Deck 11: Managing Project Risk

ملء الشاشة (f)
exit full mode
سؤال
After potential risks have been identified, the project team then evaluates the risk based on the probability that the risk event will occur and the potential loss associated with the event.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
According to Tzvi Raz, Aaron Shenhar, and Dov Dvir's risk management studies, risk management is widely used.
سؤال
Risk sharing involves partnering with others to share responsibility for the risk activities.
سؤال
Project risk is an uncertain event that has an effect on at least one project objective.
سؤال
A project with new and emerging technology will have a low complexity rating and a correspondingly low risk.
سؤال
On projects with a large equipment budget, the highest portion of risk may be toward the end of the project.
سؤال
All project mangers conduct a formal risk assessment on the project.
سؤال
Risk is the possibility of loss or injury.
سؤال
The purchase of insurance on certain items is a risk sharing method.
سؤال
Identifying risk is a purely routine, disciplined process.
سؤال
The project team often develops an alternative method for accomplishing a project goal when a risk event has been identified that may frustrate the accomplishment of that goal.
سؤال
A risk response plan can be used to identify increasing levels of detailed risk analysis.
سؤال
During the closeout phase, agreements for risk transfer should be concluded.
سؤال
Proactive project managers usually rely on their ability to handle unexpected events without prior planning.
سؤال
On projects with a low complexity profile, the project management team typically develops a list of items perceived to be slightly higher risk and track them during project reviews.
سؤال
The risk of not finding the skills needed to execute the project is an example of an environmental risk.
سؤال
Risk management is all about eliminating risk.
سؤال
According to David Parker and Alison Mobey's study of project managers, there was a high understanding of the tools and benefits of a structured analysis of project risks.
سؤال
Risk is allocated evenly over the life of the project.
سؤال
Contingency is typically managed as multiple line items in the project budget.
سؤال
According to David Parker and Alison Mobey's study of project managers:

A) there was a low understanding of the tools and benefits of a structured analysis of project risks.
B) work is oriented toward continuous improvement of existing processes over longer periods of time.
C) most managers focused on the work processes of the operation in order to manage risk.
D) most managers are risk averse and prefer to be optimistic and not consider risks or to avoid taking risks whenever possible.
E) managers are long-term focused and process oriented.
سؤال
An) _____ is the possible occurrence that may have a negative impact on the project.

A) critical path
B) scope creep
C) risk event
D) chance cause
E) control limit
سؤال
Risks that can be anticipated, such as exceptionally bad weather, are called _____.

A) risk events
B) uncertain risks
C) known risks
D) random risks
E) risk aversions
سؤال
External complexity includes legal, cultural, political, and ecological factors.
سؤال
Projects with high scores for internal complexity have low risks because of the detailed planning needed to deal with changes of scope or project statements.
سؤال
Reactive project managers:

A) do not consider risks.
B) prefer to be optimistic.
C) will develop elaborate risk management programs for their projects.
D) are more confident in their ability to handle unexpected events without prior planning.
E) avoid taking risks whenever possible.
سؤال
Which of the following is

A) David Hillson uses the same framework as the resource breakdown structure for developing a risk breakdown structure.
B) A risk breakdown structure organizes risks associated with each activity in the work breakdown structure using a table with increasing levels of detail to the right.
C) Hillson's approach helps the project team identify unknown risks.
D) Hillson's approach can be restrictive and less creative in identifying known risks.
E) Hillson's approach can be restrictive in identifying risks not easily found inside the work breakdown structure.
سؤال
Proactive project managers:

A) do not consider risks.
B) prefer to be optimistic.
C) will develop elaborate risk management programs for their projects.
D) are more confident in their ability to handle unexpected events without prior planning.
E) avoid taking risks whenever possible.
سؤال
Inadequacy of resources is an example of environmental complexity.
سؤال
On highly complex projects, _____.

A) basic measures such as percentage of activities completed and percentage of budget spent are adequate for budget evaluation
B) the process for evaluating risk is more informal with risk assessment meetings conducted every once in a while to assess risks at different phases of the project
C) an outside expert may be included in the risk assessment process and the risk assessment plan may take a more prominent role in the project execution plan
D) the project management team may develop a list of items perceived to be higher risk and track them during project reviews
E) the project manager may informally track items that may be considered risk items
سؤال
_____ simulation is a statistical model used on projects, which simulates a possible range of outcomes by trying many different combinations of risks based on their likelihood.

A) Discrete-event
B) Monte Carlo
C) Deterministic modeling
D) Mixed-mode
E) Parallel
سؤال
Which of the following is

A) Project risk focuses on identifying, assessing, and eliminating the risks on the project.
B) Risk management is all about eliminating risk.
C) Project risk is an uncertain event that, even if it occurs, has no effect on project objectives.
D) There are no risk-free projects.
E) Risk management involves identification, evaluation, and elevation of risk.
سؤال
_____ is about developing an understanding of which potential risks have the greatest possibility of occurring and can have the greatest negative impact on the project.

A) Risk mitigation
B) Risk sharing
C) Risk generalization
D) Risk evaluation
E) Risk management
سؤال
An) _____ organizes the risks that have been identified into categories using a table with increasing levels of detail to the right.

A) master schedule
B) risk breakdown structure
C) control chart
D) risk management plan
E) risk response plan
سؤال
There is _____ correlation between project risk and project complexity.

A) an unknown
B) a positive
C) no
D) a negative
E) a general
سؤال
The _____ is the plan to reduce or eliminate loss from unexpected events.

A) risk transfer plan
B) risk avoidance plan
C) risk acceptance plan
D) risk deflection plan
E) risk mitigation plan
سؤال
The possible loss that is associated with the business purpose of the project is called _____.

A) project risk
B) organizational risk
C) strategic risk
D) external risk
E) financial risk
سؤال
The sudden unavailability of key individuals on the project is an example of _____ risks.

A) people
B) cost
C) schedule
D) client
E) contractual
سؤال
On projects with a low complexity profile, _____.

A) the process for evaluating risk is more formal with risk assessment meetings held during the life of the project to assess risks at different phases of the project
B) an outside expert may be included in the risk assessment process and the risk assessment plan may take a more prominent role in the project execution plan
C) the project management team may develop a list of items perceived to be higher risk and track them during project reviews
D) the project manager may informally track items that may be considered risk items
E) statistical models are sometimes used to evaluate risk because there are too many different possible combinations of risks to calculate them one at a time
سؤال
According to Tzvi Raz, Aaron Shenhar, and Dov Dvir's risk management studies, which of the following is

A) Risk management is widely used.
B) The projects that were most likely to have a risk management plan were those that were actually high risk.
C) When risk management practices were applied to projects, they appeared to be moderately related to the success of the project.
D) The risk management approach influenced the meeting of project schedules and cost goals but exerted more influence on project product quality.
E) Good risk management increases the likelihood of a successful project.
سؤال
Describe the Monte Carlo simulation.
سؤال
High scores for external complexity imply high risks to the schedule, budget, and quality due to _____.

A) organizational complexity and changes of scope
B) unknown flaws in the technology and lack of familiarity with it
C) expensive resolution to lawsuits
D) unknown factors and limited resources
E) lack of clarity in project and scope statements
سؤال
What are the elements of risk management during the initiation phase of the project?
سؤال
_____ is a risk reduction method that shifts the risk from the project to another party.

A) Risk mitigation
B) Risk sharing
C) Risk breakdown structure
D) Risk avoidance
E) Risk transfer
سؤال
As the project progresses into the execution phase, _____.

A) risks need to be checked off on activities that have been performed
B) the total risk on the project typically increases
C) risks are identified with each major group of activities
D) a risk response plan can be used to identify increasing levels of detailed risk analysis
E) the risk breakdown structure needs to be examined to be sure all the risk events have been avoided
سؤال
Which of the following is

A) It usually involves developing an alternative strategy that has a higher probability of success.
B) It typically involves lower costs associated with accomplishing a project task.
C) A common risk avoidance technique is to adopt new techniques rather than use existing technologies.
D) A project team chooses a new vendor over an existing one with a proven track record.
E) It involves maintaining the project plan to eliminate a risk.
سؤال
Which of the following is

A) Risk seems to have a negative correlation to complexity.
B) High-risk projects are in very few cases highly complex.
C) The risk breakdown analysis explores the project from the perspective of what elements on the project add to project complexity.
D) The project team develops a risk breakdown structure that addresses the items that are identified as high risk.
E) The process of conducting a risk analysis focuses on developing an understanding of what can go wrong and the likelihood that it will go wrong.
سؤال
What is the advantage of risk sharing a project with another company?
سؤال
What are the elements of risk management in the planning phase of the project?
سؤال
Which of the following is part of the closeout phase?

A) Conceptual estimate of risk
B) Monte Carlo simulation
C) Conclusion of risk sharing and risk transfer agreements
D) Creating a RBS
E) Resource leveling
سؤال
Which of the following is

A) Contingency funds are funds set aside by the client to address unforeseen events that cause the project costs to increase.
B) Projects with a high risk profile will typically have a small contingency budget.
C) Contingency is typically managed as multiple line items in the project budget.
D) Allocating the contingency budget to the items in the budget that have low risk allows the project team to track the use of contingency against the risk plan.
E) The availability of contingency funds in the line item budget may increase the use of contingency funds to solve problems rather than finding alternative solutions.
سؤال
On global projects with a large amount of political risk, the highest portion of risk may be _____.

A) in the execution phase
B) in the planning stage
C) toward the end of the project
D) in the early phases of the project
E) during the procurement of goods and services
سؤال
_____ risks are events that have been identified and analyzed for which advanced planning is possible.
سؤال
What is the difference between project risk and organizational risk?
سؤال
High scores for internal complexity imply high risks to the budget, schedule, and quality due to _____.

A) expensive resolution to public opposition
B) organizational complexity and changes of scope
C) unknown factors and limited resources
D) unknown flaws in the technology and lack of familiarity with it
E) expensive resolution to lawsuits
سؤال
High scores for environmental complexity imply high risks for delay and _____.

A) unknown factors
B) limited resources
C) expensive resolution to lawsuits
D) organizational complexity
E) lack of clarity in project and scope statements
سؤال
During the closeout phase, _____.

A) risks must be weighed against the potential benefit of the project's success
B) agreements for risk sharing and risk transfer need to be concluded
C) risks are identified with each major group of activities
D) a risk breakdown structure can be used to identify increasing levels of detailed risk analysis
E) the risk plan needs to be updated with new information
سؤال
Once the project is approved and moves into the planning stage, _____.

A) agreements for risk sharing need to be concluded
B) the total risk on the project typically reduces as activities are performed without loss
C) risks must be weighed against the potential benefit of the project's success in order to decide if the project should be chosen
D) risks are identified with each major group of activities
E) a risk response plan can be used to identify increasing levels of detailed risk analysis
سؤال
Risk must be considered in the _____ phase and weighed against the potential benefit of the project's success in order to decide if the project should be chosen.

A) completion
B) closeout
C) execution
D) planning
E) initiation
سؤال
Describe the impact of high scores in technology complexity. What are the risks of technology complexity?
سؤال
Projects that have a high score in the external complexity category in the _____ Index are larger and longer than usual for the project management group and the project manager and the available resources are lacking.
سؤال
During the closeout phase, agreements for risk _____ and risk _____ need to be concluded and the risk breakdown structure examined to be sure all the risk events have been avoided or mitigated.
سؤال
_____ includes both the identification of potential risk and the evaluation of the potential impact of the risk.
سؤال
Risk seems to have an) _____ correlation to complexity.
سؤال
Two variables that respond in the same way to changes in their environment are said to have an) _____.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/65
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Managing Project Risk
1
After potential risks have been identified, the project team then evaluates the risk based on the probability that the risk event will occur and the potential loss associated with the event.
True
2
According to Tzvi Raz, Aaron Shenhar, and Dov Dvir's risk management studies, risk management is widely used.
False
3
Risk sharing involves partnering with others to share responsibility for the risk activities.
True
4
Project risk is an uncertain event that has an effect on at least one project objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
5
A project with new and emerging technology will have a low complexity rating and a correspondingly low risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
6
On projects with a large equipment budget, the highest portion of risk may be toward the end of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
7
All project mangers conduct a formal risk assessment on the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
8
Risk is the possibility of loss or injury.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
9
The purchase of insurance on certain items is a risk sharing method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
10
Identifying risk is a purely routine, disciplined process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
11
The project team often develops an alternative method for accomplishing a project goal when a risk event has been identified that may frustrate the accomplishment of that goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
12
A risk response plan can be used to identify increasing levels of detailed risk analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
13
During the closeout phase, agreements for risk transfer should be concluded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
14
Proactive project managers usually rely on their ability to handle unexpected events without prior planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
15
On projects with a low complexity profile, the project management team typically develops a list of items perceived to be slightly higher risk and track them during project reviews.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
16
The risk of not finding the skills needed to execute the project is an example of an environmental risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
17
Risk management is all about eliminating risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
18
According to David Parker and Alison Mobey's study of project managers, there was a high understanding of the tools and benefits of a structured analysis of project risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
19
Risk is allocated evenly over the life of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
20
Contingency is typically managed as multiple line items in the project budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
21
According to David Parker and Alison Mobey's study of project managers:

A) there was a low understanding of the tools and benefits of a structured analysis of project risks.
B) work is oriented toward continuous improvement of existing processes over longer periods of time.
C) most managers focused on the work processes of the operation in order to manage risk.
D) most managers are risk averse and prefer to be optimistic and not consider risks or to avoid taking risks whenever possible.
E) managers are long-term focused and process oriented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
22
An) _____ is the possible occurrence that may have a negative impact on the project.

A) critical path
B) scope creep
C) risk event
D) chance cause
E) control limit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
23
Risks that can be anticipated, such as exceptionally bad weather, are called _____.

A) risk events
B) uncertain risks
C) known risks
D) random risks
E) risk aversions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
24
External complexity includes legal, cultural, political, and ecological factors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
25
Projects with high scores for internal complexity have low risks because of the detailed planning needed to deal with changes of scope or project statements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
26
Reactive project managers:

A) do not consider risks.
B) prefer to be optimistic.
C) will develop elaborate risk management programs for their projects.
D) are more confident in their ability to handle unexpected events without prior planning.
E) avoid taking risks whenever possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is

A) David Hillson uses the same framework as the resource breakdown structure for developing a risk breakdown structure.
B) A risk breakdown structure organizes risks associated with each activity in the work breakdown structure using a table with increasing levels of detail to the right.
C) Hillson's approach helps the project team identify unknown risks.
D) Hillson's approach can be restrictive and less creative in identifying known risks.
E) Hillson's approach can be restrictive in identifying risks not easily found inside the work breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
28
Proactive project managers:

A) do not consider risks.
B) prefer to be optimistic.
C) will develop elaborate risk management programs for their projects.
D) are more confident in their ability to handle unexpected events without prior planning.
E) avoid taking risks whenever possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
29
Inadequacy of resources is an example of environmental complexity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
30
On highly complex projects, _____.

A) basic measures such as percentage of activities completed and percentage of budget spent are adequate for budget evaluation
B) the process for evaluating risk is more informal with risk assessment meetings conducted every once in a while to assess risks at different phases of the project
C) an outside expert may be included in the risk assessment process and the risk assessment plan may take a more prominent role in the project execution plan
D) the project management team may develop a list of items perceived to be higher risk and track them during project reviews
E) the project manager may informally track items that may be considered risk items
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
31
_____ simulation is a statistical model used on projects, which simulates a possible range of outcomes by trying many different combinations of risks based on their likelihood.

A) Discrete-event
B) Monte Carlo
C) Deterministic modeling
D) Mixed-mode
E) Parallel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is

A) Project risk focuses on identifying, assessing, and eliminating the risks on the project.
B) Risk management is all about eliminating risk.
C) Project risk is an uncertain event that, even if it occurs, has no effect on project objectives.
D) There are no risk-free projects.
E) Risk management involves identification, evaluation, and elevation of risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
33
_____ is about developing an understanding of which potential risks have the greatest possibility of occurring and can have the greatest negative impact on the project.

A) Risk mitigation
B) Risk sharing
C) Risk generalization
D) Risk evaluation
E) Risk management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
34
An) _____ organizes the risks that have been identified into categories using a table with increasing levels of detail to the right.

A) master schedule
B) risk breakdown structure
C) control chart
D) risk management plan
E) risk response plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
35
There is _____ correlation between project risk and project complexity.

A) an unknown
B) a positive
C) no
D) a negative
E) a general
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
36
The _____ is the plan to reduce or eliminate loss from unexpected events.

A) risk transfer plan
B) risk avoidance plan
C) risk acceptance plan
D) risk deflection plan
E) risk mitigation plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
37
The possible loss that is associated with the business purpose of the project is called _____.

A) project risk
B) organizational risk
C) strategic risk
D) external risk
E) financial risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
38
The sudden unavailability of key individuals on the project is an example of _____ risks.

A) people
B) cost
C) schedule
D) client
E) contractual
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
39
On projects with a low complexity profile, _____.

A) the process for evaluating risk is more formal with risk assessment meetings held during the life of the project to assess risks at different phases of the project
B) an outside expert may be included in the risk assessment process and the risk assessment plan may take a more prominent role in the project execution plan
C) the project management team may develop a list of items perceived to be higher risk and track them during project reviews
D) the project manager may informally track items that may be considered risk items
E) statistical models are sometimes used to evaluate risk because there are too many different possible combinations of risks to calculate them one at a time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
40
According to Tzvi Raz, Aaron Shenhar, and Dov Dvir's risk management studies, which of the following is

A) Risk management is widely used.
B) The projects that were most likely to have a risk management plan were those that were actually high risk.
C) When risk management practices were applied to projects, they appeared to be moderately related to the success of the project.
D) The risk management approach influenced the meeting of project schedules and cost goals but exerted more influence on project product quality.
E) Good risk management increases the likelihood of a successful project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
41
Describe the Monte Carlo simulation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
42
High scores for external complexity imply high risks to the schedule, budget, and quality due to _____.

A) organizational complexity and changes of scope
B) unknown flaws in the technology and lack of familiarity with it
C) expensive resolution to lawsuits
D) unknown factors and limited resources
E) lack of clarity in project and scope statements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
43
What are the elements of risk management during the initiation phase of the project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
44
_____ is a risk reduction method that shifts the risk from the project to another party.

A) Risk mitigation
B) Risk sharing
C) Risk breakdown structure
D) Risk avoidance
E) Risk transfer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
45
As the project progresses into the execution phase, _____.

A) risks need to be checked off on activities that have been performed
B) the total risk on the project typically increases
C) risks are identified with each major group of activities
D) a risk response plan can be used to identify increasing levels of detailed risk analysis
E) the risk breakdown structure needs to be examined to be sure all the risk events have been avoided
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following is

A) It usually involves developing an alternative strategy that has a higher probability of success.
B) It typically involves lower costs associated with accomplishing a project task.
C) A common risk avoidance technique is to adopt new techniques rather than use existing technologies.
D) A project team chooses a new vendor over an existing one with a proven track record.
E) It involves maintaining the project plan to eliminate a risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is

A) Risk seems to have a negative correlation to complexity.
B) High-risk projects are in very few cases highly complex.
C) The risk breakdown analysis explores the project from the perspective of what elements on the project add to project complexity.
D) The project team develops a risk breakdown structure that addresses the items that are identified as high risk.
E) The process of conducting a risk analysis focuses on developing an understanding of what can go wrong and the likelihood that it will go wrong.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
48
What is the advantage of risk sharing a project with another company?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
49
What are the elements of risk management in the planning phase of the project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is part of the closeout phase?

A) Conceptual estimate of risk
B) Monte Carlo simulation
C) Conclusion of risk sharing and risk transfer agreements
D) Creating a RBS
E) Resource leveling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is

A) Contingency funds are funds set aside by the client to address unforeseen events that cause the project costs to increase.
B) Projects with a high risk profile will typically have a small contingency budget.
C) Contingency is typically managed as multiple line items in the project budget.
D) Allocating the contingency budget to the items in the budget that have low risk allows the project team to track the use of contingency against the risk plan.
E) The availability of contingency funds in the line item budget may increase the use of contingency funds to solve problems rather than finding alternative solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
52
On global projects with a large amount of political risk, the highest portion of risk may be _____.

A) in the execution phase
B) in the planning stage
C) toward the end of the project
D) in the early phases of the project
E) during the procurement of goods and services
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
53
_____ risks are events that have been identified and analyzed for which advanced planning is possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
54
What is the difference between project risk and organizational risk?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
55
High scores for internal complexity imply high risks to the budget, schedule, and quality due to _____.

A) expensive resolution to public opposition
B) organizational complexity and changes of scope
C) unknown factors and limited resources
D) unknown flaws in the technology and lack of familiarity with it
E) expensive resolution to lawsuits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
56
High scores for environmental complexity imply high risks for delay and _____.

A) unknown factors
B) limited resources
C) expensive resolution to lawsuits
D) organizational complexity
E) lack of clarity in project and scope statements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
57
During the closeout phase, _____.

A) risks must be weighed against the potential benefit of the project's success
B) agreements for risk sharing and risk transfer need to be concluded
C) risks are identified with each major group of activities
D) a risk breakdown structure can be used to identify increasing levels of detailed risk analysis
E) the risk plan needs to be updated with new information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
58
Once the project is approved and moves into the planning stage, _____.

A) agreements for risk sharing need to be concluded
B) the total risk on the project typically reduces as activities are performed without loss
C) risks must be weighed against the potential benefit of the project's success in order to decide if the project should be chosen
D) risks are identified with each major group of activities
E) a risk response plan can be used to identify increasing levels of detailed risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
59
Risk must be considered in the _____ phase and weighed against the potential benefit of the project's success in order to decide if the project should be chosen.

A) completion
B) closeout
C) execution
D) planning
E) initiation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
60
Describe the impact of high scores in technology complexity. What are the risks of technology complexity?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
61
Projects that have a high score in the external complexity category in the _____ Index are larger and longer than usual for the project management group and the project manager and the available resources are lacking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
62
During the closeout phase, agreements for risk _____ and risk _____ need to be concluded and the risk breakdown structure examined to be sure all the risk events have been avoided or mitigated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
63
_____ includes both the identification of potential risk and the evaluation of the potential impact of the risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
64
Risk seems to have an) _____ correlation to complexity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
65
Two variables that respond in the same way to changes in their environment are said to have an) _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 65 في هذه المجموعة.