Deck 29: Agile Development

ملء الشاشة (f)
exit full mode
سؤال
According to the systems development life cycle (SDLC), the progress from requirements to implementation is nonlinear.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
"Test as you go" is a principle of the SDLC.
سؤال
Designing only the portions of the system that are needed to complete the current work being done is known as ________ design.

A)waterfall
B)scrum
C)just-in-time
D)frequent
سؤال
According to the systems development life cycle (SDLC), the linear progress from requirements to design to implementation is called the ________ method.

A)life cycle
B)waterfall
C)water cycle
D)scrum
سؤال
Extreme programming is one of the alternatives to the systems development life cycle (SDLC).
سؤال
Why is the systems development life cycle (SDLC)called the waterfall method?

A)It does not return to a development phase that has been completed.
B)It uses feedback from team members to schedule tasks.
C)It delivers a working version of the product at frequent intervals.
D)It can be used only for projects on information systems.
سؤال
Agile development methodologies advocate the design of the complete system at the beginning.
سؤال
In software development, where requirements change periodically, the waterfall model works well.
سؤال
The systems development life cycle (SDLC)gained popularity when the U.S.Department of Commerce stipulated that it would be used for all software development contracts.
سؤال
Which of the following is an advantage of using agile techniques over the SDLC?

A)In projects using agile techniques, customers test only the completed version of the product.
B)Changes in systems requirements are incorporated toward the end of the project.
C)System design is completed at the beginning of the project.
D)A working version of the product is delivered frequently during the project.
سؤال
The waterfall model used by the systems development life cycle (SDLC)is suitable for building physical things, such as a runway.
سؤال
The nature of the systems development life cycle (SDLC)denies the fact that system requirements are fuzzy and always changing.
سؤال
The systems development life cycle (SDLC)generates values ________.

A)in the beginning
B)after the design phase
C)at frequent intervals
D)at the very end
سؤال
Agile development methodologies welcome changes in requirements.
سؤال
The systems development life cycle (SDLC)gained popularity because it was stipulated that it would be used for all software development contracts by the U.S.Department of ________.

A)Defense
B)Education
C)Agriculture
D)Commerce
سؤال
The systems development life cycle (SDLC)is falling out of favor because it is very risky.
سؤال
Unlike agile techniques, the systems development life cycle (SDLC)delivers benefits early and often.
سؤال
Which of the following statements indicates why the SDLC is falling out of favor?

A)The system design is revised frequently.
B)It allows the team members to establish the project schedule.
C)It is risky, as no value is generated until the end of the project.
D)Systems requirements do not change during a project.
سؤال
Why is the systems development life cycle (SDLC)losing credibility?
سؤال
The systems development life cycle (SDLC)processes are designed to frequently deliver a working version of a product.
سؤال
According to agile development methodologies, testing never involves business customers.
سؤال
In a scrum, who is a scrum master? What are his or her responsibilities?
سؤال
In the scrum process, a stand-up is a 15-minute team meeting.
سؤال
Agile development methodologies are applicable only to team projects on information systems.
سؤال
In a scrum, who is a product owner?
سؤال
According to the scrum essentials, when is a project said to be done?
سؤال
Scrum essentials encourage minimal documentation.
سؤال
Briefly outline the scrum essentials.
سؤال
Agile development techniques assume that the development teams are unaware of their weaknesses.
سؤال
Which of the following development methodologies is associated with the scrum process?

A)agile development
B)systems development life cycle
C)V-Model
D)rapid application development
سؤال
Which of the following statements is true about the points system?

A)Points are assigned by the clients at the beginning of the project.
B)The most difficult task is assigned a point score of 1.
C)Consecutive integers are used to award point scores to tasks.
D)Points estimate the relative difficulty, rather than the relative duration of tasks.
سؤال
According to scrum essentials, the first step of each work period is to ________.

A)conduct team meets
B)determine tasks to perform
C)select requirements to consider
D)deliver a working version
سؤال
The function of a scrum master is to ________.

A)stop the misuse of meeting time
B)change product requirements and their priority
C)test programs on a regular basis
D)develop the database design
سؤال
What are the principles of agile development methodologies?
سؤال
In paired programming, two computers are used by the same programmer.
سؤال
Just-in-time design may lead to substantial revision of the work product produced previously in the project.
سؤال
Diana and her team are working on developing a software to manage accounting processes for a firm.Her team is following the scrum methodology, and Diana is the only person who has the authority to make changes in the requirements and priority of the project.This makes Diana the ________ of the team.

A)scrum master
B)product owner
C)database designer
D)business analyst
سؤال
Who are considered scrum team members?
سؤال
Agile development methodologies discourage interaction between developers and customers.
سؤال
Which of the following is true of paired programming?

A)Two team members get together and write two separate programs.
B)Two members share the same computer and write a program together.
C)A team member writes two programs.
D)A team member and the customer pair up to write a program.
سؤال
A team uses its ________ to determine how many requirements it can commit to accomplishing in the next scrum period.

A)velocity
B)capacity
C)momentum
D)vector
سؤال
Scrum is distinguished from other agile development methodologies, in part, by the way that it uses requirements to drive planning and scheduling.
سؤال
Which of the following is a characteristic that makes agile development a valid systems development process?

A)Team iteration and feedback are used for scheduling and tasking.
B)Process scheduling is performed by the scrum master.
C)Through iteration, team members decide when a project is complete.
D)Once a phase of development is completed, it is not revisited.
سؤال
Which of the following statements is true about velocity?

A)The customer sets the velocity of each scrum period.
B)When a project begins, the senior team members guess the velocity of the team.
C)After a scrum team commits to requirements in a scrum period, it estimates the velocity it can achieve.
D)A team approaches the scrum master to change the order of the requirements to which it has committed.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 29: Agile Development
1
According to the systems development life cycle (SDLC), the progress from requirements to implementation is nonlinear.
False
2
"Test as you go" is a principle of the SDLC.
False
3
Designing only the portions of the system that are needed to complete the current work being done is known as ________ design.

A)waterfall
B)scrum
C)just-in-time
D)frequent
C
4
According to the systems development life cycle (SDLC), the linear progress from requirements to design to implementation is called the ________ method.

A)life cycle
B)waterfall
C)water cycle
D)scrum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
5
Extreme programming is one of the alternatives to the systems development life cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
6
Why is the systems development life cycle (SDLC)called the waterfall method?

A)It does not return to a development phase that has been completed.
B)It uses feedback from team members to schedule tasks.
C)It delivers a working version of the product at frequent intervals.
D)It can be used only for projects on information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
7
Agile development methodologies advocate the design of the complete system at the beginning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
8
In software development, where requirements change periodically, the waterfall model works well.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
9
The systems development life cycle (SDLC)gained popularity when the U.S.Department of Commerce stipulated that it would be used for all software development contracts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is an advantage of using agile techniques over the SDLC?

A)In projects using agile techniques, customers test only the completed version of the product.
B)Changes in systems requirements are incorporated toward the end of the project.
C)System design is completed at the beginning of the project.
D)A working version of the product is delivered frequently during the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
11
The waterfall model used by the systems development life cycle (SDLC)is suitable for building physical things, such as a runway.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
12
The nature of the systems development life cycle (SDLC)denies the fact that system requirements are fuzzy and always changing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
13
The systems development life cycle (SDLC)generates values ________.

A)in the beginning
B)after the design phase
C)at frequent intervals
D)at the very end
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
14
Agile development methodologies welcome changes in requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
15
The systems development life cycle (SDLC)gained popularity because it was stipulated that it would be used for all software development contracts by the U.S.Department of ________.

A)Defense
B)Education
C)Agriculture
D)Commerce
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
16
The systems development life cycle (SDLC)is falling out of favor because it is very risky.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
17
Unlike agile techniques, the systems development life cycle (SDLC)delivers benefits early and often.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following statements indicates why the SDLC is falling out of favor?

A)The system design is revised frequently.
B)It allows the team members to establish the project schedule.
C)It is risky, as no value is generated until the end of the project.
D)Systems requirements do not change during a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
19
Why is the systems development life cycle (SDLC)losing credibility?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
20
The systems development life cycle (SDLC)processes are designed to frequently deliver a working version of a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
21
According to agile development methodologies, testing never involves business customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
22
In a scrum, who is a scrum master? What are his or her responsibilities?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the scrum process, a stand-up is a 15-minute team meeting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
24
Agile development methodologies are applicable only to team projects on information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
25
In a scrum, who is a product owner?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
26
According to the scrum essentials, when is a project said to be done?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
27
Scrum essentials encourage minimal documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
28
Briefly outline the scrum essentials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
29
Agile development techniques assume that the development teams are unaware of their weaknesses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following development methodologies is associated with the scrum process?

A)agile development
B)systems development life cycle
C)V-Model
D)rapid application development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following statements is true about the points system?

A)Points are assigned by the clients at the beginning of the project.
B)The most difficult task is assigned a point score of 1.
C)Consecutive integers are used to award point scores to tasks.
D)Points estimate the relative difficulty, rather than the relative duration of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
32
According to scrum essentials, the first step of each work period is to ________.

A)conduct team meets
B)determine tasks to perform
C)select requirements to consider
D)deliver a working version
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
33
The function of a scrum master is to ________.

A)stop the misuse of meeting time
B)change product requirements and their priority
C)test programs on a regular basis
D)develop the database design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
34
What are the principles of agile development methodologies?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
35
In paired programming, two computers are used by the same programmer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
36
Just-in-time design may lead to substantial revision of the work product produced previously in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
37
Diana and her team are working on developing a software to manage accounting processes for a firm.Her team is following the scrum methodology, and Diana is the only person who has the authority to make changes in the requirements and priority of the project.This makes Diana the ________ of the team.

A)scrum master
B)product owner
C)database designer
D)business analyst
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
38
Who are considered scrum team members?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
39
Agile development methodologies discourage interaction between developers and customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is true of paired programming?

A)Two team members get together and write two separate programs.
B)Two members share the same computer and write a program together.
C)A team member writes two programs.
D)A team member and the customer pair up to write a program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
41
A team uses its ________ to determine how many requirements it can commit to accomplishing in the next scrum period.

A)velocity
B)capacity
C)momentum
D)vector
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
42
Scrum is distinguished from other agile development methodologies, in part, by the way that it uses requirements to drive planning and scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is a characteristic that makes agile development a valid systems development process?

A)Team iteration and feedback are used for scheduling and tasking.
B)Process scheduling is performed by the scrum master.
C)Through iteration, team members decide when a project is complete.
D)Once a phase of development is completed, it is not revisited.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following statements is true about velocity?

A)The customer sets the velocity of each scrum period.
B)When a project begins, the senior team members guess the velocity of the team.
C)After a scrum team commits to requirements in a scrum period, it estimates the velocity it can achieve.
D)A team approaches the scrum master to change the order of the requirements to which it has committed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.