Deck 13: Managing the Systems Development Life Cycle

ملء الشاشة (f)
exit full mode
سؤال
An accountant's responsibility in the systems development life cycle (SDLC)is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The concept of reusability is central to the structured approach to systems design.
سؤال
In the conceptual design phase of the SDLC,task force members are focused on selecting the new system design.
سؤال
When the nature of the project and the needs of the user permit,most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
سؤال
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information systems tend to be short and shorter-payback projects are often desirable.
سؤال
According to the text,a stakeholder is an end user of a system.
سؤال
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities.
سؤال
Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,and personnel costs.
سؤال
All vendor-supported systems include software,infrastructure,and maintenance.
سؤال
In a backbone system,the vendor designs the user interface to fit the client's needs.
سؤال
Intangible benefits are not physical,but can be measured and expressed in financial terms.
سؤال
A tangible benefit can be measured and expressed in financial terms.
سؤال
When determining the operational feasibility of a new system,the expected ease of transition from the old system to the new system should be considered.
سؤال
One-time costs include operating and maintenance costs.
سؤال
All of the steps in the systems development life cycle apply both to software that is developed in-house and to commercial software.
سؤال
When the nature of the project and the needs of the user permit,most organizations will create the system in-house rather than rely on a commercial package.
سؤال
The conceptual design of modern systems follows one of two basic approaches: the structured approach and the object-oriented approach.
سؤال
When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis,and conceptual design phases of the systems development life cycle are relevant costs.
سؤال
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
سؤال
In-house developed systems are less reliable than commercial software.
سؤال
Which technique is least likely to be used to quantify intangible benefits?

A)opinion surveys
B)simulation models
C)professional judgment
D)review of accounting transaction data
سؤال
The formal product of the systems evaluation and selection phase of the systems development life cycle is

A)the report of systems analysis
B)the systems selection report
C)the detailed system design
D)the systems plan
سؤال
The testing of individual program modules is a part of

A)software acquisition costs
B)systems design costs
C)data conversion costs
D)programming costs
سؤال
Examples of recurring costs include

A)software acquisition
B)data conversion
C)personnel costs
D)systems design
سؤال
When studying the detailed feasibility of a new project

A)prototyping does not affect the schedule feasibility analysis
B)the need for user training will influence the schedule feasibility analysis
C)protection from fraud and errors will influence the schedule feasibility analysis
D)a cost-benefit review will affect the schedule feasibility analysis
سؤال
A tangible benefit

A)can be measured and expressed in financial terms
B)might increase revenues
C)might decrease costs
D)all of the above
سؤال
Intangible benefits

A)are easily measured
B)are of relatively little importance in making information system decisions
C)are sometimes estimated using customer satisfaction surveys
D)when measured, do not lend themselves to manipulation
سؤال
Recurring costs include all of the following except

A)data conversion
B)software maintenance
C)insurance
D)supplies
سؤال
An example of a tangible benefit is

A)increased customer satisfaction
B)more current information
C)reduced inventories
D)faster response to competitor actions
سؤال
A primary role for accountants during the detailed design and implementation phases is to ensure that controls are adequate to meet the requirements of Statement on Auditing Standards No.109.
سؤال
Protection from inadvertent disclosures of confidential information is part of the detailed

A)operational feasibility study
B)schedule feasibility study
C)legal feasibility study
D)economic feasibility study
سؤال
When implementing a new system,the costs associated with transferring data from one storage medium to another is an example of

A)a recurring cost
B)a data conversion cost
C)a systems design cost
D)a programming cost
سؤال
Strategic systems planning

A)is not technically part of the SDLC
B)will eliminate any crisis component in systems development
C)provides a static goal to be attained within a five-year period
D)all of the above
سؤال
One-time costs include all of the following except

A)site preparation
B)insurance
C)programming and testing
D)data conversion
سؤال
An example of an intangible benefit is

A)expansion into other markets
B)reduction in supplies and overhead
C)more efficient operations
D)reduced equipment maintenance
سؤال
A cost-benefit analysis is a part of the detailed

A)operational feasibility study
B)schedule feasibility study
C)legal feasibility study
D)economic feasibility study
سؤال
Examples of one-time costs include all of the following except

A)hardware acquisition
B)insurance
C)site preparation
D)programming
سؤال
Site preparation costs include all of the following except

A)crane used to install equipment
B)freight charges
C)supplies
D)reinforcement of the building floor
سؤال
If individual modules are thoroughly tested,it is not necessary to test the whole system.
سؤال
The systems steering committee is responsible for all of the following except

A)assigning priorities
B)determining whether and when to terminate systems projects
C)analyzing the technical feasibility of the project
D)budgeting funds for systems development
سؤال
The systems analysis report does not

A)identify user needs
B)specify requirements for the new system
C)formally state the goals and objectives of the system
D)specify the system processing methods
سؤال
The degree of compatibility between the firm's existing procedures and personnel skills and the requirements of the new system is called

A)technical feasibility
B)operational feasibility
C)schedule feasibility
D)legal feasibility
سؤال
Typically a systems analysis

A)results in a formal project schedule
B)does not include a review of the current system
C)identifies user needs and specifies new system requirements
D)is performed by the internal auditor
سؤال
Which of the following is not an advantage of commercial software? Commercial software

A)can be installed faster than a custom system
B)can be easily modified to the user's exact specifications
C)is significantly less expensive than a system developed in-house
D)is less likely to have errors than an equivalent system developed in-house
سؤال
A commercial software system that is completely finished,tested,and ready for implementation is called a

A)backbone system
B)vendor-supported system
C)benchmark system
D)turnkey system
سؤال
Project feasibility includes all of the following except

A)technical feasibility
B)conceptual feasibility
C)operational feasibility
D)schedule feasibility
سؤال
A disadvantage of surveying the current system is

A)it constrains the generation of ideas about the new system
B)it highlights elements of the current system that are worth preserving
C)it pinpoints the causes of the current problems
D)all of the above are advantages of surveying the current system
سؤال
Systems analysis involves all of the following except

A)gathering facts
B)surveying the current system
C)redesigning bottleneck activities
D)reviewing key documents
سؤال
Which statement is not true? A systems design walkthrough

A)is conducted by a quality assurance group
B)occurs just after system implementation
C)simulates the operation of the system in order to uncover errors and omissions
D)reduces costs by reducing the amount of reprogramming
سؤال
Which of the following is not a tool of systems analysts?

A)observation
B)task participation
C)audit reports
D)personal interviews
سؤال
When developing the conceptual design of a system

A)all similarities and differences between competing systems are highlighted
B)structure diagrams are commonly used
C)an iterative approach may be used
D)inputs, processes, and outputs that distinguish one alternative from another are identified
سؤال
The detailed design report contains all of the following except

A)input screen formats
B)alternative conceptual designs
C)report layouts
D)process logic
سؤال
The output of the detailed design phase of the systems development life cycle (SDLC)is a

A)fully documented system report
B)systems selection report
C)detailed design report
D)systems analysis report
سؤال
The benefits of the object-oriented approach to systems design include all of the following except

A)this approach requires a top-down approach
B)development time is reduced
C)a standard module once tested does not have to be retested until changes are made
D)system maintenance activities are simplified
سؤال
The ability of a system to protect individual privacy and confidentiality is an example of

A)schedule feasibility
B)operational feasibility
C)legal feasibility
D)economic feasibility
سؤال
Project planning includes all of the following except

A)evaluating a proposal's feasibility
B)preparing a formal project proposal
C)selecting hardware vendors
D)producing a project schedule
سؤال
Reasons that a new systems implementation may be unsuccessful include all of the following except

A)organizational restructuring required by the new system results in displaced workers
B)end users do not understand the strategic merits of the new system
C)employees are not trained to use the system
D)system development team members include representatives from end-user departments
سؤال
Aspects of project feasibility include all of the following except

A)technical feasibility
B)economic feasibility
C)logistic feasibility
D)schedule feasibility
سؤال
Which statement is not correct? The structured design approach

A)is a top-down approach
B)is documented by data flow diagrams and structure diagrams
C)assembles reusable modules rather than creating systems from scratch
D)starts with an abstract description of the system and redefines it to produce a more detailed description of the system
سؤال
After the systems analysis phase of the systems development life cycle (SDLC)is complete,the company will have a formal systems analysis report on

A)the conceptual design of the new system
B)an evaluation of the new system
C)users' needs and requirements for the new system
D)a comparison of alternative implementation procedures for the new system
سؤال
Name four techniques that systems analysts use to gather facts during system surveys.
سؤال
Describe the cold turkey (or big bang)approach to system cutover.
سؤال
Name three topics that would not be included in the systems analysis report.
سؤال
Why is cost-benefit analysis more difficult for information systems than for many other types of investments organizations make?
سؤال
Discuss the differences between turnkey systems and backbone systems.
سؤال
What topics should be included in a systems analysis report?
سؤال
How is the organization's business plan used during systems planning?
سؤال
List at least three one-time costs and three recurring costs in system development.
سؤال
How is strategic systems planning related to the other SDLC activities?
سؤال
Describe a risk associated with the phased cutover procedure for data conversion.
سؤال
List three advantages and one disadvantage of commercial software.
سؤال
What is meant by object-oriented design? What does it mean for systems design?
سؤال
Name three items included in the detailed design report.
سؤال
Why is the payback method often more useful than the net present value method for evaluating systems projects?
سؤال
Why does the conceptual design phase present several possible alternatives for the system?
سؤال
Discuss the advantage of the parallel operation cutover approach.
سؤال
Explain an advantage of surveying the current system when preparing a systems analysis for a new systems project.
سؤال
List four types of facts that should be gathered during an analysis of a system.
سؤال
Contrast the structured and object-oriented approaches to conceptual systems design.
سؤال
What is the project schedule and what does it represent?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Managing the Systems Development Life Cycle
1
An accountant's responsibility in the systems development life cycle (SDLC)is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
True
2
The concept of reusability is central to the structured approach to systems design.
False
3
In the conceptual design phase of the SDLC,task force members are focused on selecting the new system design.
False
4
When the nature of the project and the needs of the user permit,most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information systems tend to be short and shorter-payback projects are often desirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
According to the text,a stakeholder is an end user of a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,and personnel costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
All vendor-supported systems include software,infrastructure,and maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
In a backbone system,the vendor designs the user interface to fit the client's needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
Intangible benefits are not physical,but can be measured and expressed in financial terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
A tangible benefit can be measured and expressed in financial terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
When determining the operational feasibility of a new system,the expected ease of transition from the old system to the new system should be considered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
One-time costs include operating and maintenance costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
All of the steps in the systems development life cycle apply both to software that is developed in-house and to commercial software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
When the nature of the project and the needs of the user permit,most organizations will create the system in-house rather than rely on a commercial package.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
The conceptual design of modern systems follows one of two basic approaches: the structured approach and the object-oriented approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis,and conceptual design phases of the systems development life cycle are relevant costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
In-house developed systems are less reliable than commercial software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which technique is least likely to be used to quantify intangible benefits?

A)opinion surveys
B)simulation models
C)professional judgment
D)review of accounting transaction data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
The formal product of the systems evaluation and selection phase of the systems development life cycle is

A)the report of systems analysis
B)the systems selection report
C)the detailed system design
D)the systems plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
The testing of individual program modules is a part of

A)software acquisition costs
B)systems design costs
C)data conversion costs
D)programming costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
Examples of recurring costs include

A)software acquisition
B)data conversion
C)personnel costs
D)systems design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
When studying the detailed feasibility of a new project

A)prototyping does not affect the schedule feasibility analysis
B)the need for user training will influence the schedule feasibility analysis
C)protection from fraud and errors will influence the schedule feasibility analysis
D)a cost-benefit review will affect the schedule feasibility analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
A tangible benefit

A)can be measured and expressed in financial terms
B)might increase revenues
C)might decrease costs
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
Intangible benefits

A)are easily measured
B)are of relatively little importance in making information system decisions
C)are sometimes estimated using customer satisfaction surveys
D)when measured, do not lend themselves to manipulation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
Recurring costs include all of the following except

A)data conversion
B)software maintenance
C)insurance
D)supplies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
An example of a tangible benefit is

A)increased customer satisfaction
B)more current information
C)reduced inventories
D)faster response to competitor actions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
A primary role for accountants during the detailed design and implementation phases is to ensure that controls are adequate to meet the requirements of Statement on Auditing Standards No.109.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Protection from inadvertent disclosures of confidential information is part of the detailed

A)operational feasibility study
B)schedule feasibility study
C)legal feasibility study
D)economic feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
When implementing a new system,the costs associated with transferring data from one storage medium to another is an example of

A)a recurring cost
B)a data conversion cost
C)a systems design cost
D)a programming cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Strategic systems planning

A)is not technically part of the SDLC
B)will eliminate any crisis component in systems development
C)provides a static goal to be attained within a five-year period
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
One-time costs include all of the following except

A)site preparation
B)insurance
C)programming and testing
D)data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
An example of an intangible benefit is

A)expansion into other markets
B)reduction in supplies and overhead
C)more efficient operations
D)reduced equipment maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
A cost-benefit analysis is a part of the detailed

A)operational feasibility study
B)schedule feasibility study
C)legal feasibility study
D)economic feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
Examples of one-time costs include all of the following except

A)hardware acquisition
B)insurance
C)site preparation
D)programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
Site preparation costs include all of the following except

A)crane used to install equipment
B)freight charges
C)supplies
D)reinforcement of the building floor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
If individual modules are thoroughly tested,it is not necessary to test the whole system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
The systems steering committee is responsible for all of the following except

A)assigning priorities
B)determining whether and when to terminate systems projects
C)analyzing the technical feasibility of the project
D)budgeting funds for systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
The systems analysis report does not

A)identify user needs
B)specify requirements for the new system
C)formally state the goals and objectives of the system
D)specify the system processing methods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
The degree of compatibility between the firm's existing procedures and personnel skills and the requirements of the new system is called

A)technical feasibility
B)operational feasibility
C)schedule feasibility
D)legal feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
Typically a systems analysis

A)results in a formal project schedule
B)does not include a review of the current system
C)identifies user needs and specifies new system requirements
D)is performed by the internal auditor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is not an advantage of commercial software? Commercial software

A)can be installed faster than a custom system
B)can be easily modified to the user's exact specifications
C)is significantly less expensive than a system developed in-house
D)is less likely to have errors than an equivalent system developed in-house
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
A commercial software system that is completely finished,tested,and ready for implementation is called a

A)backbone system
B)vendor-supported system
C)benchmark system
D)turnkey system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
Project feasibility includes all of the following except

A)technical feasibility
B)conceptual feasibility
C)operational feasibility
D)schedule feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
A disadvantage of surveying the current system is

A)it constrains the generation of ideas about the new system
B)it highlights elements of the current system that are worth preserving
C)it pinpoints the causes of the current problems
D)all of the above are advantages of surveying the current system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
Systems analysis involves all of the following except

A)gathering facts
B)surveying the current system
C)redesigning bottleneck activities
D)reviewing key documents
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which statement is not true? A systems design walkthrough

A)is conducted by a quality assurance group
B)occurs just after system implementation
C)simulates the operation of the system in order to uncover errors and omissions
D)reduces costs by reducing the amount of reprogramming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is not a tool of systems analysts?

A)observation
B)task participation
C)audit reports
D)personal interviews
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
When developing the conceptual design of a system

A)all similarities and differences between competing systems are highlighted
B)structure diagrams are commonly used
C)an iterative approach may be used
D)inputs, processes, and outputs that distinguish one alternative from another are identified
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
The detailed design report contains all of the following except

A)input screen formats
B)alternative conceptual designs
C)report layouts
D)process logic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
The output of the detailed design phase of the systems development life cycle (SDLC)is a

A)fully documented system report
B)systems selection report
C)detailed design report
D)systems analysis report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
The benefits of the object-oriented approach to systems design include all of the following except

A)this approach requires a top-down approach
B)development time is reduced
C)a standard module once tested does not have to be retested until changes are made
D)system maintenance activities are simplified
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
The ability of a system to protect individual privacy and confidentiality is an example of

A)schedule feasibility
B)operational feasibility
C)legal feasibility
D)economic feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
Project planning includes all of the following except

A)evaluating a proposal's feasibility
B)preparing a formal project proposal
C)selecting hardware vendors
D)producing a project schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
Reasons that a new systems implementation may be unsuccessful include all of the following except

A)organizational restructuring required by the new system results in displaced workers
B)end users do not understand the strategic merits of the new system
C)employees are not trained to use the system
D)system development team members include representatives from end-user departments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
Aspects of project feasibility include all of the following except

A)technical feasibility
B)economic feasibility
C)logistic feasibility
D)schedule feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which statement is not correct? The structured design approach

A)is a top-down approach
B)is documented by data flow diagrams and structure diagrams
C)assembles reusable modules rather than creating systems from scratch
D)starts with an abstract description of the system and redefines it to produce a more detailed description of the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
After the systems analysis phase of the systems development life cycle (SDLC)is complete,the company will have a formal systems analysis report on

A)the conceptual design of the new system
B)an evaluation of the new system
C)users' needs and requirements for the new system
D)a comparison of alternative implementation procedures for the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Name four techniques that systems analysts use to gather facts during system surveys.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
Describe the cold turkey (or big bang)approach to system cutover.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
Name three topics that would not be included in the systems analysis report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Why is cost-benefit analysis more difficult for information systems than for many other types of investments organizations make?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Discuss the differences between turnkey systems and backbone systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
What topics should be included in a systems analysis report?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
How is the organization's business plan used during systems planning?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
List at least three one-time costs and three recurring costs in system development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
How is strategic systems planning related to the other SDLC activities?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Describe a risk associated with the phased cutover procedure for data conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
List three advantages and one disadvantage of commercial software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
What is meant by object-oriented design? What does it mean for systems design?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
Name three items included in the detailed design report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
Why is the payback method often more useful than the net present value method for evaluating systems projects?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
Why does the conceptual design phase present several possible alternatives for the system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
Discuss the advantage of the parallel operation cutover approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
Explain an advantage of surveying the current system when preparing a systems analysis for a new systems project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
List four types of facts that should be gathered during an analysis of a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
Contrast the structured and object-oriented approaches to conceptual systems design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
What is the project schedule and what does it represent?