Deck 1: The Nature of Information Technology Projects

ملء الشاشة (f)
exit full mode
سؤال
The triple constraint relationship implies that owners,stakeholders and sponsors must communicate effectively to help ensure project success.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The rise of islands of independent that replicated data throughout the organization during the Micro Era in the 1980's often challenged the centralized control of many data processing managers.
سؤال
The Socio-Technical Approach has been adopted by many organizations because successful projects require a pure technical approach that focuses on the tools,techniques,and methodologies of IT development.
سؤال
Projects are planned organizational change.Therefore,the project manager and team do not need to worry about the political climate within the organization because top management has a firm understanding of the organization's culture,environment,politics,etc.
سؤال
Project management is the application of knowledge,skills,tools,and techniques to project activities in order to meet project requirements.
سؤال
The EDP era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
سؤال
According to the Standish Group,it appears that most project today fail not because of technology,but from a lack of user involvement and incomplete resources.
سؤال
IT projects must provide value an organization.
سؤال
A project can be defined as a temporary endeavor undertaken to accomplish a unique purpose.
سؤال
Only the most successful projects are likely to lead to best practices.
سؤال
Information Technology Projects are organizational investments.
سؤال
The Guide to the Project Management Body of Knowledge provides a basis for identifying and describing the generally accepted principles of project management.
سؤال
According to the CHAOS studies,more IT projects are becoming increasing successful,but there is still a need to improve the likelihood of success.
سؤال
Assumptions are what we use to estimate scope,schedule and budget and to assess the risks of the project.
سؤال
During the Network Era,IT projects have focused primarily on the challenge of creating a scalable IT infrastructure to support many partners,strategic alliances,vendors,and customers.
سؤال
According to the CHAOS studies,user involvement and executive support tend to be important factors for successful projects.
سؤال
The Data Processing Era that began in the 1960's focused on automating many of the organizational transactions such as general accounting,inventory management,and production scheduling with the aid of a centralized mainframe or mini computers.
سؤال
The Micro Era that started in the 1980's provided a smooth transition from large centralized computers to the personal computer that was widely welcomed by data processing managers who believed the replication of data throughout the organization would provide added backup and security.
سؤال
A project sponsor is responsible for ensuring that all of the project management and technical development processes are in place and being carried out within a set of specific requirements,defined processes,and quality standards.
سؤال
According to the CHAOS studies most IT projects are completed on time and on budget.
سؤال
The project sponsor is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
سؤال
The following are PMBOK knowledge areas except:

A)Project Integration Management
B)Project Scope Management
C)Project Cost Management
D)Project Risk Management
E)Project Research Management
سؤال
The technical expert is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
سؤال
The Globalization era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began after Y2K with the combination of technology and political barriers flattening the world so that people and organizations can work with almost anyone in any place at any time.
سؤال
____ can arise from the estimation process or the stability of the project team.

A)Internal risks
B)External risks
C)Assumptions
D)Cost overruns
E)Triple constraint
سؤال
The Micro era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
سؤال
The desire to fund a project should be based upon

A)time savings
B)resource constraints
C)cost savings
D)the value the completed project will provide to an organization.
E)None of the above
سؤال
The subject matter expert is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
سؤال
Which of the following organizational variables can influence the selection of IT projects?

A)culture
B)environment
C)politics
D)strategy
E)all of the above
سؤال
A project

A)is a temporary endeavor undertaken to accomplish a unique product,service,or result.
B)is an ongoing activity that provides value to the organization.
C)must be completed on time and on budget to be successful.
D)does not usually have a deadline.
E)has a high likelihood of success.
سؤال
The Socio-Technical Approach focuses on

A)the technology used to implement the project.
B)using technology to meet the needs of the business.
C)the tools,techniques,and methodologies to develop the application.
D)cost considerations.
E)selecting the right team members,skill sets,and resources for the project.
سؤال
The Value-Driven Approach focuses on

A)completing the project on time.
B)a bug-free application.
C)providing value to the organization.
D)completing the project under budget.
E)selecting the right team members,skill sets,and resources for the project.
سؤال
The triple constraint relationship that the text discusses refers to:

A)owners,stakeholders,and sponsors
B)time,money,and people
C)scope,schedule,and budgets
D)subject matter experts SME),technical experts TE),and project managers PM)
E)internal risks,external risks,and assumptions
سؤال
A value-driven approach to project management means

A)Applying project management tools and processes that are part of a methodology
B)Taking a purely technical approach to projects that focuses mainly on the technology
C)Deriving excellence in project management by documenting lessons learned and developing best practices
D)Applying knowledge,skills,tools,and techniques to project activities to meet project requirements
E)Measuring project success in terms of the value the project brings to the organization and not only in terms of meeting the project schedule and budget
سؤال
The top factors to project success as reported by the CHAOS studies focus on:

A)innovative and cutting edge technology
B)clear ownership of the project
C)competent staff and new technologies
D)user involvement and executive support
E)proper planning and changing requirements
سؤال
The project manager is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
سؤال
According to the CHAOS studies,which of the following factors tend to be most prevelant for challenged or failed projects?

A)Lack of user input and incomplete requirements
B)New technologies
C)Lack of interest by the customer
D)Shortage of highly trained technical experts
E)Lack of subject matter experts SME)
سؤال
Extreme Project Management XPM)

A)always uses an extreme programming approach for developing systems
B)transfers a system to the users in a series of versions called releases
C)employs an orderly approach for projects that have become chaotic and unpredictable
D)takes a holistic view of planning and managing projects that accepts that requirements often change and that people and innovation are vital to the project's success.
E)All of the above
سؤال
According to the CHAOS studies,IT projects

A)Are always over-budget and over schedule
B)Are always succesful even though they can be chaotic
C)Project success in improving because of better project management tools and processes,smaller projects,and improved communication
D)Project failure is increasing because because of a lack of available resources and due to a shortage of highly trained technical people
E)None of the above
سؤال
The Network era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
سؤال
Project Communications Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)entails providing timely and accurate information about the project to stakeholders.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Describe the globalization era in your own words.
سؤال
The Project Management Body of Knowledge

A)is a method of ensuring project success.
B)must be used on all projects.
C)is a generally accepted set of principles and practices for project management.
D)must be used in its entirety.
E)works the same on all projects.
سؤال
Project Human Resource Management

A)focuses on creating and developing the project team.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Project Time Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
What are the benefits to using a project management approach to developing information systems?
سؤال
Project Scope Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)provides assurance that the project's work is defined accurately and completed as planned.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Project Cost Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)assures that the project budget is developed and completed as approved.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Describe the Network Era in your own words.
سؤال
Project Risk Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Describe the Micro Era in your own words.
سؤال
Describe the EDP Era in your own words.
سؤال
What are the attributes of a project?
سؤال
Project Quality Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
Project Integration Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
سؤال
What is the socio-technical approach to systems development?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/56
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: The Nature of Information Technology Projects
1
The triple constraint relationship implies that owners,stakeholders and sponsors must communicate effectively to help ensure project success.
False
2
The rise of islands of independent that replicated data throughout the organization during the Micro Era in the 1980's often challenged the centralized control of many data processing managers.
True
3
The Socio-Technical Approach has been adopted by many organizations because successful projects require a pure technical approach that focuses on the tools,techniques,and methodologies of IT development.
False
4
Projects are planned organizational change.Therefore,the project manager and team do not need to worry about the political climate within the organization because top management has a firm understanding of the organization's culture,environment,politics,etc.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
5
Project management is the application of knowledge,skills,tools,and techniques to project activities in order to meet project requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
6
The EDP era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
7
According to the Standish Group,it appears that most project today fail not because of technology,but from a lack of user involvement and incomplete resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
8
IT projects must provide value an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
9
A project can be defined as a temporary endeavor undertaken to accomplish a unique purpose.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
10
Only the most successful projects are likely to lead to best practices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
11
Information Technology Projects are organizational investments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
12
The Guide to the Project Management Body of Knowledge provides a basis for identifying and describing the generally accepted principles of project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
13
According to the CHAOS studies,more IT projects are becoming increasing successful,but there is still a need to improve the likelihood of success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
14
Assumptions are what we use to estimate scope,schedule and budget and to assess the risks of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
15
During the Network Era,IT projects have focused primarily on the challenge of creating a scalable IT infrastructure to support many partners,strategic alliances,vendors,and customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
16
According to the CHAOS studies,user involvement and executive support tend to be important factors for successful projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
17
The Data Processing Era that began in the 1960's focused on automating many of the organizational transactions such as general accounting,inventory management,and production scheduling with the aid of a centralized mainframe or mini computers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
18
The Micro Era that started in the 1980's provided a smooth transition from large centralized computers to the personal computer that was widely welcomed by data processing managers who believed the replication of data throughout the organization would provide added backup and security.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
19
A project sponsor is responsible for ensuring that all of the project management and technical development processes are in place and being carried out within a set of specific requirements,defined processes,and quality standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
20
According to the CHAOS studies most IT projects are completed on time and on budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
21
The project sponsor is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
22
The following are PMBOK knowledge areas except:

A)Project Integration Management
B)Project Scope Management
C)Project Cost Management
D)Project Risk Management
E)Project Research Management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
23
The technical expert is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
24
The Globalization era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began after Y2K with the combination of technology and political barriers flattening the world so that people and organizations can work with almost anyone in any place at any time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
25
____ can arise from the estimation process or the stability of the project team.

A)Internal risks
B)External risks
C)Assumptions
D)Cost overruns
E)Triple constraint
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
26
The Micro era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
27
The desire to fund a project should be based upon

A)time savings
B)resource constraints
C)cost savings
D)the value the completed project will provide to an organization.
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
28
The subject matter expert is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following organizational variables can influence the selection of IT projects?

A)culture
B)environment
C)politics
D)strategy
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
30
A project

A)is a temporary endeavor undertaken to accomplish a unique product,service,or result.
B)is an ongoing activity that provides value to the organization.
C)must be completed on time and on budget to be successful.
D)does not usually have a deadline.
E)has a high likelihood of success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
31
The Socio-Technical Approach focuses on

A)the technology used to implement the project.
B)using technology to meet the needs of the business.
C)the tools,techniques,and methodologies to develop the application.
D)cost considerations.
E)selecting the right team members,skill sets,and resources for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
32
The Value-Driven Approach focuses on

A)completing the project on time.
B)a bug-free application.
C)providing value to the organization.
D)completing the project under budget.
E)selecting the right team members,skill sets,and resources for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
33
The triple constraint relationship that the text discusses refers to:

A)owners,stakeholders,and sponsors
B)time,money,and people
C)scope,schedule,and budgets
D)subject matter experts SME),technical experts TE),and project managers PM)
E)internal risks,external risks,and assumptions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
34
A value-driven approach to project management means

A)Applying project management tools and processes that are part of a methodology
B)Taking a purely technical approach to projects that focuses mainly on the technology
C)Deriving excellence in project management by documenting lessons learned and developing best practices
D)Applying knowledge,skills,tools,and techniques to project activities to meet project requirements
E)Measuring project success in terms of the value the project brings to the organization and not only in terms of meeting the project schedule and budget
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
35
The top factors to project success as reported by the CHAOS studies focus on:

A)innovative and cutting edge technology
B)clear ownership of the project
C)competent staff and new technologies
D)user involvement and executive support
E)proper planning and changing requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
36
The project manager is

A)responsible for ensuring that all management and technical processes are in place and carried out.
B)the client,customer,or organizational manager who acts as the project champion and provides organizational resources and direction.
C)the user or client who has specific knowledge,expertise,or insight in a specific functional area needed to support the project.
D)provides the technical solution to the organizational problem and may include systems analysts,network specialists,or programmers.
E)the person responsible for final acceptance of the application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
37
According to the CHAOS studies,which of the following factors tend to be most prevelant for challenged or failed projects?

A)Lack of user input and incomplete requirements
B)New technologies
C)Lack of interest by the customer
D)Shortage of highly trained technical experts
E)Lack of subject matter experts SME)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
38
Extreme Project Management XPM)

A)always uses an extreme programming approach for developing systems
B)transfers a system to the users in a series of versions called releases
C)employs an orderly approach for projects that have become chaotic and unpredictable
D)takes a holistic view of planning and managing projects that accepts that requirements often change and that people and innovation are vital to the project's success.
E)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
39
According to the CHAOS studies,IT projects

A)Are always over-budget and over schedule
B)Are always succesful even though they can be chaotic
C)Project success in improving because of better project management tools and processes,smaller projects,and improved communication
D)Project failure is increasing because because of a lack of available resources and due to a shortage of highly trained technical people
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
40
The Network era

A)Began in the early 1980s with the personal computer
B)Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
C)Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
D)Is credited to the U.S.Navy when it used a project management approach to manage the Polaris missile project.
E)Began in the late 1960s and early 1970s with a defense project called ARPANET that eventually led to the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
41
Project Communications Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)entails providing timely and accurate information about the project to stakeholders.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
42
Describe the globalization era in your own words.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
43
The Project Management Body of Knowledge

A)is a method of ensuring project success.
B)must be used on all projects.
C)is a generally accepted set of principles and practices for project management.
D)must be used in its entirety.
E)works the same on all projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
44
Project Human Resource Management

A)focuses on creating and developing the project team.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
45
Project Time Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
46
What are the benefits to using a project management approach to developing information systems?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
47
Project Scope Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)provides assurance that the project's work is defined accurately and completed as planned.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
48
Project Cost Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)assures that the project budget is developed and completed as approved.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
49
Describe the Network Era in your own words.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
50
Project Risk Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
51
Describe the Micro Era in your own words.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
52
Describe the EDP Era in your own words.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
53
What are the attributes of a project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
54
Project Quality Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
55
Project Integration Management

A)focuses on coordinating the project plan's development,execution,and control of changes.
B)includes identifying the project phases and activities and estimating,sequencing,and assigning resources.
C)focuses on planning,developing,and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D)focuses on identifying and responding appropriately to risks that can impact the project.
E)is concerned with acquiring project resources that are outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
56
What is the socio-technical approach to systems development?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 56 في هذه المجموعة.