_____ occurs whenever one stage completes work and no units from the previous stage are awaiting processing.

A) Flow-blocking delay
B) Lack-of-work delay
C) Buffer delay
D) Propagation delay
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An assembly line with 28 operations is to be balanced. The total amount of time required for all 28 operations is 39 minutes. The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes. The line will operate for 450 minutes per day.
1)Determine the minimum and maximum cycle time.
2)What is the output rate if the cycle time is set at 2.2 minutes?

A)min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B)min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C)min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D)min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
سؤال
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 450 minutes per day. What must the cycle time be to achieve an output rate of 400 units/day?

A) 1.39 minutes
B) 11.54 minutes
C) 1.125 minutes
D) 0.89 minutes
سؤال
A _____ layout is an arrangement based on self-contained groups of equipment needed to produce a particular set of goods or services.

A) product
B) process
C) cellular
D) fixed-position
سؤال
Which of the following is NOT a common reason for facility layout studies?

A) There is significant change in demand or throughput volume.
B) A new good or service is introduced to the customer benefit package.
C) A new material supplier is used.
D) Different process, equipment and/or technology are installed.
سؤال
A _____ layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or delivery of a service.

A) product
B) process
C) cellular
D) fixed-position
سؤال
The production of large goods such as airplanes is best accomplished using a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
سؤال
The typical layout of facilities in a legal office would be an example of a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
سؤال
_____ classifies parts into families so that cellular layouts can be effectively used.

A) Ergonomics
B) Job enlargement
C) Group technology
D) Flow-blocking delay
سؤال
_____ layout is used for high volumes of demand and setup requirements.

A) Product
B) Process
C) Cellular
D) Fixed-position
سؤال
Which of the following statements is NOT true about cellular layout?

A) Workers concentrate more on moving parts of the machines rather than on production.
B) Workflow is standardized and centrally located.
C) It makes additional floor space available for productive uses.
D) It facilitates the processing of families of parts with similar processing requirements.
سؤال
The typical layout of facilities in a pizza restaurant would be an example of a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
سؤال
A _____ layout consists of a functional grouping of equipment or activities that do similar work.

A) product
B) process
C) cellular
D) fixed-position
سؤال
All of the following are limitations of process layouts EXCEPT:

A) high material handling costs.
B) more complicated planning and control systems.
C) low equipment utilization.
D) diverse range of products.
سؤال
All of the following are common objectives of layout studies EXCEPT to:

A) minimize delays in materials handling and customer movement.
B) minimize the number of workstations.
C) provide for good housekeeping and maintenance.
D) maintain flexibility.
سؤال
Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
 <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.</strong> A) task 3 B) task 4 C) task 5 D) task 6 <div style=padding-top: 35px>   <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.</strong> A) task 3 B) task 4 C) task 5 D) task 6 <div style=padding-top: 35px>  Worksheet for assembly-line balancing problem
 Workstation  Assigned Tasks  Total Time  Idle Time  A  B  C  D  E  F \begin{array}{|c|c|c|c|}\hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\\hline \text { A } & & & \\\hline \text { B } & & & \\\hline \text { C } & & & \\\hline \text { D } & & & \\\hline \text { E } & & & \\\hline \text { F } & & & \\\hline\end{array} Use the previous assembly-line balancing (ALB) information to answer Questions .

-The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.

A) task 3
B) task 4
C) task 5
D) task 6
سؤال
Identify an advantage of product layouts.

A) Highly flexible
B) Lower work-in-process inventories
C) Higher job satisfaction
D) Easy to add new products
سؤال
Which of the following statements is NOT true about fixed-position layouts?

A) Work-in-process remains stationary.
B) They require a high level of planning and control.
C) The volume of demand is very high.
D) They are used in the production of heavy machine tools and locomotives.
سؤال
Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
 <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -What is the cycle time?</strong> A) 6 minutes/unit B) 7 minutes/unit C) 8 minutes/unit D) 9 minutes/unit <div style=padding-top: 35px>   <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -What is the cycle time?</strong> A) 6 minutes/unit B) 7 minutes/unit C) 8 minutes/unit D) 9 minutes/unit <div style=padding-top: 35px>  Worksheet for assembly-line balancing problem
 Workstation  Assigned Tasks  Total Time  Idle Time  A  B  C  D  E  F \begin{array}{|c|c|c|c|}\hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\\hline \text { A } & & & \\\hline \text { B } & & & \\\hline \text { C } & & & \\\hline \text { D } & & & \\\hline \text { E } & & & \\\hline \text { F } & & & \\\hline\end{array} Use the previous assembly-line balancing (ALB) information to answer Questions .

-What is the cycle time?

A) 6 minutes/unit
B) 7 minutes/unit
C) 8 minutes/unit
D) 9 minutes/unit
سؤال
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. The company is planning to operate 2 shifts per day, 8 hours per shift. If the desired output rate of the line is 480 units per day, what is the cycle time?

A) 60 seconds
B) 120 seconds
C) 180 seconds
D) 240 seconds
سؤال
_____ occurs when a work center completes a unit but cannot release it because the in-process storage at the next stage is full.

A) Lack-of-work delay
B) Propagation delay
C) Flow-blocking delay
D) Overload delay
سؤال
The eleven tasks defined in Table 1 given below are necessary to assemble an MP3 player along with their time (in seconds) and flow diagram,
Table 1
 TASK  TIME (in seconds)  A 40 B 15 C 35 D 12 E 27 F 29 G 60 H 60 I 30 J 14 K 22 TOTAl: 327\begin{array}{cc}\text { TASK } & \text { TIME (in seconds) } \\\text { A } & 40 \\\text { B } & 15 \\\text { C } & 35 \\\text { D } & 12 \\\text { E } & 27 \\\text { F } & 29 \\\text { G } & 60 \\\text { H } & 60 \\\text { I } & 30 \\\text { J } & 14 \\\text { K } & 22 \\\hline\text { TOTAl: }&327\end{array}  <strong>The eleven tasks defined in Table 1 given below are necessary to assemble an MP3 player along with their time (in seconds) and flow diagram, Table 1  \begin{array}{cc}\text { TASK } & \text { TIME (in seconds) } \\ \text { A } & 40 \\ \text { B } & 15 \\ \text { C } & 35 \\ \text { D } & 12 \\ \text { E } & 27 \\ \text { F } & 29 \\ \text { G } & 60 \\ \text { H } & 60 \\ \text { I } & 30 \\ \text { J } & 14 \\ \text { K } & 22 \\ \hline\text { TOTAl: }&327 \end{array}     -Refer to Table 1. Using this data and a cycle time of 60 seconds, determine an assembly-line balance by using the longest-task-time rule. </strong> A) Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G, H Station 5: J, I, K  B) Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G, H Station 5: J Station 6: I, K  C)Station 1: A, B Station 2: C, E Station 3: D, F Station 4: G Station 5: H, I Station 6: J, K  D)Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G Station 5: H, J Station 6: I, K <div style=padding-top: 35px>

-Refer to Table 1. Using this data and a cycle time of 60 seconds, determine an assembly-line balance by using the longest-task-time rule.

A) Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G, H
Station 5: J, I, K

B) Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G, H
Station 5: J
Station 6: I, K

C)Station 1: A, B
Station 2: C, E
Station 3: D, F
Station 4: G
Station 5: H, I
Station 6: J, K

D)Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G
Station 5: H, J
Station 6: I, K

سؤال
Which of the following is NOT an objective of ergonomics?

A) To increase speed and accuracy
B) To reduce fatigue
C) To improve customer interaction
D) To increase the cost of doing the job
سؤال
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
 Task  Time (n minutes)  Predecessor(s)  A 0.5 none  B 0.4 A  C 0.6 A  D 0.2 B, C  E 0.3 B  F 0.7 E, D  G 0.4 F C \begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 0.5 & \text { none } \\\text { B } & 0.4 & \text { A } \\\text { C } & 0.6 & \text { A } \\\text { D } & 0.2 & \text { B, C } \\\text { E } & 0.3 & \text { B } \\\text { F } & 0.7 & \text { E, D } \\\text { G } & 0.4 & \text { F C }\end{array}

-Using the longest-task-time rule, the efficiency of an assembly-line balance is _____.

A) Less than 65%
B) more than 65% but less than 75%
C) more than 75% but less than 85%
D) more than 85% but less than 95%
سؤال
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 300 minutes per day. What must the cycle time be to achieve an output rate of 250 units/day?

A) 1.39 minutes
B) 11.2 minutes
C) 1.2 minutes
D) 0.89 minutes
سؤال
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
 Task  Time (n minutes)  Predecessor(s)  A 0.5 none  B 0.4 A  C 0.6 A  D 0.2 B, C  E 0.3 B  F 0.7 E, D  G 0.4 F C \begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 0.5 & \text { none } \\\text { B } & 0.4 & \text { A } \\\text { C } & 0.6 & \text { A } \\\text { D } & 0.2 & \text { B, C } \\\text { E } & 0.3 & \text { B } \\\text { F } & 0.7 & \text { E, D } \\\text { G } & 0.4 & \text { F C }\end{array}

-The cycle time is _____ seconds.

A) 45
B) 60
C) 75
D) 100
سؤال
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. Total idle time is _____ seconds using the longest-task-time rule.

A) 10
B) 15
C) 30
D) 25
سؤال
A line-balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass, Inc. The desired output rate of 30 spreaders per hour will be achieved. The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled. Which of the following statements is TRUE?

A) The cycle time is 30 seconds per spreader.
B) The theoretical minimum number of workstations is 10.
C) If the solution calls for 12 stations, the efficiency is 90%.
D) If the solution calls for 11 stations, the efficiency is 80%.
سؤال
The eleven tasks necessary to assemble an MP3 player along with their time (in seconds) and immediate predecessor(s) is given below:
 Task  Time (n minutes)  Predecessor(s)  A 40 none  B 15 none  C 35 none  D 12 A, B  E 27 B, C  F 29 D  G 60 D, E  H 30 E  I 14 F, G  J 22 G, H  K 43 I, J  Total 327\begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 40 & \text { none } \\\text { B } & 15 & \text { none } \\\text { C } & 35 & \text { none } \\\text { D } & 12 & \text { A, B } \\\text { E } & 27 & \text { B, C } \\\text { F } & 29 & \text { D } \\\text { G } & 60 & \text { D, E } \\\text { H } & 30 & \text { E } \\\text { I } & 14 & \text { F, G } \\\text { J } & 22 & \text { G, H } \\\text { K } & 43 & \text { I, J }\\\text { Total }&327\end{array} The company wants to produce 600 units in a 9-hour day.

-The minimum number of workstations required is _____.

A) 5
B) 6
C) 7
D) 8
سؤال
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 88 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. Using a cycle time of 60 seconds, determine an assembly-line balance by selecting the longest-processing-time task available. Compute the total idle time and assembly-line efficiency.
The total idle time is _____ seconds.

A) less than or equal to 20
B) more than 20 but less than or equal to 30
C) more than 30 but less than or equal to 40
D) more than 40 but less than or equal to 50
سؤال
A(n) _____ team performs entire jobs rather than specialized, assembly-line work.

A) virtual
B) self-managed
C) natural work
D) ergonomic
سؤال
For a given cycle time in line balancing, assembly-line efficiency can be increased by _____.

A) speeding the assembly line
B) slowing the assembly line
C) decreasing the number of workstations
D) increasing the number of workstations
سؤال
Which of the following statements is NOT true about assembly lines?

A) They are low cost.
B) They are a type of cellular layout.
C) They make goods and services affordable to mass markets.
D) They are important in service operations.
سؤال
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 88 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. Using a cycle time of 60 seconds, determine an assembly-line balance by selecting the longest-processing-time task available. Compute the total idle time and assembly-line efficiency.
Using the longest-task-time rule, the efficiency of the assembly-line balance is _____.

A) less than 65%
B) more than 65% but less than 75%
C) more than 75% but less than 85%
D) more than 85% but less than 95%
سؤال
_____ is vertical expansion of job duties to give a worker more responsibility.

A) Job enlargement
B) Job rotation
C) Job enrichment
D) Job design
سؤال
In designing _____ layouts, one is concerned with the arrangement of departments or work centers relative to each other.

A) product
B) cellular
C) process
D) fixed-position
سؤال
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. What is the efficiency using the longest-task-time rule?

A) Less than 85%
B) More than 85% but less than 91%
C) More than 91% but less than 93%
D) More than 93% but less than 95%
سؤال
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour. Table 2   Is this a good assembly-line balancing solution? Explain. What do you recommend?<div style=padding-top: 35px>
Is this a good assembly-line balancing solution? Explain. What do you recommend?
سؤال
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. What is the assembly-line efficiency with 11 stations and a product produced every 5 minutes?

A) Less than 65%
B) More than 65% but less than 75%
C) More than 75% but less than 85%
D) More than 85% but less than 95%
سؤال
The eleven tasks necessary to assemble an MP3 player along with their time (in seconds) and immediate predecessor(s) is given below:
 Task  Time (n minutes)  Predecessor(s)  A 40 none  B 15 none  C 35 none  D 12 A, B  E 27 B, C  F 29 D  G 60 D, E  H 30 E  I 14 F, G  J 22 G, H  K 43 I, J  Total 327\begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 40 & \text { none } \\\text { B } & 15 & \text { none } \\\text { C } & 35 & \text { none } \\\text { D } & 12 & \text { A, B } \\\text { E } & 27 & \text { B, C } \\\text { F } & 29 & \text { D } \\\text { G } & 60 & \text { D, E } \\\text { H } & 30 & \text { E } \\\text { I } & 14 & \text { F, G } \\\text { J } & 22 & \text { G, H } \\\text { K } & 43 & \text { I, J }\\\text { Total }&327\end{array} The company wants to produce 600 units in a 9-hour day.

-The cycle time is _____ seconds.

A) 45
B) 54
C) 63
D) 71
سؤال
Flow-blocking and lack-of-work delays can be reduced by assigning an appropriate level of capacity at each workstation.
سؤال
The facility layout in a library would most likely be a process layout.
سؤال
In a perfectly balanced assembly line, no bottlenecks exist.
سؤال
_____ is the horizontal expansion of a job to give a worker more variety-although not necessarily more responsibility.

A) Job design
B) Ergonomics
C) Job enlargement
D) Job enrichment
سؤال
Process layouts generally require less investment in equipment than product layouts because the equipment is less specialized.
سؤال
Changes in goods and services for a firm's customer benefit package do not impact facility layouts.
سؤال
The objective of assembly-line balancing is to group tasks among workstations so that the amount of work assigned to each workstation is highly variable, thus maximizing flexibility.
سؤال
A fixed-position layout is based on the sequence of operations that is performed during the manufacturing of a good or delivery of a service.
سؤال
In a product layout, flow-blocking delay occurs whenever one stage completes work and no units from the previous stage are awaiting processing.
سؤال
In a product layout, a breakdown of one piece of equipment will not cause the entire process to shut down.
سؤال
The predominant layout type used in hospitals is the fixed-position layout.
سؤال
In a _____ team, members communicate by computer, take turns as leaders, and join and leave the team as necessary.

A) self-managed
B) virtual
C) natural work
D) cross-functional
سؤال
Services such as legal and medical specialties employ cellular layouts.
سؤال
The determination of specific job tasks and responsibilities is called _____.

A) job design
B) ergonomics
C) job enlargement
D) job enrichment
سؤال
The volume of demand in product layout is low, while it is high in process layout.
سؤال
An assembly line is a type of product layout.
سؤال
Cellular layouts are designed according to the functional characteristics of equipment much in the same fashion as process layouts.
سؤال
Product layouts are less flexible than process layouts.
سؤال
Facility layout is not only concerned with the arrangement of physical facilities, but also the material handling capabilities within the facility.
سؤال
Workers in cellular layouts generally have greater responsibilities than those who work in product or process layouts.
سؤال
In a process layout technique, improvement is done on a current solution by exchanging two or three departments at a time to determine if total materials handling costs have been reduced.
سؤال
Explain assembly-line balancing. Discuss the three types of information needed to balance an assembly line.
سؤال
Differentiate between a flow-blocking delay and lack-of-work delay. How can each be reduced?
سؤال
Assembly-line balancing problems involving many distinct products (mixed-model line balancing) are generally easier to solve than single-model balancing problems because there are more alternatives available to assign tasks to workstations.
سؤال
Cycle time should be smaller than the largest operation time.
سؤال
Job enlargement approaches give workers more variety of work, but not necessarily more responsibility.
سؤال
Ergonomics is the science that is concerned with determining specific job tasks and responsibilities.
سؤال
A Gallup study showed that workers who are allowed to personalize their workplaces were no more productive than those who are not allowed.
سؤال
Because of precedence relationships in a network, assembly-line efficiencies will generally be very high.
سؤال
Cycle time is related to the output rate and the available time to produce output.
سؤال
Cycle time in assembly-line balancing is the maximum amount of time it takes to process a part at some workstation along the line.
سؤال
Virtual teams are empowered work teams that assume many traditional management responsibilities.
سؤال
In designing process layouts, arrangement of departments or work centers relative to each other is a primary concern.
سؤال
Which one of the following statements is TRUE regarding the BankUSA: Cash Movement case study?

A) The cycle time for the outgoing wire process was less than 2.0 minutes per wire.
B) Commercial (business) outgoing wires used a separate process different from the one for individual customer tractions.
C) Outgoing wire error rate data was not available in the case study.
D) The current assembly line for outgoing wires was understaffed based on assembly-line balancing (ALB) analysis.
سؤال
Self-managed teams perform entire jobs, rather than specialized, assembly-line work.
سؤال
Discuss four reasons for conducting a facility layout study.
سؤال
An assembly-line balancing minimizes the number of workstations for a given production rate or maximizes the production rate for a given number of workstations.
سؤال
Describe approaches used for process layout design.
سؤال
Differentiate between product layout, process layout, cellular layout, and fixed-position layout. State the advantages and disadvantages of each.
سؤال
Teams are a way of accomplishing job enrichment.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/92
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Facility and Work Designs
1
_____ occurs whenever one stage completes work and no units from the previous stage are awaiting processing.

A) Flow-blocking delay
B) Lack-of-work delay
C) Buffer delay
D) Propagation delay
B
2
An assembly line with 28 operations is to be balanced. The total amount of time required for all 28 operations is 39 minutes. The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes. The line will operate for 450 minutes per day.
1)Determine the minimum and maximum cycle time.
2)What is the output rate if the cycle time is set at 2.2 minutes?

A)min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B)min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C)min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D)min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
A
3
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 450 minutes per day. What must the cycle time be to achieve an output rate of 400 units/day?

A) 1.39 minutes
B) 11.54 minutes
C) 1.125 minutes
D) 0.89 minutes
C
4
A _____ layout is an arrangement based on self-contained groups of equipment needed to produce a particular set of goods or services.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is NOT a common reason for facility layout studies?

A) There is significant change in demand or throughput volume.
B) A new good or service is introduced to the customer benefit package.
C) A new material supplier is used.
D) Different process, equipment and/or technology are installed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
6
A _____ layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or delivery of a service.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
7
The production of large goods such as airplanes is best accomplished using a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
8
The typical layout of facilities in a legal office would be an example of a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
9
_____ classifies parts into families so that cellular layouts can be effectively used.

A) Ergonomics
B) Job enlargement
C) Group technology
D) Flow-blocking delay
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
10
_____ layout is used for high volumes of demand and setup requirements.

A) Product
B) Process
C) Cellular
D) Fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following statements is NOT true about cellular layout?

A) Workers concentrate more on moving parts of the machines rather than on production.
B) Workflow is standardized and centrally located.
C) It makes additional floor space available for productive uses.
D) It facilitates the processing of families of parts with similar processing requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
12
The typical layout of facilities in a pizza restaurant would be an example of a _____ layout.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
13
A _____ layout consists of a functional grouping of equipment or activities that do similar work.

A) product
B) process
C) cellular
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
14
All of the following are limitations of process layouts EXCEPT:

A) high material handling costs.
B) more complicated planning and control systems.
C) low equipment utilization.
D) diverse range of products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
15
All of the following are common objectives of layout studies EXCEPT to:

A) minimize delays in materials handling and customer movement.
B) minimize the number of workstations.
C) provide for good housekeeping and maintenance.
D) maintain flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
16
Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
 <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.</strong> A) task 3 B) task 4 C) task 5 D) task 6   <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.</strong> A) task 3 B) task 4 C) task 5 D) task 6  Worksheet for assembly-line balancing problem
 Workstation  Assigned Tasks  Total Time  Idle Time  A  B  C  D  E  F \begin{array}{|c|c|c|c|}\hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\\hline \text { A } & & & \\\hline \text { B } & & & \\\hline \text { C } & & & \\\hline \text { D } & & & \\\hline \text { E } & & & \\\hline \text { F } & & & \\\hline\end{array} Use the previous assembly-line balancing (ALB) information to answer Questions .

-The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.

A) task 3
B) task 4
C) task 5
D) task 6
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
17
Identify an advantage of product layouts.

A) Highly flexible
B) Lower work-in-process inventories
C) Higher job satisfaction
D) Easy to add new products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following statements is NOT true about fixed-position layouts?

A) Work-in-process remains stationary.
B) They require a high level of planning and control.
C) The volume of demand is very high.
D) They are used in the production of heavy machine tools and locomotives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
19
Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
 <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -What is the cycle time?</strong> A) 6 minutes/unit B) 7 minutes/unit C) 8 minutes/unit D) 9 minutes/unit   <strong>Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT     Worksheet for assembly-line balancing problem  \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB) information to answer Questions .  -What is the cycle time?</strong> A) 6 minutes/unit B) 7 minutes/unit C) 8 minutes/unit D) 9 minutes/unit  Worksheet for assembly-line balancing problem
 Workstation  Assigned Tasks  Total Time  Idle Time  A  B  C  D  E  F \begin{array}{|c|c|c|c|}\hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\\hline \text { A } & & & \\\hline \text { B } & & & \\\hline \text { C } & & & \\\hline \text { D } & & & \\\hline \text { E } & & & \\\hline \text { F } & & & \\\hline\end{array} Use the previous assembly-line balancing (ALB) information to answer Questions .

-What is the cycle time?

A) 6 minutes/unit
B) 7 minutes/unit
C) 8 minutes/unit
D) 9 minutes/unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
20
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. The company is planning to operate 2 shifts per day, 8 hours per shift. If the desired output rate of the line is 480 units per day, what is the cycle time?

A) 60 seconds
B) 120 seconds
C) 180 seconds
D) 240 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
21
_____ occurs when a work center completes a unit but cannot release it because the in-process storage at the next stage is full.

A) Lack-of-work delay
B) Propagation delay
C) Flow-blocking delay
D) Overload delay
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
22
The eleven tasks defined in Table 1 given below are necessary to assemble an MP3 player along with their time (in seconds) and flow diagram,
Table 1
 TASK  TIME (in seconds)  A 40 B 15 C 35 D 12 E 27 F 29 G 60 H 60 I 30 J 14 K 22 TOTAl: 327\begin{array}{cc}\text { TASK } & \text { TIME (in seconds) } \\\text { A } & 40 \\\text { B } & 15 \\\text { C } & 35 \\\text { D } & 12 \\\text { E } & 27 \\\text { F } & 29 \\\text { G } & 60 \\\text { H } & 60 \\\text { I } & 30 \\\text { J } & 14 \\\text { K } & 22 \\\hline\text { TOTAl: }&327\end{array}  <strong>The eleven tasks defined in Table 1 given below are necessary to assemble an MP3 player along with their time (in seconds) and flow diagram, Table 1  \begin{array}{cc}\text { TASK } & \text { TIME (in seconds) } \\ \text { A } & 40 \\ \text { B } & 15 \\ \text { C } & 35 \\ \text { D } & 12 \\ \text { E } & 27 \\ \text { F } & 29 \\ \text { G } & 60 \\ \text { H } & 60 \\ \text { I } & 30 \\ \text { J } & 14 \\ \text { K } & 22 \\ \hline\text { TOTAl: }&327 \end{array}     -Refer to Table 1. Using this data and a cycle time of 60 seconds, determine an assembly-line balance by using the longest-task-time rule. </strong> A) Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G, H Station 5: J, I, K  B) Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G, H Station 5: J Station 6: I, K  C)Station 1: A, B Station 2: C, E Station 3: D, F Station 4: G Station 5: H, I Station 6: J, K  D)Station 1: A, B Station 2: C, D Station 3: E, F Station 4: G Station 5: H, J Station 6: I, K

-Refer to Table 1. Using this data and a cycle time of 60 seconds, determine an assembly-line balance by using the longest-task-time rule.

A) Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G, H
Station 5: J, I, K

B) Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G, H
Station 5: J
Station 6: I, K

C)Station 1: A, B
Station 2: C, E
Station 3: D, F
Station 4: G
Station 5: H, I
Station 6: J, K

D)Station 1: A, B
Station 2: C, D
Station 3: E, F
Station 4: G
Station 5: H, J
Station 6: I, K

فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is NOT an objective of ergonomics?

A) To increase speed and accuracy
B) To reduce fatigue
C) To improve customer interaction
D) To increase the cost of doing the job
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
24
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
 Task  Time (n minutes)  Predecessor(s)  A 0.5 none  B 0.4 A  C 0.6 A  D 0.2 B, C  E 0.3 B  F 0.7 E, D  G 0.4 F C \begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 0.5 & \text { none } \\\text { B } & 0.4 & \text { A } \\\text { C } & 0.6 & \text { A } \\\text { D } & 0.2 & \text { B, C } \\\text { E } & 0.3 & \text { B } \\\text { F } & 0.7 & \text { E, D } \\\text { G } & 0.4 & \text { F C }\end{array}

-Using the longest-task-time rule, the efficiency of an assembly-line balance is _____.

A) Less than 65%
B) more than 65% but less than 75%
C) more than 75% but less than 85%
D) more than 85% but less than 95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
25
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 300 minutes per day. What must the cycle time be to achieve an output rate of 250 units/day?

A) 1.39 minutes
B) 11.2 minutes
C) 1.2 minutes
D) 0.89 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
26
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
 Task  Time (n minutes)  Predecessor(s)  A 0.5 none  B 0.4 A  C 0.6 A  D 0.2 B, C  E 0.3 B  F 0.7 E, D  G 0.4 F C \begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 0.5 & \text { none } \\\text { B } & 0.4 & \text { A } \\\text { C } & 0.6 & \text { A } \\\text { D } & 0.2 & \text { B, C } \\\text { E } & 0.3 & \text { B } \\\text { F } & 0.7 & \text { E, D } \\\text { G } & 0.4 & \text { F C }\end{array}

-The cycle time is _____ seconds.

A) 45
B) 60
C) 75
D) 100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
27
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. Total idle time is _____ seconds using the longest-task-time rule.

A) 10
B) 15
C) 30
D) 25
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
28
A line-balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass, Inc. The desired output rate of 30 spreaders per hour will be achieved. The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled. Which of the following statements is TRUE?

A) The cycle time is 30 seconds per spreader.
B) The theoretical minimum number of workstations is 10.
C) If the solution calls for 12 stations, the efficiency is 90%.
D) If the solution calls for 11 stations, the efficiency is 80%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
29
The eleven tasks necessary to assemble an MP3 player along with their time (in seconds) and immediate predecessor(s) is given below:
 Task  Time (n minutes)  Predecessor(s)  A 40 none  B 15 none  C 35 none  D 12 A, B  E 27 B, C  F 29 D  G 60 D, E  H 30 E  I 14 F, G  J 22 G, H  K 43 I, J  Total 327\begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 40 & \text { none } \\\text { B } & 15 & \text { none } \\\text { C } & 35 & \text { none } \\\text { D } & 12 & \text { A, B } \\\text { E } & 27 & \text { B, C } \\\text { F } & 29 & \text { D } \\\text { G } & 60 & \text { D, E } \\\text { H } & 30 & \text { E } \\\text { I } & 14 & \text { F, G } \\\text { J } & 22 & \text { G, H } \\\text { K } & 43 & \text { I, J }\\\text { Total }&327\end{array} The company wants to produce 600 units in a 9-hour day.

-The minimum number of workstations required is _____.

A) 5
B) 6
C) 7
D) 8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
30
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 88 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. Using a cycle time of 60 seconds, determine an assembly-line balance by selecting the longest-processing-time task available. Compute the total idle time and assembly-line efficiency.
The total idle time is _____ seconds.

A) less than or equal to 20
B) more than 20 but less than or equal to 30
C) more than 30 but less than or equal to 40
D) more than 40 but less than or equal to 50
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
31
A(n) _____ team performs entire jobs rather than specialized, assembly-line work.

A) virtual
B) self-managed
C) natural work
D) ergonomic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
32
For a given cycle time in line balancing, assembly-line efficiency can be increased by _____.

A) speeding the assembly line
B) slowing the assembly line
C) decreasing the number of workstations
D) increasing the number of workstations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following statements is NOT true about assembly lines?

A) They are low cost.
B) They are a type of cellular layout.
C) They make goods and services affordable to mass markets.
D) They are important in service operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
34
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 88 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. Using a cycle time of 60 seconds, determine an assembly-line balance by selecting the longest-processing-time task available. Compute the total idle time and assembly-line efficiency.
Using the longest-task-time rule, the efficiency of the assembly-line balance is _____.

A) less than 65%
B) more than 65% but less than 75%
C) more than 75% but less than 85%
D) more than 85% but less than 95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
35
_____ is vertical expansion of job duties to give a worker more responsibility.

A) Job enlargement
B) Job rotation
C) Job enrichment
D) Job design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
36
In designing _____ layouts, one is concerned with the arrangement of departments or work centers relative to each other.

A) product
B) cellular
C) process
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
37
Assembly-Line Balancing Problem-Table 1 below
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and Patrick, as an operations manager, is responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
 Work  Immediate  Element  Time (sec) Predecessor (s)  A 60B40 A  C 30 B  D 20 B  E 40 B  F 60 C G70 D H50 F, G  I 20 E J60 H, I \begin{array}{|l|l|l|}\hline\text { Work } && \text { Immediate } \\ \text { Element } & \text { Time }(s e c) & \text { Predecessor (s) }\\\hline\text { A } & 60 & -- \\B & 40 & \text { A } \\\text { C } & 30 & \text { B } \\\text { D } & 20 & \text { B } \\\text { E } & 40 & \text { B } \\\text { F } & 60 & \text { C } \\G & 70 & \text { D } \\H & 50 & \text { F, G } \\\text { I } & 20 & \text { E } \\J & 60 & \text { H, I }\\\hline\end{array}

-Use the information in Table 1. What is the efficiency using the longest-task-time rule?

A) Less than 85%
B) More than 85% but less than 91%
C) More than 91% but less than 93%
D) More than 93% but less than 95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
38
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour.
Table 2
Consider the following assembly line information for manufacturing the latest cell phone in Table 2. The firm wants to produce 80 cell phones per hour. Table 2   Is this a good assembly-line balancing solution? Explain. What do you recommend?
Is this a good assembly-line balancing solution? Explain. What do you recommend?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
39
An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. What is the assembly-line efficiency with 11 stations and a product produced every 5 minutes?

A) Less than 65%
B) More than 65% but less than 75%
C) More than 75% but less than 85%
D) More than 85% but less than 95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
40
The eleven tasks necessary to assemble an MP3 player along with their time (in seconds) and immediate predecessor(s) is given below:
 Task  Time (n minutes)  Predecessor(s)  A 40 none  B 15 none  C 35 none  D 12 A, B  E 27 B, C  F 29 D  G 60 D, E  H 30 E  I 14 F, G  J 22 G, H  K 43 I, J  Total 327\begin{array}{ccc}\text { Task } & \text { Time (n minutes) } & \text { Predecessor(s) } \\\text { A } & 40 & \text { none } \\\text { B } & 15 & \text { none } \\\text { C } & 35 & \text { none } \\\text { D } & 12 & \text { A, B } \\\text { E } & 27 & \text { B, C } \\\text { F } & 29 & \text { D } \\\text { G } & 60 & \text { D, E } \\\text { H } & 30 & \text { E } \\\text { I } & 14 & \text { F, G } \\\text { J } & 22 & \text { G, H } \\\text { K } & 43 & \text { I, J }\\\text { Total }&327\end{array} The company wants to produce 600 units in a 9-hour day.

-The cycle time is _____ seconds.

A) 45
B) 54
C) 63
D) 71
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
41
Flow-blocking and lack-of-work delays can be reduced by assigning an appropriate level of capacity at each workstation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
42
The facility layout in a library would most likely be a process layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
43
In a perfectly balanced assembly line, no bottlenecks exist.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
44
_____ is the horizontal expansion of a job to give a worker more variety-although not necessarily more responsibility.

A) Job design
B) Ergonomics
C) Job enlargement
D) Job enrichment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
45
Process layouts generally require less investment in equipment than product layouts because the equipment is less specialized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
46
Changes in goods and services for a firm's customer benefit package do not impact facility layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
47
The objective of assembly-line balancing is to group tasks among workstations so that the amount of work assigned to each workstation is highly variable, thus maximizing flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
48
A fixed-position layout is based on the sequence of operations that is performed during the manufacturing of a good or delivery of a service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
49
In a product layout, flow-blocking delay occurs whenever one stage completes work and no units from the previous stage are awaiting processing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
50
In a product layout, a breakdown of one piece of equipment will not cause the entire process to shut down.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
51
The predominant layout type used in hospitals is the fixed-position layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
52
In a _____ team, members communicate by computer, take turns as leaders, and join and leave the team as necessary.

A) self-managed
B) virtual
C) natural work
D) cross-functional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
53
Services such as legal and medical specialties employ cellular layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
54
The determination of specific job tasks and responsibilities is called _____.

A) job design
B) ergonomics
C) job enlargement
D) job enrichment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
55
The volume of demand in product layout is low, while it is high in process layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
56
An assembly line is a type of product layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
57
Cellular layouts are designed according to the functional characteristics of equipment much in the same fashion as process layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
58
Product layouts are less flexible than process layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
59
Facility layout is not only concerned with the arrangement of physical facilities, but also the material handling capabilities within the facility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
60
Workers in cellular layouts generally have greater responsibilities than those who work in product or process layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
61
In a process layout technique, improvement is done on a current solution by exchanging two or three departments at a time to determine if total materials handling costs have been reduced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
62
Explain assembly-line balancing. Discuss the three types of information needed to balance an assembly line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
63
Differentiate between a flow-blocking delay and lack-of-work delay. How can each be reduced?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
64
Assembly-line balancing problems involving many distinct products (mixed-model line balancing) are generally easier to solve than single-model balancing problems because there are more alternatives available to assign tasks to workstations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
65
Cycle time should be smaller than the largest operation time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
66
Job enlargement approaches give workers more variety of work, but not necessarily more responsibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
67
Ergonomics is the science that is concerned with determining specific job tasks and responsibilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
68
A Gallup study showed that workers who are allowed to personalize their workplaces were no more productive than those who are not allowed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
69
Because of precedence relationships in a network, assembly-line efficiencies will generally be very high.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
70
Cycle time is related to the output rate and the available time to produce output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
71
Cycle time in assembly-line balancing is the maximum amount of time it takes to process a part at some workstation along the line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
72
Virtual teams are empowered work teams that assume many traditional management responsibilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
73
In designing process layouts, arrangement of departments or work centers relative to each other is a primary concern.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which one of the following statements is TRUE regarding the BankUSA: Cash Movement case study?

A) The cycle time for the outgoing wire process was less than 2.0 minutes per wire.
B) Commercial (business) outgoing wires used a separate process different from the one for individual customer tractions.
C) Outgoing wire error rate data was not available in the case study.
D) The current assembly line for outgoing wires was understaffed based on assembly-line balancing (ALB) analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
75
Self-managed teams perform entire jobs, rather than specialized, assembly-line work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
76
Discuss four reasons for conducting a facility layout study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
77
An assembly-line balancing minimizes the number of workstations for a given production rate or maximizes the production rate for a given number of workstations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
78
Describe approaches used for process layout design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
79
Differentiate between product layout, process layout, cellular layout, and fixed-position layout. State the advantages and disadvantages of each.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
80
Teams are a way of accomplishing job enrichment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 92 في هذه المجموعة.