Deck 8: Aggregate Planning in a Supply Chain

ملء الشاشة (f)
exit full mode
سؤال
Safety inventory is defined as inventory held to satisfy demand that is higher than forecasted.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Safety capacity is defined as capacity used to satisfy demand that is lower than forecasted.
سؤال
A planning horizon is usually between three and five years.
سؤال
Traditionally, much of aggregate planning is focused within an enterprise and may not always be seen as a part of supply chain management.
سؤال
The goal of aggregate planning is to build a plan that satisfies demand while minimizing downtime.
سؤال
A poor aggregate plan may result in a large amount of excess inventory and capacity, thereby raising costs.
سؤال
Aggregate planning is a process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and even pricing over a specified time horizon.
سؤال
The goal of aggregate planning is to satisfy demand in a way that minimizes profit.
سؤال
Forecasting errors are dealt with in aggregate plans using either safety backlog or safety capacity.
سؤال
As capacity utilization increases, it becomes less important to perform aggregate planning.
سؤال
As inputs into the aggregate plan change, managers do not need to make changes to the aggregate plan.
سؤال
To improve the quality of aggregate plans, forecast errors must be taken into account when formulating aggregate plans.
سؤال
Short-term production serves as a broad blueprint for operations and establishes the parameters within which aggregate planning decisions are made.
سؤال
Linear programming finds the solution that creates the highest profit while satisfying the constraints that a company faces.
سؤال
Most strategies that an aggregate planner actually uses are in combination, and are referred to as hybrid strategies.
سؤال
The aggregate planner must make a trade-off between capacity, inventory, and backlog costs.
سؤال
To create an aggregate plan, a company must specify the planning horizon for the plan and the duration of each period within the planning horizon.
سؤال
The aggregate planning problem is concerned with determining the production level, inventory level, and capacity level (internal and outsourced) for each period that maximizes the firm's profit over the planning horizon.
سؤال
Given that forecasts are always wrong to some degree, the aggregate plan needs to have some flexibility built into it if it is to be useful.
سؤال
Companies should work with downstream partners to produce forecasts and with upstream partners to determine constraints when doing aggregate planning.
سؤال
The fundamental trade-offs available to an aggregate planner are between

A) capability, inventory, and backlog costs.
B) capability, inventory, and sales costs.
C) capacity, inventory, and backlog costs.
D) capacity, inventory, and sales costs.
سؤال
The strategy where workforce (capacity) is kept stable but the number of hours worked is varied over time in an effort to synchronize production with demand is the

A) flexibility strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
سؤال
Aggregate planning solves problems involving

A) aggregate decisions and stock keeping unit (SKU) level decisions.
B) aggregate decisions or stock keeping unit (SKU) level decisions.
C) aggregate decisions rather than stock keeping unit (SKU) level decisions.
D) stock keeping unit (SKU) level decisions rather than aggregate decisions.
سؤال
The strategy where the production rate is synchronized with the demand rate by varying machine capacity or hiring and laying off employees as the demand rate varies is the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
سؤال
The operational parameter concerned with the number of workers/units of capacity needed for production is

A) production rate.
B) workforce.
C) overtime.
D) backlog.
سؤال
The goal of aggregate planning is to

A) dissatisfy customers in a way that maximizes profit.
B) dissatisfy customers in a way that minimizes profit.
C) satisfy demand in a way that maximizes profit.
D) satisfy demand in a way that minimizes profit.
سؤال
The planning horizon is

A) the time period over which the aggregate plan is to produce a solution.
B) the duration of each time period in the aggregate plan.
C) the length of time required to produce the aggregate plan.
D) the solution to the aggregate plan.
سؤال
An aggregate planner requires information on constraints. Which of the following is one of the typical constraints for an aggregate planner?

A) Inventory holding cost
B) Labor/machine hours required per unit
C) Stockout or backlog cost
D) Limits on overtime
سؤال
The strategy where a stable machine capacity and workforce are maintained with a constant output rate, with inventory levels fluctuating over time, is the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
سؤال
________ is used to determine customer service levels.

A) Inventory held
B) Backlog/stockout quantity
C) Workforce hired/laid off
D) Machine capacity increase/decrease
سؤال
A poor aggregate plan can result in

A) appropriate inventory levels.
B) efficient use of capacity.
C) better sales and lost profits.
D) lost sales and lost profits.
سؤال
The operational parameter concerned with the number of units completed per unit time (such as per week or per month) is

A) production rate.
B) workforce.
C) overtime.
D) backlog.
سؤال
Demand is forecast for the next five months as 200, 300, 500, 300, 200. The production planner decides to adopt a level strategy, so over the next five months they should produce

A) 200, 300, 500, 300, 200.
B) 500, 400, 300, 200, 100.
C) 100, 200, 300, 400, 500.
D) 300, 300, 300, 300, 300.
سؤال
The process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and even pricing over a specified time horizon is

A) aggregate planning.
B) detail planning.
C) inventory planning.
D) sales planning.
سؤال
The operational parameter concerned with the planned inventory carried over the various periods in the planning horizon is

A) production rate.
B) overtime.
C) backlog.
D) inventory on hand.
سؤال
Aggregate planning, to be effective, requires inputs from

A) all customers.
B) all departments.
C) all suppliers.
D) throughout the supply chain.
سؤال
Aggregate planning is concerned with determining

A) the production level, sales level, and capacity for each period.
B) the demand level, inventory level, and capacity for each period.
C) the production level, inventory level, and capacity for each period.
D) the production level, staffing level, and capacity for each period.
سؤال
Aggregate planning should consider information from

A) only the enterprise as its breadth of scope.
B) downstream partners to produce forecasts.
C) upstream partners to determine constraints.
D) all of the above
سؤال
Much of aggregate planning has traditionally been focused

A) on short-term production scheduling.
B) on customer relationship management.
C) within an enterprise.
D) beyond enterprise boundaries.
سؤال
The length of the planning horizon is usually between

A) one and three months.
B) three and eighteen months.
C) one and three years.
D) three and five years.
سؤال
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-What is the optimal total cost of the aggregate plan developed to address Scenario 8.2?

A) $27,200
B) $20,960
C) $31,400
D) $26,600
سؤال
Forecasting errors are dealt with using

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) B and C only
سؤال
Inventory held to satisfy demand that is higher than forecasted is

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) safety sales.
سؤال
Most strategies that an aggregate planner actually uses are in combination and are referred to as the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
سؤال
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many months does the regular time output exceed plant capacity in the optimal solution to Scenario 8.2?

A) 0
B) 1
C) 2
D) 3
سؤال
What is the name of the plan that breaks apart the aggregate plan into distinct product families?

A) Master production schedule
B) Rough cut capacity plan
C) SKU aggregate plan
D) Process plan
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the objective function for this scenario.

A)  Max Output = Regular + Overtime + Subcontracting \text { Max Output } = \sum \text { Regular } + \sum \text { Overtime } + \sum \text { Subcontracting }
B) Max Profit == \sum Revenue $5- \$ 5 \sum Regular $7.5- \$ 7.5 \sum Overtime $9- \$ 9 \sum Subcontracting $2\$ 2 \sum Ending Inventory
C)  Min Cost =$5 Regular +$7.5 Overtime +$9 Subcontracting +$2 Ending Inventory \text { Min Cost } = \$ 5 \sum \text { Regular } + \$ 7.5 \sum \text { Overtime } + \$ 9 \sum \text { Subcontracting } + \$ 2 \sum \text { Ending Inventory }
D)  Min Output = Overtime + Subcontracting \text { Min Output } = \sum \text { Overtime } + \sum \text { Subcontracting }
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the number of constraints in this scenario.

A) 12
B) 15
C) 20
D) 24
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-What is the optimal total cost of the aggregate plan developed to address Scenario 8.1?

A) $16,700
B) $18,950
C) $18,450
D) $16,250
سؤال
When formulating aggregate plans,

A) forecast errors have no impact.
B) forecast errors must be taken into account.
C) forecast accuracy is assumed.
D) forecast accuracy is not a factor.
سؤال
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many units are produced using overtime in the optimal aggregate plan developed to address Scenario 8.2?

A) 360
B) 200
C) 400
D) 280
سؤال
Capacity used to satisfy demand that is higher than forecasted is

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) safety sales.
سؤال
A highly effective tool for a company to use when it tries to maximize profits while being subjected to a series of constraints is

A) aggregate programming.
B) distribution programming.
C) production programming.
D) linear programming.
سؤال
Demand is forecast for the next five months as 200, 300, 500, 300, 200. The production planner decides to adopt a chase strategy, so over the next five months they should produce

A) 200, 300, 500, 300, 200.
B) 500, 400, 300, 200, 100.
C) 100, 200, 300, 400, 500.
D) 300, 300, 300, 300, 300.
سؤال
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-Without actually solving the aggregate planning problem, it is safe to conclude that in the optimal solution to Scenario 8.2.

A) the total ending inventory will exceed the number of units made using overtime.
B) the number of units made using subcontracting will exceed the number of units made using overtime.
C) the number of units made using regular time will exceed the forecast.
D) the number of units made using subcontracting will exceed the number of units made using regular time.
سؤال
Which of the following is an approach a company can use to create a buffer for forecast error using safety inventory?

A) Overtime
B) Carry extra workforce permanently
C) Build and carry extra inventories
D) Subcontracting
سؤال
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many units are produced using overtime in the optimal aggregate plan developed to address Scenario 8.2?

A) 360
B) 200
C) 400
D) 280
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the number of decision variables in this scenario.

A) 10
B) 15
C) 20
D) 24
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Which of these is a constraint that is appropriate for Scenario 8.1?

A)  Output 680\sum \text { Output } \geq 680
B)  Ending Inventory 0\sum \text { Ending Inventory } \leq 0
C)  Subcontracting + Overtime 300\sum \text { Subcontracting } + \sum \text { Overtime } \leq 300
D)  Subcontracting 300\sum \text { Subcontracting } \leq 300
سؤال
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Which of these statements about Scenario 8.1 is evident without even developing an aggregate plan?

A) Some overtime will be needed.
B) Ending inventory must be negative.
C) Overtime must exceed subcontracting.
D) Subcontracting must exceed regular time output.
سؤال
How frequently should the aggregate plan be rerun?

A) Weekly
B) Monthly
C) Every 3 to 8 months
D) As inputs to the aggregate plan change
سؤال
Scenario 8.1 - Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
Scenario 8.1 - Gang Aft Agley Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.   The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts. Formulate the aggregate plan using linear programming.<div style=padding-top: 35px>
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.
Formulate the aggregate plan using linear programming.
سؤال
What information does a master production schedule provide that an aggregate plan does not?

A) Expense information for the planning period
B) Revenue information for the planning period
C) Specific product family production information
D) A specific machine schedule for each order
سؤال
Discuss key issues to be considered when implementing aggregate planning.
سؤال
The aggregate plan needs to

A) be a final product because changes are disruptive to the supply chain.
B) be considered fixed because forecasts are usually accurate.
C) have some flexibility built into it because forecasts are always wrong.
D) have some flexibility built into it because forecasts are usually right.
سؤال
As capacity utilization increases,

A) it becomes less important to perform aggregate planning.
B) it becomes more important to perform aggregate planning.
C) it does not affect the importance of performing aggregate planning.
D) it lessens the importance of aggregate planning.
سؤال
Explain the basic strategies that an aggregate planner has available to balance the various costs and meet demand.
سؤال
Advanced planning systems for aggregate planning rely heavily on ________ to deliver their full potential.

A) forecasting
B) the supply chain
C) constraints
D) data accuracy
سؤال
The earliest IT supply chain products were

A) aggregate planning modules.
B) cloud-based.
C) SaaS (software as a service).
D) enterprise resource planning modules.
سؤال
Scenario 8.1 - Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
Scenario 8.1 - Gang Aft Agley Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.   The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts. Formulate the aggregate plan using linear programming and solve it using Solver.<div style=padding-top: 35px>
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.
Formulate the aggregate plan using linear programming and solve it using Solver.
سؤال
Discuss the primary objective and operational parameters of aggregate planning.
سؤال
The quality of the aggregate plan can be improved by using information from

A) only the local firm.
B) only downstream partners.
C) only upstream partners.
D) all parts of the supply chain.
سؤال
The aggregate plan should be communicated to

A) only the local firm.
B) only downstream partners.
C) only upstream partners.
D) all supply chain partners who will be affected by it.
سؤال
Which of these software vendors offer advanced planning systems?

A) SAP
B) Solver
C) Excel
D) Google
سؤال
Discuss the information required for aggregate planning.
سؤال
The quality of the forecast can be improved by using information from

A) the focal firm.
B) downstream partners.
C) upstream partners.
D) competing supply chains.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/76
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Aggregate Planning in a Supply Chain
1
Safety inventory is defined as inventory held to satisfy demand that is higher than forecasted.
FALSE
2
Safety capacity is defined as capacity used to satisfy demand that is lower than forecasted.
FALSE
3
A planning horizon is usually between three and five years.
FALSE
4
Traditionally, much of aggregate planning is focused within an enterprise and may not always be seen as a part of supply chain management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
5
The goal of aggregate planning is to build a plan that satisfies demand while minimizing downtime.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
6
A poor aggregate plan may result in a large amount of excess inventory and capacity, thereby raising costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
7
Aggregate planning is a process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and even pricing over a specified time horizon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
8
The goal of aggregate planning is to satisfy demand in a way that minimizes profit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
9
Forecasting errors are dealt with in aggregate plans using either safety backlog or safety capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
10
As capacity utilization increases, it becomes less important to perform aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
11
As inputs into the aggregate plan change, managers do not need to make changes to the aggregate plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
12
To improve the quality of aggregate plans, forecast errors must be taken into account when formulating aggregate plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
13
Short-term production serves as a broad blueprint for operations and establishes the parameters within which aggregate planning decisions are made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
14
Linear programming finds the solution that creates the highest profit while satisfying the constraints that a company faces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
15
Most strategies that an aggregate planner actually uses are in combination, and are referred to as hybrid strategies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
16
The aggregate planner must make a trade-off between capacity, inventory, and backlog costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
17
To create an aggregate plan, a company must specify the planning horizon for the plan and the duration of each period within the planning horizon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
18
The aggregate planning problem is concerned with determining the production level, inventory level, and capacity level (internal and outsourced) for each period that maximizes the firm's profit over the planning horizon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
19
Given that forecasts are always wrong to some degree, the aggregate plan needs to have some flexibility built into it if it is to be useful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
20
Companies should work with downstream partners to produce forecasts and with upstream partners to determine constraints when doing aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
21
The fundamental trade-offs available to an aggregate planner are between

A) capability, inventory, and backlog costs.
B) capability, inventory, and sales costs.
C) capacity, inventory, and backlog costs.
D) capacity, inventory, and sales costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
22
The strategy where workforce (capacity) is kept stable but the number of hours worked is varied over time in an effort to synchronize production with demand is the

A) flexibility strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
23
Aggregate planning solves problems involving

A) aggregate decisions and stock keeping unit (SKU) level decisions.
B) aggregate decisions or stock keeping unit (SKU) level decisions.
C) aggregate decisions rather than stock keeping unit (SKU) level decisions.
D) stock keeping unit (SKU) level decisions rather than aggregate decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
24
The strategy where the production rate is synchronized with the demand rate by varying machine capacity or hiring and laying off employees as the demand rate varies is the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
25
The operational parameter concerned with the number of workers/units of capacity needed for production is

A) production rate.
B) workforce.
C) overtime.
D) backlog.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
26
The goal of aggregate planning is to

A) dissatisfy customers in a way that maximizes profit.
B) dissatisfy customers in a way that minimizes profit.
C) satisfy demand in a way that maximizes profit.
D) satisfy demand in a way that minimizes profit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
27
The planning horizon is

A) the time period over which the aggregate plan is to produce a solution.
B) the duration of each time period in the aggregate plan.
C) the length of time required to produce the aggregate plan.
D) the solution to the aggregate plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
28
An aggregate planner requires information on constraints. Which of the following is one of the typical constraints for an aggregate planner?

A) Inventory holding cost
B) Labor/machine hours required per unit
C) Stockout or backlog cost
D) Limits on overtime
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
29
The strategy where a stable machine capacity and workforce are maintained with a constant output rate, with inventory levels fluctuating over time, is the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
30
________ is used to determine customer service levels.

A) Inventory held
B) Backlog/stockout quantity
C) Workforce hired/laid off
D) Machine capacity increase/decrease
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
31
A poor aggregate plan can result in

A) appropriate inventory levels.
B) efficient use of capacity.
C) better sales and lost profits.
D) lost sales and lost profits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
32
The operational parameter concerned with the number of units completed per unit time (such as per week or per month) is

A) production rate.
B) workforce.
C) overtime.
D) backlog.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
33
Demand is forecast for the next five months as 200, 300, 500, 300, 200. The production planner decides to adopt a level strategy, so over the next five months they should produce

A) 200, 300, 500, 300, 200.
B) 500, 400, 300, 200, 100.
C) 100, 200, 300, 400, 500.
D) 300, 300, 300, 300, 300.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
34
The process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and even pricing over a specified time horizon is

A) aggregate planning.
B) detail planning.
C) inventory planning.
D) sales planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
35
The operational parameter concerned with the planned inventory carried over the various periods in the planning horizon is

A) production rate.
B) overtime.
C) backlog.
D) inventory on hand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
36
Aggregate planning, to be effective, requires inputs from

A) all customers.
B) all departments.
C) all suppliers.
D) throughout the supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
37
Aggregate planning is concerned with determining

A) the production level, sales level, and capacity for each period.
B) the demand level, inventory level, and capacity for each period.
C) the production level, inventory level, and capacity for each period.
D) the production level, staffing level, and capacity for each period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
38
Aggregate planning should consider information from

A) only the enterprise as its breadth of scope.
B) downstream partners to produce forecasts.
C) upstream partners to determine constraints.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
39
Much of aggregate planning has traditionally been focused

A) on short-term production scheduling.
B) on customer relationship management.
C) within an enterprise.
D) beyond enterprise boundaries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
40
The length of the planning horizon is usually between

A) one and three months.
B) three and eighteen months.
C) one and three years.
D) three and five years.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
41
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-What is the optimal total cost of the aggregate plan developed to address Scenario 8.2?

A) $27,200
B) $20,960
C) $31,400
D) $26,600
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
42
Forecasting errors are dealt with using

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) B and C only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
43
Inventory held to satisfy demand that is higher than forecasted is

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) safety sales.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
44
Most strategies that an aggregate planner actually uses are in combination and are referred to as the

A) adjustable strategy.
B) chase strategy.
C) level strategy.
D) mixed strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
45
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many months does the regular time output exceed plant capacity in the optimal solution to Scenario 8.2?

A) 0
B) 1
C) 2
D) 3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
46
What is the name of the plan that breaks apart the aggregate plan into distinct product families?

A) Master production schedule
B) Rough cut capacity plan
C) SKU aggregate plan
D) Process plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
47
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the objective function for this scenario.

A)  Max Output = Regular + Overtime + Subcontracting \text { Max Output } = \sum \text { Regular } + \sum \text { Overtime } + \sum \text { Subcontracting }
B) Max Profit == \sum Revenue $5- \$ 5 \sum Regular $7.5- \$ 7.5 \sum Overtime $9- \$ 9 \sum Subcontracting $2\$ 2 \sum Ending Inventory
C)  Min Cost =$5 Regular +$7.5 Overtime +$9 Subcontracting +$2 Ending Inventory \text { Min Cost } = \$ 5 \sum \text { Regular } + \$ 7.5 \sum \text { Overtime } + \$ 9 \sum \text { Subcontracting } + \$ 2 \sum \text { Ending Inventory }
D)  Min Output = Overtime + Subcontracting \text { Min Output } = \sum \text { Overtime } + \sum \text { Subcontracting }
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
48
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the number of constraints in this scenario.

A) 12
B) 15
C) 20
D) 24
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
49
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-What is the optimal total cost of the aggregate plan developed to address Scenario 8.1?

A) $16,700
B) $18,950
C) $18,450
D) $16,250
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
50
When formulating aggregate plans,

A) forecast errors have no impact.
B) forecast errors must be taken into account.
C) forecast accuracy is assumed.
D) forecast accuracy is not a factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
51
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many units are produced using overtime in the optimal aggregate plan developed to address Scenario 8.2?

A) 360
B) 200
C) 400
D) 280
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
52
Capacity used to satisfy demand that is higher than forecasted is

A) safety backlog.
B) safety capacity.
C) safety inventory.
D) safety sales.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
53
A highly effective tool for a company to use when it tries to maximize profits while being subjected to a series of constraints is

A) aggregate programming.
B) distribution programming.
C) production programming.
D) linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
54
Demand is forecast for the next five months as 200, 300, 500, 300, 200. The production planner decides to adopt a chase strategy, so over the next five months they should produce

A) 200, 300, 500, 300, 200.
B) 500, 400, 300, 200, 100.
C) 100, 200, 300, 400, 500.
D) 300, 300, 300, 300, 300.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
55
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-Without actually solving the aggregate planning problem, it is safe to conclude that in the optimal solution to Scenario 8.2.

A) the total ending inventory will exceed the number of units made using overtime.
B) the number of units made using subcontracting will exceed the number of units made using overtime.
C) the number of units made using regular time will exceed the forecast.
D) the number of units made using subcontracting will exceed the number of units made using regular time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following is an approach a company can use to create a buffer for forecast error using safety inventory?

A) Overtime
B) Carry extra workforce permanently
C) Build and carry extra inventories
D) Subcontracting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
57
Scenario 8.2 - Willow
A company faces the aggregate planning problem shown in the table below. Cost of regular production is $8 per unit, the cost of producing the same unit on overtime is $15, the cost of subcontracting is $12 per unit, and the cost of carrying a unit in inventory from one month to the next is $6.
 January  February  March  April  May  Forecast 4008001200700300 Beginning Inventory 100 Regular Time  Qvertime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 400 & 800 & 1200 & 700 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Qvertime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 400 units in any five month window. The plant capacity is 20 units per day produced using two shifts and the plant runs seven days a week. By policy, management wants to avoid stockouts.

-How many units are produced using overtime in the optimal aggregate plan developed to address Scenario 8.2?

A) 360
B) 200
C) 400
D) 280
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
58
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Use the information from Scenario 8.1 to determine the number of decision variables in this scenario.

A) 10
B) 15
C) 20
D) 24
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
59
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Which of these is a constraint that is appropriate for Scenario 8.1?

A)  Output 680\sum \text { Output } \geq 680
B)  Ending Inventory 0\sum \text { Ending Inventory } \leq 0
C)  Subcontracting + Overtime 300\sum \text { Subcontracting } + \sum \text { Overtime } \leq 300
D)  Subcontracting 300\sum \text { Subcontracting } \leq 300
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
60
Scenario 8.1-Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
 January  February  March  April  May  Forecast 5007501200650300 Beginning Inventory 100 Regular Time  Overtime  Subcontracting  Ending Inventory \begin{array}{|l|c|c|c|c|c|}\hline & \text { January } & \text { February } & \text { March } & \text { April } & \text { May } \\\hline \text { Forecast } & 500 & 750 & 1200 & 650 & 300 \\\hline \text { Beginning Inventory } & 100 & & & & \\\hline \text { Regular Time } & & & & & \\\hline \text { Overtime } & & & & & \\\hline \text { Subcontracting } & & & & & \\\hline \text { Ending Inventory } & & & & & \\\hline\end{array}
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.

-Which of these statements about Scenario 8.1 is evident without even developing an aggregate plan?

A) Some overtime will be needed.
B) Ending inventory must be negative.
C) Overtime must exceed subcontracting.
D) Subcontracting must exceed regular time output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
61
How frequently should the aggregate plan be rerun?

A) Weekly
B) Monthly
C) Every 3 to 8 months
D) As inputs to the aggregate plan change
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
62
Scenario 8.1 - Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
Scenario 8.1 - Gang Aft Agley Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.   The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts. Formulate the aggregate plan using linear programming.
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.
Formulate the aggregate plan using linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
63
What information does a master production schedule provide that an aggregate plan does not?

A) Expense information for the planning period
B) Revenue information for the planning period
C) Specific product family production information
D) A specific machine schedule for each order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
64
Discuss key issues to be considered when implementing aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
65
The aggregate plan needs to

A) be a final product because changes are disruptive to the supply chain.
B) be considered fixed because forecasts are usually accurate.
C) have some flexibility built into it because forecasts are always wrong.
D) have some flexibility built into it because forecasts are usually right.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
66
As capacity utilization increases,

A) it becomes less important to perform aggregate planning.
B) it becomes more important to perform aggregate planning.
C) it does not affect the importance of performing aggregate planning.
D) it lessens the importance of aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
67
Explain the basic strategies that an aggregate planner has available to balance the various costs and meet demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
68
Advanced planning systems for aggregate planning rely heavily on ________ to deliver their full potential.

A) forecasting
B) the supply chain
C) constraints
D) data accuracy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
69
The earliest IT supply chain products were

A) aggregate planning modules.
B) cloud-based.
C) SaaS (software as a service).
D) enterprise resource planning modules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
70
Scenario 8.1 - Gang Aft Agley
Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.
Scenario 8.1 - Gang Aft Agley Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is $9 per unit, and the cost of carrying a unit in inventory from one month to the next is $2.   The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts. Formulate the aggregate plan using linear programming and solve it using Solver.
The labor contract at the plant prohibits both overtime and subcontracting output to exceed 300 units in any five month window. The plant capacity is 600 units per month produced using two shifts, regardless of the number of days in a month. By policy, management wants to avoid stockouts.
Formulate the aggregate plan using linear programming and solve it using Solver.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
71
Discuss the primary objective and operational parameters of aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
72
The quality of the aggregate plan can be improved by using information from

A) only the local firm.
B) only downstream partners.
C) only upstream partners.
D) all parts of the supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
73
The aggregate plan should be communicated to

A) only the local firm.
B) only downstream partners.
C) only upstream partners.
D) all supply chain partners who will be affected by it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of these software vendors offer advanced planning systems?

A) SAP
B) Solver
C) Excel
D) Google
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
75
Discuss the information required for aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
76
The quality of the forecast can be improved by using information from

A) the focal firm.
B) downstream partners.
C) upstream partners.
D) competing supply chains.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 76 في هذه المجموعة.