Which of the following is a characteristic of large-scale systems development projects?

A)short development intervals
B)single development site
C)avoidance of system localization
D)50-100 development team members
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Large-scale systems development requires extended development intervals as long as five or six years.
سؤال
Larger projects with longer development intervals will find it easier to meet baseline requirements.
سؤال
Which of the following statements is true of large-scale systems development projects?

A)They use simple computer programs to ensure consistency and speed in development.
B)They use development teams of less than 20 members to reduce complexity.
C)Their development can involve the integration of services from several companies.
D)Their development is carried out in a single site to ensure consistency.
سؤال
In the Project Management Body of Knowledge (PMBOK®)Guide, the different stages in the life of a project are referred to as ________.

A)configuration controls
B)knowledge areas
C)process groups
D)resource zones
سؤال
________ is a knowledge area that concerns contracts with outside vendors for services, materials, and outsourcing of functions.

A)Communications management
B)Quality management
C)Project integration
D)Procurement management
سؤال
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
سؤال
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Project integration
B)Project management
C)Procurement management
D)Quality management
سؤال
In the context of a systems development project, which of the following statements is true of the relationships between requirements, cost, and time?

A)Increasing the time for the completion of a project always increases the cost of the project.
B)Increasing the cost of a project will always reduce the time required to finish the project.
C)Reducing the requirements in a project rarely affects the time required to finish the project.
D)Reducing the number of requirements in a project reduces the overall cost of the project.
سؤال
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
سؤال
Pete, a civil engineer, is appointed to build a state-of-the-art office building.He begins planning the design and construction of the building with his team.He estimates that the building would take six months to build and assigns work and material accordingly to the workers.In this scenario, Pete is specifying the ________.

A)baseline
B)data model
C)line of code
D)scatter plot
سؤال
________ is a knowledge area that concerns the methods, media, and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
سؤال
What are the characteristics of information systems (IS)in large-scale systems development projects?
سؤال
The development of large-scale systems can involve the integration of products and services from different companies.
سؤال
Knowledge areas of the Project Management Body of Knowledge (PMBOK®)Guide refer to the factors in a project that need to be managed throughout the life of the project.
سؤال
What are the trade-offs in a systems development project's requirements, cost, and time?
سؤال
Increasing the cost of a project can reduce the time required to complete the project up to a certain point, beyond which, the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
سؤال
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

A)systems development life cycle
B)rapid application development
C)agile software development
D)structured system analysis
سؤال
The time involved in a project can always be reduced by increasing cost.
سؤال
Systems development projects require the balancing of three critical drivers: requirements, cost, and ________.

A)scope
B)time
C)performance
D)value
سؤال
________ refers to a set of management policies, practices, and tools that developers use to maintain control over a project's resources.

A)Perceptual mapping
B)Coordination control
C)Critical path analysis
D)Configuration control
سؤال
The smaller and shorter a project, the greater the chance of disruption due to unanticipated events.
سؤال
The critical path determines the earliest date by considering the shortest path through the network of activities.
سؤال
A well-managed project will never face problems of diseconomies of scale.
سؤال
Baseline work breakdown structures can be used for monitoring a project.
سؤال
A ________ defines the boundaries of a system in a work breakdown structure (WBS).

A)trade-off
B)code
C)scope
D)scale
سؤال
Which of the following tools shows the tasks, dates, and dependencies in a project?

A)Gantt chart
B)exception report
C)push report
D)DPlot
سؤال
In case of task dependencies in a project, all tasks must begin and end at the same time.
سؤال
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)Gantt chart
B)critical path
C)encryption algorithm
D)scatter plot
سؤال
Prototypes are examples of deliverables in a systems development project.
سؤال
A function point is a feature or function of a new program.
سؤال
Each task in a systems development project should culminate in one or more ________.

A)deliverables
B)zones
C)segments
D)designs
سؤال
Odell is the lead software developer for a new security system that needs to be urgently developed for a client.The client is insistent that the software be as infallible as possible, therefore, Odell would have to plan the systems development with precision.Which of the following activities would be Odell's biggest challenge while planning?

A)creating
B)scheduling
C)analyzing
D)testing
سؤال
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)economies of scope
C)increase in configuration control
D)lack of coordination
سؤال
A(n)________ is a hierarchy of the tasks required to complete a project.

A)scatter plot
B)work breakdown structure
C)encryption algorithm
D)virtual model
سؤال
Unexpected events are a minor hurdle and are rarely considered while managing a large-scale systems development project.
سؤال
What is a critical path? How is a critical path analysis done?
سؤال
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organizations can take to address this challenge.
سؤال
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
سؤال
Scheduling a large-scale project is more difficult than scheduling individual projects.
سؤال
________ is the process by which users agree to one set of conditions, then add a bit more, then add a bit more, and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
سؤال
Requirements creep is the process by which a project manager reduces his or her responsibilities for requirements through miniscule rollbacks.
سؤال
What are the biggest challenges for managing a large-scale systems development project?
سؤال
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 28: Systems Development Project Management
1
Which of the following is a characteristic of large-scale systems development projects?

A)short development intervals
B)single development site
C)avoidance of system localization
D)50-100 development team members
D
2
Large-scale systems development requires extended development intervals as long as five or six years.
True
3
Larger projects with longer development intervals will find it easier to meet baseline requirements.
False
4
Which of the following statements is true of large-scale systems development projects?

A)They use simple computer programs to ensure consistency and speed in development.
B)They use development teams of less than 20 members to reduce complexity.
C)Their development can involve the integration of services from several companies.
D)Their development is carried out in a single site to ensure consistency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
5
In the Project Management Body of Knowledge (PMBOK®)Guide, the different stages in the life of a project are referred to as ________.

A)configuration controls
B)knowledge areas
C)process groups
D)resource zones
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
6
________ is a knowledge area that concerns contracts with outside vendors for services, materials, and outsourcing of functions.

A)Communications management
B)Quality management
C)Project integration
D)Procurement management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
7
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
8
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Project integration
B)Project management
C)Procurement management
D)Quality management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
9
In the context of a systems development project, which of the following statements is true of the relationships between requirements, cost, and time?

A)Increasing the time for the completion of a project always increases the cost of the project.
B)Increasing the cost of a project will always reduce the time required to finish the project.
C)Reducing the requirements in a project rarely affects the time required to finish the project.
D)Reducing the number of requirements in a project reduces the overall cost of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
10
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
11
Pete, a civil engineer, is appointed to build a state-of-the-art office building.He begins planning the design and construction of the building with his team.He estimates that the building would take six months to build and assigns work and material accordingly to the workers.In this scenario, Pete is specifying the ________.

A)baseline
B)data model
C)line of code
D)scatter plot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
12
________ is a knowledge area that concerns the methods, media, and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
13
What are the characteristics of information systems (IS)in large-scale systems development projects?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
14
The development of large-scale systems can involve the integration of products and services from different companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
15
Knowledge areas of the Project Management Body of Knowledge (PMBOK®)Guide refer to the factors in a project that need to be managed throughout the life of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
16
What are the trade-offs in a systems development project's requirements, cost, and time?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
17
Increasing the cost of a project can reduce the time required to complete the project up to a certain point, beyond which, the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

A)systems development life cycle
B)rapid application development
C)agile software development
D)structured system analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
19
The time involved in a project can always be reduced by increasing cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
20
Systems development projects require the balancing of three critical drivers: requirements, cost, and ________.

A)scope
B)time
C)performance
D)value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
21
________ refers to a set of management policies, practices, and tools that developers use to maintain control over a project's resources.

A)Perceptual mapping
B)Coordination control
C)Critical path analysis
D)Configuration control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
22
The smaller and shorter a project, the greater the chance of disruption due to unanticipated events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
23
The critical path determines the earliest date by considering the shortest path through the network of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
24
A well-managed project will never face problems of diseconomies of scale.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
25
Baseline work breakdown structures can be used for monitoring a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
26
A ________ defines the boundaries of a system in a work breakdown structure (WBS).

A)trade-off
B)code
C)scope
D)scale
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following tools shows the tasks, dates, and dependencies in a project?

A)Gantt chart
B)exception report
C)push report
D)DPlot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
28
In case of task dependencies in a project, all tasks must begin and end at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
29
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)Gantt chart
B)critical path
C)encryption algorithm
D)scatter plot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
30
Prototypes are examples of deliverables in a systems development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
31
A function point is a feature or function of a new program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
32
Each task in a systems development project should culminate in one or more ________.

A)deliverables
B)zones
C)segments
D)designs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
33
Odell is the lead software developer for a new security system that needs to be urgently developed for a client.The client is insistent that the software be as infallible as possible, therefore, Odell would have to plan the systems development with precision.Which of the following activities would be Odell's biggest challenge while planning?

A)creating
B)scheduling
C)analyzing
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
34
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)economies of scope
C)increase in configuration control
D)lack of coordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
35
A(n)________ is a hierarchy of the tasks required to complete a project.

A)scatter plot
B)work breakdown structure
C)encryption algorithm
D)virtual model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
36
Unexpected events are a minor hurdle and are rarely considered while managing a large-scale systems development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
37
What is a critical path? How is a critical path analysis done?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
38
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organizations can take to address this challenge.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
39
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
40
Scheduling a large-scale project is more difficult than scheduling individual projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
41
________ is the process by which users agree to one set of conditions, then add a bit more, then add a bit more, and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
42
Requirements creep is the process by which a project manager reduces his or her responsibilities for requirements through miniscule rollbacks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
43
What are the biggest challenges for managing a large-scale systems development project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
44
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.