Deck 3: The Project Infrastructure

ملء الشاشة (f)
exit full mode
سؤال
The existence of parallel tasks will likely lengthen the project schedule.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project management processes are: Initiating,Planning,Executing,Evaluating,and Closing.
سؤال
Constraints are factors that can limit the project and usually can have an impact on scope,schedule,budget,or quality.
سؤال
Constraints can be thought of as things that must go right in order for the project to be completed as planned.
سؤال
A project's scope is primarily a list of resources available to the project team.
سؤال
The project charter and project plan make up the project's strategic plan.
سؤال
Any proposed changes to the project that the user wants should be approved and included.
سؤال
Assumptions can be thought of as things that must go right in order for the project to be completed as planned.
سؤال
Development of the project charter is the responsibility of the project sponsor.
سؤال
Breaking a project down into phases increases the complexity and project risk.
سؤال
Contract closure ensures that all of the deliverables and agreed upon terms of the project have been completed and delivered.
سؤال
A kick-off meeting is often held to develop the project plan.
سؤال
The project scope must be defined before the project MOV can be developed.
سؤال
Identifying the project stakeholders is an important component of the project charter.
سؤال
Once the project plan is complete,it should be reviewed by the project manager,project sponsor,and project team to make sure it is able to achieve the project's MOV.
سؤال
The kick-off meeting brings closure to the planning phase of the project.
سؤال
The project charter serves as an agreement between the project sponsor and the project team.
سؤال
PMBOK views project integration management as one of the most important because it coordinates the other eight knowledge areas.
سؤال
In general,the project plan and project charter should be developed together.
سؤال
Project integration concerns making choices about where resources and effort should be concentrated,as well as anticipating and dealing with issues that often involves making tradeoffs between objectives and alternatives.
سؤال
Things that must go right in order for the project plan to be completed are called:

A)Phases
B)Constraints
C)Assumptions
D)Metrics
E)Essentials
سؤال
The _____ model is where the user and developer work closely together to develop a partially or fully functional system as soon as possible.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
The project charter and project plan concentrate on which of the following PMBOK areas?:

A)Project Scope Management
B)Project Time Management
C)Project Communication Management
D)Project Schedule Management
E)Project Integration Management
سؤال
Monitoring and controlling processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)allows for managing and measuring progress toward the project's MOV and scope,schedule,budget,and quality objectives.
سؤال
Product-oriented processes will define all of the sub-phases and deliverables associated with the_____ project management life cycle phase.

A)conceptualize and initialize the project
B)develop the project charter and plan
C)execute and control
D)close project
E)evaluate project success
سؤال
The _____ model attempts to compress the analysis,design,build,and test activities of the SDLC into a series of short iterations or development cycles.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
Closing processes:

A)Signal the beginning of the project or phase.
B)formally accepts the project's product,service,or end result so the project or phase can be brought to an orderly close.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)allows for managing and measuring progress toward the project's MOV and scope,schedule,budget,and quality objectives.
سؤال
Planning processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)Are part of the project management processes and ITPM phases.
D)supports planning of the entire project and each individual phase
E)none of the above
سؤال
The _____ model stresses a sequential and logical flow of software development activities.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
The project charter

A)and the project plan should be developed together.
B)and the project plan are the same document.
C)and the project plan are developed in the scope document.
D)is summarized in the project plan.
E)is developed by the project sponsor.
سؤال
With _____,the system is transferred to the users in a series of versions called releases.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
The _____ model is commonly used for large government systems and by companies that develop shrink-wrap or commercial software packages.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
The project management process groups are:

A)Documenting,Defining,Summarizing,Selecting
B)Planning,Analyzing,Executing,Testing,Maintaining
C)Initiating,Planning,Defining,Verifying,Closing
D)Opening,Estimating,Choosing,Executing,and Closing
E)Initiating,Planning,Executing,Controlling,and Closing
سؤال
Executing processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)none of the above
سؤال
The documenting and archiving of all project documents and evaluating the project in terms of MOV is the definition of:

A)Contract closure
B)Administrative closure
C)End phase evaluation
D)Project history
E)Final phase management
سؤال
The _____ model breaks up a software project into a number of miniprojects that address one or more major risks until all the risks have been addressed.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
The project's charter and project plan represents:

A)A review of the business case.
B)A strategic plan.
C)A tactical plan.
D)A budgeting technique.
E)none of the above
سؤال
_____ help initiate,plan,execute,monitor and control,and close a project.

A)Implementation processes
B)Project Management tools
C)Project Management process groups
D)Product-oriented processes
E)Project management processes
سؤال
Initiating processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)Are part of the project management processes and ITPM phases.
D)all of the above
E)none of the above
سؤال
All of the following are iterative systems development methods except:

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
سؤال
A communication plan,a quality management plan,and change management plan are all associated with which part of the project charter?

A)Project Resources
B)Project Scope
C)Project Description
D)Project References
E)Project Administration
سؤال
Why should the project charter and project plan be developed together?
سؤال
The _____ will specify how the project's product will be integrated into the organizational environment.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
سؤال
The _____ describes how changes to the project's scope will be submitted,logged,and reviewed.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
سؤال
The _____ details how quality planning,assurance,and control will be supported throughout the project life cycle.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
سؤال
What are project management processes? Give one example.
سؤال
Within the Project Charter,_____ focuses on the knowledge areas,processes,and controls that will support the project and are separate subplans or strategies.

A)Project description
B)Statement of Work
C)MOV
D)Project Scope
E)Project Administration
سؤال
Which of the following statements are ?:

A)Milestones are logical units of work.
B)Baseline plans are approved project plans.
C)All tasks are linear,i.e.have to be completed in a particular sequence.
D)The kick-off meeting typically begins the planning phase of a project.
E)MOV are readily changed through change control processes.
سؤال
What is a project's scope?
سؤال
Describe project integration management and its relationship to the other eight Project Management Body of Knowledge areas.
سؤال
What is the purpose of a project charter? How does it serve as an agreement or a contract?
سؤال
Within the Project Charter,_____defines the work to be completed.

A)Project description
B)Statement of Work
C)MOV
D)Project Scope
E)Project Administration
سؤال
The _____ will identify the process for staff acquisition and team development.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
سؤال
Describe overall change control and its importance to the project team.
سؤال
The _____ outlines how the project's status or progress will be reported to stakeholders.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
سؤال
The significant event at the conclusion of each phase is called _____.

A)sequence
B)tasks
C)action item
D)milestone
E)deliverable
سؤال
The _____serves as the agreement and contract between the project sponsor and the project team including such items as the project MOV,infrasturcture,and project plan details.

A)Project chart
B)Statement of work
C)Project plan
D)Project management processes
E)Product-oriented processes
سؤال
What are product-oriented processes? Give one example.
سؤال
The business case,project plan,source code,or product are all examples of _____.

A)deliverables
B)milestones
C)tasks
D)project phases
E)none of the above
سؤال
Describe the project planning framework.
سؤال
What is a deliverable? What is the relationship between phases and deliverables?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/61
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: The Project Infrastructure
1
The existence of parallel tasks will likely lengthen the project schedule.
False
2
The project management processes are: Initiating,Planning,Executing,Evaluating,and Closing.
False
3
Constraints are factors that can limit the project and usually can have an impact on scope,schedule,budget,or quality.
True
4
Constraints can be thought of as things that must go right in order for the project to be completed as planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
5
A project's scope is primarily a list of resources available to the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
6
The project charter and project plan make up the project's strategic plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
7
Any proposed changes to the project that the user wants should be approved and included.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
8
Assumptions can be thought of as things that must go right in order for the project to be completed as planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
9
Development of the project charter is the responsibility of the project sponsor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
10
Breaking a project down into phases increases the complexity and project risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
11
Contract closure ensures that all of the deliverables and agreed upon terms of the project have been completed and delivered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
12
A kick-off meeting is often held to develop the project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
13
The project scope must be defined before the project MOV can be developed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
14
Identifying the project stakeholders is an important component of the project charter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
15
Once the project plan is complete,it should be reviewed by the project manager,project sponsor,and project team to make sure it is able to achieve the project's MOV.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
16
The kick-off meeting brings closure to the planning phase of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
17
The project charter serves as an agreement between the project sponsor and the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
18
PMBOK views project integration management as one of the most important because it coordinates the other eight knowledge areas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
19
In general,the project plan and project charter should be developed together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
20
Project integration concerns making choices about where resources and effort should be concentrated,as well as anticipating and dealing with issues that often involves making tradeoffs between objectives and alternatives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
21
Things that must go right in order for the project plan to be completed are called:

A)Phases
B)Constraints
C)Assumptions
D)Metrics
E)Essentials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
22
The _____ model is where the user and developer work closely together to develop a partially or fully functional system as soon as possible.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
23
The project charter and project plan concentrate on which of the following PMBOK areas?:

A)Project Scope Management
B)Project Time Management
C)Project Communication Management
D)Project Schedule Management
E)Project Integration Management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
24
Monitoring and controlling processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)allows for managing and measuring progress toward the project's MOV and scope,schedule,budget,and quality objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
25
Product-oriented processes will define all of the sub-phases and deliverables associated with the_____ project management life cycle phase.

A)conceptualize and initialize the project
B)develop the project charter and plan
C)execute and control
D)close project
E)evaluate project success
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
26
The _____ model attempts to compress the analysis,design,build,and test activities of the SDLC into a series of short iterations or development cycles.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
27
Closing processes:

A)Signal the beginning of the project or phase.
B)formally accepts the project's product,service,or end result so the project or phase can be brought to an orderly close.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)allows for managing and measuring progress toward the project's MOV and scope,schedule,budget,and quality objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
28
Planning processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)Are part of the project management processes and ITPM phases.
D)supports planning of the entire project and each individual phase
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
29
The _____ model stresses a sequential and logical flow of software development activities.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
30
The project charter

A)and the project plan should be developed together.
B)and the project plan are the same document.
C)and the project plan are developed in the scope document.
D)is summarized in the project plan.
E)is developed by the project sponsor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
31
With _____,the system is transferred to the users in a series of versions called releases.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
32
The _____ model is commonly used for large government systems and by companies that develop shrink-wrap or commercial software packages.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
33
The project management process groups are:

A)Documenting,Defining,Summarizing,Selecting
B)Planning,Analyzing,Executing,Testing,Maintaining
C)Initiating,Planning,Defining,Verifying,Closing
D)Opening,Estimating,Choosing,Executing,and Closing
E)Initiating,Planning,Executing,Controlling,and Closing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
34
Executing processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)focus on integrating people and resources to carry out the planned activities.
D)supports planning of the entire project and each individual phase
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
35
The documenting and archiving of all project documents and evaluating the project in terms of MOV is the definition of:

A)Contract closure
B)Administrative closure
C)End phase evaluation
D)Project history
E)Final phase management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
36
The _____ model breaks up a software project into a number of miniprojects that address one or more major risks until all the risks have been addressed.

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
37
The project's charter and project plan represents:

A)A review of the business case.
B)A strategic plan.
C)A tactical plan.
D)A budgeting technique.
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
38
_____ help initiate,plan,execute,monitor and control,and close a project.

A)Implementation processes
B)Project Management tools
C)Project Management process groups
D)Product-oriented processes
E)Project management processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
39
Initiating processes:

A)Signal the beginning of the project or phase.
B)Requires an organization to make a commitment of time and resources.
C)Are part of the project management processes and ITPM phases.
D)all of the above
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
40
All of the following are iterative systems development methods except:

A)Rapid Application Development RAD)
B)Waterfall
C)Prototyping
D)Spiral
E)eXtreme Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
41
A communication plan,a quality management plan,and change management plan are all associated with which part of the project charter?

A)Project Resources
B)Project Scope
C)Project Description
D)Project References
E)Project Administration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
42
Why should the project charter and project plan be developed together?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
43
The _____ will specify how the project's product will be integrated into the organizational environment.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
44
The _____ describes how changes to the project's scope will be submitted,logged,and reviewed.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
45
The _____ details how quality planning,assurance,and control will be supported throughout the project life cycle.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
46
What are project management processes? Give one example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
47
Within the Project Charter,_____ focuses on the knowledge areas,processes,and controls that will support the project and are separate subplans or strategies.

A)Project description
B)Statement of Work
C)MOV
D)Project Scope
E)Project Administration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following statements are ?:

A)Milestones are logical units of work.
B)Baseline plans are approved project plans.
C)All tasks are linear,i.e.have to be completed in a particular sequence.
D)The kick-off meeting typically begins the planning phase of a project.
E)MOV are readily changed through change control processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
49
What is a project's scope?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
50
Describe project integration management and its relationship to the other eight Project Management Body of Knowledge areas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
51
What is the purpose of a project charter? How does it serve as an agreement or a contract?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
52
Within the Project Charter,_____defines the work to be completed.

A)Project description
B)Statement of Work
C)MOV
D)Project Scope
E)Project Administration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
53
The _____ will identify the process for staff acquisition and team development.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
54
Describe overall change control and its importance to the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
55
The _____ outlines how the project's status or progress will be reported to stakeholders.

A)Communications Plan
B)Scope Management Plan
C)Quality Management Plan
D)Change Management Plan
E)Human Resources Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
56
The significant event at the conclusion of each phase is called _____.

A)sequence
B)tasks
C)action item
D)milestone
E)deliverable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
57
The _____serves as the agreement and contract between the project sponsor and the project team including such items as the project MOV,infrasturcture,and project plan details.

A)Project chart
B)Statement of work
C)Project plan
D)Project management processes
E)Product-oriented processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
58
What are product-oriented processes? Give one example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
59
The business case,project plan,source code,or product are all examples of _____.

A)deliverables
B)milestones
C)tasks
D)project phases
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
60
Describe the project planning framework.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
61
What is a deliverable? What is the relationship between phases and deliverables?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.