Deck 24: Project Management

ملء الشاشة (f)
exit full mode
سؤال
A Gantt chart provides a visual representation of the sequence of activities in a project.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An advantage of Gantt charts in project management is that they reveal which activities can be delayed without delaying the overall project.
سؤال
A project manager usually staffs the human resources required for a project by hiring outside specialists that only work for the company for the duration of the project.
سؤال
Companies that are organized as pure project organizations are equivalent to matrix organizations that temporarily group specialists from different departments.
سؤال
The precedence network for a project depicts sequential relationships among activities in a project.
سؤال
The task of identifying risks should involve everyone associated with the project.
سؤال
Projects involve routine operations that are performed repeatedly.
سؤال
Careful planning of complex projects can eliminate the occurrence of risk events that have undesirable consequences.
سؤال
Risks involved in a project can be transferred by outsourcing a particular component of the project and requiring performance bonds.
سؤال
Sequential dependencies among project activities are less important than the time required to complete activities.
سؤال
The probability of occurrence of risk events is lower near the beginning of a project and higher near the end of the project.
سؤال
Purchase planning is typically outside the scope of project planning activities.
سؤال
Once a project is underway,project managers are only responsible for managing the project schedule (time)and budget (costs).
سؤال
One way that project management differs from management of more traditional operations is the limited time frame of projects.
سؤال
PERT was originally developed for military planning in the 1940's during the Second World War (WWII).
سؤال
A hierarchical listing of what must be done during a project is called a project matrix.
سؤال
Project managers bear the ultimate responsibility for the success or failure of the project.
سؤال
Although PERT and CPM were originally developed for somewhat different types of projects,they are now nearly identical in terms of analysis and procedures.
سؤال
The path in a PERT/CPM precedence network with the fewest activities and shortest duration is referred to as the critical path.
سؤال
Following project initiation,planning and scheduling,project execution is the last phase of a projects life cycle.
سؤال
The standard deviation of a project duration is equal to the sum of the variances of all the activities of the project.
سؤال
For the PERT/CPM technique,completing the backward pass includes making the latest finish (LF)equal to the earliest finish (EF)for the end activity.
سؤال
Consecutive activities on the same path have shared slack,which means if activities are delayed,the amount of slack remaining is reduced for all these activities without delaying completion of the project.
سؤال
The standard deviation of the duration of the critical path is equal to the square root of the sum of the variances of all of the activities on the critical path.
سؤال
In order to determine the probability of timely project completion,it is sometimes necessary to take into account paths other than the critical path.
سؤال
The latest starting time for an activity is equal to the latest finish time minus the activity time.
سؤال
A normal distribution is usually used to describe probabilistic duration estimates for activities in a project.
سؤال
Activity slack is the difference between the latest finish and earliest finish times.
سؤال
Activities not on the critical path have a slack time equal to zero.
سؤال
The critical path has zero path slack time.
سؤال
The earliest finish time for an activity is equal to the latest finish time minus the activity slack.
سؤال
Simulation can be used for cases in which network activity durations are dependent.
سؤال
If two consecutive activities on the same path each have two days of activity slack,this means that each of them can be delayed by two days without delaying the overall project.
سؤال
Project managers are sometimes able to reduce indirect project costs by increasing direct costs.
سؤال
The path in a precedence network with the longest duration is the critical path.
سؤال
The earliest finish time for an activity is equal to the latest finish time minus the activity time.
سؤال
The sum of activity durations of the longest path in a network indicates expected project completion time,and the activities on it are called the critical activities.
سؤال
Deterministic networks use three duration estimates for each activity in order to best determine the activity's estimated duration.
سؤال
A beta distribution can be used to describe the inherent variability of an activity's duration.
سؤال
The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.
سؤال
Uncontrolled changes to a project is called:

A)cost creep
B)project randomness
C)scope creep
D)transferring risk
E)avoidance
سؤال
A project manager should not be concerned with the political nature of the organization they are working with.
سؤال
The life cycle of a project does not include which of the following phases?

A)Initiation
B)Planning and scheduling
C)Growth and maturity
D)Closeout
E)Execution
سؤال
Which of the following is not a common theme regarding people that work on projects?

A)They are often on loan from their regular job.
B)They are often work only part time on the project.
C)Many are associated with the project for less than the full time required to complete it.
D)They are exclusively from inside the organization.
E)Some people go from project to project.
سؤال
Only activities on the critical path are initial candidates for crashing.
سؤال
Project execution involves the actual performance of the activities/work packages that were planned in project planning.
سؤال
The cost control technique of earned value analysis measures project progress by the budgeted cost of work scheduled.
سؤال
Once a project is underway,the project manager is not responsible for effectively managing:

A)the people.
B)costs.
C)time.
D)communications.
E)the project sponsor
سؤال
Which of the following would probably not involve the use of project management?

A)Planning and constructing a new city hall
B)Developing a marketing campaign for the launch of a new product
C)Designing and constructing a subway system
D)Scheduling workers and purchasing raw materials for a manufacturing plant
E)Producing and staging a music festival
سؤال
Which of the following is not part of the project management triangle?

A)risk
B)cost
C)schedule
D)scope
سؤال
A hierarchical listing of what must be done during the project is called:

A)work breakdown structure (WBS).
B)program evaluation and review technique (PERT).
C)planning matrix.
D)crashing.
E)critical path method (CPM).
سؤال
Scope creep refers to the tendency for projects to take longer than planned.
سؤال
Which of the following is the last step in project portfolio selection?

A)Collect project data
B)Assess resources
C)Prioritize projects within categories
D)Provide reasons for selection or non-selection of each project
E)Project closeout
سؤال
The optimum project length in crashing occurs when the cumulative cost of crashing equals savings in the indirect costs.
سؤال
Which of the following is not a form of risk reduction in project management?

A)Backup systems
B)Outsourcing components of the project
C)Frequent monitoring of project activities
D)Expand the project scope to reduce external dependencies
E)Improving communications
سؤال
Risk assessment is part of the project management triangle.
سؤال
Project planning determines how the project is to be undertaken,and includes breaking the job down into smaller components called task identification.
سؤال
Which of the following is not involved in project planning?

A)Risk management planning
B)Material requirements planning (MRP)
C)Quality planning
D)Communication planning
E)Purchase planning
سؤال
Quality tools such as control charts can be used in project management to identify variance.
سؤال
The main determinant of the way PERT/CPM networks are used is whether activity/work package durations are ________ or ____________.

A)statistical,actual
B)probabilistic or deterministic.
C)normal,variable
D)actual,variable
E)probabilistic or statistical
سؤال
In the probabilistic approach to precedence network analysis,the duration estimate that is given the highest weighting in calculating the expected duration for an activity is:

A)duration of the immediately prior activity.
B)duration of the immediately following activity.
C)most likely duration.
D)optimistic duration.
E)pessimistic duration.
سؤال
The principal advantage a Gantt chart has over other project scheduling techniques is:

A)its ability to reveal relationships among activities.
B)it illustrates multiple paths as a project network.
C)it focuses on the critical path.
D)its simplicity.
E)both cost and time are included in the chart.
سؤال
The project management technique that is repeated until activities are decomposed into work packages that can be performed by a designated worker,team or subcontract is called:

A)work breakdown structure (WBS).
B)program evaluation and review technique (PERT).
C)planning matrix.
D)crashing.
E)project scheduling
سؤال
A relatively simple tool for planning and scheduling simple projects is the:

A)an activity-on-arrows network.
B)an activity-on-nodes network.
C)a Gantt chart.
D)critical path method.
E)program evaluation and review technique.
سؤال
There are four activities on the critical path,and the standard deviations for their durations are 1,2,4,and 2 days.The standard deviation of the duration of the critical path is:

A)3
B)5
C)9
D)16
E)25
سؤال
A PERT/CPM activity has an optimistic duration estimate of 3 days,a most likely duration estimate of 8 days,and a pessimistic duration estimate of 10 days.The expected duration of this activity te is:

A)7.0
B)7.5
C)8.0
D)8.5
E)10.0
سؤال
Concerning PERT and CPM,which of the following statements is correct?

A)These are two different names for what is essentially the same technique.
B)CPM tends to focus more on the critical path.
C)PERT gives a clearer indication of activity slack,while CPM gives a better picture of path slack.
D)Because of its recent discovery,much less is known about CPM than PERT.
E)Neither provides as much detail as a Gantt chart.
سؤال
Which of the following is used to compute the earliest finish times once the earliest start times are calculated for an activity on a precedence network?

A)Expected activity duration
B)Activity slack time
C)Activities that are on the critical path
D)Variance in project duration
E)Maximum project duration
سؤال
In a precedence network the critical path is the sequence of activities which has:

A)the most activities.
B)the most nodes.
C)the most events.
D)the longest duration.
E)the greatest variance.
سؤال
In precedence network analysis,knowing the slack time allows managers to:

A)delay critical activities.
B)extent the project if necessary.
C)increase the critical path.
D)pay attention to activities that could delay the project.
E)decrease the project duration.
سؤال
In the probabilistic approach to precedence network analysis,the duration estimate annotated "tm" for any activity is the:

A)mean duration.
B)median duration.
C)most likely duration.
D)optimistic duration.
E)pessimistic duration.
سؤال
Which of the following is not an advantages of CPM/PERT?

A)Relationships among activities can be identified.
B)Activities that need to be watched closely can be identified.
C)Arrows and nodes depict sequential relationships.
D)Slippage in project activities is no longer an issue
E)Paths are clearly identified.
سؤال
Given this information about activity B: ES = 10,EF = 15,LS = 16 and LF = 21,we can determine that the amount of slack associated with the activity is:

A)0
B)1
C)5
D)6
E)11
سؤال
Activity 4 in a network diagram has an optimistic duration estimate of 4 days,a most likely duration estimate of 7 days,and a pessimistic duration estimate of 10 days.The expected duration of Activity 4 is:

A)5
B)6
C)7
D)8
E)9
سؤال
Activity 7 is directly preceded by two activities-activity 5 and activity 6.Activity 5 has an expected duration of five and an ES time of six.Activity 6 has an expected duration of seven and an ES time of seven.Activity 7 has an expected duration of 10.The ES for activity 7 is:

A)11
B)14
C)21
D)24
E)25
سؤال
Besides project activities,the primary information that all Gantt charts illustrate is:

A)project budget and when activities occur.
B)cost of activities and delays in the schedule.
C)planned duration of activities and when they occur in the schedule.
D)project budget and staffing levels.
E)critical path and project budget.
سؤال
Which of the following is not an advantage(s)the PERT/CPM technique has over a Gantt chart?

A)its ability to reveal relationships among activities.
B)it illustrates multiple paths as a project network.
C)it indicates which activities are most critical.
D)it indicates the implications of delays in activities.
E)it is a more complex scheduling system.
سؤال
Which of the following is not a part of project scheduling?

A)Identify resource requirements for activities
B)Estimate the duration of activities
C)Identify activities in the work breakdown structure
D)Identify sequential dependencies among activities
E)Risk management planning
سؤال
When developing probabilistic estimates of project duration,it is necessary to know which of the following?

A)The mean and variance of every activity
B)The mean and variance of activities on the critical path
C)The standard deviation of activities on the critical path
D)Each activity's probability of completion
E)The distribution of activity durations
سؤال
Activity C has an early start time of 8,an early finish time of 12,a latest start time of 13,and a latest finish time of 17.Its slack is:

A)0
B)1
C)4
D)5
E)9
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/131
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 24: Project Management
1
A Gantt chart provides a visual representation of the sequence of activities in a project.
True
2
An advantage of Gantt charts in project management is that they reveal which activities can be delayed without delaying the overall project.
False
3
A project manager usually staffs the human resources required for a project by hiring outside specialists that only work for the company for the duration of the project.
False
4
Companies that are organized as pure project organizations are equivalent to matrix organizations that temporarily group specialists from different departments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
5
The precedence network for a project depicts sequential relationships among activities in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
6
The task of identifying risks should involve everyone associated with the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
7
Projects involve routine operations that are performed repeatedly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
8
Careful planning of complex projects can eliminate the occurrence of risk events that have undesirable consequences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
9
Risks involved in a project can be transferred by outsourcing a particular component of the project and requiring performance bonds.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
10
Sequential dependencies among project activities are less important than the time required to complete activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
11
The probability of occurrence of risk events is lower near the beginning of a project and higher near the end of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
12
Purchase planning is typically outside the scope of project planning activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
13
Once a project is underway,project managers are only responsible for managing the project schedule (time)and budget (costs).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
14
One way that project management differs from management of more traditional operations is the limited time frame of projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
15
PERT was originally developed for military planning in the 1940's during the Second World War (WWII).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
16
A hierarchical listing of what must be done during a project is called a project matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
17
Project managers bear the ultimate responsibility for the success or failure of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
18
Although PERT and CPM were originally developed for somewhat different types of projects,they are now nearly identical in terms of analysis and procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
19
The path in a PERT/CPM precedence network with the fewest activities and shortest duration is referred to as the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
20
Following project initiation,planning and scheduling,project execution is the last phase of a projects life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
21
The standard deviation of a project duration is equal to the sum of the variances of all the activities of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
22
For the PERT/CPM technique,completing the backward pass includes making the latest finish (LF)equal to the earliest finish (EF)for the end activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
23
Consecutive activities on the same path have shared slack,which means if activities are delayed,the amount of slack remaining is reduced for all these activities without delaying completion of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
24
The standard deviation of the duration of the critical path is equal to the square root of the sum of the variances of all of the activities on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
25
In order to determine the probability of timely project completion,it is sometimes necessary to take into account paths other than the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
26
The latest starting time for an activity is equal to the latest finish time minus the activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
27
A normal distribution is usually used to describe probabilistic duration estimates for activities in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
28
Activity slack is the difference between the latest finish and earliest finish times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
29
Activities not on the critical path have a slack time equal to zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
30
The critical path has zero path slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
31
The earliest finish time for an activity is equal to the latest finish time minus the activity slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
32
Simulation can be used for cases in which network activity durations are dependent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
33
If two consecutive activities on the same path each have two days of activity slack,this means that each of them can be delayed by two days without delaying the overall project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
34
Project managers are sometimes able to reduce indirect project costs by increasing direct costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
35
The path in a precedence network with the longest duration is the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
36
The earliest finish time for an activity is equal to the latest finish time minus the activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
37
The sum of activity durations of the longest path in a network indicates expected project completion time,and the activities on it are called the critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
38
Deterministic networks use three duration estimates for each activity in order to best determine the activity's estimated duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
39
A beta distribution can be used to describe the inherent variability of an activity's duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
40
The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
41
Uncontrolled changes to a project is called:

A)cost creep
B)project randomness
C)scope creep
D)transferring risk
E)avoidance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
42
A project manager should not be concerned with the political nature of the organization they are working with.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
43
The life cycle of a project does not include which of the following phases?

A)Initiation
B)Planning and scheduling
C)Growth and maturity
D)Closeout
E)Execution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is not a common theme regarding people that work on projects?

A)They are often on loan from their regular job.
B)They are often work only part time on the project.
C)Many are associated with the project for less than the full time required to complete it.
D)They are exclusively from inside the organization.
E)Some people go from project to project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
45
Only activities on the critical path are initial candidates for crashing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
46
Project execution involves the actual performance of the activities/work packages that were planned in project planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
47
The cost control technique of earned value analysis measures project progress by the budgeted cost of work scheduled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
48
Once a project is underway,the project manager is not responsible for effectively managing:

A)the people.
B)costs.
C)time.
D)communications.
E)the project sponsor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following would probably not involve the use of project management?

A)Planning and constructing a new city hall
B)Developing a marketing campaign for the launch of a new product
C)Designing and constructing a subway system
D)Scheduling workers and purchasing raw materials for a manufacturing plant
E)Producing and staging a music festival
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is not part of the project management triangle?

A)risk
B)cost
C)schedule
D)scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
51
A hierarchical listing of what must be done during the project is called:

A)work breakdown structure (WBS).
B)program evaluation and review technique (PERT).
C)planning matrix.
D)crashing.
E)critical path method (CPM).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
52
Scope creep refers to the tendency for projects to take longer than planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is the last step in project portfolio selection?

A)Collect project data
B)Assess resources
C)Prioritize projects within categories
D)Provide reasons for selection or non-selection of each project
E)Project closeout
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
54
The optimum project length in crashing occurs when the cumulative cost of crashing equals savings in the indirect costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is not a form of risk reduction in project management?

A)Backup systems
B)Outsourcing components of the project
C)Frequent monitoring of project activities
D)Expand the project scope to reduce external dependencies
E)Improving communications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
56
Risk assessment is part of the project management triangle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
57
Project planning determines how the project is to be undertaken,and includes breaking the job down into smaller components called task identification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following is not involved in project planning?

A)Risk management planning
B)Material requirements planning (MRP)
C)Quality planning
D)Communication planning
E)Purchase planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
59
Quality tools such as control charts can be used in project management to identify variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
60
The main determinant of the way PERT/CPM networks are used is whether activity/work package durations are ________ or ____________.

A)statistical,actual
B)probabilistic or deterministic.
C)normal,variable
D)actual,variable
E)probabilistic or statistical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
61
In the probabilistic approach to precedence network analysis,the duration estimate that is given the highest weighting in calculating the expected duration for an activity is:

A)duration of the immediately prior activity.
B)duration of the immediately following activity.
C)most likely duration.
D)optimistic duration.
E)pessimistic duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
62
The principal advantage a Gantt chart has over other project scheduling techniques is:

A)its ability to reveal relationships among activities.
B)it illustrates multiple paths as a project network.
C)it focuses on the critical path.
D)its simplicity.
E)both cost and time are included in the chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
63
The project management technique that is repeated until activities are decomposed into work packages that can be performed by a designated worker,team or subcontract is called:

A)work breakdown structure (WBS).
B)program evaluation and review technique (PERT).
C)planning matrix.
D)crashing.
E)project scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
64
A relatively simple tool for planning and scheduling simple projects is the:

A)an activity-on-arrows network.
B)an activity-on-nodes network.
C)a Gantt chart.
D)critical path method.
E)program evaluation and review technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
65
There are four activities on the critical path,and the standard deviations for their durations are 1,2,4,and 2 days.The standard deviation of the duration of the critical path is:

A)3
B)5
C)9
D)16
E)25
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
66
A PERT/CPM activity has an optimistic duration estimate of 3 days,a most likely duration estimate of 8 days,and a pessimistic duration estimate of 10 days.The expected duration of this activity te is:

A)7.0
B)7.5
C)8.0
D)8.5
E)10.0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
67
Concerning PERT and CPM,which of the following statements is correct?

A)These are two different names for what is essentially the same technique.
B)CPM tends to focus more on the critical path.
C)PERT gives a clearer indication of activity slack,while CPM gives a better picture of path slack.
D)Because of its recent discovery,much less is known about CPM than PERT.
E)Neither provides as much detail as a Gantt chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following is used to compute the earliest finish times once the earliest start times are calculated for an activity on a precedence network?

A)Expected activity duration
B)Activity slack time
C)Activities that are on the critical path
D)Variance in project duration
E)Maximum project duration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
69
In a precedence network the critical path is the sequence of activities which has:

A)the most activities.
B)the most nodes.
C)the most events.
D)the longest duration.
E)the greatest variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
70
In precedence network analysis,knowing the slack time allows managers to:

A)delay critical activities.
B)extent the project if necessary.
C)increase the critical path.
D)pay attention to activities that could delay the project.
E)decrease the project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
71
In the probabilistic approach to precedence network analysis,the duration estimate annotated "tm" for any activity is the:

A)mean duration.
B)median duration.
C)most likely duration.
D)optimistic duration.
E)pessimistic duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is not an advantages of CPM/PERT?

A)Relationships among activities can be identified.
B)Activities that need to be watched closely can be identified.
C)Arrows and nodes depict sequential relationships.
D)Slippage in project activities is no longer an issue
E)Paths are clearly identified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
73
Given this information about activity B: ES = 10,EF = 15,LS = 16 and LF = 21,we can determine that the amount of slack associated with the activity is:

A)0
B)1
C)5
D)6
E)11
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
74
Activity 4 in a network diagram has an optimistic duration estimate of 4 days,a most likely duration estimate of 7 days,and a pessimistic duration estimate of 10 days.The expected duration of Activity 4 is:

A)5
B)6
C)7
D)8
E)9
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
75
Activity 7 is directly preceded by two activities-activity 5 and activity 6.Activity 5 has an expected duration of five and an ES time of six.Activity 6 has an expected duration of seven and an ES time of seven.Activity 7 has an expected duration of 10.The ES for activity 7 is:

A)11
B)14
C)21
D)24
E)25
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
76
Besides project activities,the primary information that all Gantt charts illustrate is:

A)project budget and when activities occur.
B)cost of activities and delays in the schedule.
C)planned duration of activities and when they occur in the schedule.
D)project budget and staffing levels.
E)critical path and project budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following is not an advantage(s)the PERT/CPM technique has over a Gantt chart?

A)its ability to reveal relationships among activities.
B)it illustrates multiple paths as a project network.
C)it indicates which activities are most critical.
D)it indicates the implications of delays in activities.
E)it is a more complex scheduling system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following is not a part of project scheduling?

A)Identify resource requirements for activities
B)Estimate the duration of activities
C)Identify activities in the work breakdown structure
D)Identify sequential dependencies among activities
E)Risk management planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
79
When developing probabilistic estimates of project duration,it is necessary to know which of the following?

A)The mean and variance of every activity
B)The mean and variance of activities on the critical path
C)The standard deviation of activities on the critical path
D)Each activity's probability of completion
E)The distribution of activity durations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
80
Activity C has an early start time of 8,an early finish time of 12,a latest start time of 13,and a latest finish time of 17.Its slack is:

A)0
B)1
C)4
D)5
E)9
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 131 في هذه المجموعة.