Deck 22: Scheduling

ملء الشاشة (f)
exit full mode
سؤال
The output of the system cannot exceed the output of the bottleneck operation(s).
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Splitting a large lot after one operation beyond a bottleneck operation would reduce the overall waiting time of the bottleneck operation.
سؤال
A Gantt chart is a basic scheduling tool that is most useful in low-volume systems.
سؤال
Scheduling in intermediate-volume systems has three basic issues: run size, timing, and sequence.
سؤال
The term loading, as used in scheduling, refers to choosing the order in which jobs will be processed in low-volume systems.
سؤال
The elimination of idle time on both bottleneck and non-bottleneck operations must be accomplished to optimize output.
سؤال
Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.
سؤال
The assignment model seeks an optimum matching of tasks and resources.
سؤال
When orders exceed our capacity, priority rules are used to select which orders will be accepted.
سؤال
Line balancing is a major factor in the design and scheduling of low-volume systems because of batch processing.
سؤال
Flow-shop scheduling is used in high-volume systems.
سؤال
Infinite loading and finite loading are two major approaches used to load work centers.
سؤال
A schedule chart can be used to monitor job progress.
سؤال
Loading is the determination of which work centers should perform which jobs.
سؤال
A Gantt chart is a basic scheduling tool that works best for high-volume systems.
سؤال
When operations are often bottlenecked, additional planned idle time will improve the throughput in those areas.
سؤال
The quantity sent to a bottleneck operation could be split into two or more process batches to better utilize a bottleneck resource rather than process the entire batch.
سؤال
A schedule chart depicts the loading and idle times for a group of machines or departments.
سؤال
As long as the bottleneck operations are used effectively, idle time in non-bottleneck operations will not affect the overall productivity of the system.
سؤال
Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of output to input.
سؤال
Similar to that in manufacturing, the service scheduling hierarchy begins with __________ and ends with _________.

A) aggregate planning; detailed daily scheduling
B) aggregate planning; master scheduling
C) master scheduling; detailed material planning
D) aggregate planning; detailed material planning
E) quarterly planning; monthly planning
سؤال
To facilitate utilization of bottleneck operations, in theory of constraints scheduling ________ can be split into __________ to reduce waiting times.

A) bottleneck lots; nonbottleneck lots
B) transfer batches; process lots
C) sized lots; constrained lots
D) process batches; transfer batches
E) buffer lots; transfer lots
سؤال
In the decision-making hierarchy, scheduling decisions are the final step in the transformation process before actual output occurs.
سؤال
The theory of constraints has a goal of maximizing flow through the entire system.
سؤال
Priority rules are widely used to sequence jobs in high-volume systems.
سؤال
In theory of constraints scheduling, the synchronization of the sequence of operations is referred to as the:

A) buffer.
B) bottleneck.
C) constraint.
D) ropE.
E) drum.
سؤال
Ensuring that the constraining resource is used to its maximum is an example of constraint:

A) elevation.
B) subordination.
C) identification.
D) elimination.
E) exploitation.
سؤال
Makespan is the total time needed to complete a group of jobs.
سؤال
The SPT priority rule always results in the lowest average completion time.
سؤال
Priority rules are used in low-volume systems to identify an optimal processing sequence.
سؤال
The Hungarian method is limited to a maximum of two jobs per resource.
سؤال
In theory of constraints scheduling, the __________ refers to the schedule and the __________ refers to inventory used to ensure that the bottleneck is never idle.

A) rope; drum
B) drum; rope
C) drum; buffer
D) buffer; drum
E) buffer; rope
سؤال
Scheduling pertains to:

A) hiring workers.
B) process selection.
C) buying machinery.
D) timing the use of specific resources.
E) determining the lowest cost.
سؤال
In a single work center, makespan improvement can be accomplished by selecting the optimal sequencing rule.
سؤال
Which of the following is not usually a characteristic of successful high-volume systems?

A) smooth workflow through the system
B) customized output
C) rapid repair of breakdowns
D) minimal quality problems
E) reliable supply schedules
سؤال
Which of the following is the last step in the capacity/scheduling chain?

A) product planning
B) process planning
C) capacity planning
D) aggregate planning
E) scheduling
سؤال
Priority rules generally assume that job setup cost is independent of the processing sequence of jobs.
سؤال
Which of the following is present in the manufacturing scheduling hierarchy but is absent in the service scheduling hierarchy?

A) aggregate planning
B) materials planning
C) master scheduling
D) detailed, short-term scheduling
E) detailed, short-term planning
سؤال
Which of the following is not an example of a high-volume system?

A) aircraft manufacturing
B) magazine printing
C) petroleum refining
D) waste treatment
E) commercial donut baking
سؤال
Bottlenecks in service systems may shift with the passage of time, so that different operations become bottleneck operations at different times.
سؤال
The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method? <strong>The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method?  </strong> A) 1-B, 2-C, 3-A B) 1-B, 2-A, 3-C C) 1-A, 2-C, 3-B D) 1-A, 2-B, 3-C E) 1-C, 2-A, 3-B <div style=padding-top: 35px>

A) 1-B, 2-C, 3-A
B) 1-B, 2-A, 3-C
C) 1-A, 2-C, 3-B
D) 1-A, 2-B, 3-C
E) 1-C, 2-A, 3-B
سؤال
Primary considerations in scheduling high-volume systems involve:

A) I and III
B) I and II
C) II and III
D) I, II, and III
E) II only
سؤال
Effective scheduling cannot:

A) yield cost savings and improved productivity.
B) reduce the need for expansion of facilities.
C) improve customer service.
D) eliminate the need to train employees.
E) improve patient care in medical settings.
سؤال
Which of the following is not an assumption of priority rules?

A) The set of jobs is known: no new jobs arrive after processing begins.
B) Setup time is independent of processing sequence.
C) Finite loading is assumeD.
D) Processing times are deterministic.
E) No machine breakdowns are assumed.
سؤال
Average completion (flow) time for a schedule sequence at a work center is:

A) the sum of processing time divided by the number of jobs.
B) the sum of jobs' flow times divided by the number of jobs.
C) overall flow time divided by total processing time.
D) total processing time plus total late time divided by number of jobs.
E) the sum of flow time plus total late time divided by number of jobs.
سؤال
Scheduled due dates are the result of:

A) promises to customers.
B) MRP processing.
C) managerial decisions.
D) all of the choices.
E) our competitor's promises.
سؤال
Which sequencing rule is designed specifically to minimize job tardiness?

A) S/O
B) EDD
C) FCFS
D) SPT
E) LPT
سؤال
Organizations with fixed, perishable capacity can benefit from:

A) yield management.
B) price increases.
C) constraints.
D) suboptimization.
E) waiting lines.
سؤال
Based on the cost information given in the following table, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method? <strong>Based on the cost information given in the following table, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method?  </strong> A) 1-B, 2-A, 3-C B) 1-A, 2-B, 3-C C) 1-C, 2-A, 3-B D) 1-B, 2-C, 3-A E) 1-C, 2-B, 3-A <div style=padding-top: 35px>

A) 1-B, 2-A, 3-C
B) 1-A, 2-B, 3-C
C) 1-C, 2-A, 3-B
D) 1-B, 2-C, 3-A
E) 1-C, 2-B, 3-A
سؤال
The two different approaches to load work centers in job-shop scheduling are:

A) load charts and schedule charts.
B) Gantt charts and assignment method.
C) infinite loading and finite loading.
D) linear programming and makespan.
E) infinite charting and finite charting.
سؤال
The scheduling sequencing rule which always results in the lowest average completion (flow) time is the:

A) first come, first served (FCFS) rule.
B) shortest processing time first (SPT) rulE.
C) earliest due date first (EDD) rule.
D) least slack per operation first (S/O) rule.
E) run until slack happens (RUSH) rule.
سؤال
A scheduling rule used for sequencing jobs through two work centers such that makespan is minimized is:

A) critical ratio rule.
B) Johnson's rulE.
C) slack per operation rule.
D) shortest processing time rule.
E) Pareto rule.
سؤال
A scheduling technique used to achieve an optimum matching of tasks and resources is:

A) the assignment methoD.
B) Johnson's rule.
C) the optimum production technology method.
D) the appointment method.
E) the reservation method.
سؤال
Which of the following is not a measure for judging the effectiveness of a schedule sequence?

A) average number of jobs at the work center
B) total number of jobs at the work center
C) average completion (flow) time
D) average job tardiness
E) length of time between start of first job to completion of the last job in the work center
سؤال
The priority rule where jobs are processed according to the smallest ratio of time remaining to due date to processing time is:

A) CR.
B) EEDD.
C) FCFS.
D) S/O.
E) SPT.
سؤال
The priority rule which will sequence jobs in the order they are received is:

A) EDD.
B) LIFO.
C) SPT.
D) CR.
E) FCFS.
سؤال
The EDD priority rule usually does well with regard to:

A) cost.
B) lateness.
C) overtime.
D) waste.
E) makespan.
سؤال
A work center can be a:
(I) machine.
(II) group of machines.
(III) department.
IV) a part used to produce a product.

A) I, II, and III only
B) II and IV only
C) II and III only
D) I and III only
E) I, II, III, and IV
سؤال
The purpose of cyclical scheduling is to:

A) eliminate weekends and holidays.
B) establish work assignments that will repeat on a cyclical basis.
C) add flexible hours.
D) incorporate overtime.
E) rotate schedules across a service workforce to ensure everyone gets an equal number of weekends off per year.
سؤال
In a task assignment situation, in how many different ways can five jobs be assigned to five machines if each job must be assigned to each machine and each machine must be assigned one job?

A) 1
B) 5
C) 25
D) 120
E) 3,125
سؤال
One disadvantage of appointment systems is:

A) Capacity can be adjusted by varying hours.
B) The customer's desired time may be already taken.
C) People generally accept it as fair.
D) It can reduce customer waiting time.
E) Appointments do not have to be all the same length.
سؤال
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row reduction, what is the resulting entry in the new table for assigning resource 4 to Job D?</strong> A) 0 hours B) 2 hours C) 3 hours D) 6 hours E) 9 hours <div style=padding-top: 35px>
After the row reduction, what is the resulting entry in the new table for assigning resource 4 to Job D?

A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours
سؤال
The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:   If he uses the earliest due date first priority rule to schedule these jobs, what will be the average job tardiness?</strong> A) 0 hours B) 1.5 hours C) 1.75 hours D) 2 hours E) 2.25 hours <div style=padding-top: 35px>
If he uses the earliest due date first priority rule to schedule these jobs, what will be the average job tardiness?

A) 0 hours
B) 1.5 hours
C) 1.75 hours
D) 2 hours
E) 2.25 hours
سؤال
What is the optimum job sequence for the jobs listed below using Johnson's rule? <strong>What is the optimum job sequence for the jobs listed below using Johnson's rule?  </strong> A) e-g-f-d B) d-g-f-e C) d-f-g-e D) e-d-f-g E) f-e-d-g <div style=padding-top: 35px>

A) e-g-f-d
B) d-g-f-e
C) d-f-g-e
D) e-d-f-g
E) f-e-d-g
سؤال
Scheduling in service systems often takes the form of:
(I) appointment systems.
(II) reservation systems.
(III) makespan systems.

A) I only
B) II only
C) I and II only
D) III only
E) I, II, and III
سؤال
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. In how many different ways can she assign these consultants to these projects?</strong> A) 4 B) 8 C) 16 D) 24 E) 256 <div style=padding-top: 35px>
Assume there must be one-to-one matching between consultants and projects. In how many different ways can she assign these consultants to these projects?

A) 4
B) 8
C) 16
D) 24
E) 256
سؤال
In an assignment model where there are fewer jobs than resources:

A) dummy jobs are needed to solve the problem.
B) dummy resources are needed to solve the problem.
C) the problem cannot be solved using an assignment model.
D) the problem will have multiple optimum solutions.
E) the simplex method must be used to solve the problem.
سؤال
The following table contains information about five jobs waiting to be processed at work center number three. <strong>The following table contains information about five jobs waiting to be processed at work center number three.   The sequence that would result using the SPT rule is:</strong> A) e-b-c-d-a. B) c-a-b-e-d. C) a-d-c-e-b. D) d-e-b-a-C. E) e-d-b-a-c. <div style=padding-top: 35px>
The sequence that would result using the SPT rule is:

A) e-b-c-d-a.
B) c-a-b-e-d.
C) a-d-c-e-b.
D) d-e-b-a-C.
E) e-d-b-a-c.
سؤال
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   For the optimal schedule, what is the total number of hours required to complete these jobs?</strong> A) 23 hours B) 22 hours C) 21 hours D) 20 hours E) 19 hours <div style=padding-top: 35px>
For the optimal schedule, what is the total number of hours required to complete these jobs?

A) 23 hours
B) 22 hours
C) 21 hours
D) 20 hours
E) 19 hours
سؤال
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. After the row and column reductions, what is the resulting entry in the new table for assigning Rick to project D?</strong> A) 0 hours B) 8 hours C) 10 hours D) 9 hours E) 22 hours <div style=padding-top: 35px>
Assume there must be one-to-one matching between consultants and projects. After the row and column reductions, what is the resulting entry in the new table for assigning Rick to project D?

A) 0 hours
B) 8 hours
C) 10 hours
D) 9 hours
E) 22 hours
سؤال
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row and column reductions, what is the resulting entry in the new table for assigning resource 4 to job D?</strong> A) 0 hours B) 2 hours C) 3 hours D) 6 hours E) 9 hours <div style=padding-top: 35px>
After the row and column reductions, what is the resulting entry in the new table for assigning resource 4 to job D?

A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours
سؤال
A major difference between manufacturing and service systems in terms of scheduling is:

A) variability in arrival and service rates.
B) processing cost per unit.
C) the number of units to be processed.
D) length of processing time.
E) output rate.
سؤال
For the jobs listed below, which processing sequence would result using Johnson's rule? <strong>For the jobs listed below, which processing sequence would result using Johnson's rule?  </strong> A) c-a-d-b B) b-d-a-c C) a-b-c-d D) d-c-b-a E) c-a-b-d <div style=padding-top: 35px>

A) c-a-d-b
B) b-d-a-c
C) a-b-c-d
D) d-c-b-a
E) c-a-b-d
سؤال
The following table contains information about five jobs waiting to be processed at work center number three. <strong>The following table contains information about five jobs waiting to be processed at work center number three.   Using the EDD rule, the sequence of jobs would be:</strong> A) d-e-b-a-c. B) a-d-c-b-E. C) e-d-b-a-c. D) a-d-c-e-d. E) e-b-c-d-a. <div style=padding-top: 35px>
Using the EDD rule, the sequence of jobs would be:

A) d-e-b-a-c.
B) a-d-c-b-E.
C) e-d-b-a-c.
D) a-d-c-e-d.
E) e-b-c-d-a.
سؤال
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects?</strong> A) Charlie to A; Betty to B; Johnny to C; Rick to D B) Charlie to D; Betty to C; Johnny to B; Rick to A C) Charlie to C; Betty to A; Johnny to D; Rick to B D) Charlie to D; Betty to B; Johnny to C; Rick to A E) Charlie to D; Betty to A; Johnny to C; Rick to B <div style=padding-top: 35px>
Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects?

A) Charlie to A; Betty to B; Johnny to C; Rick to D
B) Charlie to D; Betty to C; Johnny to B; Rick to A
C) Charlie to C; Betty to A; Johnny to D; Rick to B
D) Charlie to D; Betty to B; Johnny to C; Rick to A
E) Charlie to D; Betty to A; Johnny to C; Rick to B
سؤال
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes?</strong> A) 0 lines B) 1 line C) 2 lines D) 3 lines E) 4 lines <div style=padding-top: 35px>
After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes?

A) 0 lines
B) 1 line
C) 2 lines
D) 3 lines
E) 4 lines
سؤال
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   What is the optimal assignment of resources to jobs?</strong> A) 1 to A; 2 to C; 3 to B; 4 to D B) 1 to B; 2 to D; 3 to C; 4 to A C) 1 to C; 2 to B; 3 to A; 4 to D D) 1 to D; 2 to B; 3 to C; 4 to A E) 1 to A; 2 to C; 3 to D; 4 to B <div style=padding-top: 35px>
What is the optimal assignment of resources to jobs?

A) 1 to A; 2 to C; 3 to B; 4 to D
B) 1 to B; 2 to D; 3 to C; 4 to A
C) 1 to C; 2 to B; 3 to A; 4 to D
D) 1 to D; 2 to B; 3 to C; 4 to A
E) 1 to A; 2 to C; 3 to D; 4 to B
سؤال
The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:   If he uses the first come, first served priority rule to schedule these jobs, what will be the average completion time?</strong> A) 7.5 hours B) 5 hours C) 3 hours D) 2.5 hours E) 2 hours <div style=padding-top: 35px>
If he uses the first come, first served priority rule to schedule these jobs, what will be the average completion time?

A) 7.5 hours
B) 5 hours
C) 3 hours
D) 2.5 hours
E) 2 hours
سؤال
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. For the optimal schedule, what is the total number of hours it will take these consultants to complete these projects?</strong> A) 53 hours B) 46 hours C) 50 hours D) 61 hours E) 54 hours <div style=padding-top: 35px>
Assume there must be one-to-one matching between consultants and projects. For the optimal schedule, what is the total number of hours it will take these consultants to complete these projects?

A) 53 hours
B) 46 hours
C) 50 hours
D) 61 hours
E) 54 hours
سؤال
Scheduling in service systems may involve scheduling:
(I) the workforce.
(II) the equipment.
(III) customers.

A) II only
B) I and II only
C) II and III only
D) I and III only
E) I, II, and III
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/98
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 22: Scheduling
1
The output of the system cannot exceed the output of the bottleneck operation(s).
True
2
Splitting a large lot after one operation beyond a bottleneck operation would reduce the overall waiting time of the bottleneck operation.
False
3
A Gantt chart is a basic scheduling tool that is most useful in low-volume systems.
True
4
Scheduling in intermediate-volume systems has three basic issues: run size, timing, and sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
5
The term loading, as used in scheduling, refers to choosing the order in which jobs will be processed in low-volume systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
6
The elimination of idle time on both bottleneck and non-bottleneck operations must be accomplished to optimize output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
7
Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
8
The assignment model seeks an optimum matching of tasks and resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
9
When orders exceed our capacity, priority rules are used to select which orders will be accepted.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
10
Line balancing is a major factor in the design and scheduling of low-volume systems because of batch processing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
11
Flow-shop scheduling is used in high-volume systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
12
Infinite loading and finite loading are two major approaches used to load work centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
13
A schedule chart can be used to monitor job progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
14
Loading is the determination of which work centers should perform which jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
15
A Gantt chart is a basic scheduling tool that works best for high-volume systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
16
When operations are often bottlenecked, additional planned idle time will improve the throughput in those areas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
17
The quantity sent to a bottleneck operation could be split into two or more process batches to better utilize a bottleneck resource rather than process the entire batch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
18
A schedule chart depicts the loading and idle times for a group of machines or departments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
19
As long as the bottleneck operations are used effectively, idle time in non-bottleneck operations will not affect the overall productivity of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
20
Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of output to input.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
21
Similar to that in manufacturing, the service scheduling hierarchy begins with __________ and ends with _________.

A) aggregate planning; detailed daily scheduling
B) aggregate planning; master scheduling
C) master scheduling; detailed material planning
D) aggregate planning; detailed material planning
E) quarterly planning; monthly planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
22
To facilitate utilization of bottleneck operations, in theory of constraints scheduling ________ can be split into __________ to reduce waiting times.

A) bottleneck lots; nonbottleneck lots
B) transfer batches; process lots
C) sized lots; constrained lots
D) process batches; transfer batches
E) buffer lots; transfer lots
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the decision-making hierarchy, scheduling decisions are the final step in the transformation process before actual output occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
24
The theory of constraints has a goal of maximizing flow through the entire system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
25
Priority rules are widely used to sequence jobs in high-volume systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
26
In theory of constraints scheduling, the synchronization of the sequence of operations is referred to as the:

A) buffer.
B) bottleneck.
C) constraint.
D) ropE.
E) drum.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
27
Ensuring that the constraining resource is used to its maximum is an example of constraint:

A) elevation.
B) subordination.
C) identification.
D) elimination.
E) exploitation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
28
Makespan is the total time needed to complete a group of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
29
The SPT priority rule always results in the lowest average completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
30
Priority rules are used in low-volume systems to identify an optimal processing sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
31
The Hungarian method is limited to a maximum of two jobs per resource.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
32
In theory of constraints scheduling, the __________ refers to the schedule and the __________ refers to inventory used to ensure that the bottleneck is never idle.

A) rope; drum
B) drum; rope
C) drum; buffer
D) buffer; drum
E) buffer; rope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
33
Scheduling pertains to:

A) hiring workers.
B) process selection.
C) buying machinery.
D) timing the use of specific resources.
E) determining the lowest cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
34
In a single work center, makespan improvement can be accomplished by selecting the optimal sequencing rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is not usually a characteristic of successful high-volume systems?

A) smooth workflow through the system
B) customized output
C) rapid repair of breakdowns
D) minimal quality problems
E) reliable supply schedules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is the last step in the capacity/scheduling chain?

A) product planning
B) process planning
C) capacity planning
D) aggregate planning
E) scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
37
Priority rules generally assume that job setup cost is independent of the processing sequence of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is present in the manufacturing scheduling hierarchy but is absent in the service scheduling hierarchy?

A) aggregate planning
B) materials planning
C) master scheduling
D) detailed, short-term scheduling
E) detailed, short-term planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following is not an example of a high-volume system?

A) aircraft manufacturing
B) magazine printing
C) petroleum refining
D) waste treatment
E) commercial donut baking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
40
Bottlenecks in service systems may shift with the passage of time, so that different operations become bottleneck operations at different times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
41
The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method? <strong>The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method?  </strong> A) 1-B, 2-C, 3-A B) 1-B, 2-A, 3-C C) 1-A, 2-C, 3-B D) 1-A, 2-B, 3-C E) 1-C, 2-A, 3-B

A) 1-B, 2-C, 3-A
B) 1-B, 2-A, 3-C
C) 1-A, 2-C, 3-B
D) 1-A, 2-B, 3-C
E) 1-C, 2-A, 3-B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
42
Primary considerations in scheduling high-volume systems involve:

A) I and III
B) I and II
C) II and III
D) I, II, and III
E) II only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
43
Effective scheduling cannot:

A) yield cost savings and improved productivity.
B) reduce the need for expansion of facilities.
C) improve customer service.
D) eliminate the need to train employees.
E) improve patient care in medical settings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is not an assumption of priority rules?

A) The set of jobs is known: no new jobs arrive after processing begins.
B) Setup time is independent of processing sequence.
C) Finite loading is assumeD.
D) Processing times are deterministic.
E) No machine breakdowns are assumed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
45
Average completion (flow) time for a schedule sequence at a work center is:

A) the sum of processing time divided by the number of jobs.
B) the sum of jobs' flow times divided by the number of jobs.
C) overall flow time divided by total processing time.
D) total processing time plus total late time divided by number of jobs.
E) the sum of flow time plus total late time divided by number of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
46
Scheduled due dates are the result of:

A) promises to customers.
B) MRP processing.
C) managerial decisions.
D) all of the choices.
E) our competitor's promises.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which sequencing rule is designed specifically to minimize job tardiness?

A) S/O
B) EDD
C) FCFS
D) SPT
E) LPT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
48
Organizations with fixed, perishable capacity can benefit from:

A) yield management.
B) price increases.
C) constraints.
D) suboptimization.
E) waiting lines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
49
Based on the cost information given in the following table, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method? <strong>Based on the cost information given in the following table, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method?  </strong> A) 1-B, 2-A, 3-C B) 1-A, 2-B, 3-C C) 1-C, 2-A, 3-B D) 1-B, 2-C, 3-A E) 1-C, 2-B, 3-A

A) 1-B, 2-A, 3-C
B) 1-A, 2-B, 3-C
C) 1-C, 2-A, 3-B
D) 1-B, 2-C, 3-A
E) 1-C, 2-B, 3-A
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
50
The two different approaches to load work centers in job-shop scheduling are:

A) load charts and schedule charts.
B) Gantt charts and assignment method.
C) infinite loading and finite loading.
D) linear programming and makespan.
E) infinite charting and finite charting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
51
The scheduling sequencing rule which always results in the lowest average completion (flow) time is the:

A) first come, first served (FCFS) rule.
B) shortest processing time first (SPT) rulE.
C) earliest due date first (EDD) rule.
D) least slack per operation first (S/O) rule.
E) run until slack happens (RUSH) rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
52
A scheduling rule used for sequencing jobs through two work centers such that makespan is minimized is:

A) critical ratio rule.
B) Johnson's rulE.
C) slack per operation rule.
D) shortest processing time rule.
E) Pareto rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
53
A scheduling technique used to achieve an optimum matching of tasks and resources is:

A) the assignment methoD.
B) Johnson's rule.
C) the optimum production technology method.
D) the appointment method.
E) the reservation method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is not a measure for judging the effectiveness of a schedule sequence?

A) average number of jobs at the work center
B) total number of jobs at the work center
C) average completion (flow) time
D) average job tardiness
E) length of time between start of first job to completion of the last job in the work center
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
55
The priority rule where jobs are processed according to the smallest ratio of time remaining to due date to processing time is:

A) CR.
B) EEDD.
C) FCFS.
D) S/O.
E) SPT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
56
The priority rule which will sequence jobs in the order they are received is:

A) EDD.
B) LIFO.
C) SPT.
D) CR.
E) FCFS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
57
The EDD priority rule usually does well with regard to:

A) cost.
B) lateness.
C) overtime.
D) waste.
E) makespan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
58
A work center can be a:
(I) machine.
(II) group of machines.
(III) department.
IV) a part used to produce a product.

A) I, II, and III only
B) II and IV only
C) II and III only
D) I and III only
E) I, II, III, and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
59
The purpose of cyclical scheduling is to:

A) eliminate weekends and holidays.
B) establish work assignments that will repeat on a cyclical basis.
C) add flexible hours.
D) incorporate overtime.
E) rotate schedules across a service workforce to ensure everyone gets an equal number of weekends off per year.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
60
In a task assignment situation, in how many different ways can five jobs be assigned to five machines if each job must be assigned to each machine and each machine must be assigned one job?

A) 1
B) 5
C) 25
D) 120
E) 3,125
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
61
One disadvantage of appointment systems is:

A) Capacity can be adjusted by varying hours.
B) The customer's desired time may be already taken.
C) People generally accept it as fair.
D) It can reduce customer waiting time.
E) Appointments do not have to be all the same length.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
62
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row reduction, what is the resulting entry in the new table for assigning resource 4 to Job D?</strong> A) 0 hours B) 2 hours C) 3 hours D) 6 hours E) 9 hours
After the row reduction, what is the resulting entry in the new table for assigning resource 4 to Job D?

A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
63
The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:   If he uses the earliest due date first priority rule to schedule these jobs, what will be the average job tardiness?</strong> A) 0 hours B) 1.5 hours C) 1.75 hours D) 2 hours E) 2.25 hours
If he uses the earliest due date first priority rule to schedule these jobs, what will be the average job tardiness?

A) 0 hours
B) 1.5 hours
C) 1.75 hours
D) 2 hours
E) 2.25 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
64
What is the optimum job sequence for the jobs listed below using Johnson's rule? <strong>What is the optimum job sequence for the jobs listed below using Johnson's rule?  </strong> A) e-g-f-d B) d-g-f-e C) d-f-g-e D) e-d-f-g E) f-e-d-g

A) e-g-f-d
B) d-g-f-e
C) d-f-g-e
D) e-d-f-g
E) f-e-d-g
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
65
Scheduling in service systems often takes the form of:
(I) appointment systems.
(II) reservation systems.
(III) makespan systems.

A) I only
B) II only
C) I and II only
D) III only
E) I, II, and III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
66
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. In how many different ways can she assign these consultants to these projects?</strong> A) 4 B) 8 C) 16 D) 24 E) 256
Assume there must be one-to-one matching between consultants and projects. In how many different ways can she assign these consultants to these projects?

A) 4
B) 8
C) 16
D) 24
E) 256
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
67
In an assignment model where there are fewer jobs than resources:

A) dummy jobs are needed to solve the problem.
B) dummy resources are needed to solve the problem.
C) the problem cannot be solved using an assignment model.
D) the problem will have multiple optimum solutions.
E) the simplex method must be used to solve the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
68
The following table contains information about five jobs waiting to be processed at work center number three. <strong>The following table contains information about five jobs waiting to be processed at work center number three.   The sequence that would result using the SPT rule is:</strong> A) e-b-c-d-a. B) c-a-b-e-d. C) a-d-c-e-b. D) d-e-b-a-C. E) e-d-b-a-c.
The sequence that would result using the SPT rule is:

A) e-b-c-d-a.
B) c-a-b-e-d.
C) a-d-c-e-b.
D) d-e-b-a-C.
E) e-d-b-a-c.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
69
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   For the optimal schedule, what is the total number of hours required to complete these jobs?</strong> A) 23 hours B) 22 hours C) 21 hours D) 20 hours E) 19 hours
For the optimal schedule, what is the total number of hours required to complete these jobs?

A) 23 hours
B) 22 hours
C) 21 hours
D) 20 hours
E) 19 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
70
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. After the row and column reductions, what is the resulting entry in the new table for assigning Rick to project D?</strong> A) 0 hours B) 8 hours C) 10 hours D) 9 hours E) 22 hours
Assume there must be one-to-one matching between consultants and projects. After the row and column reductions, what is the resulting entry in the new table for assigning Rick to project D?

A) 0 hours
B) 8 hours
C) 10 hours
D) 9 hours
E) 22 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
71
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row and column reductions, what is the resulting entry in the new table for assigning resource 4 to job D?</strong> A) 0 hours B) 2 hours C) 3 hours D) 6 hours E) 9 hours
After the row and column reductions, what is the resulting entry in the new table for assigning resource 4 to job D?

A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
72
A major difference between manufacturing and service systems in terms of scheduling is:

A) variability in arrival and service rates.
B) processing cost per unit.
C) the number of units to be processed.
D) length of processing time.
E) output rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
73
For the jobs listed below, which processing sequence would result using Johnson's rule? <strong>For the jobs listed below, which processing sequence would result using Johnson's rule?  </strong> A) c-a-d-b B) b-d-a-c C) a-b-c-d D) d-c-b-a E) c-a-b-d

A) c-a-d-b
B) b-d-a-c
C) a-b-c-d
D) d-c-b-a
E) c-a-b-d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
74
The following table contains information about five jobs waiting to be processed at work center number three. <strong>The following table contains information about five jobs waiting to be processed at work center number three.   Using the EDD rule, the sequence of jobs would be:</strong> A) d-e-b-a-c. B) a-d-c-b-E. C) e-d-b-a-c. D) a-d-c-e-d. E) e-b-c-d-a.
Using the EDD rule, the sequence of jobs would be:

A) d-e-b-a-c.
B) a-d-c-b-E.
C) e-d-b-a-c.
D) a-d-c-e-d.
E) e-b-c-d-a.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
75
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects?</strong> A) Charlie to A; Betty to B; Johnny to C; Rick to D B) Charlie to D; Betty to C; Johnny to B; Rick to A C) Charlie to C; Betty to A; Johnny to D; Rick to B D) Charlie to D; Betty to B; Johnny to C; Rick to A E) Charlie to D; Betty to A; Johnny to C; Rick to B
Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects?

A) Charlie to A; Betty to B; Johnny to C; Rick to D
B) Charlie to D; Betty to C; Johnny to B; Rick to A
C) Charlie to C; Betty to A; Johnny to D; Rick to B
D) Charlie to D; Betty to B; Johnny to C; Rick to A
E) Charlie to D; Betty to A; Johnny to C; Rick to B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
76
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes?</strong> A) 0 lines B) 1 line C) 2 lines D) 3 lines E) 4 lines
After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes?

A) 0 lines
B) 1 line
C) 2 lines
D) 3 lines
E) 4 lines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
77
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: <strong>There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   What is the optimal assignment of resources to jobs?</strong> A) 1 to A; 2 to C; 3 to B; 4 to D B) 1 to B; 2 to D; 3 to C; 4 to A C) 1 to C; 2 to B; 3 to A; 4 to D D) 1 to D; 2 to B; 3 to C; 4 to A E) 1 to A; 2 to C; 3 to D; 4 to B
What is the optimal assignment of resources to jobs?

A) 1 to A; 2 to C; 3 to B; 4 to D
B) 1 to B; 2 to D; 3 to C; 4 to A
C) 1 to C; 2 to B; 3 to A; 4 to D
D) 1 to D; 2 to B; 3 to C; 4 to A
E) 1 to A; 2 to C; 3 to D; 4 to B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
78
The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: <strong>The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:   If he uses the first come, first served priority rule to schedule these jobs, what will be the average completion time?</strong> A) 7.5 hours B) 5 hours C) 3 hours D) 2.5 hours E) 2 hours
If he uses the first come, first served priority rule to schedule these jobs, what will be the average completion time?

A) 7.5 hours
B) 5 hours
C) 3 hours
D) 2.5 hours
E) 2 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
79
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: <strong>The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. For the optimal schedule, what is the total number of hours it will take these consultants to complete these projects?</strong> A) 53 hours B) 46 hours C) 50 hours D) 61 hours E) 54 hours
Assume there must be one-to-one matching between consultants and projects. For the optimal schedule, what is the total number of hours it will take these consultants to complete these projects?

A) 53 hours
B) 46 hours
C) 50 hours
D) 61 hours
E) 54 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
80
Scheduling in service systems may involve scheduling:
(I) the workforce.
(II) the equipment.
(III) customers.

A) II only
B) I and II only
C) II and III only
D) I and III only
E) I, II, and III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.