Deck 6: Just-In-Time Lean Purchasing

ملء الشاشة (f)
exit full mode
سؤال
__________ manufacturers attempt to reduce incoming material inspection as much as possible. In order to eliminate the associated receiving inspection costs, a very high emphasis is placed on the quality of incoming materials under the _______ system.

A) Most / JIT
B) Japanese / JIT
C) Many / JOB
D) Smart / JIT
E) Low cost / MOB
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In order to obtain ________ lot sizes for production, the order quantity size needs to be _________ and corresponding delivery schedules need to be made more _________.

A) small / reduced / frequent
B) larger / increased / infrequent
C) smaller / increased / frequent
D) larger / reduced / frequent
E) small / increased / infrequent
سؤال
The reliability of supply is a critical consideration in the selection of _______ suppliers.

A) key
B) all
C) MOB
D) JIT
E) JOT
سؤال
The role of the purchasing function in a manufacturing organization has become increasingly important. The _____________ production control system focuses on reducing both raw materials and work-in-process inventories.

A) JUST-ON-TARGET
B) MBO
C) just-in-time
D) strategic
E) just-in-line
سؤال
Thus, a kanban system is referred to as a __________ because the kanban is used to ______ parts to the next production stage only when they are needed.

A) push system / push
B) pull system / pull
C) traditional system / ship
D) traditional system / transfer
E) pull system / push
سؤال
JIT emphasizes scheduling flexibility by aiming for __________________.

A) reduced waste and shorter setup times
B) reduced purchasing lead times and setup times
C) faster delivery and smaller orders
D) increased purchasing lead times and shorter setup times
E) short purchasing lead times and lower costs
سؤال
Supplier performance can be measured more accurately under the __________ purchasing approach compared to the traditional one.

A) MBO
B) JIT
C) JOT
D) JOB
E) ITS
سؤال
Lower levels of __________ contribute significantly to reduced working capital requirements for the firm.

A) waste
B) supplies
C) materials
D) safety stock
E) inventory
سؤال
Rule Three (3) of the dual card kanban states: Containers for each specific part are ___________, and they are always filled with the same (ideally, small) quantity.

A) made of plastic
B) made to a customized size for the part
C) made of metal
D) standardized
E) "B" and "C" only
سؤال
Since JIT purchasing has gained popularity within the United States, the purchasing function has been preoccupied with trimming the overall supplier base in quest of so called __________ suppliers.

A) mega
B) super
C) superior
D) high quality
E) prominent
سؤال
The JIT philosophy inherently attempts to reduce lead times for order completions. Under traditional purchasing practices, the lead time is made up of all the following components with one exception. Which one is the exception?

A) paperwork lead time
B) manufacturing time for supplier
C) transportation lead time
D) time spent on unpacking and storing
E) time spent on receiving and inspection
سؤال
One of the most crucial elements of the ____________ system is small lot sizes.

A) just-in-time
B) management ordering and buying
C) just-on-target
D) purchasing
E) computer ordering and buying
سؤال
Rule Two (2) of the dual card kanban is: There as many kanbans per container as needed.
سؤال
Implementation of just-in-time (Lean) purchasing assists the purchasing function in its major objective(s) of ___________________________.

A) improving quality of incoming materials and supplier delivery performance
B) along with reducing lead times and cost of materials
C) improving supplier relationships and reducing waste
D) "A" and "B" only
E) "A" and "C" only
سؤال
ompared to traditional purchasing approaches, delivery lead times under the ________ system are considerably shorter. Lead-time reliability is usually much better for ___________ systems.

A) JIT / just-in-time
B) JOB / JOB
C) JOT / JOT
D) MBO / management buying and ordering
E) JIT / computerized
سؤال
JIT purchasing facilitates reduction in _____________ and the associated _____________ costs.

A) the cost of materials / storage
B) the cost of shipping / holding
C) the cost of inventory / storage
D) inventory levels / materials'
E) inventory levels / inventory holding
سؤال
The ____________ is to provide a firm with component parts and raw materials. ____________ also must ensure that high-quality products are provided on time, at a reasonable price.

A) manufacturing department / Manufacturing
B) operations division / Operations
C) function of purchasing / Purchasing
D) procurement department / Operations
E) buying function / Manufacturing
سؤال
Traditionally, long and infrequent production runs have in the past been considered beneficial for the overall productivity of a manufacturing organization.However, long production runs usually lead to ____________ of raw-material and finished-goods inventories.

A) stable levels
B) low levels
C) steady flows
D) intermittent flows
E) high levels
سؤال
The cost of raw materials has traditionally, been a serious concern of top management. Over the years, material cost as a proportion of total cost of the end product has risen sharply and is as high as ______ percent in some instances.

A) 50
B) 60
C) 70
D) 80
E) 90
سؤال
Rule One (1) of the dual card kanban is: No parts are made unless there is a production kanban to authorize production. If no production kanban are in the "in box" at a work center, the process remains idle, and workers perform other assigned activities. This rule enforces the "pull" nature of the process control.
سؤال
ecause of ____________ and frequent delivery schedules, suppliers are in a position to receive quick feedback regarding any potential manufacturing or design problems. Also, manufacturing is in a position to implement engineering changes quicker because of the _________ inventory levels.

A) large orders / increased
B) computerization / flat
C) smaller orders / increased
D) computerized ordering systems / reduced
E) smaller lot sizes / reduced
سؤال
__________ percent of the firms surveyed using JIT practices in the United States indicated that they had serious problems regarding lack of support from engineering.

A) Nineteen
B) Twenty-nine
C) Sixty-nine
D) Forty-nine
E) Thirty-nine
سؤال
Scheduling flexibility prevents confusion in the manufacturing plant and offers unique _____________ to manufacturing firms since they are capable of adapting to changes in the environment more quickly.

A) opportunities
B) strengths
C) opportunities and advantages
D) competitive opportunities
E) competitive advantages
سؤال
crucial issue to be considered is the relevance of _________ in the successful implementation of the just-in-time system in a country.

A) culture
B) procedure
C) communication style
D) life styles
E) policy
سؤال
If suppliers fail to provide materials of _____________ on a regular basis, production slow-downs and stoppages will occur regularly.

A) adequate quantity
B) acceptable quantity
C) adequate quality
D) high quality
E) acceptable quality
سؤال
Many firms report lack of support from __________ as being one of the major problems encountered in the implementation of JIT (Lean) purchasing.

A) stakeholders
B) their employees
C) their stockholders
D) their bankers
E) their lenders
سؤال
ffective development and implementation of the just-in-time system requires integration of important functional areas such as ______________________.

A) purchasing
B) manufacturing
C) quality
D) production and transportation
E) all of the above
سؤال
Some of the common problems associated with implementing the JIT system are as follows with one exception. Which one is the exception?

A) Lack of cooperation from suppliers
B) Lack of top management support
C) Lack of employee readiness and support
D) Lack of support from development
E) Low product quality
سؤال
The JIT philosophy concept cannot be implemented successfully without total support from ______________.

A) all involved
B) all employees
C) top management
D) middle management
E) the purchasing department
سؤال
comprehensive JIT progress report indicates that supplier costs were reduced by ________ when they adopted the JIT system in cooperation with their customers.

A) significant amounts
B) 11 percent
C) twenty fold
D) 100 percent
E) 10 percent
سؤال
The _________ see little incentive in adopting the JIT approach when the primary benefits of the program go to the buyer.

A) customers
B) suppliers
C) employees
D) stockholders
E) stakeholders
سؤال
Since ______________ (is) are critical in achieving a competitive advantage in today's global business world, manufacturers gain immensely by implementing the _____ production control system.

A) low prices / JIT
B) low costs / JOB
C) high-quality products / JIT
D) quality products / MOB
E) satisfaction / MBO
سؤال
ew buying firms, however, work closely with _________ to develop long-term relationships that provide for highly structured _______________ that lower costs for the buying firm.

A) suppliers / transportation routes
B) suppliers / deliveries
C) carriers / routes
D) carriers / delivery schedules
E) suppliers / delivery schedules
سؤال
Very often, resistance is encountered because the employees are required to change their _____________, or because they interpret the new system as being _____________ jobs.

A) long-standing work habits / a threat to their
B) work stations / unnecessary to their
C) job descriptions / an intrusion in their
D) job standards / an evaluation of their
E) personal work habits / a change in the expectations of their
سؤال
It is well documented that JIT reduces physical inventory level. Reductions in physical inventory will also have a favorable impact on:
Reduced insurance premiums associated with the storage of inventory.Reduced inventory holding costs.Reduced labor cost in store rooms and material handing costs.Reduced clerical and administrative costs.Reduced waste from the manufacturing process.Reduced obsolescence costs.Reduced deprecation of handling and storage equipment.ach of the cost savings will result in a leaner more profitable operation.
سؤال
JIT purchasing results in improved __________ and corresponding levels of higher ______________.

A) customer service / quality
B) relationships / customer service
C) customer service / satisfaction
D) buyer relations / supplier satisfaction
E) quality / customer satisfaction
Power Point Slide 30
سؤال
The JIT progress report mentioned in the textbook indicates that supplier quality improved by ______ percent since the JIT system was adopted.

A) 26
B) 16
C) 36
D) 6
E) 46
سؤال
s cooperation and relationships between suppliers and manufacturers build up in a JIT system, so do the opportunities to ______________________ and focus on ________________________.

A) lower costs of materials and supplies / reducing waste and shrinkage
B) conduct an extensive competitive analysis / reducing selling prices
C) conduct an extensive value analysis / reducing the cost of parts purchased
D) analyze competition / developing competitive strengths
E) conduct cost analysis / reducing the costs of doing business
سؤال
The switch to a JIT system presents formidable challenges. _________ must be prepared to change their behavior when their customers are using the JIT system.

A) Marketing
B) Management
C) Finance
D) Operations
E) Manufacturing
سؤال
Implementation of the JIT philosophy requires a _________ change in the organization.

A) major
B) minor
C) management
D) design
E) cultural
سؤال
The key lean principles focus on __________, ____________, ____________, and ___________. All of these key business principles have a direct effect on the purchasing function.

A) profit / reduction of waste / involvement / efficiency
B) human resources / waste removal / postponement / inefficiency
C) people / the elimination of waste / postponement / efficiency
D) people / the elimination of waste / involvement / efficiency
E) people / waste removal / postponement / efficiency
سؤال
The __________ system is a powerful management tool that could easily determine the success or failure of the manufacturing system.

A) MBO
B) CAD
C) CAM
D) TQM
E) JIT (lean)
سؤال
In its simplest form, "the manufacturing process" is a composition of the material flows. Just-in-time (JIT) is designed to manage the flow of ________________________ .

A) materials
B) components
C) tools
D) associated information
E) All of the above
سؤال
_______ has evolved as a novel manufacturing concept based on a philosophy of trust and commitment of the entire organization. The benefits of implementing a _____ system impact all entities involved in supply-chain management.

A) JIT / JIT
B) JST / JST
C) GOP / GOP
D) JOB / JOB
E) ITS / ITS
سؤال
nother critical issue for JIT manufacturers is the __________ in product demand. JIT systems seem to work best when its smooth production and low inventory requirements are aimed at meeting a relatively _________ product demand.

A) regularity / unstable
B) variability / stable
C) variability / variable
D) predictability / predictable
E) stability / stable
سؤال
JIT is Toyota's manufacturing philosophy to minimize _______, and the JIT production system is a subsystem controlled by ________.

A) costs / computer
B) waste / kanban
C) expenses / kanban
D) costs / kanban
E) waste / computer
سؤال
.JIT is also referred to as _______ production.

A) mass
B) quality
C) lean
D) custom
E) short run
سؤال
n organization driven by a JIT philosophy can improve _________________ by reducing inventory levels, reducing variability, improving product quality, reducing production and delivery lead times, and reducing setup costs.

A) profits
B) return on investment
C) dividends
D) "A" and "B"
E) "B" and "C"
سؤال
ccording to Monden (1983), the success of Toyota's kanban-controlled production system is supported by:

A) smoothing of production, standardization of jobs, and reduction of setup times
B) improvement of activities and design of machine layout
C) automation of processes
D) All of the above.
E) "A" and "C" only.
سؤال
Improvements in the kanban-controlled production systems have followed a pragmatic approach, ________________. Therefore, success of the JIT production system must be explained in conjunction with ________________, _________________, and lean thinking.

A) management by objectives/management by objectives/zero defects
B) zero defects/zero defects/total quality management
C) continuous improvement/continuous improvement/ total quality management
D) total quality management/total quality management/zero defects
E) quality circles/quality circles/continuous improvement systems
سؤال
Many companies turned to JIT looking for a relatively _________________ that would yield substantial short-term benefits. Over the years, these companies have come to realize the tremendous effort and commitment required to make a JIT system run smoothly.

A) painless organizational surgery
B) painless operational surgery
C) easy manufacturing process
D) easy operational process
E) painless financial surgery
سؤال
ll marketing strategies are compatible with the JIT system.
سؤال
The transition to ______ has not necessarily been a smooth one for many companies in the United States. But this does not imply that switching from a pure ____ system to a __________ system was a mistake for most companies.

A) JOT / MRI / JOT or hybrid
B) JIT / MBO / JIT or hybrid
C) JIT / MRP / JIT or hybrid
D) JOT / MRP / JOT or matrix
E) JIT / MRI / JIT or hybrid
سؤال
The ________ JIT production system has been erected based on the premise of minimizing _________________ (waste) by reducing or eliminating discrete batches.

A) computer controlled/batches or lots
B) computer controlled/inventories
C) kanban-controlled/stock on hand
D) kanban-controlled/work-in-process inventories
E) computer controlled/stock on hand
سؤال
The JIT production system is not a ___________.

A) pull system
B) complete system
C) true production system
D) quality system
E) panacea
سؤال
.The just-in-time (JIT) system is no longer a (n) _______________ in the manufacturing world today. In the face of intense global competition, many firms in the United States are looking at improved techniques to manage their manufacturing operations.

A) manufacturing theory
B) production concept
C) management concept
D) untried theory
E) esoteric concept
سؤال
There is a list of reasons why the Toyota manufacturing system may not work for all firms. The reasons include all of the following with one exception. The exception is:

A) different management styles, and so forth
B) supplier power
C) a diverse workforce
D) cultural differences
E) geographical dispersion of suppliers
سؤال
The following practices are considered essential for a comprehensive JIT implementation:
1. Uniform production (also known as heijunka)
2. Quick set times
3. Small lot sizes
4. Short lead times
سؤال
It takes time to ___________ of the workforce and _____________ relationships with suppliers.

A) change habits / improve
B) change attitudes / nurture long-term
C) improve the attitudes / build
D) change old habits / nurture long-term
E) change attitudes / maintain short-term
سؤال
The Toyota manufacturing system has been viewed in following different ways:

A) As a lean production system because it uses less of every resource compared with the conventional mass production system.
B) As a conventional reorder point system with extremely small lot sizes.
C) As a pull system as opposed to the conventional push system.
D) All of the above.
E) "A" and "C" only.
سؤال
In a ____________, removing an end item (or a fixed lot of end items) triggers the order release, by which the flow of materials or components is initiated. In contrast, ____________ allow for the production or material flow in anticipation of future demand

A) push system / pull systems
B) pull system / push systems
C) CIT system / CAM systems
D) diverse system / traditional systems
E) traditional system / push systems
سؤال
There are two main types of kanban: 1. __________ signals the need to produce more parts. Each kanban is physically attached to a container.2. __________ signals the need to withdraw parts from one work center and deliver them to the next work center.

A) Reorder kanban / Production kanban
B) Withdrawal kanban / Production kanban
C) Quality circle kanban / Withdrawal kanban
D) Production kanban / Withdrawal kanban
E) Production kanban / Zero defects kanban
سؤال
The kanban card contains the part number, the part description, the type of container, and various workstation information. The kanban production control system uses simple, visual signals to control the movement of materials between work centers as well as the production of new materials to replenish those sent downstream to the next work center.
سؤال
Kanban is the Japanese word for _____________.

A) card
B) container
C) computer
D) program
E) system
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/64
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Just-In-Time Lean Purchasing
1
__________ manufacturers attempt to reduce incoming material inspection as much as possible. In order to eliminate the associated receiving inspection costs, a very high emphasis is placed on the quality of incoming materials under the _______ system.

A) Most / JIT
B) Japanese / JIT
C) Many / JOB
D) Smart / JIT
E) Low cost / MOB
B
2
In order to obtain ________ lot sizes for production, the order quantity size needs to be _________ and corresponding delivery schedules need to be made more _________.

A) small / reduced / frequent
B) larger / increased / infrequent
C) smaller / increased / frequent
D) larger / reduced / frequent
E) small / increased / infrequent
A
3
The reliability of supply is a critical consideration in the selection of _______ suppliers.

A) key
B) all
C) MOB
D) JIT
E) JOT
D
4
The role of the purchasing function in a manufacturing organization has become increasingly important. The _____________ production control system focuses on reducing both raw materials and work-in-process inventories.

A) JUST-ON-TARGET
B) MBO
C) just-in-time
D) strategic
E) just-in-line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
5
Thus, a kanban system is referred to as a __________ because the kanban is used to ______ parts to the next production stage only when they are needed.

A) push system / push
B) pull system / pull
C) traditional system / ship
D) traditional system / transfer
E) pull system / push
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
6
JIT emphasizes scheduling flexibility by aiming for __________________.

A) reduced waste and shorter setup times
B) reduced purchasing lead times and setup times
C) faster delivery and smaller orders
D) increased purchasing lead times and shorter setup times
E) short purchasing lead times and lower costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
7
Supplier performance can be measured more accurately under the __________ purchasing approach compared to the traditional one.

A) MBO
B) JIT
C) JOT
D) JOB
E) ITS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
8
Lower levels of __________ contribute significantly to reduced working capital requirements for the firm.

A) waste
B) supplies
C) materials
D) safety stock
E) inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
9
Rule Three (3) of the dual card kanban states: Containers for each specific part are ___________, and they are always filled with the same (ideally, small) quantity.

A) made of plastic
B) made to a customized size for the part
C) made of metal
D) standardized
E) "B" and "C" only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
10
Since JIT purchasing has gained popularity within the United States, the purchasing function has been preoccupied with trimming the overall supplier base in quest of so called __________ suppliers.

A) mega
B) super
C) superior
D) high quality
E) prominent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
11
The JIT philosophy inherently attempts to reduce lead times for order completions. Under traditional purchasing practices, the lead time is made up of all the following components with one exception. Which one is the exception?

A) paperwork lead time
B) manufacturing time for supplier
C) transportation lead time
D) time spent on unpacking and storing
E) time spent on receiving and inspection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
12
One of the most crucial elements of the ____________ system is small lot sizes.

A) just-in-time
B) management ordering and buying
C) just-on-target
D) purchasing
E) computer ordering and buying
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
13
Rule Two (2) of the dual card kanban is: There as many kanbans per container as needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
14
Implementation of just-in-time (Lean) purchasing assists the purchasing function in its major objective(s) of ___________________________.

A) improving quality of incoming materials and supplier delivery performance
B) along with reducing lead times and cost of materials
C) improving supplier relationships and reducing waste
D) "A" and "B" only
E) "A" and "C" only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
15
ompared to traditional purchasing approaches, delivery lead times under the ________ system are considerably shorter. Lead-time reliability is usually much better for ___________ systems.

A) JIT / just-in-time
B) JOB / JOB
C) JOT / JOT
D) MBO / management buying and ordering
E) JIT / computerized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
16
JIT purchasing facilitates reduction in _____________ and the associated _____________ costs.

A) the cost of materials / storage
B) the cost of shipping / holding
C) the cost of inventory / storage
D) inventory levels / materials'
E) inventory levels / inventory holding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
17
The ____________ is to provide a firm with component parts and raw materials. ____________ also must ensure that high-quality products are provided on time, at a reasonable price.

A) manufacturing department / Manufacturing
B) operations division / Operations
C) function of purchasing / Purchasing
D) procurement department / Operations
E) buying function / Manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
18
Traditionally, long and infrequent production runs have in the past been considered beneficial for the overall productivity of a manufacturing organization.However, long production runs usually lead to ____________ of raw-material and finished-goods inventories.

A) stable levels
B) low levels
C) steady flows
D) intermittent flows
E) high levels
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
19
The cost of raw materials has traditionally, been a serious concern of top management. Over the years, material cost as a proportion of total cost of the end product has risen sharply and is as high as ______ percent in some instances.

A) 50
B) 60
C) 70
D) 80
E) 90
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
20
Rule One (1) of the dual card kanban is: No parts are made unless there is a production kanban to authorize production. If no production kanban are in the "in box" at a work center, the process remains idle, and workers perform other assigned activities. This rule enforces the "pull" nature of the process control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
21
ecause of ____________ and frequent delivery schedules, suppliers are in a position to receive quick feedback regarding any potential manufacturing or design problems. Also, manufacturing is in a position to implement engineering changes quicker because of the _________ inventory levels.

A) large orders / increased
B) computerization / flat
C) smaller orders / increased
D) computerized ordering systems / reduced
E) smaller lot sizes / reduced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
22
__________ percent of the firms surveyed using JIT practices in the United States indicated that they had serious problems regarding lack of support from engineering.

A) Nineteen
B) Twenty-nine
C) Sixty-nine
D) Forty-nine
E) Thirty-nine
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
23
Scheduling flexibility prevents confusion in the manufacturing plant and offers unique _____________ to manufacturing firms since they are capable of adapting to changes in the environment more quickly.

A) opportunities
B) strengths
C) opportunities and advantages
D) competitive opportunities
E) competitive advantages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
24
crucial issue to be considered is the relevance of _________ in the successful implementation of the just-in-time system in a country.

A) culture
B) procedure
C) communication style
D) life styles
E) policy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
25
If suppliers fail to provide materials of _____________ on a regular basis, production slow-downs and stoppages will occur regularly.

A) adequate quantity
B) acceptable quantity
C) adequate quality
D) high quality
E) acceptable quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
26
Many firms report lack of support from __________ as being one of the major problems encountered in the implementation of JIT (Lean) purchasing.

A) stakeholders
B) their employees
C) their stockholders
D) their bankers
E) their lenders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
27
ffective development and implementation of the just-in-time system requires integration of important functional areas such as ______________________.

A) purchasing
B) manufacturing
C) quality
D) production and transportation
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
28
Some of the common problems associated with implementing the JIT system are as follows with one exception. Which one is the exception?

A) Lack of cooperation from suppliers
B) Lack of top management support
C) Lack of employee readiness and support
D) Lack of support from development
E) Low product quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
29
The JIT philosophy concept cannot be implemented successfully without total support from ______________.

A) all involved
B) all employees
C) top management
D) middle management
E) the purchasing department
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
30
comprehensive JIT progress report indicates that supplier costs were reduced by ________ when they adopted the JIT system in cooperation with their customers.

A) significant amounts
B) 11 percent
C) twenty fold
D) 100 percent
E) 10 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
31
The _________ see little incentive in adopting the JIT approach when the primary benefits of the program go to the buyer.

A) customers
B) suppliers
C) employees
D) stockholders
E) stakeholders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
32
Since ______________ (is) are critical in achieving a competitive advantage in today's global business world, manufacturers gain immensely by implementing the _____ production control system.

A) low prices / JIT
B) low costs / JOB
C) high-quality products / JIT
D) quality products / MOB
E) satisfaction / MBO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
33
ew buying firms, however, work closely with _________ to develop long-term relationships that provide for highly structured _______________ that lower costs for the buying firm.

A) suppliers / transportation routes
B) suppliers / deliveries
C) carriers / routes
D) carriers / delivery schedules
E) suppliers / delivery schedules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
34
Very often, resistance is encountered because the employees are required to change their _____________, or because they interpret the new system as being _____________ jobs.

A) long-standing work habits / a threat to their
B) work stations / unnecessary to their
C) job descriptions / an intrusion in their
D) job standards / an evaluation of their
E) personal work habits / a change in the expectations of their
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
35
It is well documented that JIT reduces physical inventory level. Reductions in physical inventory will also have a favorable impact on:
Reduced insurance premiums associated with the storage of inventory.Reduced inventory holding costs.Reduced labor cost in store rooms and material handing costs.Reduced clerical and administrative costs.Reduced waste from the manufacturing process.Reduced obsolescence costs.Reduced deprecation of handling and storage equipment.ach of the cost savings will result in a leaner more profitable operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
36
JIT purchasing results in improved __________ and corresponding levels of higher ______________.

A) customer service / quality
B) relationships / customer service
C) customer service / satisfaction
D) buyer relations / supplier satisfaction
E) quality / customer satisfaction
Power Point Slide 30
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
37
The JIT progress report mentioned in the textbook indicates that supplier quality improved by ______ percent since the JIT system was adopted.

A) 26
B) 16
C) 36
D) 6
E) 46
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
38
s cooperation and relationships between suppliers and manufacturers build up in a JIT system, so do the opportunities to ______________________ and focus on ________________________.

A) lower costs of materials and supplies / reducing waste and shrinkage
B) conduct an extensive competitive analysis / reducing selling prices
C) conduct an extensive value analysis / reducing the cost of parts purchased
D) analyze competition / developing competitive strengths
E) conduct cost analysis / reducing the costs of doing business
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
39
The switch to a JIT system presents formidable challenges. _________ must be prepared to change their behavior when their customers are using the JIT system.

A) Marketing
B) Management
C) Finance
D) Operations
E) Manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
40
Implementation of the JIT philosophy requires a _________ change in the organization.

A) major
B) minor
C) management
D) design
E) cultural
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
41
The key lean principles focus on __________, ____________, ____________, and ___________. All of these key business principles have a direct effect on the purchasing function.

A) profit / reduction of waste / involvement / efficiency
B) human resources / waste removal / postponement / inefficiency
C) people / the elimination of waste / postponement / efficiency
D) people / the elimination of waste / involvement / efficiency
E) people / waste removal / postponement / efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
42
The __________ system is a powerful management tool that could easily determine the success or failure of the manufacturing system.

A) MBO
B) CAD
C) CAM
D) TQM
E) JIT (lean)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
43
In its simplest form, "the manufacturing process" is a composition of the material flows. Just-in-time (JIT) is designed to manage the flow of ________________________ .

A) materials
B) components
C) tools
D) associated information
E) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
44
_______ has evolved as a novel manufacturing concept based on a philosophy of trust and commitment of the entire organization. The benefits of implementing a _____ system impact all entities involved in supply-chain management.

A) JIT / JIT
B) JST / JST
C) GOP / GOP
D) JOB / JOB
E) ITS / ITS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
45
nother critical issue for JIT manufacturers is the __________ in product demand. JIT systems seem to work best when its smooth production and low inventory requirements are aimed at meeting a relatively _________ product demand.

A) regularity / unstable
B) variability / stable
C) variability / variable
D) predictability / predictable
E) stability / stable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
46
JIT is Toyota's manufacturing philosophy to minimize _______, and the JIT production system is a subsystem controlled by ________.

A) costs / computer
B) waste / kanban
C) expenses / kanban
D) costs / kanban
E) waste / computer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
47
.JIT is also referred to as _______ production.

A) mass
B) quality
C) lean
D) custom
E) short run
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
48
n organization driven by a JIT philosophy can improve _________________ by reducing inventory levels, reducing variability, improving product quality, reducing production and delivery lead times, and reducing setup costs.

A) profits
B) return on investment
C) dividends
D) "A" and "B"
E) "B" and "C"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
49
ccording to Monden (1983), the success of Toyota's kanban-controlled production system is supported by:

A) smoothing of production, standardization of jobs, and reduction of setup times
B) improvement of activities and design of machine layout
C) automation of processes
D) All of the above.
E) "A" and "C" only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
50
Improvements in the kanban-controlled production systems have followed a pragmatic approach, ________________. Therefore, success of the JIT production system must be explained in conjunction with ________________, _________________, and lean thinking.

A) management by objectives/management by objectives/zero defects
B) zero defects/zero defects/total quality management
C) continuous improvement/continuous improvement/ total quality management
D) total quality management/total quality management/zero defects
E) quality circles/quality circles/continuous improvement systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
51
Many companies turned to JIT looking for a relatively _________________ that would yield substantial short-term benefits. Over the years, these companies have come to realize the tremendous effort and commitment required to make a JIT system run smoothly.

A) painless organizational surgery
B) painless operational surgery
C) easy manufacturing process
D) easy operational process
E) painless financial surgery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
52
ll marketing strategies are compatible with the JIT system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
53
The transition to ______ has not necessarily been a smooth one for many companies in the United States. But this does not imply that switching from a pure ____ system to a __________ system was a mistake for most companies.

A) JOT / MRI / JOT or hybrid
B) JIT / MBO / JIT or hybrid
C) JIT / MRP / JIT or hybrid
D) JOT / MRP / JOT or matrix
E) JIT / MRI / JIT or hybrid
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
54
The ________ JIT production system has been erected based on the premise of minimizing _________________ (waste) by reducing or eliminating discrete batches.

A) computer controlled/batches or lots
B) computer controlled/inventories
C) kanban-controlled/stock on hand
D) kanban-controlled/work-in-process inventories
E) computer controlled/stock on hand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
55
The JIT production system is not a ___________.

A) pull system
B) complete system
C) true production system
D) quality system
E) panacea
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
56
.The just-in-time (JIT) system is no longer a (n) _______________ in the manufacturing world today. In the face of intense global competition, many firms in the United States are looking at improved techniques to manage their manufacturing operations.

A) manufacturing theory
B) production concept
C) management concept
D) untried theory
E) esoteric concept
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
57
There is a list of reasons why the Toyota manufacturing system may not work for all firms. The reasons include all of the following with one exception. The exception is:

A) different management styles, and so forth
B) supplier power
C) a diverse workforce
D) cultural differences
E) geographical dispersion of suppliers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
58
The following practices are considered essential for a comprehensive JIT implementation:
1. Uniform production (also known as heijunka)
2. Quick set times
3. Small lot sizes
4. Short lead times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
59
It takes time to ___________ of the workforce and _____________ relationships with suppliers.

A) change habits / improve
B) change attitudes / nurture long-term
C) improve the attitudes / build
D) change old habits / nurture long-term
E) change attitudes / maintain short-term
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
60
The Toyota manufacturing system has been viewed in following different ways:

A) As a lean production system because it uses less of every resource compared with the conventional mass production system.
B) As a conventional reorder point system with extremely small lot sizes.
C) As a pull system as opposed to the conventional push system.
D) All of the above.
E) "A" and "C" only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
61
In a ____________, removing an end item (or a fixed lot of end items) triggers the order release, by which the flow of materials or components is initiated. In contrast, ____________ allow for the production or material flow in anticipation of future demand

A) push system / pull systems
B) pull system / push systems
C) CIT system / CAM systems
D) diverse system / traditional systems
E) traditional system / push systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
62
There are two main types of kanban: 1. __________ signals the need to produce more parts. Each kanban is physically attached to a container.2. __________ signals the need to withdraw parts from one work center and deliver them to the next work center.

A) Reorder kanban / Production kanban
B) Withdrawal kanban / Production kanban
C) Quality circle kanban / Withdrawal kanban
D) Production kanban / Withdrawal kanban
E) Production kanban / Zero defects kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
63
The kanban card contains the part number, the part description, the type of container, and various workstation information. The kanban production control system uses simple, visual signals to control the movement of materials between work centers as well as the production of new materials to replenish those sent downstream to the next work center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
64
Kanban is the Japanese word for _____________.

A) card
B) container
C) computer
D) program
E) system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.