Deck 10: Monitoring and Information Systems

ملء الشاشة (f)
exit full mode
سؤال
In earned value analysis,the 50-50 rule assumes that __________.

A)50 percent is earned when the task is half done and 50 percent is earned at completion
B)50 percent is earned when the task begins and 50 percent is earned at completion
C)50 percent is earned when the task begins and 50 percent is earned at the halfway stage
D)50 percent is earned when the project is planned and 50 percent is earned when the project is over
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
According to the authors,the project manager can tolerate almost any kind of behavior,EXCEPT __________.

A)tardiness
B)negative attitude
C)unpunctuality
D)dishonesty
سؤال
For each factor to be measured during monitoring; performance criteria,standards,and __________ should be established.

A)data collection procedures
B)mechanized systems
C)automated systems
D)audit checks
سؤال
In earned value analysis,if the cost variance is (-$10,000),__________.

A)the cost variance is favorable
B)the cost variance is unfavorable
C)the scheduled variance is favorable
D)the scheduled cost avoidance is unfavorable
سؤال
In earned value analysis,the 0 - 100 percent rule allows __________.

A)100 percent credit before starting work and 0 percent credit after the completion
B)0 percent credit when work begins and 100 percent credit when the project is complete
C)0 percent credit when work begins and 100 percent credit at completion of the activity
D)0 percent credit at completion of the activity and 100 percent credit at formal acceptance during scope verification
سؤال
Management by exception has the disadvantage of being __________.

A)too expensive
B)too difficult to implement
C)a quantitative approach
D)an "after the fact" type of approach
سؤال
The first step in setting up a monitoring system is to __________.

A)collect existing data to see what data is relevant and available
B)collect every available piece of information so it can be analyzed
C)use whatever information is available
D)identify the key factors to be controlled
سؤال
Monitoring,as an activity,should be kept distinct from __________,which is the process of making judgments about the quality and effectiveness of project performance.

A)collecting
B)reporting
C)evaluation
D)recording
سؤال
According to the authors,in the planning - monitoring - controlling cycle,the directions of the flows indicate that __________.

A)information flows from the top to bottom and authority flows from the bottom to the top
B)information flows from the bottom to the top and authority flows from the top to the bottom
C)authority flows from the bottom to the top
D)information flows from the top to the bottom
سؤال
The most common mistake made when monitoring data is to gather information that is clearly related to project performance but __________.

A)is so volatile that trends cannot be detected
B)has little or no probability of changing significantly between collection periods
C)is too unusual to use
D)cannot be captured in the mechanized PMIS
سؤال
An appropriate and common secondary user for monitoring includes __________.

A)auditing,learning from mistakes,and reporting progress and status
B)exercising effective control over the project
C)evaluating current status of the project
D)fixing the blame when things go wrong
سؤال
A large proportion of all data collected takes one of the following forms EXCEPT __________.

A)indicators
B)verbal measures
C)raw numbers
D)individual perceptions
سؤال
Measuring characteristics such as "quality of team member cooperation" and "morale of team members" generally takes the form of __________characterizations.

A)verbal
B)raw number
C)indicative
D)all of the above
سؤال
__________ is when individuals are overwhelmed with too many reports,too much detail,and too much dat a.

A)Information overload
B)PMIS verification
C)Project isolation
D)Computer paralysis
سؤال
Which of the following is NOT a common difficulty in the design of project reports?

A)Providing too much detail
B)Having too many interface modules
C)Poor correspondence to the parent firm's reporting system
D)Poor correspondence between the planning and monitoring systems
سؤال
One of the most common errors when collecting data is __________.

A)collecting rapidly changing data frequently
B)collecting data infrequently because data collection is so time consuming
C)collecting data that rarely changes
D)reporting to management after collecting data.
سؤال
ETC + AC = __________.

A)BAC
B)EAC
C)SPI
D)CPI
سؤال
According to the authors,the key items to be planned,monitored,and controlled are __________.

A)schedule,budget,and financial stability
B)schedule,quality,performance,and customer satisfaction
C)schedule,budget,and feasibility
D)schedule,budget,and performance
سؤال
If CPI = 1.05,then __________ is favorable.

A)time variance
B)schedule variance
C)cost variance
D)performance variance
سؤال
Monitoring,as an activity,should be kept distinct from __________,which uses data supplied by monitoring to bring actual performance into approximate congruence with planned performance.

A)recording
B)controlling
C)collecting
D)reporting
سؤال
In earned value analysis,the __________ is computed as the earned value minus the actual cost of work performed.

A)schedule variance
B)cost variance
C)time variance
D)CPI
سؤال
If EV = $500,AC = $450,PV = $475; CPI = __________.

A)1)05
B)1)11
C))95
D))90
سؤال
EV - PV = __________.

A)SV
B)CV
C)CPI
D)TV
سؤال
When collecting raw project data,it is important to make sure that all data are collected from sources that operate on the same __________ and with the same rules for data collection.

A)continent
B)floor of the building
C)time intervals
D)scope plan
سؤال
Which of the following conventions has the characteristic of the project always seeming to be running late,until the very end when it seems to suddenly catch up?

A)The 50-50 rule
B)The 0-100 percent rule
C)Critical input use rule
D)The proportionality rule
سؤال
Ordinal rankings of performance are examples of a __________ type of measure.

A)frequency count
B)raw number
C)verbal measure
D)subjective numeric rating
سؤال
If EV = $500,AC = $475,PV = $450; SV = ________.

A)$50
B)$25
C)90%
D)95%
سؤال
__________ is collecting,recording,and reporting information concerning any and all aspects of project performance that the project manager or others in the organization wish to know.

A)Initiating
B)Planning
C)Controlling
D)Monitoring
سؤال
The project __________ describes what is being done,when and the planned level of resource usage for each task,work-package or element in the project.

A)WBS
B)risk management plan
C)schedule
D)quality report
سؤال
In general,__________ tend to bias data advertently or inadvertently.

A)project managers
B)stakeholders
C)those who report them
D)those who use them
سؤال
In earned value analysis,BAC refers to the __________.

A)budgeted annual cost
B)budget at completion
C)budget at close-out
D)big annual cost
سؤال
__________ are used when some aspect of system performance cannot be measured directly.

A)Indicators
B)Frequency counts
C)Raw numbers
D)Verbal measures
سؤال
The earned value rule that divides the actual task time-to-date by the scheduled time for the task to calculate percent complete is called the __________ rule.

A)50-50
B)0-100 percent
C)critical input use
D)proportionality
سؤال
__________ can often give the project manager early warning signals of potential problems in a project and help understand the relationships of individual tasks to one another and to the overall project.

A)Detailed and timely reports
B)Executive summaries
C)Scope change reports
D)The WBS
سؤال
A(n)__________ can be used to deal with issues of honesty related to the monitoring system.

A)WBS
B)executive summary
C)internal audit
D)quality control chart
سؤال
The best sources of items to be monitored are the project risk management plan,change of scope orders,and __________.

A)schedule
B)WBS
C)quality report
D)resource report
سؤال
In earned value analysis,EAC refers to the __________.

A)estimated cost at completion
B)estimated actual cost
C)eliminated annual cost
D)estimated annual cost
سؤال
The project control process should be viewed as a(n)__________,with revised plans and schedules (if warranted)following corrective actions.The project control process should run continuously until the project is completed.

A)closed loop system
B)open loop system
C)open environment
D)earned value plan
سؤال
Reports for __________ have a need for detailed information about individual tasks and the factors affecting such tasks.

A)top executives
B)lower-level personnel
C)all the stakeholders
D)project managers
سؤال
A(n)__________ is a simple tally of the occurrence of an event.This type of measure is easy to collect and is often reported as events per unit of time or reported as events as a percent of a standard number.

A)frequency count
B)raw number
C)subjective numeric rating
D)verbal measure
سؤال
In earned value analysis,(CPI)(SPI)= __________.

A)CV
B)TPI
C)CSI
D)SV
سؤال
Describe the three common difficulties in designing project reports.
سؤال
ST-AT =

A)TV
B)EV
C)CV
D)SV
سؤال
Identify some of the benefits when timely reports are delivered to the proper people by the project management information system.
سؤال
Suggest some practical measures that can be used to improve the perception about the benefits of meetings.
سؤال
Conceptually,EAC represents the amount spent to date plus __________.

A)the delay costs
B)BAC
C)CV
D)ETC
سؤال
Excessive computer involvement with computer activity replacing project management; loss of touch with the project and its realities,is referred to as __________.

A)computer simulation
B)computer paralysis
C)information overload
D)robotic automation
سؤال
Identify the main complaints associated with meetings.
سؤال
Vague or incomplete project requirements are an example of which telltale sign that a project is in trouble?

A)Muddy waters
B)Mysterious stakeholders
C)Unconstrained constraints
D)Scope creep
سؤال
A status report that is vague or contains overly optimistic language like "very soon" or "marginal increase" in costs is referred to as

A)suspicious
B)paralyzed
C)incomplete
D)risky
سؤال
List the four conventions used to aid in estimating percent completion.
سؤال
(BAC + EV) / CPI = __________.

A)EAC
B)TPI
C)CPI
D)ETC
سؤال
If CSI is less than 1,it is indicative of a(n)__________.

A)problem
B)good project
C)efficient project
D)budget error
سؤال
When using earned value analysis,identify the three conditions that can exist with respect to the completion of activities in a project.
سؤال
Unfortunately,it is common to focus monitoring activities on data that are easily __________ but not necessarily important.

A)gathered
B)purchased
C)analyzed
D)reported
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Monitoring and Information Systems
1
In earned value analysis,the 50-50 rule assumes that __________.

A)50 percent is earned when the task is half done and 50 percent is earned at completion
B)50 percent is earned when the task begins and 50 percent is earned at completion
C)50 percent is earned when the task begins and 50 percent is earned at the halfway stage
D)50 percent is earned when the project is planned and 50 percent is earned when the project is over
B
2
According to the authors,the project manager can tolerate almost any kind of behavior,EXCEPT __________.

A)tardiness
B)negative attitude
C)unpunctuality
D)dishonesty
D
3
For each factor to be measured during monitoring; performance criteria,standards,and __________ should be established.

A)data collection procedures
B)mechanized systems
C)automated systems
D)audit checks
A
4
In earned value analysis,if the cost variance is (-$10,000),__________.

A)the cost variance is favorable
B)the cost variance is unfavorable
C)the scheduled variance is favorable
D)the scheduled cost avoidance is unfavorable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
In earned value analysis,the 0 - 100 percent rule allows __________.

A)100 percent credit before starting work and 0 percent credit after the completion
B)0 percent credit when work begins and 100 percent credit when the project is complete
C)0 percent credit when work begins and 100 percent credit at completion of the activity
D)0 percent credit at completion of the activity and 100 percent credit at formal acceptance during scope verification
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
Management by exception has the disadvantage of being __________.

A)too expensive
B)too difficult to implement
C)a quantitative approach
D)an "after the fact" type of approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
The first step in setting up a monitoring system is to __________.

A)collect existing data to see what data is relevant and available
B)collect every available piece of information so it can be analyzed
C)use whatever information is available
D)identify the key factors to be controlled
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
Monitoring,as an activity,should be kept distinct from __________,which is the process of making judgments about the quality and effectiveness of project performance.

A)collecting
B)reporting
C)evaluation
D)recording
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
According to the authors,in the planning - monitoring - controlling cycle,the directions of the flows indicate that __________.

A)information flows from the top to bottom and authority flows from the bottom to the top
B)information flows from the bottom to the top and authority flows from the top to the bottom
C)authority flows from the bottom to the top
D)information flows from the top to the bottom
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
The most common mistake made when monitoring data is to gather information that is clearly related to project performance but __________.

A)is so volatile that trends cannot be detected
B)has little or no probability of changing significantly between collection periods
C)is too unusual to use
D)cannot be captured in the mechanized PMIS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
An appropriate and common secondary user for monitoring includes __________.

A)auditing,learning from mistakes,and reporting progress and status
B)exercising effective control over the project
C)evaluating current status of the project
D)fixing the blame when things go wrong
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
A large proportion of all data collected takes one of the following forms EXCEPT __________.

A)indicators
B)verbal measures
C)raw numbers
D)individual perceptions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
Measuring characteristics such as "quality of team member cooperation" and "morale of team members" generally takes the form of __________characterizations.

A)verbal
B)raw number
C)indicative
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
__________ is when individuals are overwhelmed with too many reports,too much detail,and too much dat a.

A)Information overload
B)PMIS verification
C)Project isolation
D)Computer paralysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following is NOT a common difficulty in the design of project reports?

A)Providing too much detail
B)Having too many interface modules
C)Poor correspondence to the parent firm's reporting system
D)Poor correspondence between the planning and monitoring systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
One of the most common errors when collecting data is __________.

A)collecting rapidly changing data frequently
B)collecting data infrequently because data collection is so time consuming
C)collecting data that rarely changes
D)reporting to management after collecting data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
ETC + AC = __________.

A)BAC
B)EAC
C)SPI
D)CPI
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
According to the authors,the key items to be planned,monitored,and controlled are __________.

A)schedule,budget,and financial stability
B)schedule,quality,performance,and customer satisfaction
C)schedule,budget,and feasibility
D)schedule,budget,and performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
If CPI = 1.05,then __________ is favorable.

A)time variance
B)schedule variance
C)cost variance
D)performance variance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
Monitoring,as an activity,should be kept distinct from __________,which uses data supplied by monitoring to bring actual performance into approximate congruence with planned performance.

A)recording
B)controlling
C)collecting
D)reporting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
In earned value analysis,the __________ is computed as the earned value minus the actual cost of work performed.

A)schedule variance
B)cost variance
C)time variance
D)CPI
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
If EV = $500,AC = $450,PV = $475; CPI = __________.

A)1)05
B)1)11
C))95
D))90
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
EV - PV = __________.

A)SV
B)CV
C)CPI
D)TV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
When collecting raw project data,it is important to make sure that all data are collected from sources that operate on the same __________ and with the same rules for data collection.

A)continent
B)floor of the building
C)time intervals
D)scope plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following conventions has the characteristic of the project always seeming to be running late,until the very end when it seems to suddenly catch up?

A)The 50-50 rule
B)The 0-100 percent rule
C)Critical input use rule
D)The proportionality rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
Ordinal rankings of performance are examples of a __________ type of measure.

A)frequency count
B)raw number
C)verbal measure
D)subjective numeric rating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
If EV = $500,AC = $475,PV = $450; SV = ________.

A)$50
B)$25
C)90%
D)95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
__________ is collecting,recording,and reporting information concerning any and all aspects of project performance that the project manager or others in the organization wish to know.

A)Initiating
B)Planning
C)Controlling
D)Monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
The project __________ describes what is being done,when and the planned level of resource usage for each task,work-package or element in the project.

A)WBS
B)risk management plan
C)schedule
D)quality report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
In general,__________ tend to bias data advertently or inadvertently.

A)project managers
B)stakeholders
C)those who report them
D)those who use them
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
In earned value analysis,BAC refers to the __________.

A)budgeted annual cost
B)budget at completion
C)budget at close-out
D)big annual cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
__________ are used when some aspect of system performance cannot be measured directly.

A)Indicators
B)Frequency counts
C)Raw numbers
D)Verbal measures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
The earned value rule that divides the actual task time-to-date by the scheduled time for the task to calculate percent complete is called the __________ rule.

A)50-50
B)0-100 percent
C)critical input use
D)proportionality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
__________ can often give the project manager early warning signals of potential problems in a project and help understand the relationships of individual tasks to one another and to the overall project.

A)Detailed and timely reports
B)Executive summaries
C)Scope change reports
D)The WBS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
A(n)__________ can be used to deal with issues of honesty related to the monitoring system.

A)WBS
B)executive summary
C)internal audit
D)quality control chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
The best sources of items to be monitored are the project risk management plan,change of scope orders,and __________.

A)schedule
B)WBS
C)quality report
D)resource report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
In earned value analysis,EAC refers to the __________.

A)estimated cost at completion
B)estimated actual cost
C)eliminated annual cost
D)estimated annual cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
The project control process should be viewed as a(n)__________,with revised plans and schedules (if warranted)following corrective actions.The project control process should run continuously until the project is completed.

A)closed loop system
B)open loop system
C)open environment
D)earned value plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
Reports for __________ have a need for detailed information about individual tasks and the factors affecting such tasks.

A)top executives
B)lower-level personnel
C)all the stakeholders
D)project managers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
A(n)__________ is a simple tally of the occurrence of an event.This type of measure is easy to collect and is often reported as events per unit of time or reported as events as a percent of a standard number.

A)frequency count
B)raw number
C)subjective numeric rating
D)verbal measure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
In earned value analysis,(CPI)(SPI)= __________.

A)CV
B)TPI
C)CSI
D)SV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
Describe the three common difficulties in designing project reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
ST-AT =

A)TV
B)EV
C)CV
D)SV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
Identify some of the benefits when timely reports are delivered to the proper people by the project management information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
Suggest some practical measures that can be used to improve the perception about the benefits of meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
Conceptually,EAC represents the amount spent to date plus __________.

A)the delay costs
B)BAC
C)CV
D)ETC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
Excessive computer involvement with computer activity replacing project management; loss of touch with the project and its realities,is referred to as __________.

A)computer simulation
B)computer paralysis
C)information overload
D)robotic automation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
Identify the main complaints associated with meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
Vague or incomplete project requirements are an example of which telltale sign that a project is in trouble?

A)Muddy waters
B)Mysterious stakeholders
C)Unconstrained constraints
D)Scope creep
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
A status report that is vague or contains overly optimistic language like "very soon" or "marginal increase" in costs is referred to as

A)suspicious
B)paralyzed
C)incomplete
D)risky
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
List the four conventions used to aid in estimating percent completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
(BAC + EV) / CPI = __________.

A)EAC
B)TPI
C)CPI
D)ETC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
If CSI is less than 1,it is indicative of a(n)__________.

A)problem
B)good project
C)efficient project
D)budget error
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
When using earned value analysis,identify the three conditions that can exist with respect to the completion of activities in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
Unfortunately,it is common to focus monitoring activities on data that are easily __________ but not necessarily important.

A)gathered
B)purchased
C)analyzed
D)reported
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.