Projects are conducted in four important environments.They are __________.

A)economic,political,legal,and sociotechnical
B)internal,external,transitional,and multicultural
C)routine,unique,fast-paced,and complex
D)profit,not for profit,government,and industry
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Identify the attribute that is NOT normally associated with the job of functional manager.

A)The functional manager is usually a generalist in the area being managed.
B)The functional manager is responsible for deciding what resources will be devoted to accomplishing the task.
C)The functional manager is administratively responsible for deciding how something will be done.
D)The functional manager is responsible for deciding who will do the work.
سؤال
Most of the time spent by a project manager is spent __________.

A)attending technical workshops
B)overseeing the workforce
C)filing paperwork
D)coordinating and communicating
سؤال
According to the authors,the analytic method,when applied to systems,focuses on __________.

A)assembling the components of a system into an integrated package
B)building an array of individually designed and manufactured components
C)calculating the cost and schedule requirements
D)dividing the components of a system into smaller and smaller elements
سؤال
Which of the following is NOT typically recommended to be considered when hiring new team members?

A)high-quality technical skills
B)political,and general,sensitivity
C)strong goal orientation
D)low self-esteem
سؤال
During the buildup phase,the project goals,in order of importance,are __________.

A)schedule,scope,cost
B)cost,schedule,scope
C)schedule,cost,scope
D)cost,scope,schedule
سؤال
The project manager needs __________ credibility.

A)technical and personal
B)administrative and personal
C)technical and administrative
D)technical and financial
سؤال
Resources initially budgeted for a project are frequently __________ for the task,partly because of natural optimism by the proposer about how many resources are needed.

A)sufficient
B)delayed
C)insufficient
D)hindrances
سؤال
According to the authors the project manager should be more skilled at __________.

A)general management
B)technology
C)synthesis
D)analysis
سؤال
The ideal project manager should be __________.

A)a direct,technical supervisor knowledgeable in the technology of the process being used
B)both generalist / facilitator and have a high level of technical competence in the science of the project
C)a facilitator and specialist with technical credibility
D)a technical specialist competent in principles of robust design
سؤال
The project manager's responsibilities are broad and fall primarily into three separate areas.Responsibilities to _____________ is NOT one of these.

A)the parent organization
B)the project and the client
C)the members of the project team
D)special-interest groups
سؤال
The project manager must make trade-offs between project progress and process.Conceptually,this involves trade-offs between the __________ functions.

A)technical and managerial
B)schedule and cost
C)performance and schedule
D)cost and performance
سؤال
The functional manager uses the __________ approach and the PM uses the __________ approach.

A)systems; analytic
B)numerical; nonnumeric
C)analytic; systems
D)nonnumeric; numerical
سؤال
During the __________ stage of the project lifecycle,there is no significant difference in the importance that project managers place on the three goals of cost,time,and scope.

A)main
B)formation
C)buildup
D)phaseout
سؤال
Project managers must have __________,which refers to possessing enough technical abilities to direct the project.

A)technical credibility
B)managerial credibility
C)negotiation skill
D)drive to complete the task
سؤال
According to the authors,the key to coping with uncertainty at the end of a project (a common obstacle for project managers)is __________.

A)discipline
B)communication
C)planning
D)supervision
سؤال
PMI offers a certification for project managers.PMI offers examination for certification as __________.

A)Project Management Professionals
B)Project Management Experts
C)Project Management Associates
D)Project Management Engineers
سؤال
According to the authors,of all the characteristics desirable in a project manager,__________ is the most important.

A)availability
B)a strong technical background
C)ability to keep the project team happy
D)drive to complete the task
سؤال
When managing a project,the project manager is responsible for __________.

A)auditing the project
B)executing the project
C)budgeting the project
D)designing the project
سؤال
According to the authors,three major questions face the project manager with respect to synthesizing the requirements of a project.Identify the item that is NOT listed as one of the three major questions.

A)What needs to be done?
B)Who will actually do the work of the project?
C)When must it be done?
D)How will the required resources be obtained?
سؤال
The ability to sense conflict early,then confront and deal with it before the conflict escalates into interdepartmental and intradepartmental warfare is which of the following attributes?

A)credibility
B)sensitivity
C)competency
D)ability to handle stress
سؤال
A __________ is a person who helps people overcome problems,either with technical issues or with other people.

A)problem solver
B)stakeholder
C)synthesizer
D)facilitator
سؤال
During the final or phaseout stage of the project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
سؤال
The project manager makes a __________ by allowing one aspect of the project to get worse in return for allowing another aspect of the project to get better.

A)decision
B)turnaround
C)trade-off
D)chart
سؤال
Research has shown that the chances for successful completion of a multidisciplinary project are greatly increased if project team members are _____ rather than _______,

A)problem-oriented; discipline-oriented
B)discipline-oriented; problem-oriented
C)problem-oriented; management-oriented
D)management-oriented; problem-oriented
سؤال
The project manager's responsibility to the project and to the client is met by ensuring that the __________ of the project is preserved in spite of conflicting demands made by stakeholders.

A)management
B)integrity
C)analysis
D)synthesis
سؤال
Which of the following is not a phase in the Tuckman ladder?

A)forming
B)defining
C)norming
D)mourning
سؤال
The project manager should be more skilled at __________,whereas the functional manager should be more skilled at __________.

A)synthesis; analysis
B)analysis; synthesis
C)communication; managing
D)managing,analysis
سؤال
The __________ is a person who spearheads an idea or action and sells it throughout the organization.

A)stakeholder
B)champion
C)interviewer
D)coach
سؤال
The __________ is the "corporate culture" within the organization,or even within the project.

A)cultural anomaly
B)microculture
C)multiculture
D)interfirm culture
سؤال
The __________ represents everything outside the system that delivers inputs or receives outputs from the system.

A)environment
B)feedback
C)culture
D)system
سؤال
The structure of a society is determined by its __________.

A)institutions
B)wages
C)jobs
D)enemies
سؤال
The __________ states that to understand the system,we must understand the environment (or larger system)of which it is a part.

A)systems approach
B)cultural awareness
C)systemic congruence
D)project management
سؤال
In order to meet the demands of the job of project manager-acquiring adequate resources,acquiring and motivating personnel,dealing with obstacles,making project goal trade-offs,maintaining a balanced outlook,and establishing a broad network of communication-the project manager must be a(n)_______________.

A)highly skilled negotiator
B)hard worker
C)effective budgeter
D)cultural expert
سؤال
According to the textbook,in Latin America,the __________ system leads a manager to give preference to relatives and friends when hiring.

A)amigo
B)compadre
C)counterpart
D)diablo
سؤال
___________ is when someone takes over the project manager's job by exercising extremely close supervision over every action the project manager takes,or will actually tell the project manager precisely what to do.

A)Micromanagement
B)Over-management
C)Turnover
D)Supermanagement
سؤال
__________ result(s)when the demands made on an individual are greater than the person's ability to cope with them,particularly when the person has a high need for achievement.

A)Stress
B)Culture
C)Balance
D)Contingency plans
سؤال
During the buildup stage of a project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
سؤال
__________ is the entire way of life for a group of people.It contains the four elements of technology,institutions,language,and arts.

A)Management
B)Systemic living
C)Nomadic living
D)Culture
سؤال
The __________ is an alternative action if the expected result fails to materialize.

A)trade-off
B)system plan
C)feedback
D)contingency plan
سؤال
Four project environments were identified in the chapter.Assume that there is a clash in requirements between the legal environments of two countries participating in the project.Before taking action to resolve the clash in requirements,what would you recommend that the project manager do?
سؤال
When asked,"How do you motivate astronauts?" a representative of NASA responded,"We don't motivate them,but,boy,are we careful about whom we select." Discuss the implications of this statement for project managers seeking to motivate project team members.
سؤال
With respect to acquiring resources,there is a high potential for conflict between the functional manager and the project manager.Describe a major source of that conflict and suggest how it can be managed properly.
سؤال
Identify three important characteristics that would be desirable in a project manager.Explain your reasoning.
سؤال
You are the project manager of a multi-national project with stakeholders and team members on both sides of the Atlantic.You receive an email request from a stakeholder in the United Kingdom for information that is "needed by 4 / 3 / 14".You run into the stakeholder at a conference in the middle of March 2014 and he refuses to acknowledge you in any way.To what do you attribute this "weird" behavior?
سؤال
At the inception of a project,crises tend to be associated with resources.Explain why this scenario could be common in some organizations.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/46
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: The Project Manager
1
Projects are conducted in four important environments.They are __________.

A)economic,political,legal,and sociotechnical
B)internal,external,transitional,and multicultural
C)routine,unique,fast-paced,and complex
D)profit,not for profit,government,and industry
A
2
Identify the attribute that is NOT normally associated with the job of functional manager.

A)The functional manager is usually a generalist in the area being managed.
B)The functional manager is responsible for deciding what resources will be devoted to accomplishing the task.
C)The functional manager is administratively responsible for deciding how something will be done.
D)The functional manager is responsible for deciding who will do the work.
A
3
Most of the time spent by a project manager is spent __________.

A)attending technical workshops
B)overseeing the workforce
C)filing paperwork
D)coordinating and communicating
D
4
According to the authors,the analytic method,when applied to systems,focuses on __________.

A)assembling the components of a system into an integrated package
B)building an array of individually designed and manufactured components
C)calculating the cost and schedule requirements
D)dividing the components of a system into smaller and smaller elements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is NOT typically recommended to be considered when hiring new team members?

A)high-quality technical skills
B)political,and general,sensitivity
C)strong goal orientation
D)low self-esteem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
6
During the buildup phase,the project goals,in order of importance,are __________.

A)schedule,scope,cost
B)cost,schedule,scope
C)schedule,cost,scope
D)cost,scope,schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
7
The project manager needs __________ credibility.

A)technical and personal
B)administrative and personal
C)technical and administrative
D)technical and financial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
8
Resources initially budgeted for a project are frequently __________ for the task,partly because of natural optimism by the proposer about how many resources are needed.

A)sufficient
B)delayed
C)insufficient
D)hindrances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
9
According to the authors the project manager should be more skilled at __________.

A)general management
B)technology
C)synthesis
D)analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
10
The ideal project manager should be __________.

A)a direct,technical supervisor knowledgeable in the technology of the process being used
B)both generalist / facilitator and have a high level of technical competence in the science of the project
C)a facilitator and specialist with technical credibility
D)a technical specialist competent in principles of robust design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
11
The project manager's responsibilities are broad and fall primarily into three separate areas.Responsibilities to _____________ is NOT one of these.

A)the parent organization
B)the project and the client
C)the members of the project team
D)special-interest groups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
12
The project manager must make trade-offs between project progress and process.Conceptually,this involves trade-offs between the __________ functions.

A)technical and managerial
B)schedule and cost
C)performance and schedule
D)cost and performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
13
The functional manager uses the __________ approach and the PM uses the __________ approach.

A)systems; analytic
B)numerical; nonnumeric
C)analytic; systems
D)nonnumeric; numerical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
14
During the __________ stage of the project lifecycle,there is no significant difference in the importance that project managers place on the three goals of cost,time,and scope.

A)main
B)formation
C)buildup
D)phaseout
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
15
Project managers must have __________,which refers to possessing enough technical abilities to direct the project.

A)technical credibility
B)managerial credibility
C)negotiation skill
D)drive to complete the task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
16
According to the authors,the key to coping with uncertainty at the end of a project (a common obstacle for project managers)is __________.

A)discipline
B)communication
C)planning
D)supervision
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
17
PMI offers a certification for project managers.PMI offers examination for certification as __________.

A)Project Management Professionals
B)Project Management Experts
C)Project Management Associates
D)Project Management Engineers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
18
According to the authors,of all the characteristics desirable in a project manager,__________ is the most important.

A)availability
B)a strong technical background
C)ability to keep the project team happy
D)drive to complete the task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
19
When managing a project,the project manager is responsible for __________.

A)auditing the project
B)executing the project
C)budgeting the project
D)designing the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
20
According to the authors,three major questions face the project manager with respect to synthesizing the requirements of a project.Identify the item that is NOT listed as one of the three major questions.

A)What needs to be done?
B)Who will actually do the work of the project?
C)When must it be done?
D)How will the required resources be obtained?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
21
The ability to sense conflict early,then confront and deal with it before the conflict escalates into interdepartmental and intradepartmental warfare is which of the following attributes?

A)credibility
B)sensitivity
C)competency
D)ability to handle stress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
22
A __________ is a person who helps people overcome problems,either with technical issues or with other people.

A)problem solver
B)stakeholder
C)synthesizer
D)facilitator
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
23
During the final or phaseout stage of the project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
24
The project manager makes a __________ by allowing one aspect of the project to get worse in return for allowing another aspect of the project to get better.

A)decision
B)turnaround
C)trade-off
D)chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
25
Research has shown that the chances for successful completion of a multidisciplinary project are greatly increased if project team members are _____ rather than _______,

A)problem-oriented; discipline-oriented
B)discipline-oriented; problem-oriented
C)problem-oriented; management-oriented
D)management-oriented; problem-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
26
The project manager's responsibility to the project and to the client is met by ensuring that the __________ of the project is preserved in spite of conflicting demands made by stakeholders.

A)management
B)integrity
C)analysis
D)synthesis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is not a phase in the Tuckman ladder?

A)forming
B)defining
C)norming
D)mourning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
28
The project manager should be more skilled at __________,whereas the functional manager should be more skilled at __________.

A)synthesis; analysis
B)analysis; synthesis
C)communication; managing
D)managing,analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
29
The __________ is a person who spearheads an idea or action and sells it throughout the organization.

A)stakeholder
B)champion
C)interviewer
D)coach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
30
The __________ is the "corporate culture" within the organization,or even within the project.

A)cultural anomaly
B)microculture
C)multiculture
D)interfirm culture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
31
The __________ represents everything outside the system that delivers inputs or receives outputs from the system.

A)environment
B)feedback
C)culture
D)system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
32
The structure of a society is determined by its __________.

A)institutions
B)wages
C)jobs
D)enemies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
33
The __________ states that to understand the system,we must understand the environment (or larger system)of which it is a part.

A)systems approach
B)cultural awareness
C)systemic congruence
D)project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
34
In order to meet the demands of the job of project manager-acquiring adequate resources,acquiring and motivating personnel,dealing with obstacles,making project goal trade-offs,maintaining a balanced outlook,and establishing a broad network of communication-the project manager must be a(n)_______________.

A)highly skilled negotiator
B)hard worker
C)effective budgeter
D)cultural expert
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
35
According to the textbook,in Latin America,the __________ system leads a manager to give preference to relatives and friends when hiring.

A)amigo
B)compadre
C)counterpart
D)diablo
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
36
___________ is when someone takes over the project manager's job by exercising extremely close supervision over every action the project manager takes,or will actually tell the project manager precisely what to do.

A)Micromanagement
B)Over-management
C)Turnover
D)Supermanagement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
37
__________ result(s)when the demands made on an individual are greater than the person's ability to cope with them,particularly when the person has a high need for achievement.

A)Stress
B)Culture
C)Balance
D)Contingency plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
38
During the buildup stage of a project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
39
__________ is the entire way of life for a group of people.It contains the four elements of technology,institutions,language,and arts.

A)Management
B)Systemic living
C)Nomadic living
D)Culture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
40
The __________ is an alternative action if the expected result fails to materialize.

A)trade-off
B)system plan
C)feedback
D)contingency plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
41
Four project environments were identified in the chapter.Assume that there is a clash in requirements between the legal environments of two countries participating in the project.Before taking action to resolve the clash in requirements,what would you recommend that the project manager do?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
42
When asked,"How do you motivate astronauts?" a representative of NASA responded,"We don't motivate them,but,boy,are we careful about whom we select." Discuss the implications of this statement for project managers seeking to motivate project team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
43
With respect to acquiring resources,there is a high potential for conflict between the functional manager and the project manager.Describe a major source of that conflict and suggest how it can be managed properly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
44
Identify three important characteristics that would be desirable in a project manager.Explain your reasoning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
45
You are the project manager of a multi-national project with stakeholders and team members on both sides of the Atlantic.You receive an email request from a stakeholder in the United Kingdom for information that is "needed by 4 / 3 / 14".You run into the stakeholder at a conference in the middle of March 2014 and he refuses to acknowledge you in any way.To what do you attribute this "weird" behavior?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
46
At the inception of a project,crises tend to be associated with resources.Explain why this scenario could be common in some organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.