy of the company is to charge 2.5 times the cost of labor for the order.
a. How many hours should the sixth lawnmower take?
b. How many labor-hours should the whole order take?
c. What is the customer's price for the whole order?
d. What is the price per lawnmower?
e. If the original time estimate for the first lawnmower is too low, and it actually takes 80 hours for the third lawnmower, what is the labor hour estimate for the first unit?
f. If it actually really takes 80 hours for the third lawnmower, what is the new total labor cost for the entire order?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
53
Locksmith Inc. has an order from a bank for 50 specially designed safes, one for each branch. It is estimated that the first safe will require 75 hours of shop time and a 90 percent learning curve is expected. The labor rate is $15.00 per hour and the pricing policy of the company is to triple the labor cost of the order.
a. How many labor-hours should the 50th unit require?
b. How many labor-hours will the whole order require?
c. What is the customer's price for each safe?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
54
A company manufactures computer parts. They have received an order for 100 custom disc drives. It is estimated that the first drive will take 20 hours of shop time and an 80 percent learning curve is expected. The labor rate is $15.00, and the pricing policy is to charge 3 times the labor cost.
a. How many hours will the 100th disc drive take?
b. How many hours will the entire order take?
c. What is the price of the entire order?
d. What is the price per unit?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
55
Based on data from a work-sampling study, an office worker spends 21.5 percent of his time filing. Over the work-sampling period, he was idle 12 percent of the time. If the worker filed 420 items in a 40-hour workweek while performing other activities, and if his performance rating factor for filing was 0.95, determine the standard time, in minutes, he took to file an item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
56
A furniture manufacturer has an order for 20 custom wine cabinets for a large hotel in Hawaii. It is estimated that the first cabinet will take 100 hours of shop time. An 85 percent learning curve is expected. The labor rate is $12.00 per hour. The pricing policy is to charge two times the labor cost for the order.
a. How many hours will the 20th wine cabinet take?
b. How many hours should the whole order take?
c. What is the price of each cabinet?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.