Deck 12: Building Information Systems and Managing Projects

ملء الشاشة (f)
exit full mode
سؤال
In a direct cutover conversion strategy, the new system:

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
E) is run in at least two separate divisions in order to compare results.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Acceptance testing:

A) includes all the preparations for the trials.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) rolls system tests out to separate business divisions for independent results.
سؤال
According to the chapter case, what was the primary problem facing the Girl Scouts regarding their supply chain problems?

A) There were high error rates in ordering and fulfillment.
B) It required too much time of volunteers.
C) The paper-based system was outdated.
D) There was no integration with suppliers.
E) The ordering process was inefficient for a large volume of orders.
سؤال
The entire system-building effort is driven by:

A) senior managers.
B) the CIO.
C) executive information requirements.
D) end-user user information requirements.
E) the project management team.
سؤال
Documentation reveals how well the system has met its original objectives.
سؤال
Developing an information system has been compared to the problem-solving process. Which one of the following problem-solving steps is not a part of systems analysis?

A) Implement the solution
B) Choose the best solution
C) Develop alternative solutions
D) Define and understand the problem
E) Evaluating feedback
سؤال
In a parallel conversion strategy, the new system:

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
E) is run in at least two separate divisions in order to compare results.
سؤال
A new information system is not considered in production until conversion is complete.
سؤال
Which process develops a detailed description of the functions that a new information system must perform?

A) Feasibility study
B) Systems design
C) Test plan development
D) PERT chart
E) Requirements analysis
سؤال
Each program in a new information system is tested separately in:

A) application testing.
B) acceptance testing.
C) unit testing.
D) user testing.
E) system testing.
سؤال
A systems analysis includes a ________ that is used to determine whether the solution is achievable from a financial, technical, and organizational standpoint.

A) test plan
B) conversion plan
C) feasibility study
D) risk analysis
E) GANTT chart
سؤال
According to the chapter case, one objective of the new Girl Scouts' information systems was to allow greater centralization and control of profits and delivery.
سؤال
System testing:

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) rolls system tests out to separate business divisions for independent results.
سؤال
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed:

A) compliance.
B) production.
C) maintenance.
D) acceptance.
E) conversion.
سؤال
The systems design step comes before:

A) implementation.
B) conversion.
C) systems analysis.
D) a feasibility study.
E) requirements analysis.
سؤال
Transferring data from a legacy system to the new system would be defined by which system design specification category?

A) Input
B) Database
C) Manual procedures
D) Conversion
E) Software development and programming
سؤال
According to the chapter case, the Girl Scouts' conversion strategy of first introducing the modules for ordering cookies and then introducing the modules for transmitting orders and instructions to the cookie factory and shipper is called a(n) ________ strategy.

A) direct cutover
B) indirect cutover
C) incremental conversion
D) parallel
E) phased approach
سؤال
The first step in the problem solving process is to develop alternative solutions.
سؤال
Which is the first step in developing a new information system?

A) Defining the problem
B) Gathering information requirements
C) Programming
D) Developing alternative solutions
E) Feasibility study
سؤال
Which is the last step in developing a new information system?

A) Training and documentation
B) Conversion
C) Maintenance
D) Change management
E) Implementing the system
سؤال
As a technical project manager you have decided to propose implementing a prototyping methodology for a small web-based design project. What is the first step you will follow in this project?

A) Use the existing prototype.
B) Identify user requirements.
C) Conduct a feasibility study.
D) Identify different solutions.
E) Develop an initial prototype.
سؤال
The process of creating workable information systems in a very short period of time is called:

A) RAD.
B) JAD.
C) prototyping.
D) end-user development.
E) SDLC.
سؤال
The oldest method for building information systems is:

A) JAD.
B) prototyping.
C) object-oriented development.
D) the systems development lifecycle.
E) RAD.
سؤال
Which of the following is a technique used to create websites that will conform to the screen resolution of the user?

A) Native design
B) Responsive design
C) End-user design
D) Multi-platform design
E) Mobile development
سؤال
You are an IT project manager for an advertising firm. The firm wishes to create an online survey tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?

A) RAD
B) JAD
C) End-user development
D) Prototyping
E) SDLC
سؤال
Management can control the development of end-user applications in part by:

A) developing a formal development methodology.
B) requiring cost justification for end-user IS projects.
C) establishing standards for project requirements.
D) requiring Gantt charts.
E) implementing a systems development life cycle.
سؤال
What is the purpose of systems analysis? Explain in detail what is involved in the process of systems analysis.
سؤال
Which of the following is not a typical tool or technique used in responsive design?

A) Flexible layouts
B) Flexible images
C) Detecting user screen resolution
D) Table-based layouts
E) Media queries to optimize design
سؤال
In a data flow diagram, external entities are represented by:

A) rounded boxes.
B) square boxes.
C) circles.
D) open rectangles.
E) triangles.
سؤال
"Hidden costs," such as ________ costs, can easily undercut anticipated benefits from outsourcing.

A) hardware
B) software
C) employee salary
D) communications costs
E) vendor selection
سؤال
Which of the following is the biggest risk in using end-user development to create a new information system?

A) The software used may create inaccurate information.
B) The system doesn't adequately reflect user needs.
C) Hardware is unable to support the new system.
D) The system may not be able to scale up to handle larger amounts of data.
E) End users are overly taxed and become reluctant to use the system.
سؤال
Which of the following is not one of the unique considerations in developing applications for a mobile platform?

A) Reduced screen space
B) Keyboard configuration
C) User gestures
D) Bandwidth constraints
E) Multiple mobile platforms
سؤال
A detailed list of questions submitted to external vendors to determine how well they meet the organization's specific requirements is called:

A) a feasibility study.
B) process specifications.
C) a systems analysis.
D) a case study.
E) a request for proposal.
سؤال
In the traditional systems development lifecycle, end users:

A) contribute heavily throughout development.
B) have no input.
C) contribute only during testing.
D) are important only during the conversion phase.
E) are limited to providing information requirements and reviewing the technical staff's work.
سؤال
A test plan includes all the preparations for the series of tests to be performed on the system.
سؤال
You work for the IT department of a startup and it is your job to set up the testing processes for a new enterprise system the company will be hosting. Describe the processes you will recommend. What unique considerations will you have?
سؤال
You have been hired as a consultant to make recommendations for Smarty's, a healthy fast-food chain that is undergoing major expansion. Smarty's needs to create an enterprise resource planning system. However, Smarty's needs to have this system up and running as quickly as possible or it is likely they will begin losing business. What do you recommend?
سؤال
If an organization's requirements conflict with the software package chosen and the package cannot be customized, the organization should:

A) select a different package.
B) outsource the development of the system.
C) redesign the RFP.
D) change the evaluation process.
E) change its procedures.
سؤال
Which of the following types of systems development is characterized by significantly speeding the generation of information requirements and involving users at an intense level in the systems design?

A) RAD
B) JAD
C) Prototyping
D) End-user development
E) SDLC
سؤال
Of the following, which is the most important reason for creating a mobile version of a business's website?

A) Mobile devices provide access from anywhere.
B) Mobile devices use touch interfaces.
C) Mobile devices use lower bandwidth.
D) Mobile devices use different platforms.
E) Mobile websites use different programming than traditional websites.
سؤال
What are the advantages and disadvantages of prototyping? Describe the steps in prototyping. Give at least two circumstances under which prototyping might be useful.
سؤال
A prototype is the final working version of an information system.
سؤال
Systems analysts typically gather facts about existing systems by examining the programming code and using the system themselves.
سؤال
One problem with prototyping is that the systems constructed may not be able to handle large quantities of data in a production environment.
سؤال
It is important for all systems development activities to be placed in sequential order.
سؤال
The primary tool for representing a system's component processes and the flow of data between them is the:

A) data dictionary.
B) process specifications diagram.
C) user documentation.
D) data flow diagram.
E) Gantt chart.
سؤال
The term structured, when discussing structured methodologies, refers to the fact that:

A) the finished software is highly documented.
B) the development process is highly documented.
C) the techniques are step by step, with each step building on the previous one.
D) a defined hierarchy of objects and classes are used to structure the programming.
E) programming objects are organized into structured classes.
سؤال
In one form of outsourcing, a company creates the software for its system, but operates the software on a vendor's computers.
سؤال
End-user-developed solutions take longer to complete than conventionally programmed applications.
سؤال
Identify and describe the main five systems development approaches.
سؤال
In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?

A) Degree would be a sister class to Mathematics and Physics.
B) Degree is a superclass to Mathematics and Physics.
C) Mathematics and Physics would be ancestors to Degree.
D) Degree would be a subclass to Mathematics and Physics.
E) Degree, Mathematics, and Physics would be three separate classes.
سؤال
End user development is useful primarily for creating:

A) enterprise systems.
B) user interfaces.
C) conventional programs.
D) mobile apps.
E) simple programs.
سؤال
Native apps are inexpensive to develop because they use the capabilities of the mobile device.
سؤال
Why is developing applications for mobile platforms so different from development for PC applications?
سؤال
Object-oriented modeling is based on the concepts of:

A) objects and relationships.
B) classes and objects.
C) class and inheritance.
D) objects and inheritance.
E) tables and relationships.
سؤال
An entire information system is broken down into its main subsystems by using:

A) high-level data flow diagrams.
B) low-level data flow diagrams.
C) process specifications.
D) structured diagrams.
E) Gantt charts.
سؤال
What is the difference between a mobile website and a mobile web app?
سؤال
Identify four types of rapid-cycle systems development. Why is rapid-cycle development a trend in current software development?
سؤال
In object-oriented development, an object:

A) combines data with processes.
B) contains data that any other object can access or act upon.
C) is designed to process any data input.
D) can only interact with other objects of the same class.
E) is used to hold a collection of processes of the same class.
سؤال
To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use:

A) structure charts.
B) Gantt charts.
C) process specifications diagrams.
D) data flow diagrams.
E) PERT charts.
سؤال
Objects are grouped into hierarchies, and hierarchies into classes.
سؤال
Identify and describe a key tool used in structured methodologies.
سؤال
________ are an intangible benefit of information systems.

A) Improved operations
B) Lower vendor costs
C) Reduced software costs
D) Lower operational costs, improved resource control, and more information
E) Ongoing training costs
سؤال
Object-oriented development could potentially reduce the time and cost of writing software because:

A) object-oriented programming requires less training.
B) iterative prototyping is not required.
C) objects are reusable.
D) a single user interface object can be used for the entire application.
E) end users are responsible for creating the early prototypes.
سؤال
________ is a tangible benefit of information systems.

A) Improved asset usage
B) Reduced workforce
C) Better corporate image
D) More information
E) Improved resource control
سؤال
Which of the following is an online development environment?

A) JAD
B) CASE
C) RAD
D) PaaS
E) SDLC
سؤال
________ provides software tools to automate development methodologies and reduce the amount of repetitive work in systems development.

A) XML
B) CAD
C) JAD
D) RAD
E) CASE
سؤال
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
سؤال
PaaS are online development environments that enable developers to quickly write customer- or employee-facing web applications.
سؤال
What does the word "structured" mean in the term "structured methodologies"?
سؤال
Component-based development uses structured methodologies.
سؤال
Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development?

A) Object-oriented development
B) Component-based development
C) Structured methodologies
D) RAD
E) End-user development
سؤال
According to the chapter case, which of the following is not one of the problems created by the Great Britain's National Health Service (NHS) booking tool, Choose and Book?

A) Assigning wrong specialists to appointments
B) Confusing interface
C) Appointment booking errors
D) Lack of paper trail
E) Improper handling of referrals
سؤال
Which of the following is not a typical CASE tool?

A) Report generators
B) Analysis tools
C) Data dictionaries
D) Code generators
E) Debugging tools
سؤال
________ describe the transformation occurring within the lowest level of the data flow diagrams. They express the logic of each process.

A) Structure charts
B) DFDs
C) Component procedures
D) Gantt charts
E) Process specifications
سؤال
What qualities of object-oriented development make this method especially suitable for Internet applications?
سؤال
A PERT chart:

A) portrays a project as a network diagram consisting of numbered nodes that represent tasks.
B) is used to evaluate project risk and time.
C) displays a horizontal bar for each project task.
D) tracks progress of, and modifications to, project tasks.
E) is used to evaluate project costs and benefits.
سؤال
Which process is used to develop risk profiles for a firm's information system projects and assets?

A) Information systems plan
B) Scoring model
C) Feasibility study
D) Systems analysis
E) Portfolio analysis
سؤال
________ refers to the application of knowledge, skills, tools, and techniques to achieve specific targets within specified budget and time constraints.

A) Systems analysis
B) Systems design
C) Project management
D) Project implementation
E) Project scope
سؤال
You have been hired by a pharmaceutical company to evaluate its portfolio of systems and IT projects. Which types of projects would be best avoided?

A) Any high-risk projects
B) Any low-benefit projects
C) None-any project might be beneficial
D) Any low-risk projects
E) High-risk, low-benefit projects
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Building Information Systems and Managing Projects
1
In a direct cutover conversion strategy, the new system:

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
E) is run in at least two separate divisions in order to compare results.
B
2
Acceptance testing:

A) includes all the preparations for the trials.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) rolls system tests out to separate business divisions for independent results.
D
3
According to the chapter case, what was the primary problem facing the Girl Scouts regarding their supply chain problems?

A) There were high error rates in ordering and fulfillment.
B) It required too much time of volunteers.
C) The paper-based system was outdated.
D) There was no integration with suppliers.
E) The ordering process was inefficient for a large volume of orders.
E
4
The entire system-building effort is driven by:

A) senior managers.
B) the CIO.
C) executive information requirements.
D) end-user user information requirements.
E) the project management team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
5
Documentation reveals how well the system has met its original objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
6
Developing an information system has been compared to the problem-solving process. Which one of the following problem-solving steps is not a part of systems analysis?

A) Implement the solution
B) Choose the best solution
C) Develop alternative solutions
D) Define and understand the problem
E) Evaluating feedback
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
7
In a parallel conversion strategy, the new system:

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
E) is run in at least two separate divisions in order to compare results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
8
A new information system is not considered in production until conversion is complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which process develops a detailed description of the functions that a new information system must perform?

A) Feasibility study
B) Systems design
C) Test plan development
D) PERT chart
E) Requirements analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
10
Each program in a new information system is tested separately in:

A) application testing.
B) acceptance testing.
C) unit testing.
D) user testing.
E) system testing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
11
A systems analysis includes a ________ that is used to determine whether the solution is achievable from a financial, technical, and organizational standpoint.

A) test plan
B) conversion plan
C) feasibility study
D) risk analysis
E) GANTT chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
12
According to the chapter case, one objective of the new Girl Scouts' information systems was to allow greater centralization and control of profits and delivery.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
13
System testing:

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) rolls system tests out to separate business divisions for independent results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
14
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed:

A) compliance.
B) production.
C) maintenance.
D) acceptance.
E) conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
15
The systems design step comes before:

A) implementation.
B) conversion.
C) systems analysis.
D) a feasibility study.
E) requirements analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
16
Transferring data from a legacy system to the new system would be defined by which system design specification category?

A) Input
B) Database
C) Manual procedures
D) Conversion
E) Software development and programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
17
According to the chapter case, the Girl Scouts' conversion strategy of first introducing the modules for ordering cookies and then introducing the modules for transmitting orders and instructions to the cookie factory and shipper is called a(n) ________ strategy.

A) direct cutover
B) indirect cutover
C) incremental conversion
D) parallel
E) phased approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
18
The first step in the problem solving process is to develop alternative solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which is the first step in developing a new information system?

A) Defining the problem
B) Gathering information requirements
C) Programming
D) Developing alternative solutions
E) Feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which is the last step in developing a new information system?

A) Training and documentation
B) Conversion
C) Maintenance
D) Change management
E) Implementing the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
21
As a technical project manager you have decided to propose implementing a prototyping methodology for a small web-based design project. What is the first step you will follow in this project?

A) Use the existing prototype.
B) Identify user requirements.
C) Conduct a feasibility study.
D) Identify different solutions.
E) Develop an initial prototype.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
22
The process of creating workable information systems in a very short period of time is called:

A) RAD.
B) JAD.
C) prototyping.
D) end-user development.
E) SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
23
The oldest method for building information systems is:

A) JAD.
B) prototyping.
C) object-oriented development.
D) the systems development lifecycle.
E) RAD.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is a technique used to create websites that will conform to the screen resolution of the user?

A) Native design
B) Responsive design
C) End-user design
D) Multi-platform design
E) Mobile development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
25
You are an IT project manager for an advertising firm. The firm wishes to create an online survey tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?

A) RAD
B) JAD
C) End-user development
D) Prototyping
E) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
26
Management can control the development of end-user applications in part by:

A) developing a formal development methodology.
B) requiring cost justification for end-user IS projects.
C) establishing standards for project requirements.
D) requiring Gantt charts.
E) implementing a systems development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
27
What is the purpose of systems analysis? Explain in detail what is involved in the process of systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is not a typical tool or technique used in responsive design?

A) Flexible layouts
B) Flexible images
C) Detecting user screen resolution
D) Table-based layouts
E) Media queries to optimize design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
29
In a data flow diagram, external entities are represented by:

A) rounded boxes.
B) square boxes.
C) circles.
D) open rectangles.
E) triangles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
30
"Hidden costs," such as ________ costs, can easily undercut anticipated benefits from outsourcing.

A) hardware
B) software
C) employee salary
D) communications costs
E) vendor selection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is the biggest risk in using end-user development to create a new information system?

A) The software used may create inaccurate information.
B) The system doesn't adequately reflect user needs.
C) Hardware is unable to support the new system.
D) The system may not be able to scale up to handle larger amounts of data.
E) End users are overly taxed and become reluctant to use the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is not one of the unique considerations in developing applications for a mobile platform?

A) Reduced screen space
B) Keyboard configuration
C) User gestures
D) Bandwidth constraints
E) Multiple mobile platforms
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
33
A detailed list of questions submitted to external vendors to determine how well they meet the organization's specific requirements is called:

A) a feasibility study.
B) process specifications.
C) a systems analysis.
D) a case study.
E) a request for proposal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
34
In the traditional systems development lifecycle, end users:

A) contribute heavily throughout development.
B) have no input.
C) contribute only during testing.
D) are important only during the conversion phase.
E) are limited to providing information requirements and reviewing the technical staff's work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
35
A test plan includes all the preparations for the series of tests to be performed on the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
36
You work for the IT department of a startup and it is your job to set up the testing processes for a new enterprise system the company will be hosting. Describe the processes you will recommend. What unique considerations will you have?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
37
You have been hired as a consultant to make recommendations for Smarty's, a healthy fast-food chain that is undergoing major expansion. Smarty's needs to create an enterprise resource planning system. However, Smarty's needs to have this system up and running as quickly as possible or it is likely they will begin losing business. What do you recommend?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
38
If an organization's requirements conflict with the software package chosen and the package cannot be customized, the organization should:

A) select a different package.
B) outsource the development of the system.
C) redesign the RFP.
D) change the evaluation process.
E) change its procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following types of systems development is characterized by significantly speeding the generation of information requirements and involving users at an intense level in the systems design?

A) RAD
B) JAD
C) Prototyping
D) End-user development
E) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
40
Of the following, which is the most important reason for creating a mobile version of a business's website?

A) Mobile devices provide access from anywhere.
B) Mobile devices use touch interfaces.
C) Mobile devices use lower bandwidth.
D) Mobile devices use different platforms.
E) Mobile websites use different programming than traditional websites.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
41
What are the advantages and disadvantages of prototyping? Describe the steps in prototyping. Give at least two circumstances under which prototyping might be useful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
42
A prototype is the final working version of an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
43
Systems analysts typically gather facts about existing systems by examining the programming code and using the system themselves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
44
One problem with prototyping is that the systems constructed may not be able to handle large quantities of data in a production environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
45
It is important for all systems development activities to be placed in sequential order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
46
The primary tool for representing a system's component processes and the flow of data between them is the:

A) data dictionary.
B) process specifications diagram.
C) user documentation.
D) data flow diagram.
E) Gantt chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
47
The term structured, when discussing structured methodologies, refers to the fact that:

A) the finished software is highly documented.
B) the development process is highly documented.
C) the techniques are step by step, with each step building on the previous one.
D) a defined hierarchy of objects and classes are used to structure the programming.
E) programming objects are organized into structured classes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
48
In one form of outsourcing, a company creates the software for its system, but operates the software on a vendor's computers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
49
End-user-developed solutions take longer to complete than conventionally programmed applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
50
Identify and describe the main five systems development approaches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
51
In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?

A) Degree would be a sister class to Mathematics and Physics.
B) Degree is a superclass to Mathematics and Physics.
C) Mathematics and Physics would be ancestors to Degree.
D) Degree would be a subclass to Mathematics and Physics.
E) Degree, Mathematics, and Physics would be three separate classes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
52
End user development is useful primarily for creating:

A) enterprise systems.
B) user interfaces.
C) conventional programs.
D) mobile apps.
E) simple programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
53
Native apps are inexpensive to develop because they use the capabilities of the mobile device.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
54
Why is developing applications for mobile platforms so different from development for PC applications?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
55
Object-oriented modeling is based on the concepts of:

A) objects and relationships.
B) classes and objects.
C) class and inheritance.
D) objects and inheritance.
E) tables and relationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
56
An entire information system is broken down into its main subsystems by using:

A) high-level data flow diagrams.
B) low-level data flow diagrams.
C) process specifications.
D) structured diagrams.
E) Gantt charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
57
What is the difference between a mobile website and a mobile web app?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
58
Identify four types of rapid-cycle systems development. Why is rapid-cycle development a trend in current software development?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
59
In object-oriented development, an object:

A) combines data with processes.
B) contains data that any other object can access or act upon.
C) is designed to process any data input.
D) can only interact with other objects of the same class.
E) is used to hold a collection of processes of the same class.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
60
To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use:

A) structure charts.
B) Gantt charts.
C) process specifications diagrams.
D) data flow diagrams.
E) PERT charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
61
Objects are grouped into hierarchies, and hierarchies into classes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
62
Identify and describe a key tool used in structured methodologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
63
________ are an intangible benefit of information systems.

A) Improved operations
B) Lower vendor costs
C) Reduced software costs
D) Lower operational costs, improved resource control, and more information
E) Ongoing training costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
64
Object-oriented development could potentially reduce the time and cost of writing software because:

A) object-oriented programming requires less training.
B) iterative prototyping is not required.
C) objects are reusable.
D) a single user interface object can be used for the entire application.
E) end users are responsible for creating the early prototypes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
65
________ is a tangible benefit of information systems.

A) Improved asset usage
B) Reduced workforce
C) Better corporate image
D) More information
E) Improved resource control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following is an online development environment?

A) JAD
B) CASE
C) RAD
D) PaaS
E) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
67
________ provides software tools to automate development methodologies and reduce the amount of repetitive work in systems development.

A) XML
B) CAD
C) JAD
D) RAD
E) CASE
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
68
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
69
PaaS are online development environments that enable developers to quickly write customer- or employee-facing web applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
70
What does the word "structured" mean in the term "structured methodologies"?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
71
Component-based development uses structured methodologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
72
Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development?

A) Object-oriented development
B) Component-based development
C) Structured methodologies
D) RAD
E) End-user development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
73
According to the chapter case, which of the following is not one of the problems created by the Great Britain's National Health Service (NHS) booking tool, Choose and Book?

A) Assigning wrong specialists to appointments
B) Confusing interface
C) Appointment booking errors
D) Lack of paper trail
E) Improper handling of referrals
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is not a typical CASE tool?

A) Report generators
B) Analysis tools
C) Data dictionaries
D) Code generators
E) Debugging tools
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
75
________ describe the transformation occurring within the lowest level of the data flow diagrams. They express the logic of each process.

A) Structure charts
B) DFDs
C) Component procedures
D) Gantt charts
E) Process specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
76
What qualities of object-oriented development make this method especially suitable for Internet applications?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
77
A PERT chart:

A) portrays a project as a network diagram consisting of numbered nodes that represent tasks.
B) is used to evaluate project risk and time.
C) displays a horizontal bar for each project task.
D) tracks progress of, and modifications to, project tasks.
E) is used to evaluate project costs and benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which process is used to develop risk profiles for a firm's information system projects and assets?

A) Information systems plan
B) Scoring model
C) Feasibility study
D) Systems analysis
E) Portfolio analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
79
________ refers to the application of knowledge, skills, tools, and techniques to achieve specific targets within specified budget and time constraints.

A) Systems analysis
B) Systems design
C) Project management
D) Project implementation
E) Project scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
80
You have been hired by a pharmaceutical company to evaluate its portfolio of systems and IT projects. Which types of projects would be best avoided?

A) Any high-risk projects
B) Any low-benefit projects
C) None-any project might be beneficial
D) Any low-risk projects
E) High-risk, low-benefit projects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.