Deck 23: Project Management

ملء الشاشة (f)
exit full mode
سؤال
Although PERT and CPM were originally developed independently, they are now nearly identical in terms of analysis and procedures.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Good project management is very important with virtual teams.
سؤال
Matrix organizations transfer control of workers to project managers for the duration of the project.
سؤال
The latest starting time for an activity is equal to the latest finish time minus the activity time.
سؤال
A hierarchical listing of what must be done during a project is called matrix.
سؤال
The higher the node number, the longer the activity will take.
سؤال
A Gantt chart is a popular visual tool for displaying the established precedence relationships.
سؤال
Once a project is approved and underway, project managers are only responsible for effectively managing time and costs which, if done well, will assure project completion on time and on budget.
سؤال
The project computing algorithm requires both a forward and a backward pass.
سؤال
An advantage of Gantt charts in project management is that they identify which activities can be delayed without delaying the overall project.
سؤال
The main function of dummy activities is to clarify relationships in network diagrams.
سؤال
One way that project management differs from management of more traditional activities is because of the limited time framework of projects.
سؤال
Path probabilities are calculated by dividing path mean by path standard deviations.
سؤال
Some organizations use a matrix organization to integrate the activities of specialists within a functional framework.
سؤال
The earliest finish time for an activity is equal to the latest finish time minus the activity time.
سؤال
The sum of times of the longest path in a network indicates expected project duration, and the activities represent the critical activities.
سؤال
The probability of occurrence of risk events is lower near the beginning of a project and higher near the end of the project since very few activities remain.
سؤال
The path in a network with the average length of time to completion is called the critical path.
سؤال
The costs associated with risk events tend to be lower near the beginning of a project and higher near the end of the project.
سؤال
The network diagram shows sequential relationships among major activities on a project.
سؤال
The task of identifying risks should involve everyone associated with the project.
سؤال
A disadvantage of activity-on-node diagrams is the occasional need for dummy activities.
سؤال
Which of the following is not one of the six key decisions in project management?
(I) Selecting the project team
(II) Deciding on the project manager's title
(III) Managing and controlling project resources
(IV) Deciding which projects to implement
(V) Selecting the project manager

A) I
B) II
C) III
D) IV
E) V
سؤال
The total cost of crashing any one activity should never exceed 20 percent of the total cost of the original project.
سؤال
One upside to terminating a project that is not going as well as planned is that:

A) poorly performing project team members will be kept from causing trouble elsewhere.
B) no additional costs will be incurred.
C) poor project managers will be weeded out.
D) resources can perhaps be put to better use elsewherE.
E) project completion will be hastened.
سؤال
Activities not on the critical path have a slack time equal to zero.
سؤال
If the expected length of a path is more than 2.5 standard deviations less than a desired project completion time, the path will not be a factor in assessing the probability of finishing the project on time.
سؤال
Slack time is equal to LS-ES or LF-EF.
سؤال
Most likely time generally is at least as long as optimistic time.
سؤال
Project management software eliminates constraint violations when there are shared resources.
سؤال
Deterministic networks use three time estimates-shortest, most likely, and longest-for each activity in order to best determine the activity's estimated time.
سؤال
If two consecutive activities on the same path each have two days of activity slack, this means that each of them can be delayed by two days without delaying the project.
سؤال
The standard deviation of the critical path is equal to the sum of the standard deviations of all of the activities on the critical path.
سؤال
Which of the following stages is that one in which the project's expected costs, benefits, and risks are assessed?

A) executing
B) monitoring/controlling
C) assessment
D) planning
E) initiating
سؤال
The earliest finish time for an activity is equal to the latest finish time minus the activity slack.
سؤال
The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.
سؤال
In the execution phase of a project's life cycle, activities are guided by decisions that were made in the __________ phase.

A) initiating
B) planning
C) monitoring/controlling
D) closing
E) assessment
سؤال
In order to determine the probability of timely project completion, it is sometimes necessary to take into account paths other than the critical path.
سؤال
If two consecutive activities have shared slack, this means that each of them can use only half of the slack without delaying completion of the project.
سؤال
Many activities have slack time; if we add these slack times together, this represents the potential improvement in early completion for the project.
سؤال
Which of the following would probably not involve the use of PERT?

A) planning and constructing a new city hall
B) developing an advertising campaign for a new product
C) designing and constructing a subway system
D) writing a poem
E) preparing for the visit of a foreign dignitary
سؤال
Project management differs from management of more traditional activities mainly because of:
(I) its limited time frame.
(II) its unique, defined set of activities.
(III) the requirement for use of the appropriate resources.
(IV) the need for planning and execution.

A) I
B) II
C) I and II
D) I and III
E) I, II, and IV
سؤال
Consider the portion of a project depicted by this graph: <strong>Consider the portion of a project depicted by this graph:   What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13?</strong> A) 22 B) 23 C) 24 D) 25 E) 26 <div style=padding-top: 35px>
What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13?

A) 22
B) 23
C) 24
D) 25
E) 26
سؤال
The advantage a precedence diagram has over a Gantt chart is:

A) its ability to reveal relationships among activities.
B) its difficulty in depicting networks.
C) its complexity.
D) its simplicity.
E) its lack of riskiness.
سؤال
Concerning PERT and CPM:

A) These are two different names for essentially the same techniquE.
B) CPM tends to focus more on the critical path; PERT focuses on the parallel paths.
C) PERT gives a clearer indication of activity slack, while CPM gives a better picture of path slack.
D) Because of its recent discovery, much less is known about CPM than PERT.
E) CPM is useful for project manager selection; PERT is useful for project team selection.
سؤال
To _____ an activity means to shorten the time it will take.

A) smash
B) fund
C) crash
D) aggregate
E) matrix
سؤال
Which of the following is not true about the use of dummy activities in project networking?

A) They preserve the separate identities of activities.
B) They clarify precedence relationships among activities.
C) They have an activity time equal to zero.
D) They have an activity time variance equal to zero.
E) They are used in activities-on-nodes (AON) network diagrams.
سؤال
A hierarchical listing of what must be done in a project is called a:

A) work breakdown structure (WBS).
B) PERT.
C) planning matrix.
D) crashing plan.
E) critical path.
سؤال
A sequence of activities that leads from the starting node to the finishing node is called a:

A) path.
B) sequel.
C) trail.
D) critical sequence.
E) time line.
سؤال
Shortening activity durations is called:

A) expediting.
B) crashing.
C) vendor management.
D) null nodes.
E) trade-off analysis.
سؤال
Which of the following is not typically treated as part of a project life cycle?

A) feasibility assessment
B) planning
C) maturity
D) release resources
E) project staffing
سؤال
Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence): <strong>Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence):   Given these, Event _____ should probably get the most attention and Event _____ should probably get the least.</strong> A) II; IV B) III; IV C) I; III D) I; II E) II; III <div style=padding-top: 35px>
Given these, Event _____ should probably get the most attention and Event _____ should probably get the least.

A) II; IV
B) III; IV
C) I; III
D) I; II
E) II; III
سؤال
Once a project is underway, the project manager usually is not responsible for effectively managing:

A) the people.
B) costs.
C) resources.
D) time.
E) project priority.
سؤال
A popular visual tool for planning and scheduling simple projects, and for monitoring progress, is the:

A) activity-on-arrows network.
B) activity-on-nodes network.
C) Gantt chart.
D) critical path method.
E) program evaluation and review technique.
سؤال
Which of the following is determined as a direct result of computing the earliest starting and finishing times for the activities of a project network?

A) expected project duration
B) activity slack time
C) which activities are on the critical path
D) variance in project duration
E) maximum project duration
سؤال
A method used for establishing a logical framework for identifying the required activities for the project is called:

A) work breakdown structurE.
B) PERT.
C) planning matrix.
D) crashing.
E) critical path analysis.
سؤال
Activity 7-8 is directly preceded by two activities-activity 5-7 and activity 6-7. Activity 5-7 has an expected time of five and an ES time of six. Activity 6-7 has an expected time of seven and an ES time of seven. Activity 7-8 has an expected time of 10. The ES for activity 7-8 is:

A) 11.
B) 14.
C) 21.
D) 24.
E) 25.
سؤال
In a project network, the critical path is the sequence of activities which has the:

A) most activities.
B) most nodes.
C) most events.
D) longest duration.
E) greatest variance.
سؤال
Which of the following is not a form of risk reduction in project management?

A) backup system
B) outsourcing
C) risk sharing
D) scenario analysis
E) frequent monitoring of critical project dimensions in order to catch and eliminate problems early
سؤال
Project risk events tend to be unlikely __________ a project, but that's also when they tend to be the __________.

A) early in; most costly
B) late in; least costly
C) late in; most costly
D) before the beginning of; most complex
E) at the conclusion of; least complex
سؤال
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2 days. The standard deviation of the critical path is:

A) 3.
B) 5.
C) 9.
D) 16.
E) 25.
سؤال
When developing probabilistic estimates of project duration, it is necessary to know which of the following?

A) the mean and variance of every activity
B) the mean and variance of activities on the critical path
C) the standard deviation of activities on the critical path
D) each activity's probability of completion
E) the distribution of activity times
سؤال
A project is represented by the following diagram: <strong>A project is represented by the following diagram:   The expected duration of this project is:</strong> A) 12. B) 17. C) 20. D) 36. E) 77. <div style=padding-top: 35px>
The expected duration of this project is:

A) 12.
B) 17.
C) 20.
D) 36.
E) 77.
سؤال
In "crashing" a project, a manager will generally focus on activities which:

A) are not on the critical path.
B) are the least costly to crash.
C) are costly to crash and are on the critical path.
D) are on the critical path and are the least costly to crash.
E) are the easiest to crash.
سؤال
The project management strategy of injecting additional resources in order to reduce the length of the project is called:

A) expediting.
B) rushing.
C) panicking.
D) crashing.
E) loading.
سؤال
Activity C has an early start time of 8, an early finish time of 12, a latest start time of 13, and a latest finish time of 17. Its slack is:

A) 0.
B) 1.
C) 4.
D) 5.
E) 9.
سؤال
Which of the following are limitations of PERT and CPM?
(I) Time estimates may include a fudge factor.
(II) Important activities may be overlooked.
(III) It is an after-the-fact analysis.

A) I and II
B) I, II, and III
C) I and III
D) II and III
E) I only
سؤال
At which point does crashing of a project cease?

A) when the project is completed
B) when no additional crashing is possible
C) when the cost to crash equals or exceeds the benefit of crashing
D) when the project is one-half completed
E) when the team has been disbanded
سؤال
A node has one entering activity, a, and two leaving activities, b and c. Given the following information, determine the latest starting time for activity a: EFb = 15, EFc = 17, LFb = 24, LFc = 27; activity times are a = 4, b = 6, c = 8.

A) 14
B) 15
C) 16
D) 17
E) 18
سؤال
Given this information about activity 3-4: ES = 10, EF = 15, LS = 16, and LF = 21, we can determine that the amount of slack associated with the activity is:

A) 0.
B) 1.
C) 5.
D) 6.
E) 11.
سؤال
Activity 4-5 in a network diagram has an optimistic time estimate of five days, a most likely time estimate of seven days, and a pessimistic time estimate of 10 days. Its expected time (in days) is approximately:

A) 5.
B) 6.
C) 7.
D) 8.
E) 9.
سؤال
There are four activities on the critical path. Coincidentally, their standard deviations are all equal to 4. The standard deviation of the critical path is therefore equal to:

A) 2.
B) 4.
C) 8.
D) 16.
E) 64.
سؤال
Gantt charts are most closely associated with

A) JIT.
B) PERT.
C) MRP.
D) MRPII.
E) Six Sigma.
سؤال
In project network analysis, "slack" refers to the difference between:

A) observed and predicted times.
B) optimistic and pessimistic times.
C) mean and modal times.
D) finish and start times.
E) latest and earliest times.
سؤال
A PERT/CPM activity has an optimistic time estimate of three days, a most likely time estimate of eight days, and a pessimistic time estimate of 10 days. The expected time (in days) of this activity is:

A) 7.0.
B) 7.5.
C) 8.0.
D) 8.5.
E) 10.0.
سؤال
Which of the following is not a limitation of PERT and similar project-scheduling techniques?

A) They force the manager to organize and quantify information.
B) One or more important activities may be omitted from the network.
C) Precedence relationships may not all be correct as shown.
D) Time estimates may contain a "fudge factor."
E) The use of a computer is essential for large projects.
سؤال
Consider the portion of a project depicted by this graph: <strong>Consider the portion of a project depicted by this graph:   What is the latest start time of activity 6-7 if the latest finish of activity 7-8 is 26, and the latest finish of activity 7-9 is 23?</strong> A) 18 B) 17 C) 13 D) 12 E) 10 <div style=padding-top: 35px>
What is the latest start time of activity 6-7 if the latest finish of activity 7-8 is 26, and the latest finish of activity 7-9 is 23?

A) 18
B) 17
C) 13
D) 12
E) 10
سؤال
The basis for use of the beta distribution in PERT is:

A) essentially theoretical.
B) its features that make it attractive in practicE.
C) its symmetry.
D) It is bimodal.
E) It can easily be converted to a normal distribution.
سؤال
Which of the following are advantages of PERT and CPM?
(I) It is visual.
(II) It is automatically updated.
(III) Activities that need to be watched closely can be identified.

A) I and II
B) II and III
C) III only
D) I and III
E) I, II, and III
سؤال
In the probabilistic approach to project network analysis, the time estimate annotated tm for any activity is the:

A) mean time.
B) median time.
C) most likely timE.
D) mode time.
E) marginal time.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/113
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 23: Project Management
1
Although PERT and CPM were originally developed independently, they are now nearly identical in terms of analysis and procedures.
True
2
Good project management is very important with virtual teams.
True
3
Matrix organizations transfer control of workers to project managers for the duration of the project.
False
4
The latest starting time for an activity is equal to the latest finish time minus the activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
5
A hierarchical listing of what must be done during a project is called matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
6
The higher the node number, the longer the activity will take.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
7
A Gantt chart is a popular visual tool for displaying the established precedence relationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
8
Once a project is approved and underway, project managers are only responsible for effectively managing time and costs which, if done well, will assure project completion on time and on budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
9
The project computing algorithm requires both a forward and a backward pass.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
10
An advantage of Gantt charts in project management is that they identify which activities can be delayed without delaying the overall project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
11
The main function of dummy activities is to clarify relationships in network diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
12
One way that project management differs from management of more traditional activities is because of the limited time framework of projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
13
Path probabilities are calculated by dividing path mean by path standard deviations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
14
Some organizations use a matrix organization to integrate the activities of specialists within a functional framework.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
15
The earliest finish time for an activity is equal to the latest finish time minus the activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
16
The sum of times of the longest path in a network indicates expected project duration, and the activities represent the critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
17
The probability of occurrence of risk events is lower near the beginning of a project and higher near the end of the project since very few activities remain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
18
The path in a network with the average length of time to completion is called the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
19
The costs associated with risk events tend to be lower near the beginning of a project and higher near the end of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
20
The network diagram shows sequential relationships among major activities on a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
21
The task of identifying risks should involve everyone associated with the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
22
A disadvantage of activity-on-node diagrams is the occasional need for dummy activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is not one of the six key decisions in project management?
(I) Selecting the project team
(II) Deciding on the project manager's title
(III) Managing and controlling project resources
(IV) Deciding which projects to implement
(V) Selecting the project manager

A) I
B) II
C) III
D) IV
E) V
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
24
The total cost of crashing any one activity should never exceed 20 percent of the total cost of the original project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
25
One upside to terminating a project that is not going as well as planned is that:

A) poorly performing project team members will be kept from causing trouble elsewhere.
B) no additional costs will be incurred.
C) poor project managers will be weeded out.
D) resources can perhaps be put to better use elsewherE.
E) project completion will be hastened.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
26
Activities not on the critical path have a slack time equal to zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
27
If the expected length of a path is more than 2.5 standard deviations less than a desired project completion time, the path will not be a factor in assessing the probability of finishing the project on time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
28
Slack time is equal to LS-ES or LF-EF.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
29
Most likely time generally is at least as long as optimistic time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
30
Project management software eliminates constraint violations when there are shared resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
31
Deterministic networks use three time estimates-shortest, most likely, and longest-for each activity in order to best determine the activity's estimated time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
32
If two consecutive activities on the same path each have two days of activity slack, this means that each of them can be delayed by two days without delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
33
The standard deviation of the critical path is equal to the sum of the standard deviations of all of the activities on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following stages is that one in which the project's expected costs, benefits, and risks are assessed?

A) executing
B) monitoring/controlling
C) assessment
D) planning
E) initiating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
35
The earliest finish time for an activity is equal to the latest finish time minus the activity slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
36
The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
37
In the execution phase of a project's life cycle, activities are guided by decisions that were made in the __________ phase.

A) initiating
B) planning
C) monitoring/controlling
D) closing
E) assessment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
38
In order to determine the probability of timely project completion, it is sometimes necessary to take into account paths other than the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
39
If two consecutive activities have shared slack, this means that each of them can use only half of the slack without delaying completion of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
40
Many activities have slack time; if we add these slack times together, this represents the potential improvement in early completion for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following would probably not involve the use of PERT?

A) planning and constructing a new city hall
B) developing an advertising campaign for a new product
C) designing and constructing a subway system
D) writing a poem
E) preparing for the visit of a foreign dignitary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
42
Project management differs from management of more traditional activities mainly because of:
(I) its limited time frame.
(II) its unique, defined set of activities.
(III) the requirement for use of the appropriate resources.
(IV) the need for planning and execution.

A) I
B) II
C) I and II
D) I and III
E) I, II, and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
43
Consider the portion of a project depicted by this graph: <strong>Consider the portion of a project depicted by this graph:   What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13?</strong> A) 22 B) 23 C) 24 D) 25 E) 26
What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13?

A) 22
B) 23
C) 24
D) 25
E) 26
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
44
The advantage a precedence diagram has over a Gantt chart is:

A) its ability to reveal relationships among activities.
B) its difficulty in depicting networks.
C) its complexity.
D) its simplicity.
E) its lack of riskiness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
45
Concerning PERT and CPM:

A) These are two different names for essentially the same techniquE.
B) CPM tends to focus more on the critical path; PERT focuses on the parallel paths.
C) PERT gives a clearer indication of activity slack, while CPM gives a better picture of path slack.
D) Because of its recent discovery, much less is known about CPM than PERT.
E) CPM is useful for project manager selection; PERT is useful for project team selection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
46
To _____ an activity means to shorten the time it will take.

A) smash
B) fund
C) crash
D) aggregate
E) matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is not true about the use of dummy activities in project networking?

A) They preserve the separate identities of activities.
B) They clarify precedence relationships among activities.
C) They have an activity time equal to zero.
D) They have an activity time variance equal to zero.
E) They are used in activities-on-nodes (AON) network diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
48
A hierarchical listing of what must be done in a project is called a:

A) work breakdown structure (WBS).
B) PERT.
C) planning matrix.
D) crashing plan.
E) critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
49
A sequence of activities that leads from the starting node to the finishing node is called a:

A) path.
B) sequel.
C) trail.
D) critical sequence.
E) time line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
50
Shortening activity durations is called:

A) expediting.
B) crashing.
C) vendor management.
D) null nodes.
E) trade-off analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is not typically treated as part of a project life cycle?

A) feasibility assessment
B) planning
C) maturity
D) release resources
E) project staffing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
52
Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence): <strong>Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence):   Given these, Event _____ should probably get the most attention and Event _____ should probably get the least.</strong> A) II; IV B) III; IV C) I; III D) I; II E) II; III
Given these, Event _____ should probably get the most attention and Event _____ should probably get the least.

A) II; IV
B) III; IV
C) I; III
D) I; II
E) II; III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
53
Once a project is underway, the project manager usually is not responsible for effectively managing:

A) the people.
B) costs.
C) resources.
D) time.
E) project priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
54
A popular visual tool for planning and scheduling simple projects, and for monitoring progress, is the:

A) activity-on-arrows network.
B) activity-on-nodes network.
C) Gantt chart.
D) critical path method.
E) program evaluation and review technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is determined as a direct result of computing the earliest starting and finishing times for the activities of a project network?

A) expected project duration
B) activity slack time
C) which activities are on the critical path
D) variance in project duration
E) maximum project duration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
56
A method used for establishing a logical framework for identifying the required activities for the project is called:

A) work breakdown structurE.
B) PERT.
C) planning matrix.
D) crashing.
E) critical path analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
57
Activity 7-8 is directly preceded by two activities-activity 5-7 and activity 6-7. Activity 5-7 has an expected time of five and an ES time of six. Activity 6-7 has an expected time of seven and an ES time of seven. Activity 7-8 has an expected time of 10. The ES for activity 7-8 is:

A) 11.
B) 14.
C) 21.
D) 24.
E) 25.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
58
In a project network, the critical path is the sequence of activities which has the:

A) most activities.
B) most nodes.
C) most events.
D) longest duration.
E) greatest variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following is not a form of risk reduction in project management?

A) backup system
B) outsourcing
C) risk sharing
D) scenario analysis
E) frequent monitoring of critical project dimensions in order to catch and eliminate problems early
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
60
Project risk events tend to be unlikely __________ a project, but that's also when they tend to be the __________.

A) early in; most costly
B) late in; least costly
C) late in; most costly
D) before the beginning of; most complex
E) at the conclusion of; least complex
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
61
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2 days. The standard deviation of the critical path is:

A) 3.
B) 5.
C) 9.
D) 16.
E) 25.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
62
When developing probabilistic estimates of project duration, it is necessary to know which of the following?

A) the mean and variance of every activity
B) the mean and variance of activities on the critical path
C) the standard deviation of activities on the critical path
D) each activity's probability of completion
E) the distribution of activity times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
63
A project is represented by the following diagram: <strong>A project is represented by the following diagram:   The expected duration of this project is:</strong> A) 12. B) 17. C) 20. D) 36. E) 77.
The expected duration of this project is:

A) 12.
B) 17.
C) 20.
D) 36.
E) 77.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
64
In "crashing" a project, a manager will generally focus on activities which:

A) are not on the critical path.
B) are the least costly to crash.
C) are costly to crash and are on the critical path.
D) are on the critical path and are the least costly to crash.
E) are the easiest to crash.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
65
The project management strategy of injecting additional resources in order to reduce the length of the project is called:

A) expediting.
B) rushing.
C) panicking.
D) crashing.
E) loading.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
66
Activity C has an early start time of 8, an early finish time of 12, a latest start time of 13, and a latest finish time of 17. Its slack is:

A) 0.
B) 1.
C) 4.
D) 5.
E) 9.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following are limitations of PERT and CPM?
(I) Time estimates may include a fudge factor.
(II) Important activities may be overlooked.
(III) It is an after-the-fact analysis.

A) I and II
B) I, II, and III
C) I and III
D) II and III
E) I only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
68
At which point does crashing of a project cease?

A) when the project is completed
B) when no additional crashing is possible
C) when the cost to crash equals or exceeds the benefit of crashing
D) when the project is one-half completed
E) when the team has been disbanded
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
69
A node has one entering activity, a, and two leaving activities, b and c. Given the following information, determine the latest starting time for activity a: EFb = 15, EFc = 17, LFb = 24, LFc = 27; activity times are a = 4, b = 6, c = 8.

A) 14
B) 15
C) 16
D) 17
E) 18
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
70
Given this information about activity 3-4: ES = 10, EF = 15, LS = 16, and LF = 21, we can determine that the amount of slack associated with the activity is:

A) 0.
B) 1.
C) 5.
D) 6.
E) 11.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
71
Activity 4-5 in a network diagram has an optimistic time estimate of five days, a most likely time estimate of seven days, and a pessimistic time estimate of 10 days. Its expected time (in days) is approximately:

A) 5.
B) 6.
C) 7.
D) 8.
E) 9.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
72
There are four activities on the critical path. Coincidentally, their standard deviations are all equal to 4. The standard deviation of the critical path is therefore equal to:

A) 2.
B) 4.
C) 8.
D) 16.
E) 64.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
73
Gantt charts are most closely associated with

A) JIT.
B) PERT.
C) MRP.
D) MRPII.
E) Six Sigma.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
74
In project network analysis, "slack" refers to the difference between:

A) observed and predicted times.
B) optimistic and pessimistic times.
C) mean and modal times.
D) finish and start times.
E) latest and earliest times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
75
A PERT/CPM activity has an optimistic time estimate of three days, a most likely time estimate of eight days, and a pessimistic time estimate of 10 days. The expected time (in days) of this activity is:

A) 7.0.
B) 7.5.
C) 8.0.
D) 8.5.
E) 10.0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which of the following is not a limitation of PERT and similar project-scheduling techniques?

A) They force the manager to organize and quantify information.
B) One or more important activities may be omitted from the network.
C) Precedence relationships may not all be correct as shown.
D) Time estimates may contain a "fudge factor."
E) The use of a computer is essential for large projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
77
Consider the portion of a project depicted by this graph: <strong>Consider the portion of a project depicted by this graph:   What is the latest start time of activity 6-7 if the latest finish of activity 7-8 is 26, and the latest finish of activity 7-9 is 23?</strong> A) 18 B) 17 C) 13 D) 12 E) 10
What is the latest start time of activity 6-7 if the latest finish of activity 7-8 is 26, and the latest finish of activity 7-9 is 23?

A) 18
B) 17
C) 13
D) 12
E) 10
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
78
The basis for use of the beta distribution in PERT is:

A) essentially theoretical.
B) its features that make it attractive in practicE.
C) its symmetry.
D) It is bimodal.
E) It can easily be converted to a normal distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following are advantages of PERT and CPM?
(I) It is visual.
(II) It is automatically updated.
(III) Activities that need to be watched closely can be identified.

A) I and II
B) II and III
C) III only
D) I and III
E) I, II, and III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
80
In the probabilistic approach to project network analysis, the time estimate annotated tm for any activity is the:

A) mean time.
B) median time.
C) most likely timE.
D) mode time.
E) marginal time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.