Deck 23: Job and Staff Scheduling

ملء الشاشة (f)
exit full mode
سؤال
The Theory of Constraints focuses on developing schedules for part-time workers or overtime shifts to address capacity constraints.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Finite loading does not account for the capacity of work centres.
سؤال
Forward scheduling is based on completing jobs exactly on their due date.
سؤال
A schedule/control Gantt chart can be used to monitor job progress.
سؤال
Backward scheduling is based on working back from the due dates for jobs.
سؤال
In job scheduling,most loading of work centres is based on infinite loading.
سؤال
A Gantt chart is a visual aid for loading,scheduling,and control purposes.
سؤال
Priority rules generally assume that a job's setup time is independent of the sequence of processing jobs.
سؤال
The term loading,as used in scheduling,refers to choosing the sequence of jobs to process.
سؤال
A load Gantt chart only designates the total load for work centres not the timing of jobs.
سؤال
Sequencing is concerned with the order in which jobs are processed,while loading is concerned with assigning jobs to work centres or workstations.
سؤال
In the production planning hierarchy,scheduling is the final step before the actual output is produced.
سؤال
First come,first served (FCFS)is an example of a priority rule for sequencing.
سؤال
Scheduling work centre loading must be completed before starting materials requirement planning (MRP).
سؤال
Make-span is the total time needed to complete a group of jobs.
سؤال
Loading refers to the assignment of jobs to work centres.
سؤال
Input/Output (I/O)control is a visual representation of the progress of jobs that indicates if they are ahead or behind schedule.
سؤال
Input/output (I/O)control refers to monitoring changes in productivity for various work centres in a process.
سؤال
All priority rules are designed to ensure that the most urgent jobs (earliest due date)are scheduled first.
سؤال
A Gantt chart is a specialized scheduling tool specifically for planning construction projects.
سؤال
Shop-floor control,or production activity control,involves the execution of the job schedule,and taking any necessary actions.
سؤال
Bottlenecks occur at work centres when the idle time is equal to zero.
سؤال
The primary limitation of the first come,first served (FCFS)priority rule is that short jobs will tend to delay longer jobs that follow.
سؤال
For the Theory of Constraints,the transfer batch denotes a portion of the production lot that could be moved to the bottleneck operation.
سؤال
A basic difference between staff scheduling in services and manufacturing companies is the of demand for end products in manufacturing is more volatile in contrast to relatively uniform,predictable demand in services.
سؤال
For a one machine/station shop,the shortest (imminent)processing time (SPT)priority rule will always result in the lowest average flow time.
سؤال
The output of the system is limited by the output of the bottleneck operation(s).
سؤال
Splitting a large lot at one or more operations after a bottleneck operation would reduce the waiting time of the bottleneck operation.
سؤال
The elimination of idle time on both bottleneck and non-bottleneck operations is equally important.
سؤال
Johnson's rule is a technique used to sequence jobs through a two-step work sequence.
سؤال
As long as the bottleneck operations are used effectively,the idle time of non-bottleneck operations will not affect the overall productivity of the system.
سؤال
For service systems with customers directly involved in the process,FCFS is the dominant priority rule.
سؤال
All priority or dispatching rules involve complex computations intended to establish an optimal processing sequence for production facilities.
سؤال
Which of the following is not a common criteria when using the Assignment model?

A)costs
B)prioritizing
C)profits
D)performance
E)optimization
سؤال
For services,the process of assigning work shifts to staff begins with forecasting the amount of work to be done during each hour (or shift)during the time period the schedule is being planned.
سؤال
A major reason for scheduling difficulty is variability in setup times,processing times,interruptions,and changes in the set of jobs.
سؤال
A schedule/control Gantt chart depicts jobs or their components versus time to illustrate if they are behind or ahead of schedule.
سؤال
The inability to store services makes staff scheduling for services more complex than for manufacturing companies.
سؤال
Moore's rule is a technique to minimize the number of late jobs for a group of jobs to be processed on one work centre/machine.
سؤال
The shortest processing time (SPT)rule minimizes downstream idle time.
سؤال
An area in a production facility consisting of one or more workers and machines with similar capabilities that can be considered one unit for the purpose of scheduling is a:

A)job shop.
B)bottleneck.
C)work team.
D)cell layout.
E)work centre.
سؤال
In airline crew scheduling what is the last thing that is scheduled?

A)flights
B)crews
C)planes
D)maintenance
E)destinations
سؤال
Which of the following is not a method to reduce scheduling difficulty?

A)Set realistic due dates
B)Adapt the schedule to changing customer requirements
C)Focus in bottleneck operations
D)Use scheduling software
E)Use shop floor control
سؤال
When sequencing jobs with sequence-dependent setup times the goal is to:

A)Minimize total setup time
B)Maximize total setup time
C)Average the setup times
D)Minimize flow time
E)Maximize utilization
سؤال
In the drum-buffer-rope conceptualization used in the theory of constraints,the "buffer" refers to:

A)inventory just before the bottleneck.
B)the bottleneck of the process.
C)total capacity of the process.
D)first stage in the process.
E)the master schedule.
سؤال
Two different approaches to load work centres in job scheduling are:

A)economic order quantity (EOQ)and material requirements planning (MRP).
B)Gantt charts and shop-floor control.
C)infinite loading and finite loading.
D)linear programming and trial-and-error.
E)linear programming and Gantt charts.
سؤال
The priority rule where jobs are processed according to the smallest ratio of time until due date to processing time is:

A)critical ratio (CR).
B)earliest due date (EDD).
C)first come,first serve (FCFS).
D)minimum slack time (MST).
E)shortest processing time (SPT).
سؤال
Input/Output (I/O)control is used to:

A)increase work flows and queues at a work centre.
B)ensure overloading of a work centre to maximize efficiency.
C)minimize WIP at a work centre
D)manage work flows and queues at a work centre.
E)maximize make-span.
سؤال
Assigning jobs to work centres and to various machines within each work centre describes:

A)loading.
B)staff scheduling.
C)material requirements planning.
D)capacity planning.
E)capacity utilization.
سؤال
Which of the following is not a "tool" (technique)for shop-floor control?

A)Anticipated delay report
B)Input/output (I/O)control
C)Daily dispatch lists
D)Product structure tree
E)Schedule/control Gantt chart
سؤال
Job scheduling pertains to:

A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing the use of work centres.
E)inventory allocation.
سؤال
Scheduling that starts with the present time and continues into the future is called:

A)detailed scheduling.
B)staff scheduling.
C)master production scheduling.
D)forward scheduling.
E)backward scheduling.
سؤال
In the drum-buffer-rope conceptualization used in the theory of constraints,the "drum" that sets the pace for production refers to:

A)work-in-process inventory before the bottleneck.
B)the bottleneck of the process.
C)total capacity of the process.
D)first stage in the process.
E)the master schedule.
سؤال
Which of the following is the last step in the production planning hierarchy before actual output is produced?

A)Material requirements planning.
B)Enterprise resource planning.
C)Capacity planning.
D)Aggregate planning.
E)Scheduling.
سؤال
Assigning jobs to work centres without regard to the available capacity of the work centres describes:

A)backward loading.
B)forward loading.
C)finite loading.
D)infinite loading.
E)capacity loading.
سؤال
Finite loading,as compared to infinite loading,assumes that:

A)there are a finite number of jobs to be done.
B)work centres can be loaded without regard to their capacity.
C)work centres' capacity must be taken into account in assigning jobs.
D)work centres' capacity will be increased as needed after assigning jobs.
E)only certain jobs will be loaded based on processing time.
سؤال
The purpose of a Gantt chart is to:

A)visually express the capacity of resources.
B)quantitatively analyze the optimum sequencing of resources.
C)visually represent the loading and scheduling of jobs for control purposes.
D)quantitatively analyze the capacity of production resources.
E)visually express the material allocation at work centres.
سؤال
As a performance measure in scheduling,job flow time does not include:

A)movement time between operations.
B)processing time.
C)idle time.
D)setup time.
E)due dates for each job.
سؤال
Monitoring and managing the work flow at each work centre on the shop-floor of a production facility is called:

A)lot sizing.
B)inventory turnover.
C)daily dispatch lists.
D)Gantt chart.
E)Input/output (I/O)control.
سؤال
A schedule/control Gantt chart is a visual representation of progress on the shop-floor which shows _______ on a vertical axis,and _______ on the horizontal axis.

A)jobs in progress; time
B)jobs in progress; total costs
C)hours worked; jobs in progress
D)total costs; jobs in progress
E)actual output; actual input
سؤال
A scheduling rule used for sequencing jobs through two work centres is:

A)critical ratio rule.
B)Johnson's rule.
C)minimum slack time rule.
D)shortest processing time rule.
E)earliest due date rule.
سؤال
For the jobs listed below,which processing sequence would result using Johnson's Rule? Processing time (hrs.)
11eab92b_c479_cbf3_99e6_89f1b7be27d5

A)c-a-d-b
B)b-d-a-c
C)a-b-c-d
D)d-c-b-a
E)c-a-b-d
سؤال
What is the optimum job sequence for the jobs listed below,using Johnson's Rule? 11eab92b_c479_cbf4_99e6_4fc80f07f601

A)e-g-f-d
B)d-g-f-e
C)d-f-g-e
D)e-d-f-g
E)f-e-d-g
سؤال
Shift scheduling for services does not involve:

A)forecasting the amount of work to be done per time period.
B)assigning shifts to staff based on skill and availability.
C)converting work per time period into number of workers required
D)covering requirements with a minimum of shifts.
E)staffing at a constant minimum level to minimize wage costs.
سؤال
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average job lateness?</strong> A)0 hours B)1.5 hours C)1.75 hours D)2 hours E)2.25 hours <div style=padding-top: 35px> If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average job lateness?

A)0 hours
B)1.5 hours
C)1.75 hours
D)2 hours
E)2.25 hours
سؤال
The Theory of Constraints focuses on ________.

A)work-in-process inventory
B)total processing time
C)bottleneck operations
D)job sequencing
E)worker assignments
سؤال
Average job flow time for a schedule sequence at a work station is:

A)total processing time divided by the number of jobs.
B)total flow time divided by the number of jobs.
C)total flow time divided by total processing time.
D)total processing time plus total late time divided by number of jobs.
E)total flow time plus total late time divided by number of jobs.
سؤال
Which of the following is not a measure for judging the effectiveness of a schedule sequence?

A)Average work-in-process
B)Total processing time
C)Job flow time
D)Job lateness
E)average hours or days late
سؤال
Which sequencing rule is designed specifically to minimize job lateness?

A)Critical ratio (CR)
B)Earliest due date (EDD)
C)First come,first serve (FCFS)
D)Minimum slack time (MST)
E)Shortest processing time (SPT)
سؤال
The total time needed to complete a group of jobs from the beginning of the first job to the completion of the last job is called the:

A)job flow time.
B)make-span.
C)earliest due date (EDD).
D)delivery time.
E)average WIP.
سؤال
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the MST rule,the sequence of jobs would be:</strong> A)c-a-b-d-e. B)a-b-d-e-c. C)d-e-b-a-c. D)c-a-b-e-d. E)e-d-b-a-c. <div style=padding-top: 35px> Using the MST rule,the sequence of jobs would be:

A)c-a-b-d-e.
B)a-b-d-e-c.
C)d-e-b-a-c.
D)c-a-b-e-d.
E)e-d-b-a-c.
سؤال
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the EDD rule,the sequence of jobs would be:</strong> A)d-e-b-a-c. B)a-d-c-b-e. C)e-d-b-a-c. D)a-d-c-e-d. E)e-b-c-d-a. <div style=padding-top: 35px> Using the EDD rule,the sequence of jobs would be:

A)d-e-b-a-c.
B)a-d-c-b-e.
C)e-d-b-a-c.
D)a-d-c-e-d.
E)e-b-c-d-a.
سؤال
A primary reason why staff scheduling in services can be more challenging than it is for manufacturing is:

A)services have less processing variability.
B)services cannot be inventoried.
C)people generally are willing to wait longer for manufactured products.
D)customers will not wait for services.
E)all services use appointments that have to match customers' schedules.
سؤال
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the earliest due date first (EDD)priority rule to schedule these jobs,what will be the average job lateness?</strong> A)0 hours B)1.5 hours C)1.75 hours D)2 hours E)2.25 hours <div style=padding-top: 35px> If he uses the earliest due date first (EDD)priority rule to schedule these jobs,what will be the average job lateness?

A)0 hours
B)1.5 hours
C)1.75 hours
D)2 hours
E)2.25 hours
سؤال
In scheduling staff for services,flexible capacity is achieved by:

A)part time workers and the timing of shifts.
B)using Johnson's rule.
C)offering incentives for customers to come during non-peak hours.
D)maintaining inventory.
E)managing waiting lines so customers perceptions of waiting are altered.
سؤال
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the CR rule,the sequence of jobs would be:</strong> A)c-a-b-d-e. B)a-b-d-e-c. C)d-e-b-a-c. D)c-a-b-e-d. E)e-d-b-a-c. <div style=padding-top: 35px> Using the CR rule,the sequence of jobs would be:

A)c-a-b-d-e.
B)a-b-d-e-c.
C)d-e-b-a-c.
D)c-a-b-e-d.
E)e-d-b-a-c.
سؤال
The scheduling sequencing rule which always results in the lowest average flow (flow)time is the:

A)critical ratio (CR).
B)earliest due date (EDD).
C)first come,first serve (FCFS).
D)minimum slack time (MST).
E)shortest processing time (SPT).
سؤال
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average flow time?</strong> A)7.5 hours B)5 hours C)3 hours D)2.5 hours E)2 hours <div style=padding-top: 35px> If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average flow time?

A)7.5 hours
B)5 hours
C)3 hours
D)2.5 hours
E)2 hours
سؤال
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the first come,first served (FCFS)priority rule to schedule these jobs,what will be the average flow time?</strong> A)7.5 hours B)5 hours C)3 hours D)2.5 hours E)2 hours <div style=padding-top: 35px> If he uses the first come,first served (FCFS)priority rule to schedule these jobs,what will be the average flow time?

A)7.5 hours
B)5 hours
C)3 hours
D)2.5 hours
E)2 hours
سؤال
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   The sequence that would result using the SPT rule is:</strong> A)e-b-c-d-a. B)c-a-b-e-d. C)a-d-c-e-b. D)d-e-b-a-c. E)e-d-b-a-c. <div style=padding-top: 35px> The sequence that would result using the SPT rule is:

A)e-b-c-d-a.
B)c-a-b-e-d.
C)a-d-c-e-b.
D)d-e-b-a-c.
E)e-d-b-a-c.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/116
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 23: Job and Staff Scheduling
1
The Theory of Constraints focuses on developing schedules for part-time workers or overtime shifts to address capacity constraints.
False
2
Finite loading does not account for the capacity of work centres.
False
3
Forward scheduling is based on completing jobs exactly on their due date.
False
4
A schedule/control Gantt chart can be used to monitor job progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
5
Backward scheduling is based on working back from the due dates for jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
6
In job scheduling,most loading of work centres is based on infinite loading.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
7
A Gantt chart is a visual aid for loading,scheduling,and control purposes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
8
Priority rules generally assume that a job's setup time is independent of the sequence of processing jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
9
The term loading,as used in scheduling,refers to choosing the sequence of jobs to process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
10
A load Gantt chart only designates the total load for work centres not the timing of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
11
Sequencing is concerned with the order in which jobs are processed,while loading is concerned with assigning jobs to work centres or workstations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the production planning hierarchy,scheduling is the final step before the actual output is produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
13
First come,first served (FCFS)is an example of a priority rule for sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
14
Scheduling work centre loading must be completed before starting materials requirement planning (MRP).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
15
Make-span is the total time needed to complete a group of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
16
Loading refers to the assignment of jobs to work centres.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
17
Input/Output (I/O)control is a visual representation of the progress of jobs that indicates if they are ahead or behind schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
18
Input/output (I/O)control refers to monitoring changes in productivity for various work centres in a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
19
All priority rules are designed to ensure that the most urgent jobs (earliest due date)are scheduled first.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
20
A Gantt chart is a specialized scheduling tool specifically for planning construction projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
21
Shop-floor control,or production activity control,involves the execution of the job schedule,and taking any necessary actions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
22
Bottlenecks occur at work centres when the idle time is equal to zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
23
The primary limitation of the first come,first served (FCFS)priority rule is that short jobs will tend to delay longer jobs that follow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
24
For the Theory of Constraints,the transfer batch denotes a portion of the production lot that could be moved to the bottleneck operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
25
A basic difference between staff scheduling in services and manufacturing companies is the of demand for end products in manufacturing is more volatile in contrast to relatively uniform,predictable demand in services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
26
For a one machine/station shop,the shortest (imminent)processing time (SPT)priority rule will always result in the lowest average flow time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
27
The output of the system is limited by the output of the bottleneck operation(s).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
28
Splitting a large lot at one or more operations after a bottleneck operation would reduce the waiting time of the bottleneck operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
29
The elimination of idle time on both bottleneck and non-bottleneck operations is equally important.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
30
Johnson's rule is a technique used to sequence jobs through a two-step work sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
31
As long as the bottleneck operations are used effectively,the idle time of non-bottleneck operations will not affect the overall productivity of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
32
For service systems with customers directly involved in the process,FCFS is the dominant priority rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
33
All priority or dispatching rules involve complex computations intended to establish an optimal processing sequence for production facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not a common criteria when using the Assignment model?

A)costs
B)prioritizing
C)profits
D)performance
E)optimization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
35
For services,the process of assigning work shifts to staff begins with forecasting the amount of work to be done during each hour (or shift)during the time period the schedule is being planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
36
A major reason for scheduling difficulty is variability in setup times,processing times,interruptions,and changes in the set of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
37
A schedule/control Gantt chart depicts jobs or their components versus time to illustrate if they are behind or ahead of schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
38
The inability to store services makes staff scheduling for services more complex than for manufacturing companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
39
Moore's rule is a technique to minimize the number of late jobs for a group of jobs to be processed on one work centre/machine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
40
The shortest processing time (SPT)rule minimizes downstream idle time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
41
An area in a production facility consisting of one or more workers and machines with similar capabilities that can be considered one unit for the purpose of scheduling is a:

A)job shop.
B)bottleneck.
C)work team.
D)cell layout.
E)work centre.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
42
In airline crew scheduling what is the last thing that is scheduled?

A)flights
B)crews
C)planes
D)maintenance
E)destinations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is not a method to reduce scheduling difficulty?

A)Set realistic due dates
B)Adapt the schedule to changing customer requirements
C)Focus in bottleneck operations
D)Use scheduling software
E)Use shop floor control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
44
When sequencing jobs with sequence-dependent setup times the goal is to:

A)Minimize total setup time
B)Maximize total setup time
C)Average the setup times
D)Minimize flow time
E)Maximize utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
45
In the drum-buffer-rope conceptualization used in the theory of constraints,the "buffer" refers to:

A)inventory just before the bottleneck.
B)the bottleneck of the process.
C)total capacity of the process.
D)first stage in the process.
E)the master schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
46
Two different approaches to load work centres in job scheduling are:

A)economic order quantity (EOQ)and material requirements planning (MRP).
B)Gantt charts and shop-floor control.
C)infinite loading and finite loading.
D)linear programming and trial-and-error.
E)linear programming and Gantt charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
47
The priority rule where jobs are processed according to the smallest ratio of time until due date to processing time is:

A)critical ratio (CR).
B)earliest due date (EDD).
C)first come,first serve (FCFS).
D)minimum slack time (MST).
E)shortest processing time (SPT).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
48
Input/Output (I/O)control is used to:

A)increase work flows and queues at a work centre.
B)ensure overloading of a work centre to maximize efficiency.
C)minimize WIP at a work centre
D)manage work flows and queues at a work centre.
E)maximize make-span.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
49
Assigning jobs to work centres and to various machines within each work centre describes:

A)loading.
B)staff scheduling.
C)material requirements planning.
D)capacity planning.
E)capacity utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is not a "tool" (technique)for shop-floor control?

A)Anticipated delay report
B)Input/output (I/O)control
C)Daily dispatch lists
D)Product structure tree
E)Schedule/control Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
51
Job scheduling pertains to:

A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing the use of work centres.
E)inventory allocation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
52
Scheduling that starts with the present time and continues into the future is called:

A)detailed scheduling.
B)staff scheduling.
C)master production scheduling.
D)forward scheduling.
E)backward scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
53
In the drum-buffer-rope conceptualization used in the theory of constraints,the "drum" that sets the pace for production refers to:

A)work-in-process inventory before the bottleneck.
B)the bottleneck of the process.
C)total capacity of the process.
D)first stage in the process.
E)the master schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is the last step in the production planning hierarchy before actual output is produced?

A)Material requirements planning.
B)Enterprise resource planning.
C)Capacity planning.
D)Aggregate planning.
E)Scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
55
Assigning jobs to work centres without regard to the available capacity of the work centres describes:

A)backward loading.
B)forward loading.
C)finite loading.
D)infinite loading.
E)capacity loading.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
56
Finite loading,as compared to infinite loading,assumes that:

A)there are a finite number of jobs to be done.
B)work centres can be loaded without regard to their capacity.
C)work centres' capacity must be taken into account in assigning jobs.
D)work centres' capacity will be increased as needed after assigning jobs.
E)only certain jobs will be loaded based on processing time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
57
The purpose of a Gantt chart is to:

A)visually express the capacity of resources.
B)quantitatively analyze the optimum sequencing of resources.
C)visually represent the loading and scheduling of jobs for control purposes.
D)quantitatively analyze the capacity of production resources.
E)visually express the material allocation at work centres.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
58
As a performance measure in scheduling,job flow time does not include:

A)movement time between operations.
B)processing time.
C)idle time.
D)setup time.
E)due dates for each job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
59
Monitoring and managing the work flow at each work centre on the shop-floor of a production facility is called:

A)lot sizing.
B)inventory turnover.
C)daily dispatch lists.
D)Gantt chart.
E)Input/output (I/O)control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
60
A schedule/control Gantt chart is a visual representation of progress on the shop-floor which shows _______ on a vertical axis,and _______ on the horizontal axis.

A)jobs in progress; time
B)jobs in progress; total costs
C)hours worked; jobs in progress
D)total costs; jobs in progress
E)actual output; actual input
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
61
A scheduling rule used for sequencing jobs through two work centres is:

A)critical ratio rule.
B)Johnson's rule.
C)minimum slack time rule.
D)shortest processing time rule.
E)earliest due date rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
62
For the jobs listed below,which processing sequence would result using Johnson's Rule? Processing time (hrs.)
11eab92b_c479_cbf3_99e6_89f1b7be27d5

A)c-a-d-b
B)b-d-a-c
C)a-b-c-d
D)d-c-b-a
E)c-a-b-d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
63
What is the optimum job sequence for the jobs listed below,using Johnson's Rule? 11eab92b_c479_cbf4_99e6_4fc80f07f601

A)e-g-f-d
B)d-g-f-e
C)d-f-g-e
D)e-d-f-g
E)f-e-d-g
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
64
Shift scheduling for services does not involve:

A)forecasting the amount of work to be done per time period.
B)assigning shifts to staff based on skill and availability.
C)converting work per time period into number of workers required
D)covering requirements with a minimum of shifts.
E)staffing at a constant minimum level to minimize wage costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
65
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average job lateness?</strong> A)0 hours B)1.5 hours C)1.75 hours D)2 hours E)2.25 hours If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average job lateness?

A)0 hours
B)1.5 hours
C)1.75 hours
D)2 hours
E)2.25 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
66
The Theory of Constraints focuses on ________.

A)work-in-process inventory
B)total processing time
C)bottleneck operations
D)job sequencing
E)worker assignments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
67
Average job flow time for a schedule sequence at a work station is:

A)total processing time divided by the number of jobs.
B)total flow time divided by the number of jobs.
C)total flow time divided by total processing time.
D)total processing time plus total late time divided by number of jobs.
E)total flow time plus total late time divided by number of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following is not a measure for judging the effectiveness of a schedule sequence?

A)Average work-in-process
B)Total processing time
C)Job flow time
D)Job lateness
E)average hours or days late
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which sequencing rule is designed specifically to minimize job lateness?

A)Critical ratio (CR)
B)Earliest due date (EDD)
C)First come,first serve (FCFS)
D)Minimum slack time (MST)
E)Shortest processing time (SPT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
70
The total time needed to complete a group of jobs from the beginning of the first job to the completion of the last job is called the:

A)job flow time.
B)make-span.
C)earliest due date (EDD).
D)delivery time.
E)average WIP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
71
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the MST rule,the sequence of jobs would be:</strong> A)c-a-b-d-e. B)a-b-d-e-c. C)d-e-b-a-c. D)c-a-b-e-d. E)e-d-b-a-c. Using the MST rule,the sequence of jobs would be:

A)c-a-b-d-e.
B)a-b-d-e-c.
C)d-e-b-a-c.
D)c-a-b-e-d.
E)e-d-b-a-c.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
72
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the EDD rule,the sequence of jobs would be:</strong> A)d-e-b-a-c. B)a-d-c-b-e. C)e-d-b-a-c. D)a-d-c-e-d. E)e-b-c-d-a. Using the EDD rule,the sequence of jobs would be:

A)d-e-b-a-c.
B)a-d-c-b-e.
C)e-d-b-a-c.
D)a-d-c-e-d.
E)e-b-c-d-a.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
73
A primary reason why staff scheduling in services can be more challenging than it is for manufacturing is:

A)services have less processing variability.
B)services cannot be inventoried.
C)people generally are willing to wait longer for manufactured products.
D)customers will not wait for services.
E)all services use appointments that have to match customers' schedules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
74
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the earliest due date first (EDD)priority rule to schedule these jobs,what will be the average job lateness?</strong> A)0 hours B)1.5 hours C)1.75 hours D)2 hours E)2.25 hours If he uses the earliest due date first (EDD)priority rule to schedule these jobs,what will be the average job lateness?

A)0 hours
B)1.5 hours
C)1.75 hours
D)2 hours
E)2.25 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
75
In scheduling staff for services,flexible capacity is achieved by:

A)part time workers and the timing of shifts.
B)using Johnson's rule.
C)offering incentives for customers to come during non-peak hours.
D)maintaining inventory.
E)managing waiting lines so customers perceptions of waiting are altered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
76
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   Using the CR rule,the sequence of jobs would be:</strong> A)c-a-b-d-e. B)a-b-d-e-c. C)d-e-b-a-c. D)c-a-b-e-d. E)e-d-b-a-c. Using the CR rule,the sequence of jobs would be:

A)c-a-b-d-e.
B)a-b-d-e-c.
C)d-e-b-a-c.
D)c-a-b-e-d.
E)e-d-b-a-c.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
77
The scheduling sequencing rule which always results in the lowest average flow (flow)time is the:

A)critical ratio (CR).
B)earliest due date (EDD).
C)first come,first serve (FCFS).
D)minimum slack time (MST).
E)shortest processing time (SPT).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
78
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average flow time?</strong> A)7.5 hours B)5 hours C)3 hours D)2.5 hours E)2 hours If he uses the shortest processing time first (SPT)priority rule to schedule these jobs,what will be the average flow time?

A)7.5 hours
B)5 hours
C)3 hours
D)2.5 hours
E)2 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
79
The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the first come,first served (FCFS)priority rule to schedule these jobs,what will be the average flow time?</strong> A)7.5 hours B)5 hours C)3 hours D)2.5 hours E)2 hours If he uses the first come,first served (FCFS)priority rule to schedule these jobs,what will be the average flow time?

A)7.5 hours
B)5 hours
C)3 hours
D)2.5 hours
E)2 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
80
The table below contains information about five jobs waiting to be processed at work station number three. <strong>The table below contains information about five jobs waiting to be processed at work station number three.   The sequence that would result using the SPT rule is:</strong> A)e-b-c-d-a. B)c-a-b-e-d. C)a-d-c-e-b. D)d-e-b-a-c. E)e-d-b-a-c. The sequence that would result using the SPT rule is:

A)e-b-c-d-a.
B)c-a-b-e-d.
C)a-d-c-e-b.
D)d-e-b-a-c.
E)e-d-b-a-c.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck