Deck 4: Materials Management

ملء الشاشة (f)
exit full mode
سؤال
The ________ is the source of raw materials and component part inventories.

A) buyer
B) customer
C) manufacturing organization
D) supplier
E) none of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The five basic functions of __________ are fundamental to achieving smooth flow, reasonable equipment utilization and materials handling costs, and maintenance of good customer service.

A) purchasing
B) inventory
C) supply
D) capital assets
E) operations
سؤال
The ______ cycle is both a link and a set of activities. As a link, the ______ cycle facilitates the flow of information and materials.

A) order / order
B) communications / communications
C) life / life
D) production / production
E) product / product
سؤال
The delay between receipt of raw materials and the availability of the finished goods produced from them is _____________. For the whole system, ____ should be as short as possible.

A) production time (PT) / PT
B) regular time (RT) / RT
C) over time (OT) / OT
D) throughput time (TPT) / TPT
E) tech time (TT) / TT
سؤال
In general, __________ is stored capacity.

A) stock
B) inventory
C) assets
D) overtime
E) second and third shifts
سؤال
If a firm makes products to order, _____________ is measured by the degree to which products are completed and shipped ___________.

A) quality / as ordered
B) delivery / on time
C) customer service / as promised
D) customer relations / within three days
E) customer service / within a week
سؤال
If we represent the order cycle as a set of activities, we can identify an important property of the order cycle- _______.

A) order time
B) communication time
C) fax time
D) lead time
E) cycle time
سؤال
The acronym "MTS" is defined as:

A) made-to-standard
B) make-to-specs
C) made-to-specifications
D) make-to-stock
E) make-to-specifications
سؤال
When planning to acquire materials, whether raw materials, component parts, or finished goods, the __________ must be considered for both the buyer and seller.

A) specifications
B) design
C) product
D) capacity
E) price
سؤال
The acronym "MTO" is defined as:

A) make-to-order
B) maintenance-to-order
C) materials-to-order
D) message-to-operations
E) machined-to-order
سؤال
ach activity in the order cycle is a bundle of tasks. For example, the receipt of materials by the customer involves all of the following, with one exception. Which is the exception?

A) Physical receipt
B) Unpacking
C) Unloading
D) Storage location decision
E) Move to storage
سؤال
The purpose of materials management is to ______________.

A) obtain raw materials and component parts for the operations division
B) negotiate the best prices for raw materials and component parts
C) find and approve major suppliers of raw materials and parts
D) support the transformation of raw materials and component parts into shipped or finished goods
E) supervise the purchasing function
سؤال
The managers of integrated materials systems have two objectives:

A) Customer service and Maximum quality materials
B) Customer relations and Minimum total materials costs
C) Minimum total materials costs and Maximum flexibility in production
D) Customer satisfaction and Minimum total materials costs
E) None of the above
سؤال
The ________ of production is limited by the process technology and/or the disposition of the workforce.

A) upper level
B) quality
C) mid-level
D) entry level
E) speed
سؤال
____________ is a concept that applies to all suppliers whether they are external to the company or internal.

A) Public relations
B) Customer relations
C) Customer service
D) Customer satisfaction
E) Public service
سؤال
Unfilled orders are processed in one of the following three ways:

A) Backorder, Cancellation, Suspension
B) Reorder, Substitution, or Backorder
C) Backorder, Substitution, or Cancellation
D) Substitution, Cancellation, or Requisition
E) Requisition, Substitution, or Cancellation
سؤال
The _______ cycle has some important characteristics. First, an _______ cycle has "length." The distance between supplier and customer determines, in part, how long it takes to transmit data and transport materials.

A) order / order
B) entry / entry
C) production / production
D) requisition / requisition
E) communications / communications
سؤال
The shorter the ______ cycle, the quicker the customer is served and the less inventory the customer needs.

A) order
B) production
C) transportation
D) shipping
E) delivery
سؤال
s an element of customer service, on-time shipment is a variation on the notion of availability. On-time shipment has to do with the ________ promises made, and the _____ of orders shipped as promised to ______ orders.

A) cost / number / backordered
B) transportation / number / total
C) delivery / number / total
D) delivery / ratio / total
E) delivery / ratio / backordered
سؤال
It is not necessary that all resource flows between components occur at the same time or in the same manner. This idea is called _______________ and is useful when designing supply-distribution systems.

A) supplier separation
B) channel separation
C) source separation
D) vendor separation
E) channel division
سؤال
When it comes to customer satisfaction customers want all of the following with one exception. Which is the exception?

A) Short lead time
B) Good quality
C) Low cost
D) Customized products
E) Post-sale service
سؤال
_________ is the extent to which a supplier can accommodate a customer's requests. Perhaps the request is for special processing, packaging, or shipment.

A) Customer service Flexibility
B) Customizing
C) Customer satisfaction
D) Flexibility
E) Programming
سؤال
ustomers want assurances that their orders are on schedule, especially as the shipping date nears. This element of customer service is the timeliness and detail of the information a supplier provides a customer.
سؤال
_________ products must both:onform closely to specifications.Satisfy consumer expectations.

A) Medical
B) Automotive
C) Consumer
D) High-quality
E) Standard quality
سؤال
If poor quality is produced, goes undetected, and is shipped, the costs to _________________ are substantial.

A) supplier
B) customer
C) retailers
D) all of the above
E) "A" and "B" only
سؤال
The design of a product must "be __________" given the process capability of the supplier. Within that range, top management sets the quality level-the degree to which the product functionally satisfies customers.

A) producible
B) profitable
C) useful
D) effective
E) functional
سؤال
We hear so much about quality that it may come as a surprise that even experts don't agree about how to achieve it. Fortune recently asked the gurus of industrial quality to define it and to assign responsibility for quality.To some, quality is a design matter. It has to do with engineering-both the process technology and product design.To others, quality is an evaluation that utilizes sampling to achieve process control and make certain that inferior quality material isn't shipped from the plant.There is a third view-that quality depends upon perception. This means making a slogan a rallying cry-"Zero Defects" or "Quality is Free."
سؤال
Quality is a (n) ________ decision.

A) supply management
B) strategic
C) engineering
D) design
E) marketing
سؤال
The quality-defining characteristics of products are those that are important to the __________ of the product.

A) developer
B) end user
C) designer
D) seller
E) manufacturer
سؤال
There are various semi-processed materials intended for further processing-raw stock, crude oil, bituminous coal, paperboard, paper, lumber, copper, wheat, cotton, for example. These materials are called _____________.

A) supplies
B) commodities
C) raw materials
D) semi-processed supplies
E) production supplies
سؤال
To qualitatively evaluate consumer products and services, Consumers Union first identifies the relevant characteristics of a product. It then tests comparable products of various manufacturers and classifies products as:

A) Best buy
B) Acceptable
C) Not acceptable
D) All of the above
E) "B" and "C" only
سؤال
onformance to specification is the ________ to which material conforms to specifications.

A) standard
B) level
C) degree
D) process
E) measure
سؤال
ven though the technology of _________ is steeped in statistics and manufacturing engineering, materials managers first need to consider ________ as part of the expectations of customers, whether intermediate or final.

A) design / standards
B) quality / design
C) production / quality
D) production / design
E) quality / quality
سؤال
If one definition of quality is conformance to specs, the specifications must be __________. The manner of specifying materials depends on the kinds of material ordered.

A) unambiguous
B) detailed
C) correct
D) direct
E) standardized
سؤال
_________ means setting the specifications for a material or product. Specifications result in the _______________ characteristics of the product.

A) Development / functional
B) Engineering / standard
C) Design / standard and functional
D) Design / functional and aesthetic
E) Development / standard and aesthetic
سؤال
The name of the game, whatever the firm's classification, is ____________.

A) customer satisfaction
B) profits
C) customer relations
D) return on sales
E) return on investment
سؤال
Quality, in large part, is what people __________ it to be.

A) expect
B) perceive
C) find
D) want
E) design
سؤال
ustomers place orders based on _________. Sometimes the _________ is called the "drop dead date."

A) shipping dates / shipping date
B) seasonal dates / seasonal date
C) preferred dates / preferred date
D) drop shipment dates / drop shipment date
E) need dates / need date
سؤال
The quality of material can deteriorate between the time it leaves the production floor and the time it arrives at the customer's storeroom. Packaging, loading, transport, and unloading can all take a toll. Although damages can be claimed, materials received in poor condition can be recycled for processing.
سؤال
isagreements between supplier and customer about standards often stem from misunderstandings about material specifications.
سؤال
There are (is) ____ kind(s) of tooling with respect to their specifications.

A) one
B) two
C) three
D) four
E) five
سؤال
_______ suggests the unexpected, which means the need to patch up or replace equipment components that we don't expect to fail. Usually the parts are not carried as inventory by the equipment manufacturer.

A) PODS
B) OEM
C) Repair
D) Replace
E) Maintenance
سؤال
The acronym "MRO" refers to:

A) Management, Research, and Operations
B) Marketing Resources and Operations
C) Maintenance, Repair, and Operating
D) Managing Repair Operations
E) Metro Research Organization
سؤال
Generally speaking, ___________ supplies are standard items and are specified by manufacturer or industry codes.

A) maintenance
B) repair
C) replacement
D) OEM
E) operating
سؤال
y definition, ___________ are homogeneous.

A) supplies
B) semi-processed goods
C) commodities
D) production supplies
E) raw materials
سؤال
_____________ are items that we expect to periodically replace in a piece of equipment. Over time, machine parts are subject to wear and are replaced.

A) Maintenance items
B) POD items
C) OEM items
D) Replacement items
E) Repair items
سؤال
Purchased parts include semi finished items that will be further processed and finished materials that will become components of finished end items. The usual way of specifying purchased parts in a manufacturing environment is with a graphic description that is, engineering drawings.
سؤال
Many parts can be purchased off the shelf. They are like commodities in the sense that they are standardized. In effect, they are _____________ according to specifications established by an industry, professional association, or independent testing organization.

A) made to standard
B) made to specifications
C) made to stock
D) made to order
E) made to design
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/48
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Materials Management
1
The ________ is the source of raw materials and component part inventories.

A) buyer
B) customer
C) manufacturing organization
D) supplier
E) none of the above
D
2
The five basic functions of __________ are fundamental to achieving smooth flow, reasonable equipment utilization and materials handling costs, and maintenance of good customer service.

A) purchasing
B) inventory
C) supply
D) capital assets
E) operations
B
3
The ______ cycle is both a link and a set of activities. As a link, the ______ cycle facilitates the flow of information and materials.

A) order / order
B) communications / communications
C) life / life
D) production / production
E) product / product
A
4
The delay between receipt of raw materials and the availability of the finished goods produced from them is _____________. For the whole system, ____ should be as short as possible.

A) production time (PT) / PT
B) regular time (RT) / RT
C) over time (OT) / OT
D) throughput time (TPT) / TPT
E) tech time (TT) / TT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
5
In general, __________ is stored capacity.

A) stock
B) inventory
C) assets
D) overtime
E) second and third shifts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
6
If a firm makes products to order, _____________ is measured by the degree to which products are completed and shipped ___________.

A) quality / as ordered
B) delivery / on time
C) customer service / as promised
D) customer relations / within three days
E) customer service / within a week
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
7
If we represent the order cycle as a set of activities, we can identify an important property of the order cycle- _______.

A) order time
B) communication time
C) fax time
D) lead time
E) cycle time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
8
The acronym "MTS" is defined as:

A) made-to-standard
B) make-to-specs
C) made-to-specifications
D) make-to-stock
E) make-to-specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
9
When planning to acquire materials, whether raw materials, component parts, or finished goods, the __________ must be considered for both the buyer and seller.

A) specifications
B) design
C) product
D) capacity
E) price
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
10
The acronym "MTO" is defined as:

A) make-to-order
B) maintenance-to-order
C) materials-to-order
D) message-to-operations
E) machined-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
11
ach activity in the order cycle is a bundle of tasks. For example, the receipt of materials by the customer involves all of the following, with one exception. Which is the exception?

A) Physical receipt
B) Unpacking
C) Unloading
D) Storage location decision
E) Move to storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
12
The purpose of materials management is to ______________.

A) obtain raw materials and component parts for the operations division
B) negotiate the best prices for raw materials and component parts
C) find and approve major suppliers of raw materials and parts
D) support the transformation of raw materials and component parts into shipped or finished goods
E) supervise the purchasing function
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
13
The managers of integrated materials systems have two objectives:

A) Customer service and Maximum quality materials
B) Customer relations and Minimum total materials costs
C) Minimum total materials costs and Maximum flexibility in production
D) Customer satisfaction and Minimum total materials costs
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
14
The ________ of production is limited by the process technology and/or the disposition of the workforce.

A) upper level
B) quality
C) mid-level
D) entry level
E) speed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
15
____________ is a concept that applies to all suppliers whether they are external to the company or internal.

A) Public relations
B) Customer relations
C) Customer service
D) Customer satisfaction
E) Public service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
16
Unfilled orders are processed in one of the following three ways:

A) Backorder, Cancellation, Suspension
B) Reorder, Substitution, or Backorder
C) Backorder, Substitution, or Cancellation
D) Substitution, Cancellation, or Requisition
E) Requisition, Substitution, or Cancellation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
17
The _______ cycle has some important characteristics. First, an _______ cycle has "length." The distance between supplier and customer determines, in part, how long it takes to transmit data and transport materials.

A) order / order
B) entry / entry
C) production / production
D) requisition / requisition
E) communications / communications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
18
The shorter the ______ cycle, the quicker the customer is served and the less inventory the customer needs.

A) order
B) production
C) transportation
D) shipping
E) delivery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
19
s an element of customer service, on-time shipment is a variation on the notion of availability. On-time shipment has to do with the ________ promises made, and the _____ of orders shipped as promised to ______ orders.

A) cost / number / backordered
B) transportation / number / total
C) delivery / number / total
D) delivery / ratio / total
E) delivery / ratio / backordered
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
20
It is not necessary that all resource flows between components occur at the same time or in the same manner. This idea is called _______________ and is useful when designing supply-distribution systems.

A) supplier separation
B) channel separation
C) source separation
D) vendor separation
E) channel division
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
21
When it comes to customer satisfaction customers want all of the following with one exception. Which is the exception?

A) Short lead time
B) Good quality
C) Low cost
D) Customized products
E) Post-sale service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
22
_________ is the extent to which a supplier can accommodate a customer's requests. Perhaps the request is for special processing, packaging, or shipment.

A) Customer service Flexibility
B) Customizing
C) Customer satisfaction
D) Flexibility
E) Programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
23
ustomers want assurances that their orders are on schedule, especially as the shipping date nears. This element of customer service is the timeliness and detail of the information a supplier provides a customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
24
_________ products must both:onform closely to specifications.Satisfy consumer expectations.

A) Medical
B) Automotive
C) Consumer
D) High-quality
E) Standard quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
25
If poor quality is produced, goes undetected, and is shipped, the costs to _________________ are substantial.

A) supplier
B) customer
C) retailers
D) all of the above
E) "A" and "B" only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
26
The design of a product must "be __________" given the process capability of the supplier. Within that range, top management sets the quality level-the degree to which the product functionally satisfies customers.

A) producible
B) profitable
C) useful
D) effective
E) functional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
27
We hear so much about quality that it may come as a surprise that even experts don't agree about how to achieve it. Fortune recently asked the gurus of industrial quality to define it and to assign responsibility for quality.To some, quality is a design matter. It has to do with engineering-both the process technology and product design.To others, quality is an evaluation that utilizes sampling to achieve process control and make certain that inferior quality material isn't shipped from the plant.There is a third view-that quality depends upon perception. This means making a slogan a rallying cry-"Zero Defects" or "Quality is Free."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
28
Quality is a (n) ________ decision.

A) supply management
B) strategic
C) engineering
D) design
E) marketing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
29
The quality-defining characteristics of products are those that are important to the __________ of the product.

A) developer
B) end user
C) designer
D) seller
E) manufacturer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
30
There are various semi-processed materials intended for further processing-raw stock, crude oil, bituminous coal, paperboard, paper, lumber, copper, wheat, cotton, for example. These materials are called _____________.

A) supplies
B) commodities
C) raw materials
D) semi-processed supplies
E) production supplies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
31
To qualitatively evaluate consumer products and services, Consumers Union first identifies the relevant characteristics of a product. It then tests comparable products of various manufacturers and classifies products as:

A) Best buy
B) Acceptable
C) Not acceptable
D) All of the above
E) "B" and "C" only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
32
onformance to specification is the ________ to which material conforms to specifications.

A) standard
B) level
C) degree
D) process
E) measure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
33
ven though the technology of _________ is steeped in statistics and manufacturing engineering, materials managers first need to consider ________ as part of the expectations of customers, whether intermediate or final.

A) design / standards
B) quality / design
C) production / quality
D) production / design
E) quality / quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
34
If one definition of quality is conformance to specs, the specifications must be __________. The manner of specifying materials depends on the kinds of material ordered.

A) unambiguous
B) detailed
C) correct
D) direct
E) standardized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
35
_________ means setting the specifications for a material or product. Specifications result in the _______________ characteristics of the product.

A) Development / functional
B) Engineering / standard
C) Design / standard and functional
D) Design / functional and aesthetic
E) Development / standard and aesthetic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
36
The name of the game, whatever the firm's classification, is ____________.

A) customer satisfaction
B) profits
C) customer relations
D) return on sales
E) return on investment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
37
Quality, in large part, is what people __________ it to be.

A) expect
B) perceive
C) find
D) want
E) design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
38
ustomers place orders based on _________. Sometimes the _________ is called the "drop dead date."

A) shipping dates / shipping date
B) seasonal dates / seasonal date
C) preferred dates / preferred date
D) drop shipment dates / drop shipment date
E) need dates / need date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
39
The quality of material can deteriorate between the time it leaves the production floor and the time it arrives at the customer's storeroom. Packaging, loading, transport, and unloading can all take a toll. Although damages can be claimed, materials received in poor condition can be recycled for processing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
40
isagreements between supplier and customer about standards often stem from misunderstandings about material specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
41
There are (is) ____ kind(s) of tooling with respect to their specifications.

A) one
B) two
C) three
D) four
E) five
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
42
_______ suggests the unexpected, which means the need to patch up or replace equipment components that we don't expect to fail. Usually the parts are not carried as inventory by the equipment manufacturer.

A) PODS
B) OEM
C) Repair
D) Replace
E) Maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
43
The acronym "MRO" refers to:

A) Management, Research, and Operations
B) Marketing Resources and Operations
C) Maintenance, Repair, and Operating
D) Managing Repair Operations
E) Metro Research Organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
44
Generally speaking, ___________ supplies are standard items and are specified by manufacturer or industry codes.

A) maintenance
B) repair
C) replacement
D) OEM
E) operating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
45
y definition, ___________ are homogeneous.

A) supplies
B) semi-processed goods
C) commodities
D) production supplies
E) raw materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
46
_____________ are items that we expect to periodically replace in a piece of equipment. Over time, machine parts are subject to wear and are replaced.

A) Maintenance items
B) POD items
C) OEM items
D) Replacement items
E) Repair items
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
47
Purchased parts include semi finished items that will be further processed and finished materials that will become components of finished end items. The usual way of specifying purchased parts in a manufacturing environment is with a graphic description that is, engineering drawings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
48
Many parts can be purchased off the shelf. They are like commodities in the sense that they are standardized. In effect, they are _____________ according to specifications established by an industry, professional association, or independent testing organization.

A) made to standard
B) made to specifications
C) made to stock
D) made to order
E) made to design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.